CN106736874A - A kind of eye glass frame process equipment - Google Patents
A kind of eye glass frame process equipment Download PDFInfo
- Publication number
- CN106736874A CN106736874A CN201611163535.6A CN201611163535A CN106736874A CN 106736874 A CN106736874 A CN 106736874A CN 201611163535 A CN201611163535 A CN 201611163535A CN 106736874 A CN106736874 A CN 106736874A
- Authority
- CN
- China
- Prior art keywords
- frame processing
- outer frame
- inner frame
- fixed bracket
- fixture
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims description 33
- 239000011521 glass Substances 0.000 title claims description 31
- 230000007246 mechanism Effects 0.000 claims abstract description 79
- 239000000463 material Substances 0.000 claims description 20
- 238000003754 machining Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29D—PRODUCING PARTICULAR ARTICLES FROM PLASTICS OR FROM SUBSTANCES IN A PLASTIC STATE
- B29D12/00—Producing frames
- B29D12/02—Spectacle frames
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23Q—DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
- B23Q39/00—Metal-working machines incorporating a plurality of sub-assemblies, each capable of performing a metal-working operation
- B23Q39/04—Metal-working machines incorporating a plurality of sub-assemblies, each capable of performing a metal-working operation the sub-assemblies being arranged to operate simultaneously at different stations, e.g. with an annular work-table moved in steps
- B23Q39/048—Metal-working machines incorporating a plurality of sub-assemblies, each capable of performing a metal-working operation the sub-assemblies being arranged to operate simultaneously at different stations, e.g. with an annular work-table moved in steps the work holder of a work station transfers directly its workpiece to the work holder of a following work station
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23Q—DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
- B23Q3/00—Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine
- B23Q3/02—Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine for mounting on a work-table, tool-slide, or analogous part
- B23Q3/06—Work-clamping means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23Q—DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
- B23Q7/00—Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Automatic Assembly (AREA)
- Drilling And Boring (AREA)
- Grinding And Polishing Of Tertiary Curved Surfaces And Surfaces With Complex Shapes (AREA)
Abstract
本发明公开的是一种眼镜镜框加工设备,其特征在于工作台上设有固定支架,内框加工装置包括内框加工机构和内框加工固定夹具,外框加工装置包括第一外框加工机构和第一外框加工固定夹具以及第二外框加工机构和第二外框固定夹具,内框加工机构设于固定支架的一侧,内框加工固定夹具通过十字滑轨一设于工作台上,第一外框加工机构和第二外框加工机构均设于固定支架另一侧,第一外框加工固定夹具通过十字滑轨二设于工作台上,第二外框加工固定夹具通过十字滑轨三设于工作台上,一组内框加工机构配备至少两组外框加工机构,避免因外框加工耗时久造成内框加工机构出现等待的空白时间,提高内框加工和外框加工配合度,进而提高加工效率。
The invention discloses a spectacle frame processing equipment, which is characterized in that a fixed bracket is provided on the workbench, the inner frame processing device includes an inner frame processing mechanism and an inner frame processing fixing fixture, and the outer frame processing device includes a first outer frame processing mechanism and the first outer frame processing fixing fixture, the second outer frame processing mechanism and the second outer frame fixing fixture, the inner frame processing mechanism is set on one side of the fixing bracket, and the inner frame processing fixing fixture is set on the workbench through the cross slide rail , the first outer frame processing mechanism and the second outer frame processing mechanism are set on the other side of the fixed bracket, the first outer frame processing fixing fixture is set on the workbench through the cross slide rail two, the second outer frame processing fixing fixture is through the cross Three slide rails are set on the workbench, and one set of inner frame processing mechanism is equipped with at least two sets of outer frame processing mechanism, so as to avoid the blank time of inner frame processing mechanism due to the time-consuming outer frame processing and improve the efficiency of inner frame processing and outer frame processing. Improve processing coordination, thereby improving processing efficiency.
Description
技术领域technical field
本发明涉及眼镜镜框加工设备领域,具体涉及一种全自动数控眼镜镜框加工设备。The invention relates to the field of spectacle frame processing equipment, in particular to a fully automatic numerical control spectacle frame processing equipment.
背景技术Background technique
眼镜镜框加工一般分两道工序,镜框的内框为第一道加工工序,镜框的外框为第二道加工工序。现有的眼镜镜框加工设备,都是先进性第一加工工序,再进行第二道加工工序,两道工序不能同时进行,工作效率低。The processing of spectacle frames is generally divided into two processes, the inner frame of the frame is the first processing process, and the outer frame of the frame is the second processing process. The existing processing equipment for glasses frame is all advanced first processing procedure, and then the second processing procedure, the two procedures cannot be carried out at the same time, and the work efficiency is low.
因此,公开号为CN105904263A的发明专利公开了一种全自动数控眼镜镜框加工机,包括机架,所述机架上设有横向的导轨,所述导轨上设有与其滑动配合的眼镜内框加工固定夹具和眼镜外轮廓加工固定夹具;所述导轨的上方且靠近导轨两端处分别设有数控加工刀,两数控加工刀分别与眼镜内框加工固定夹具和眼镜外轮廓加工固定夹具对应,眼镜内框加工固定夹具可向上运动至送料机构的出料端夹取待加工料,并沿导轨滑移至与其对应的数控加工刀下方进行眼镜内框加工,眼镜内框加工固定夹具可向下运动把完成眼镜内框加工的待加工料放至眼镜外轮廓加工固定夹具上,眼镜外轮廓加工固定夹具沿导轨滑移至与其对应的数控加工刀下方进行眼镜外轮廓加工。Therefore, the patent of invention with the publication number CN105904263A discloses a fully automatic numerically controlled spectacle frame processing machine, which includes a frame, and the frame is provided with a transverse guide rail, and the guide rail is provided with a spectacle inner frame processing machine that slides and cooperates with it. The fixed fixture and the fixed fixture for the processing of the outer contour of the glasses; the upper part of the guide rail and near the two ends of the guide rail are respectively provided with CNC machining knives, and the two CNC machining knives correspond to the fixed fixture for processing the inner frame of glasses and the fixed fixture for processing the outer contour of glasses respectively. The fixed fixture for inner frame processing can move upwards to the discharge end of the feeding mechanism to pick up the material to be processed, and slide along the guide rail to the bottom of the corresponding CNC machining knife to process the inner frame of glasses, and the fixed fixture for inner frame processing of glasses can move downward Put the material to be processed that has completed the processing of the inner frame of the glasses on the fixed fixture for processing the outer contour of the glasses, and the fixed fixture for processing the outer contour of the glasses slides along the guide rail to the bottom of the corresponding CNC machining knife to process the outer contour of the glasses.
上述专利虽然解决了第一加工工序和第二道加工工序不能同时进行的技术难题,但是第一加工工序和第二加工工序所需要加工的时间并不相同,第二加工工序所需要的时间大于第一加工工序,因此第一加工工序耗费了大量的时间在等待第二加工工序,使得第一加工工序和第二加工工序之间的配合度并不高,设备的加工效率没有实现最大化。Although the above-mentioned patent solves the technical problem that the first processing procedure and the second processing procedure cannot be carried out simultaneously, the time required for the first processing procedure and the second processing procedure is not the same, and the time required for the second processing procedure is longer than The first processing step, so the first processing step spends a lot of time waiting for the second processing step, so that the cooperation between the first processing step and the second processing step is not high, and the processing efficiency of the equipment is not maximized.
发明内容Contents of the invention
针对上述的不足,本发明的目的是提供一种眼镜镜框加工设备,以实现设备的工作效率最大化。In view of the above shortcomings, the object of the present invention is to provide a spectacle frame processing equipment to maximize the working efficiency of the equipment.
为了实现上述目的,本发明采用的技术方案是:一种眼镜镜框加工设备,包括工作台、内框加工装置和外框加工装置,其特征在于所述工作台上设有固定支架,所述内框加工装置包括相对应设置的内框加工机构和内框加工固定夹具,所述外框加工装置包括相对应设置的第一外框加工机构和第一外框加工固定夹具以及相对应设置的第二外框加工机构和第二外框固定夹具,所述内框加工机构设于固定支架的一侧,所述内框加工固定夹具通过十字滑轨一设于工作台上,所述第一外框加工机构和第二外框加工机构均设于固定支架另一侧,所述第一外框加工固定夹具通过十字滑轨二设于工作台上,所述第二外框加工固定夹具通过十字滑轨三设于工作台上;In order to achieve the above object, the technical solution adopted by the present invention is: a spectacle frame processing equipment, including a workbench, an inner frame processing device and an outer frame processing device, characterized in that the workbench is provided with a fixed bracket, the inner The frame processing device includes a correspondingly arranged inner frame processing mechanism and an inner frame processing fixture, and the outer frame processing device includes a correspondingly arranged first outer frame processing mechanism, a first outer frame processing fixture and a correspondingly arranged second Two outer frame processing mechanisms and second outer frame fixing fixtures, the inner frame processing mechanism is arranged on one side of the fixed bracket, the inner frame processing fixing fixtures are set on the workbench through cross slide rails, the first outer frame The frame processing mechanism and the second outer frame processing mechanism are both arranged on the other side of the fixed bracket, the first outer frame processing fixing fixture is set on the workbench through the cross slide rail 2, and the second outer frame processing fixing fixture is set on the worktable through the cross Slide rail three is set on the workbench;
所述内框加工固定夹具可通过十字滑轨一滑移至与其对应的内框加工机构下方进行眼镜内框加工;The inner frame processing fixture can be slid to the bottom of the corresponding inner frame processing mechanism through the cross slide rail to process the inner frame of glasses;
所述内框加工固定夹具可运动把完成眼镜内框加工的待加工料运动至第一外框加工固定夹具或第二外框加工固定夹具上,第一外框加工固定夹具沿其十字滑轨二滑移至第一外框加工机构下方进行眼镜外框加工,第二外框加工固定夹具沿其十字滑轨三滑移至第二外框加工机构下方进行眼镜外框加工。The inner frame processing fixing jig can move the material to be processed to complete the processing of the inner frame of the glasses to the first outer frame processing fixing jig or the second outer frame processing fixing jig, and the first outer frame processing fixing jig moves along its cross slide rail 2. Slide to the bottom of the first frame processing mechanism to process the frame of the glasses, and the second frame processing fixing fixture along its cross slide rail 3. Slide to the bottom of the second frame processing mechanism to process the frame of the glasses.
所述固定支架设有相互平行的左侧固定支架和右侧固定支架,所述内框加工装置设于左侧固定支架和右侧固定支架之间,所述外框加工装置设有两组,分别设于左侧固定支架和右侧固定支架上。The fixed bracket is provided with a left fixed bracket and a right fixed bracket parallel to each other, the inner frame processing device is arranged between the left fixed bracket and the right fixed bracket, and the outer frame processing device is provided with two groups, They are respectively arranged on the left fixed bracket and the right fixed bracket.
所述内框加工装置安装在左侧固定支架的右侧,其中一组外框加工装置设于左侧固定支架的左侧,另一组外框加工装置设于右侧固定支架左侧或右侧。The inner frame processing device is installed on the right side of the left fixed bracket, wherein one group of outer frame processing devices is arranged on the left side of the left fixed bracket, and the other group of outer frame processing devices is arranged on the left or right side of the right fixed bracket. side.
所述内框加工装置安装在右侧固定支架的左侧,其中一组外框加工装置设于左侧固定支架左侧或右侧,另一组外框加工装置设于右侧固定支架的右侧。The inner frame processing device is installed on the left side of the right fixed bracket, wherein one group of outer frame processing devices is arranged on the left or right side of the left fixed bracket, and the other group of outer frame processing devices is arranged on the right side of the right fixed bracket. side.
还包括送料装置,所述送料装置与内框加工机构并排安装在固定支架上。It also includes a feeding device, which is installed side by side with the inner frame processing mechanism on the fixed bracket.
还包括取料装置,所述取料装置包括第一取料机构和第二取料机构,所述第一外框加工机构配备第一取料机构,所述第二外框加工机构配备第二取料机构。It also includes a reclaiming device, the reclaiming device includes a first reclaiming mechanism and a second reclaiming mechanism, the first outer frame processing mechanism is equipped with a first reclaiming mechanism, and the second outer frame processing mechanism is equipped with a second Reclaiming mechanism.
本发明的有益效果是:一组内框加工机构配备至少两组外框加工机构,避免因外框加工耗时久造成内框加工机构出现等待的空白时间,提高内框加工和外框加工配合度,进而提高加工效率。The beneficial effect of the present invention is: one set of inner frame processing mechanism is equipped with at least two sets of outer frame processing mechanism, avoiding the blank time of inner frame processing mechanism due to the long time spent in outer frame processing, and improving the cooperation between inner frame processing and outer frame processing degree, thereby improving processing efficiency.
附图说明Description of drawings
图1为本发明的立体图一;Fig. 1 is a perspective view one of the present invention;
图2为本发明的立体图二;Fig. 2 is a perspective view two of the present invention;
图3为本发明实施例一的结构示意图;FIG. 3 is a schematic structural diagram of Embodiment 1 of the present invention;
图4为本发明实施例二的结构示意图。Fig. 4 is a schematic structural diagram of Embodiment 2 of the present invention.
具体实施方式detailed description
参照图1和图2,一种眼镜镜框加工设备,包括工作台1、内框加工装置2和外框加工装置3,所述工作台1的中间设有固定支架4,所述固定支架4呈拱门形状,所述固定支架4将该眼镜镜框加工设备分为内框加工侧和外框加工侧。Referring to Fig. 1 and Fig. 2, a kind of spectacle frame processing equipment comprises a workbench 1, an inner frame processing device 2 and an outer frame processing device 3, a fixed bracket 4 is arranged in the middle of the workbench 1, and the fixed bracket 4 is in the form of In the shape of an arch, the fixed bracket 4 divides the spectacle frame processing equipment into an inner frame processing side and an outer frame processing side.
所述内框加工装置2包括相对应设置的内框加工机构21和内框加工固定夹具22,所述内框加工机构21包括内框加工数控刀211和上下滑动的内框加工刀座212,所述内框加工刀座212安装在固定支架4的内框加工侧,所述内框加工固定夹具22通过十字滑轨一51设于工作台1的内框加工侧,由内框加工固定夹具22夹着待加工料在内框加工数控刀211下方进行眼镜内框加工工序,即第一加工工序。The inner frame processing device 2 includes a corresponding inner frame processing mechanism 21 and an inner frame processing fixture 22, the inner frame processing mechanism 21 includes an inner frame processing CNC knife 211 and an inner frame processing tool seat 212 sliding up and down, The inner frame processing tool holder 212 is installed on the inner frame processing side of the fixed bracket 4, and the inner frame processing fixing fixture 22 is arranged on the inner frame processing side of the workbench 1 through the cross slide rail one 51, and the inner frame processing fixing fixture 22. Carry out the glasses inner frame processing procedure under the inner frame processing numerical control knife 211 sandwiching the material to be processed, that is, the first processing procedure.
在本实施例中,十字滑轨一51包括纵向滑轨一和横向滑轨一,即能够带动内框加工固定夹具22进行纵向和横向运动。In this embodiment, the cross slide rail 1 51 includes a longitudinal slide rail 1 and a horizontal slide rail 1, that is, it can drive the fixing jig 22 for inner frame processing to move longitudinally and laterally.
所述外框加工装置3包括第一外框加工机构31、第一外框加工固定夹具32、第二外框加工机构33和第二外框固定夹具34,所述第一外框加工机构31和第一外框加工固定夹具32上下相对应设置,所述第二外框加工机构33和第二外框固定夹具34上下相对应设置,所述第一外框加工机构31包括第一外框加工数控刀311和上下滑动的第一外框加工刀座312,所述第一外框加工数控刀311安装在第一外框加工刀座312上,所述第二外框加工机构33包括外框加工数控刀二331和上下滑动的第二外框加工刀座332,所述外框加工数控刀二331安装在第二外框加工刀座332上,所述第一外框加工刀座312和第二外框加工刀座332并排安装在固定支架4的外框加工侧,所述第一外框加工固定夹具32通过十字滑轨二52设于工作台1的外框加工侧,所述第二外框加工固定夹具34通过十字滑轨三53设于工作台1的外框加工侧,由第一外框加工固定夹具32和第二外框固定夹具34夹着待加工料分别在对应的第一外框加工数控刀311和外框加工数控刀二331下方进行眼镜外框加工工序,即第二加工工序。The outer frame processing device 3 comprises a first outer frame processing mechanism 31, a first outer frame processing fixture 32, a second outer frame processing mechanism 33 and a second outer frame fixing fixture 34, and the first outer frame processing mechanism 31 The first outer frame processing fixture 32 is arranged correspondingly up and down, the second outer frame processing mechanism 33 and the second outer frame fixing fixture 34 are arranged correspondingly up and down, and the first outer frame processing mechanism 31 includes a first outer frame Processing CNC knife 311 and the first outer frame processing tool seat 312 sliding up and down, the first outer frame processing CNC knife 311 is installed on the first outer frame processing tool seat 312, and the second outer frame processing mechanism 33 includes an outer Frame processing CNC cutter 2 331 and the second outer frame processing tool seat 332 that slides up and down, the outer frame processing CNC knife 2 331 is installed on the second outer frame processing tool seat 332, and the first outer frame processing tool seat 312 Installed side by side with the second outer frame processing tool holder 332 on the outer frame processing side of the fixed bracket 4, the first outer frame processing fixing fixture 32 is arranged on the outer frame processing side of the workbench 1 through the cross slide rail two 52, the said The second outer frame processing fixing fixture 34 is arranged on the outer frame processing side of the workbench 1 through the cross slide rail three 53, and the first outer frame processing fixing fixture 32 and the second outer frame fixing fixture 34 clamp the material to be processed respectively on the corresponding The first frame processing numerical control knife 311 and the outer frame processing numerical control knife two 331 carry out the glasses frame processing process, that is, the second processing process.
所述内框加工固定夹具22对第一待加工料完成眼镜内框加工后,先将已完成眼镜内框加工的第一待加工料运送给第一外框加工固定夹具32进行眼镜外框加工,当第二待加工料完成眼镜内框加工时,第一外框加工固定夹具32上的第一待加工料还未完成外框加工,那么第二待加工料会被内框加工固定夹具22运送给第二外框加工固定夹具34,这样第一外框加工机构31和第二外框加工机构33可以同时进行加工工作,这样内框加工机构的加工速度即使快于外框加工机构,也不会出现等待时间,造成时间浪费。After the inner frame processing fixture 22 completes the inner frame processing of the first material to be processed, the first material to be processed that has been processed on the inner frame of the glasses is first transported to the first outer frame processing fixing fixture 32 to process the outer frame of the glasses , when the second material to be processed has completed the processing of the inner frame of glasses, the first material to be processed on the first outer frame processing fixture 32 has not yet completed the outer frame processing, so the second material to be processed will be processed by the inner frame processing fixture 22 Be transported to the second outer frame processing fixture 34, so that the first outer frame processing mechanism 31 and the second outer frame processing mechanism 33 can carry out processing work simultaneously, even if the processing speed of the inner frame processing mechanism is faster than the outer frame processing mechanism like this, There will be no waiting time, resulting in wasted time.
当然内框加工固定夹具22也可以只给第一外框加工固定夹具32或第二外框固定夹具34运送待加工料,第一外框加工机构31和第二外框加工机构33可以单独与内框加工机构21配合进行眼镜的内外框加工。当其中一外框加工机构或外框加工固定夹具出现故障时,也无需停机,使用另一外框加工机构和外框固定夹具进行外框加工工作即可。Of course, the inner frame processing fixture 22 can also only carry the material to be processed to the first outer frame processing fixture 32 or the second outer frame fixing fixture 34, and the first outer frame processing mechanism 31 and the second outer frame processing mechanism 33 can be used separately. The inner frame processing mechanism 21 cooperates to process the inner and outer frames of the glasses. When one of the outer frame processing mechanisms or the outer frame processing fixing jig fails, there is no need to stop the machine, and the other outer frame processing mechanism and the outer frame fixing jig can be used to process the outer frame.
在本实施例中,眼镜镜框加工设备还包括送料装置6和取料装置7,所述送料装置6与内框加工机构21并排安装在固定支架4的内框加工侧。所述取料装置7包括第一取料机构和第二取料机构,所述第一外框加工机构配备第一取料机构,所述第二外框加工机构配备第二取料机构,实现每个外框加工机构加工完均有各自的取料机构进行取料。In this embodiment, the spectacle frame processing equipment further includes a feeding device 6 and a retrieving device 7 , and the feeding device 6 and the inner frame processing mechanism 21 are installed side by side on the inner frame processing side of the fixed bracket 4 . The retrieving device 7 includes a first retrieving mechanism and a second retrieving mechanism, the first outer frame processing mechanism is equipped with a first reclaiming mechanism, and the second outer frame processing mechanism is equipped with a second reclaiming mechanism to realize Each outer frame processing mechanism has its own retrieving mechanism for retrieving materials after processing.
本设备工作时,所述内框加工固定夹具22可通过十字滑轨一51进行滑移至送料装置6下方,送料装置6将待加工料放置在内框加工固定夹具22上,内框加工固定夹具22滑移至与其对应的内框加工机构21下方进行眼镜内框加工;When the equipment is working, the inner frame processing fixture 22 can slide to the bottom of the feeding device 6 through the cross slide rail 151, and the feeding device 6 places the material to be processed on the inner frame processing fixing fixture 22, and the inner frame processing is fixed. The jig 22 slides to the bottom of the corresponding inner frame processing mechanism 21 to process the inner frame of glasses;
眼镜内框加工完毕,所述内框加工固定夹具22从固定支架4下方钻过,把完成眼镜内框加工的待加工料运动至第一外框加工固定夹具32或第二外框加工固定夹具34上,第一外框加工固定夹具32沿其十字滑轨二52滑移至第一外框加工机构31下方进行眼镜外框加工,第二外框加工固定夹具34沿其十字滑轨三53滑移至第二外框加工机构33下方进行眼镜外框加工;After the processing of the inner frame of the glasses is completed, the inner frame processing fixing fixture 22 is drilled under the fixing bracket 4, and the material to be processed that has completed the processing of the inner frame of the glasses is moved to the first outer frame processing fixing fixture 32 or the second outer frame processing fixing fixture 34, the first outer frame processing fixture 32 slides to the bottom of the first outer frame processing mechanism 31 along its cross slide rail 2 52 to process the glasses outer frame, and the second outer frame processing fixture 34 slides along its cross slide rail three 53 Slide to the bottom of the second frame processing mechanism 33 to process the frame of glasses;
眼镜外框加工完毕,由其对应的取料机构7将外框加工固定夹具上的镜框取出,放置在集料框中。After the processing of the outer frame of glasses is finished, the picture frame on the outer frame processing fixing fixture is taken out by its corresponding material taking mechanism 7, and placed in the material collection frame.
参照图3和图4,为了进一步提高加工效率,所述固定支架4设有两个,即在工作台1上平行设有左固定支架41和右固定支架42,所述内框加工装置2设于左固定支架41和右固定支架42之间,所述外框加工装置3设有两组,分别设于左固定支架和右固定支架上。Referring to Fig. 3 and Fig. 4, in order to further improve processing efficiency, described fixed support 4 is provided with two, promptly is provided with left fixed support 41 and right fixed support 42 in parallel on workbench 1, and described inner frame processing device 2 is provided with Between the left fixing bracket 41 and the right fixing bracket 42, the outer frame processing device 3 is provided with two groups, which are respectively arranged on the left fixing bracket and the right fixing bracket.
实施例一:所述内框加工装置2安装在左固定支架41的右侧,其中一组外框加工装置3设置在左固定支架41的左侧,另一组外框加工装置3’设置在右固定支架42的左侧或右侧。Embodiment 1: The inner frame processing device 2 is installed on the right side of the left fixed bracket 41, wherein one group of outer frame processing devices 3 is arranged on the left side of the left fixed bracket 41, and the other group of outer frame processing devices 3' is arranged on the left side of the left fixed bracket 41. The left or right side of the right fixed bracket 42.
实施例二:所述内框加工装置2安装在右固定支架41的左侧,其中一组外框加工装置3设置在左固定支架41的左侧或右侧,另一组外框加工装置3’设置在右固定支架42的右侧。Embodiment 2: The inner frame processing device 2 is installed on the left side of the right fixed bracket 41, wherein one group of outer frame processing devices 3 is arranged on the left or right side of the left fixed bracket 41, and the other group of outer frame processing devices 3 ' is arranged on the right side of the right fixed bracket 42.
一组外框加工装置中包括第一外框加工机构31、第一外框加工固定夹具32、第二外框加工机构33和第二外框固定夹具34,也就是说如果设有两组外框加工装置,那么一个内框加工机构21完成内框加工工序后,由内框加工固定夹具22带着待加工料一个一个送去外框加工固定夹具,由四个外框加工机构同时进行眼镜外框加工工序,从而成倍提高加工效率。A group of outer frame processing devices comprises a first outer frame processing mechanism 31, a first outer frame processing fixture 32, a second outer frame processing mechanism 33 and a second outer frame fixing fixture 34, that is to say if two sets of outer frame processing devices are provided frame processing device, after an inner frame processing mechanism 21 completes the inner frame processing procedure, the inner frame processing fixture 22 takes the materials to be processed and sends them to the outer frame processing fixture one by one, and the glasses are processed simultaneously by four outer frame processing mechanisms. Outer frame processing procedures, thereby doubling the processing efficiency.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611163535.6A CN106736874B (en) | 2016-12-16 | 2016-12-16 | Glasses picture frame processing equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611163535.6A CN106736874B (en) | 2016-12-16 | 2016-12-16 | Glasses picture frame processing equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106736874A true CN106736874A (en) | 2017-05-31 |
CN106736874B CN106736874B (en) | 2020-03-31 |
Family
ID=58892675
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611163535.6A Expired - Fee Related CN106736874B (en) | 2016-12-16 | 2016-12-16 | Glasses picture frame processing equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106736874B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110125466A (en) * | 2019-06-13 | 2019-08-16 | 重庆市捷锐数控设备有限公司 | A kind of full-automatic double-ended machine and its processing method |
CN113510487A (en) * | 2021-07-29 | 2021-10-19 | 威海新光电碳制品有限公司 | Automatic carbon brush processing machine |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20000000613A (en) * | 1998-06-02 | 2000-01-15 | 이종익 | Glasses frame legs automatization processing apparatus |
CN201862780U (en) * | 2010-11-16 | 2011-06-15 | 南京农业大学 | Aspheric lens numerical control lathe |
CN203528168U (en) * | 2013-10-19 | 2014-04-09 | 永嘉县华雕机械制造有限公司 | Spectacle inner ring and outer ring carving machine |
CN204019245U (en) * | 2013-12-12 | 2014-12-17 | 温州市瓯海恒利眼镜设备厂 | A kind of full-automatic numerical control eye glass frame processing machine |
CN204019282U (en) * | 2014-07-16 | 2014-12-17 | 东莞市添辉眼镜有限公司 | A mirror frame processing machine |
CN105904263A (en) * | 2016-06-08 | 2016-08-31 | 叶朝波 | Full-automatic numerical control glasses frame processing machine |
CN206343975U (en) * | 2016-12-16 | 2017-07-21 | 瑞安市超捷数控设备有限公司 | A kind of eye glass frame process equipment |
-
2016
- 2016-12-16 CN CN201611163535.6A patent/CN106736874B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20000000613A (en) * | 1998-06-02 | 2000-01-15 | 이종익 | Glasses frame legs automatization processing apparatus |
CN201862780U (en) * | 2010-11-16 | 2011-06-15 | 南京农业大学 | Aspheric lens numerical control lathe |
CN203528168U (en) * | 2013-10-19 | 2014-04-09 | 永嘉县华雕机械制造有限公司 | Spectacle inner ring and outer ring carving machine |
CN204019245U (en) * | 2013-12-12 | 2014-12-17 | 温州市瓯海恒利眼镜设备厂 | A kind of full-automatic numerical control eye glass frame processing machine |
CN204019282U (en) * | 2014-07-16 | 2014-12-17 | 东莞市添辉眼镜有限公司 | A mirror frame processing machine |
CN105904263A (en) * | 2016-06-08 | 2016-08-31 | 叶朝波 | Full-automatic numerical control glasses frame processing machine |
CN206343975U (en) * | 2016-12-16 | 2017-07-21 | 瑞安市超捷数控设备有限公司 | A kind of eye glass frame process equipment |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110125466A (en) * | 2019-06-13 | 2019-08-16 | 重庆市捷锐数控设备有限公司 | A kind of full-automatic double-ended machine and its processing method |
CN113510487A (en) * | 2021-07-29 | 2021-10-19 | 威海新光电碳制品有限公司 | Automatic carbon brush processing machine |
CN113510487B (en) * | 2021-07-29 | 2022-08-02 | 威海新光电碳制品有限公司 | Automatic carbon brush processing machine |
Also Published As
Publication number | Publication date |
---|---|
CN106736874B (en) | 2020-03-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206343975U (en) | A kind of eye glass frame process equipment | |
CN204277454U (en) | Integrated drilling automation processing equipment | |
CN203751534U (en) | Double-workbench robot laser cutting machine | |
CN104191886A (en) | Double-faced carving machine for wooden door leaf | |
US10668643B2 (en) | Machining device | |
CN203993107U (en) | Numerical control machine for processing is bored in two ends milling simultaneously | |
CN204397574U (en) | Duplex bit strip manipulator discharging machining center | |
CN206605288U (en) | A multi-station CNC double-sided milling machine | |
CN203779234U (en) | A multi-head CNC machine tool | |
ITUB20155709A1 (en) | MACHINE FOR WORKING SLABS IN A SUBSTANTIALLY VERTICAL POSITION, WITH A CUP MILLING TOOL WHICH IS ADJUSTABLE AROUND A ORTHOGONAL AXLE ON THE SIDE OF THE SLAB | |
CN205147331U (en) | Automatic upper and lower skip bed | |
CN208644081U (en) | Double-spindle inclined numerical control machining lathe | |
CN105345857A (en) | Light guide plate shearing equipment | |
CN106736874A (en) | A kind of eye glass frame process equipment | |
CN204248471U (en) | Possesses the five-axle linked blade machining tool of workpiece automated exchanged cutter | |
CN209050393U (en) | A kind of automatic processing device of porous workpiece | |
CN204954369U (en) | Tile lid automatic production line | |
CN110052724A (en) | A kind of compound boat form truss handling equipment | |
CN106271698A (en) | A kind of lathe with Double-station bench | |
CN210997701U (en) | Gantry type double-tool magazine numerical control machining center | |
CN205201587U (en) | Full automatically cropped machine in two longmen | |
CN205817398U (en) | A three-axis moving column vertical machining center | |
CN205927129U (en) | Many main shafts bull lathe | |
WO2016082119A1 (en) | Six-axis multi-point precision positioning numerical control machining apparatus | |
CN203992427U (en) | Two ends are processing numerically controlled lathe simultaneously |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 325200 Luoshan avenue of Ruian City North Industrial Park, Zhejiang Applicant after: ZHEJIANG CHAOJIE CNC EQUIPMENT TECHNOLOGY CO.,LTD. Address before: 325200 Luoshan Road, Shibei Industrial Park, Wenzhou, Ruian, Zhejiang Applicant before: RUIAN CHAOJIE CNC EQUIPMENT CO.,LTD. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A glasses frame processing equipment Effective date of registration: 20231113 Granted publication date: 20200331 Pledgee: China Postal Savings Bank Co.,Ltd. Rui'an City Branch Pledgor: ZHEJIANG CHAOJIE CNC EQUIPMENT TECHNOLOGY CO.,LTD. Registration number: Y2023980065118 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200331 |
|
CF01 | Termination of patent right due to non-payment of annual fee |