CN106761718A - Determine that mid-deep strata oil reservoir employs the new method of thickness limit - Google Patents

Determine that mid-deep strata oil reservoir employs the new method of thickness limit Download PDF

Info

Publication number
CN106761718A
CN106761718A CN201510823841.7A CN201510823841A CN106761718A CN 106761718 A CN106761718 A CN 106761718A CN 201510823841 A CN201510823841 A CN 201510823841A CN 106761718 A CN106761718 A CN 106761718A
Authority
CN
China
Prior art keywords
thickness
oil reservoir
limit
well
employs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201510823841.7A
Other languages
Chinese (zh)
Inventor
张洪波
常涧峰
任金才
晁静
唐军
李亮
黄志宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Exploration and Development Research Institute of Sinopec Henan Oilfield Branch Co
Original Assignee
China Petroleum and Chemical Corp
Exploration and Development Research Institute of Sinopec Henan Oilfield Branch Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Exploration and Development Research Institute of Sinopec Henan Oilfield Branch Co filed Critical China Petroleum and Chemical Corp
Priority to CN201510823841.7A priority Critical patent/CN106761718A/en
Publication of CN106761718A publication Critical patent/CN106761718A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides the new method that a kind of determination mid-deep strata oil reservoir employs thickness limit, and its method includes:Step 1, according to the gross investment for being related to oil well individual well in oil reservoir, calculates nature and goes into operation and the economic limit primiparity under two kinds of tender budgets of fracturing production;Step 2, geologic feature and the effective thickness statistics according to oil reservoir, preferably goes out typical oil well, sets up related numerical model, and individual layer employs the initial production employed with multilayer build-up when predicting the different effective thickness under two kinds of tender budgets;Step 3, count the corresponding number of plies of initial production more than economic limit primiparity and effective thickness, and as mid-deep strata oil reservoir employs thickness limit.The new method application that the determination mid-deep strata oil reservoir employs thickness limit is easy, for mid-deep strata oil reservoir determines that employing effective thickness boundary, raising reserves exploitation rate provides reliable screening technique.

Description

Determine that mid-deep strata oil reservoir employs the new method of thickness limit
Technical field
The present invention relates to the effective exploitation technology field of mid-deep strata oil reservoir, a kind of determination is especially related to Mid-deep strata oil reservoir employs the new method of thickness limit.
Background technology
Mid-deep strata 2500~3500m of reservoir buried depth, typically develops 1~3 oil reservoir on longitudinal direction, reservoir belongs to Middle hyposmosis, air permeability is typically 10~100 × 10-3μm2, the good reservoir oil well of physical property throws naturally Product just can obtain initial productivity high, and the poor reservoir oil well fracturing production of physical property can also obtain higher Initial productivity.Because mid-deep strata oil reservoir development is influenceed by investment and economic evaluation index, therefore production capacity The reqirement of compilation of scheme improves reserves exploitation rate to greatest extent, improves a key of reserves exploitation rate It is to determine the rational limit well spacing thickness of oil reservoir.The limit well spacing thickness of oil reservoir is generally by economic pole Limit primiparity is tried to achieve divided by average rice productivity index, but for shallow sea mid-deep strata oil reservoir, the method is obvious There is following 2 deficiencies:1. individual layer is not distinguished to employ and the difference between multilayer build-up is employed;② The difference for employing thickness limit that wellfracturing is gone into operation and gone into operation naturally is not accounted for.This is resulted in generally The demand that the limit well spacing thickness asked for is employed with oil reservoir maximum reserves is not corresponded, therefore in the urgent need to adopting Reservoir reserve use rate is improved with new technical method.It is this we have invented deep in a kind of new determination Layer oil reservoir employs the new method of thickness limit, solves above technical problem.
The content of the invention
Effectively thickness is employed under it is an object of the invention to provide a kind of solution oil well difference tender budget The determination of boundary, realize oil reservoir employ thickness screening and assessment work standardization, standardization purpose really Determine the new method that mid-deep strata oil reservoir employs thickness limit.
The purpose of the present invention can be achieved by the following technical measures:Determine that mid-deep strata oil reservoir employs thickness The new method of boundary, the new method that the determination mid-deep strata oil reservoir employs thickness limit includes:Step 1, According to the gross investment for being related to oil well individual well in oil reservoir, calculate nature and go into operation and two kinds of operation sides of fracturing production Economic limit primiparity under formula;Step 2, geologic feature and the effective thickness statistics according to oil reservoir is excellent Typical oil well is selected, related numerical model is set up, the difference under two kinds of tender budgets of prediction is effectively thick Individual layer employs the initial production employed with multilayer build-up when spending;Step 3, counts in economic limit primiparity More than the initial production corresponding number of plies and effective thickness, as mid-deep strata oil reservoir employs thickness circle Limit.
The purpose of the present invention can also be achieved by the following technical measures:
In step 1, the gross investment of oil well individual well is related in oil reservoir includes individual well drilling well investment, individual well Invest and individual well operation expense on ground.
In step 1, calculate nature and go into operation with the formula of the economic limit primiparity under fracturing production and be:
In above formula, Ib+Id+IeIt is individual well drilling well investment+individual well ground investment+individual well operation expense, O It is ton oil operating cost, TAX is ton oil sale tax, PoIt is oil price, ERIt is recovery percent of reserves, R is loan profit Rate, T is the evaluation time limit, DcTo evaluate phase lapse rate, τORate during to recover the oil, α is crude oil commodity rate, β is oil well coefficient.
In step 2, natural brought in well it is actual employ thickness statistics on the basis of, preferably go out typical case Well, is bored based on oil well and meets effective thickness and initial production situation, devises the numerical model of correlation, After being fitted to its initial production situation, employ dynamic with multilayer build-up by numerical Simulation Prediction individual layer Used time difference effective thickness under initial production, integrated economics limit primiparity, determine its individual layer employ and Multilayer build-up employs the number of plies and effective thickness boundary, and effective thickness is employed so as to obtain nature operation oil well Degree boundary.
In step 2, after the individual layer that optimization obtains wellfracturing operation employs effective thickness boundary, The optimization that multilayer build-up employs effective thickness boundary does not reach nature throwing for multilayer build-up effective thickness The statistics but individual layer of product employ effective thickness meet fracturing production individual layer employ effective thickness boundary lead to Cross numerical simulation and total effective thickness is employed and individual layer effective thickness is further optimized to overlapping, from And obtain fracturing production oil well employ effective thickness boundary.
In step 3, simply merge under two kinds of tender budgets and employ effective thickness boundary, you can Effective thickness boundary is employed to mid-deep strata oil reservoir.
Determination mid-deep strata oil reservoir in the present invention employs the new method of thickness limit, including obtains mid-deep strata The individual well gross investment (individual well drilling well investment, the investment of individual well ground and individual well operation expense) of oil reservoir, meter Nature is calculated to go into operation and the economic limit primiparity under fracturing production;Based on reservoir geologic character and oil of having gone into operation The production status analysis of well, preferably goes out typical oil well, numerical reservoir model is set up, to typical oil well Initial production situation is fitted;It is single using the difference under the two kinds of tender budgets of model prediction after fitting Layer employs the initial stage that initial production under effective thickness and the different numbers of plies and overlapping are employed under effective thickness Yield;The corresponding number of plies of initial production and effective thickness more than economic limit primiparity are counted, as Mid-deep strata oil reservoir employs thickness limit.The method application is easy, is that mid-deep strata oil reservoir determines to have employed Effect thickness limit, raising reserves exploitation rate provide reliable screening technique.
Brief description of the drawings
Fig. 1 is a specific implementation of the new method that determination mid-deep strata oil reservoir of the invention employs thickness limit The flow chart of example;
Fig. 2 is individual well under chengdao oilfield reservoirs of Dongying formation difference oil price in a specific embodiment of the invention Economic limit primiparity schematic diagram when going into operation naturally;
Fig. 3 is oil well when the individual layer predicted using numerical model in a specific embodiment of the invention is employed Natural production capacity and effective thickness relation curve;
Fig. 4 is oil well when the multilayer predicted using numerical model in a specific embodiment of the invention is employed Natural production capacity and effective thickness relation curve;
Fig. 5 is individual well under chengdao oilfield reservoirs of Dongying formation difference oil price in a specific embodiment of the invention Economic limit primiparity schematic diagram during fracturing production;
Fig. 6 is oil well when the multilayer predicted using numerical model in a specific embodiment of the invention is employed Natural production capacity and effective thickness relation curve.
Specific embodiment
It is cited below particularly to enable above and other objects, features and advantages of the invention to become apparent Go out preferred embodiment, and coordinate shown in accompanying drawing, be described in detail below.
As shown in figure 1, Fig. 1 is the new method that determination mid-deep strata oil reservoir of the invention employs thickness limit Flow chart.
In step 101, individual well gross investment (individual well drilling well investment, the individual well ground of mid-deep strata oil reservoir are obtained Invest and individual well operation expense in face), according to the gross investment for being related to oil well individual well in oil reservoir, calculate nature Go into operation and the economic limit primiparity under fracturing production;Computing formula is:
In above formula, Ib+Id+IeIt is individual well drilling well investment+individual well ground investment+individual well operation expense, O It is ton oil operating cost, TAX is ton oil sale tax, PoIt is oil price, ERIt is recovery percent of reserves, R is loan profit Rate, T is the evaluation time limit, DcTo evaluate phase lapse rate, τORate during to recover the oil, α is crude oil commodity rate, β is oil well coefficient.As shown in Fig. 2 being chengdao oilfield Dongying Formation oil in a specific embodiment of the invention Hide individual well economic limit primiparity under different oil prices.
In step 102, natural brought in well is actual employ thickness statistics on the basis of, preferably go out typical case Well, is bored based on oil well and meets effective thickness and initial production situation, devises the numerical model of correlation, After being fitted to its initial production situation, employ dynamic with multilayer build-up by numerical Simulation Prediction individual layer Initial production under used time difference effective thickness, as shown in Figure 3 and Figure 4, integrated economics limit primiparity, Determine that its individual layer is employed and employ the number of plies and effective thickness boundary with multilayer build-up, gone into operation so as to obtain nature Oil well employs effective thickness boundary, as shown in table 1:
Table 1 natural operation oil well employs effective thickness boundary table
In step 103, because current mid-deep strata oil reservoir implements individual layer pressure break substantially, even if therefore oil well Bored on longitudinal direction and meet multiple oil reservoirs, initial stage oil-yielding stratum is essentially pressure break oil reservoir after wellfracturing.Optimizing After the individual layer gone into operation to wellfracturing employs effective thickness boundary, as shown in figure 5, multilayer build-up is employed The optimization of effective thickness boundary mainly for multilayer build-up effective thickness do not reach nature operation statistics, But individual layer employs effective thickness and meets the individual layer of fracturing production and employs effective thickness boundary by Numerical-Mode Intend employing total effective thickness to overlapping and individual layer effective thickness is further optimized, as shown in fig. 6, Effective thickness boundary is employed so as to obtain fracturing production oil well, as shown in table 2:
Table 2 fracturing production oil well employs effective thickness boundary table
In step 104, with its corresponding economic limit primiparity as threshold value, two kinds of operation sides are filtered out Individual layer under formula employs the economical and effective thickness limit employed with multilayer build-up.It is simple to merge two kinds of operations Effective thickness boundary is employed under mode, you can obtain mid-deep strata oil reservoir employs effective thickness boundary, As shown in table 3:
Table 3 mid-deep strata oil reservoir employs effective thickness boundary
Determination mid-deep strata oil reservoir in the present invention employs the new method of thickness limit, and middle depth is calculated first The economic limit primiparity (gone into operation naturally and fracturing production) under layer two kinds of tender budget of oil reservoir;In being based on The dynamic analysis of the geologic feature of Deep Reservoirs and typical oil well, devises the numerical model of correlation, leads to Numerical simulation study and integrated economics limit primiparity are crossed, to individual layer and multilayer build-up under two kinds of tender budgets Employ effective thickness boundary to optimize, so as to show that mid-deep strata oil reservoir employs thickness limit.The method The determination for effectively employing thickness limit under oil well difference tender budget is solved, realizes that oil reservoir employs thickness Screening and assessment work standardization, the purpose of standardization.

Claims (6)

1. determine that mid-deep strata oil reservoir employs the new method of thickness limit, it is characterised in that the determination mid-deep strata oil reservoir employs thickness circle The new method of limit includes:
Step 1, according to the gross investment for being related to oil well individual well in oil reservoir, calculates under nature operation and two kinds of tender budgets of fracturing production Economic limit primiparity;
Step 2, geologic feature and the effective thickness statistics according to oil reservoir, preferably goes out typical oil well, sets up related numerical model, Individual layer employs the initial production employed with multilayer build-up when predicting the different effective thickness under two kinds of tender budgets;
Step 3, the initial production corresponding number of plies and effective thickness of the statistics more than economic limit primiparity, as mid-deep strata oil reservoir Employ thickness limit.
2. it is according to claim 1 to determine the new method that mid-deep strata oil reservoir employs thickness limit, it is characterised in that in step 1 In, the gross investment of oil well individual well is related in oil reservoir includes individual well drilling well investment, the investment of individual well ground and individual well operation expense.
3. it is according to claim 2 to determine the new method that mid-deep strata oil reservoir employs thickness limit, it is characterised in that in step 1 In, the formula for calculating the economic limit primiparity under nature operation and fracturing production is:
q i = ( I b + I d + I e ) ( 1 + R ) T / 2 β 0.0365 τ O α o T ( p o - O - T A X ) ( 1 - D c ) T / 2
In above formula, Ib+Id+IeIt is individual well drilling well investment+individual well ground investment+individual well operation expense, O is ton oil operating cost, and TAX is The oily sale tax of ton, PoIt is oil price, ERIt is recovery percent of reserves, R is loan interest rate, and T is the evaluation time limit, DcTo evaluate phase lapse rate, τORate during to recover the oil, α is crude oil commodity rate, and β is oil well coefficient.
4. it is according to claim 1 to determine the new method that mid-deep strata oil reservoir employs thickness limit, it is characterised in that in step 2 In, natural brought in well it is actual employ thickness statistics on the basis of, preferably go out typical well, based on oil well bore meet effective thickness With initial production situation, the numerical model of correlation is devised, after being fitted to its initial production situation, by numerical value Simulation and forecast individual layer employs the initial production under different effective thickness when being employed with multilayer build-up, integrated economics limit primiparity, Determine that its individual layer is employed and employ the number of plies and effective thickness boundary with multilayer build-up, so as to obtain having employed for nature operation oil well Effect thickness limit.
5. it is according to claim 1 to determine the new method that mid-deep strata oil reservoir employs thickness limit, it is characterised in that in step 2 In, after the individual layer that optimization obtains wellfracturing operation employs effective thickness boundary, multilayer build-up employs effective thickness boundary Optimization for multilayer build-up effective thickness do not reach nature operation statistics but individual layer employ effective thickness meet pressure break throwing The individual layer of product employs effective thickness boundary total effective thickness and individual layer effective thickness is employed to overlapping by numerical simulation and enters to advance The optimization of one step, effective thickness boundary is employed so as to obtain fracturing production oil well.
6. it is according to claim 1 to determine the new method that mid-deep strata oil reservoir employs thickness limit, it is characterised in that In step 3, simply merge under two kinds of tender budgets and employ effective thickness boundary, you can obtain having employed for mid-deep strata oil reservoir Effect thickness limit.
CN201510823841.7A 2015-11-24 2015-11-24 Determine that mid-deep strata oil reservoir employs the new method of thickness limit Withdrawn CN106761718A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510823841.7A CN106761718A (en) 2015-11-24 2015-11-24 Determine that mid-deep strata oil reservoir employs the new method of thickness limit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510823841.7A CN106761718A (en) 2015-11-24 2015-11-24 Determine that mid-deep strata oil reservoir employs the new method of thickness limit

Publications (1)

Publication Number Publication Date
CN106761718A true CN106761718A (en) 2017-05-31

Family

ID=58963516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510823841.7A Withdrawn CN106761718A (en) 2015-11-24 2015-11-24 Determine that mid-deep strata oil reservoir employs the new method of thickness limit

Country Status (1)

Country Link
CN (1) CN106761718A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110284860A (en) * 2019-07-19 2019-09-27 中国石油化工股份有限公司 Blocky thick-layer sandstone oil reservoir note adopts interactive artificial inclination angle CO2Flooding method
CN111472763A (en) * 2019-12-30 2020-07-31 北京国双科技有限公司 Stratum thickness prediction method and device
CN112647916A (en) * 2020-12-22 2021-04-13 中海石油(中国)有限公司 Well selecting and layer selecting method and system for offshore low-permeability oilfield fracturing technology
CN113850007A (en) * 2021-11-30 2021-12-28 浙江中自庆安新能源技术有限公司 Method and system for predicting thickness of effective oil layer of oil reservoir based on finite element analysis
CN114961711A (en) * 2021-02-24 2022-08-30 中国石油化工股份有限公司 Method for determining effective thickness limit in low-permeability reservoir reserve calculation

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020043370A1 (en) * 2000-09-12 2002-04-18 Bobby Poe Evaluation of reservoir and hydraulic fracture properties in multilayer commingled reservoirs using commingled reservoir production data and production logging information
CN104196523A (en) * 2013-10-29 2014-12-10 中国石油化工股份有限公司 Evaluation method of carbonate gas pool reserve utilization conditions
CN104213913A (en) * 2014-07-24 2014-12-17 中国石油大学(华东) Method for calculating effective exploitation permeability lower limits of low-permeability clastic rock reservoir
CN104564041A (en) * 2014-07-24 2015-04-29 中国石油大学(华东) Low-permeability clastic rock reservoir effectiveness evaluation method based on development permeability lower limit
CN104632141A (en) * 2014-12-31 2015-05-20 大港油田集团有限责任公司 Method for selecting optimal thickened oil mining technology
CN104929594A (en) * 2014-03-19 2015-09-23 中国石油化工股份有限公司 Evaluating method for oil well measurement effect

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020043370A1 (en) * 2000-09-12 2002-04-18 Bobby Poe Evaluation of reservoir and hydraulic fracture properties in multilayer commingled reservoirs using commingled reservoir production data and production logging information
CN104196523A (en) * 2013-10-29 2014-12-10 中国石油化工股份有限公司 Evaluation method of carbonate gas pool reserve utilization conditions
CN104929594A (en) * 2014-03-19 2015-09-23 中国石油化工股份有限公司 Evaluating method for oil well measurement effect
CN104213913A (en) * 2014-07-24 2014-12-17 中国石油大学(华东) Method for calculating effective exploitation permeability lower limits of low-permeability clastic rock reservoir
CN104564041A (en) * 2014-07-24 2015-04-29 中国石油大学(华东) Low-permeability clastic rock reservoir effectiveness evaluation method based on development permeability lower limit
CN104632141A (en) * 2014-12-31 2015-05-20 大港油田集团有限责任公司 Method for selecting optimal thickened oil mining technology

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
王可君等: "深层特稠油油藏HDCS开发技术政策界限", 《特种油气藏》 *
赵燕: "中低渗稠油油藏多井型组合开发技术", 《中国石油大学胜利学院学报》 *
陈民锋等: "低渗稠油油藏水平井储量有效动用界限研究", 《深圳大学学报理工版》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110284860A (en) * 2019-07-19 2019-09-27 中国石油化工股份有限公司 Blocky thick-layer sandstone oil reservoir note adopts interactive artificial inclination angle CO2Flooding method
CN110284860B (en) * 2019-07-19 2021-07-06 中国石油化工股份有限公司 Interactive artificial dip angle CO is adopted to cubic thick-layer sandstone oil reservoir notes2Oil displacement method
CN111472763A (en) * 2019-12-30 2020-07-31 北京国双科技有限公司 Stratum thickness prediction method and device
CN112647916A (en) * 2020-12-22 2021-04-13 中海石油(中国)有限公司 Well selecting and layer selecting method and system for offshore low-permeability oilfield fracturing technology
CN112647916B (en) * 2020-12-22 2023-03-24 中海石油(中国)有限公司 Well selecting and layer selecting method and system for offshore low-permeability oilfield fracturing technology
CN114961711A (en) * 2021-02-24 2022-08-30 中国石油化工股份有限公司 Method for determining effective thickness limit in low-permeability reservoir reserve calculation
CN113850007A (en) * 2021-11-30 2021-12-28 浙江中自庆安新能源技术有限公司 Method and system for predicting thickness of effective oil layer of oil reservoir based on finite element analysis
CN113850007B (en) * 2021-11-30 2022-03-11 浙江中自庆安新能源技术有限公司 Method and system for predicting thickness of effective oil layer of oil reservoir based on finite element analysis

Similar Documents

Publication Publication Date Title
CN106761718A (en) Determine that mid-deep strata oil reservoir employs the new method of thickness limit
Clark Determination of recovery factor in the Bakken formation, Mountrail County, ND
CN103924966B (en) Grouping of Sand Members And Well based on reservoir properties time-varying model construction method again
CN104699954A (en) Calibration method for oil recovery rate of karst-fissure-cavity carbonatite reservoir
MX2007007394A (en) Method for predicting quantitative values of a rock or fluid property in a reservoir using seismic data.
CN103912248A (en) Method for predicting water content of water-flooding oil field
CN104695950A (en) Prediction method for volcanic rock oil reservoir productivity
CN105134191A (en) Method for evaluating reserves of tight oil well
CN103075142A (en) Method for selecting water plugging oil well during development of oilfield through water injection
WO2020063603A1 (en) Dynamic data processing method for oilfield development and production
EP2739813B1 (en) System and method for quantifying stimulated rock quality in a wellbore
CN106651158B (en) Quantitative evaluation method for water injection development effectiveness degree of ultra-low permeability tight reservoir horizontal well
CN110469299B (en) Evaluation method for effectiveness of water injection development of oil production well
CN106337679A (en) Novel method for measuring and calculating well pattern thickening potential
CN105735961A (en) Separate-layer fracturing stage number optimization method for low-permeability compact reservoir
CN104712301B (en) A kind of method for determining volcanic rock reservoir pressure break scale
CN103267718A (en) Double lower limit low permeability-compact sandstone reservoir classification method
CN105005712A (en) Method for evaluating water yield property of limestone aquifer
Mason Oil production potential of the North Dakota Bakken
CN106522927A (en) Improved calculating method of reasonable bottom hole flowing pressure
Boah et al. Decline curve analysis and production forecast studies for oil well performance prediction: a case study of reservoir X
CN107339086A (en) Water-drive reservoir characteristic relation chart drawing method and device
Bahari et al. Drilling cost optimization in a hydrocarbon field by combination of comparative and mathematical methods
CN105257265B (en) A kind of CO2Drive the optimization method for improving recovery ratio injection rate
CN104453807B (en) A kind of oil field injection and extraction well group water drive channelling method of discrimination

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20170531

WW01 Invention patent application withdrawn after publication