CN106736271A - A kind of preparation method of rolling/compacting rectangle steel tubing string - Google Patents

A kind of preparation method of rolling/compacting rectangle steel tubing string Download PDF

Info

Publication number
CN106736271A
CN106736271A CN201611094486.5A CN201611094486A CN106736271A CN 106736271 A CN106736271 A CN 106736271A CN 201611094486 A CN201611094486 A CN 201611094486A CN 106736271 A CN106736271 A CN 106736271A
Authority
CN
China
Prior art keywords
internal partition
rectangular
steel pipe
section
rectangular tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611094486.5A
Other languages
Chinese (zh)
Other versions
CN106736271B (en
Inventor
王玢
杨志刚
宋杰
罗荣夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201611094486.5A priority Critical patent/CN106736271B/en
Publication of CN106736271A publication Critical patent/CN106736271A/en
Application granted granted Critical
Publication of CN106736271B publication Critical patent/CN106736271B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/32Columns; Pillars; Struts of metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Piles And Underground Anchors (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a kind of preparation method of rolling/compacting rectangle steel tubing string, including:1) selection and group weldering steel box column uiform section, the rectangular steel pipe of equal thickness;2) disintegration segmentation is carried out at the bracket top flange above 150mm positions of rectangular steel pipe, rectangular steel pipe is divided into three sections;3) internal partition is cut into suitable shape, slope mouthful, and the composition backing at the mouth of slope will be cut out at 4 straight flanges of internal partition;4) 2 pieces of assemblings and welding of internal partition in the 1st rectangular tube and the 2nd section of rectangular tube are sequentially completed by order from inside to outside;5) the strong splicing such as the 1st section of rectangular steel pipe and the 2nd section of rectangular steel pipe and the 3rd section of rectangular tube of internal partition will have been assembled carried out, completed assembling, the welding of shaft structure;6) correct, polishing box column cylinder, number line and assemble the outer bracket of shaft and other parts, complete the making of overall steel column.The method achieve rectangle steel tubing string and substitute application of the steel box column in engineering, beneficial to cost efficiency, energy-saving and emission-reduction.

Description

A kind of preparation method of rolling/compacting rectangle steel tubing string
Technical field
The present invention relates to steel construction processing technique field, the making of more particularly to a kind of rolling/compacting rectangle steel tubing string Method.
Background technology
Because steel box column power direction of principal axis all has good service behaviour, steel column intensity and whole can be preferably met The stability of body structure, therefore be widely used in the frame structure of skyscraper and industrial premises.
Steel box column cylinder is typically assembled by four blocks of steel plates, i.e., upper cover plate 11, lower cover 12 and two side cover plates 13, 14, box house need to set internal partition 16 and put more energy at girder steel bracket position.Referring to Fig. 1-Fig. 3 b, its procedure of processing is as follows:
1st, cutting upper cover plate 11, lower cover 12, side cover plate 13,14 and dividing plate 16 (containing bevel cut);
2nd, side cover plate 13,14 over-assemble backing plates 15, the over-assemble electroslag welding backing plate 17 of internal partition 16;
3rd, lower cover 12 and side cover plate 13,14 are assembled into U-type groove;
4th, internal partition 16 (polylith) is respectively assembled in U-type groove according to drawing position, and welding diaphragm 16 and side cover plate 13rd, the weld seam between 14;
5th, upper cover plate 11 is assembled, casing is formed;
6th, casing overturns 90 °, assembles consumable nozzle 18, filling flux, using electroslag welding welding internal partition 16 and upper and lower cover plates 11, Weld seam between 12.
The assembling and welding of dividing plate are easily achieved using the above method.But, because box column manufacture craft is more multiple Miscellaneous, low construction efficiency, high cost are highly detrimental to the raising of construction speed and the control of cost.
With the rolling of China rectangular steel pipe, the continuous maturation of compact technique, largely with box-structure uiform section, etc. wall thickness Heavy in section heavy wall rectangular tube realizes production line balance.If concrete filled rectangular steel tube members are applied to carry out alternate sets weldering in engineering construction Box-structure, in the case where ensureing that constructional appearance size constancy and structural behaviour are constant, can also effectively improve the life of steel construction Produce efficiency and reduce production cost, the development to promoting construction industry has very important significance.But, rolling (or compacting) square Shape steel pipe, because it is full-closed structure, internal partition is assembled and welds relatively difficult, is currently seldom applied to the master of building In body structure.
The content of the invention
It is an object of the invention to provide a kind of preparation method of rolling/compacting rectangle steel tubing string, effectively to solve rectangle steel Tubing string internal partition assembles problem, realizes the raising of steel construction production efficiency and the reduction of production cost.
Therefore, the present invention uses following technical scheme:
A kind of preparation method of rolling/compacting rectangle steel tubing string, comprises the following steps:
1) selection and group weldering steel box column uiform section, the rectangular steel pipe of equal thickness;
2) rectangular steel pipe is carried out into disintegration segmentation according to drawing size at the above 150mm positions of bracket top flange, Rectangular steel pipe is divided into three sections;
3) prepare internal partition and composition backing, internal partition is cut into appropriate shape, and by 4 straight flanges of internal partition Cut out slope mouthful, and the composition backing at the mouth of slope;
4) according to order from inside to outside be sequentially completed in the 1st rectangular tube two pieces of dividing plates assembling and welding and the 2nd section 2 pieces of assemblings and welding of internal partition in rectangular tube;
5) the strong spelling such as the 1st section of rectangular steel pipe and the 2nd section of rectangular steel pipe and the 3rd section of rectangular tube of internal partition will have been assembled carried out Connect, complete assembling, the welding of shaft structure;
6) correct, polishing box column cylinder, number line and assemble the outer bracket of shaft and other parts, complete overall steel column Make.
Above-mentioned rectangular steel pipe is that mill product rectangular tube, single weld seam cold pressing rectangular tube or double weld seams are colded pressing rectangular tube.
The gradient on the slope mouthful of 4 straight flanges of above-mentioned internal partition is 45 degree.
The characteristics of present invention utilizes steel box column power direction of principal axis sectional dimension equal equal with both direction plate thickness, Selection with steel box column uiform section and wait wall thickness rectangular steel pipe substitute steel box column shaft structure, while using steel pipe disintegration divide The method and the order welded from inside to outside of section effectively solve the problems, such as in rectangular tube cannot assemble in diaphragm, ensure that rectangular tube Post solves the problems, such as that dividing plate is assembled, and has been reached identical with steel box column in the case where appearance and size is consistent with steel box column again Functional effect.
By this method, it is capable of achieving rectangle steel tubing string and substitutes application of the steel box column in engineering, is conducive to promoting finished product Rolling extensive use of (compacting) concrete filled rectangular steel tube members in project subject structure, to further promote construction industry cost efficiency with Energy-saving and emission-reduction have very important significance, and should be widely promoted application.
Brief description of the drawings
Fig. 1 is the structural representation of existing box beam cover plate and dividing plate;
Fig. 2 a- Fig. 3 b show the dividing plate assembling process schematic diagram of existing steel box column;
Fig. 4 a-4c are 3 kinds of cross sectional shape schematic diagrames of common rectangular tube, are followed successively by mill product rectangular tube, single weld seam Cold pressing rectangular tube and double weld seams are colded pressing rectangular tube;
Fig. 5 a, 5b are rectangular steel pipe disintegration segmentation position views in the method for the present invention;
Fig. 6 is the structural representation of the internal partition that backing plate is provided with the method for the present invention;
During Fig. 7 is the method for the present invention, the assembling of the 1st section and the 2nd section internal partition of lengths of steel pipes and welding sequence figure;
During Fig. 8 is the method for the present invention, 3 splicing construction schematic diagrames of lengths of steel pipes;
Fig. 9 is the assembling schematic diagram of rectangle steel tubing string bracket in the method for the present invention.
Specific embodiment
The preparation method of rolling (compacting) rectangle steel tubing string of the invention is:Selection and group weldering steel box column uiform section, etc. The rectangular steel pipe of thickness, disintegration segmentation is carried out at each 150mm at the bracket node location according to design drawing up and down by steel pipe column, Then internal partition is assembled and is welded from mouth of pipe both sides, after welding detection is qualified, by disintegration section rectangular tube using outer Side list groove, is inside welded with the method for connecing liner plate by strong welds such as tubing strings, realizes the requirement of rectangular conduit internal partition assembling.
The method of the present invention is described in detail below in conjunction with the accompanying drawings.
Referring to Fig. 4 a- Fig. 9, the preparation method of rolling of the invention/compacting rectangle steel tubing string is comprised the following steps:
1) selection and group weldering steel box column uiform section, the rectangular steel pipe of equal thickness:
Can be colded pressing rectangular tube or double weld seams from the mill product rectangular tube shown in Fig. 4 a-4c, single weld seam as needed Cold pressing rectangular tube.
2) by taking two-layer bracket node steel box column as an example, as shown in figure 5a and 5b:By rectangular steel pipe according to drawing size, Bracket top flange carries out disintegration segmentation above 150mm positions, and rectangular steel pipe is divided into 1,2,3 three sections.Wherein, shown in Fig. 5 a Internal partition 4 and steel column bracket 5 merely to explanation internal partition installation site and rectangular steel pipe segmentation position, this step Schematic diagram is defined by Fig. 5 b.
3) internal partition 4 and composition backing 6 are prepared:
Referring to Fig. 6, internal partition 4 is cut into required shape, and 45 degree will be cut out at 4 straight flanges of internal partition 4 Groove, and composition backing 6 at groove.
4) according to shown in Fig. 7, it is sequentially completed in the 1st rectangular tube 1 and the 2nd section of rectangular tube 2 according to order from inside to outside The assembling and welding of internal partition 4 are (i.e.:Internal partition positioned at inner side assemble and assembled again after the completion of welding in outside every Plate).
5) the strong splicing such as the 1st rectangular tube 1 of internal partition 4, the 2nd section of rectangular tube 2 and the 3rd section of rectangular tube will have been assembled carried out (not installing internal partition in the 3rd section of rectangular tube), completes assembling, the welding job of shaft structure.
6) correct, polishing box column cylinder, number line and assemble the outer bracket 5 of shaft and other parts, complete overall steel column Making.
It is illustrated by taking the preparation method of two-layer bracket node steel box column as an example above.Three layers of bracket node box shaped steel The preparation method of post is similar, on the basis of this structure, the outside of the 3rd section of rectangular tube weld again one section be provided with every The rectangular steel pipe of plate.
By the above method, it is capable of achieving part group weldering box-structure and is substituted with rolling/compacting concrete filled rectangular steel tube members, to drop The construction cost of low steel construction, accelerating construction progress have it is highly beneficial, while rolled-section can be actively promoted in engineering construction Batch application in construction, satisfaction builds the policy requirements of energy-saving and emission-reduction and greenery patches environmental protection construction.

Claims (3)

1. the preparation method of a kind of rolling/compacting rectangle steel tubing string, it is characterised in that comprise the following steps:
1) selection and group weldering steel box column uiform section, the rectangular steel pipe of equal thickness;
2) rectangular steel pipe is carried out into disintegration segmentation, by square according to drawing size at the above 150mm positions of bracket top flange Shape steel pipe is divided into three sections;
3) prepare internal partition and composition backing, internal partition is cut into appropriate shape, and will be cut at the individual straight flange of internal partition Go out slope mouthful, and the composition backing at the mouth of slope;
4) according to order from inside to outside be sequentially completed in the 1st rectangular tube 1 two pieces of dividing plates assembling and welding and the 2nd section of rectangle 2 pieces of assemblings and welding of internal partition in pipe;
5) the strong splicing such as the 1st section of rectangular steel pipe and the 2nd section of rectangular steel pipe and the 3rd section of rectangular tube of internal partition will have been assembled carried out, Complete assembling, the welding of shaft structure;
6) correct, polishing box column cylinder, number line and assemble the outer bracket of shaft and other parts, complete the system of overall steel column Make.
2. preparation method according to claim 1, it is characterised in that:The rectangular steel pipe is mill product rectangular tube, list Weld seam colds pressing rectangular tube or double weld seams are colded pressing rectangular tube.
3. preparation method according to claim 1, it is characterised in that:The slope on the slope mouthful of 4 straight flanges of the internal partition Spend is 45 degree.
CN201611094486.5A 2016-11-28 2016-11-28 A kind of production method of rolling/compacting rectangle steel tubing string Active CN106736271B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611094486.5A CN106736271B (en) 2016-11-28 2016-11-28 A kind of production method of rolling/compacting rectangle steel tubing string

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611094486.5A CN106736271B (en) 2016-11-28 2016-11-28 A kind of production method of rolling/compacting rectangle steel tubing string

Publications (2)

Publication Number Publication Date
CN106736271A true CN106736271A (en) 2017-05-31
CN106736271B CN106736271B (en) 2018-08-03

Family

ID=58883508

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611094486.5A Active CN106736271B (en) 2016-11-28 2016-11-28 A kind of production method of rolling/compacting rectangle steel tubing string

Country Status (1)

Country Link
CN (1) CN106736271B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110640406A (en) * 2019-09-30 2020-01-03 中国二十二冶集团有限公司 Method for manufacturing thick plate small space box type bracket
CN111230345A (en) * 2020-01-13 2020-06-05 国创建设工程有限公司 Manufacturing process of bamboo joint steel column
CN113492272A (en) * 2020-04-03 2021-10-12 唐安虎 Manufacturing method and manufacturing equipment of box column
CN114101409A (en) * 2021-11-05 2022-03-01 上海申龙客车有限公司 Bending method of rectangular pipe
CN116927423A (en) * 2023-07-18 2023-10-24 中建钢构股份有限公司 A box-shaped composite column based on hot-rolled channel steel and its preparation process

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1936207A (en) * 2006-10-30 2007-03-28 北京三杰国际钢结构有限公司 Box-type section beam-column node structure and welding method
JP2010084349A (en) * 2008-09-30 2010-04-15 Ihi Corp Reinforcing construction method of box girder end
CN201738458U (en) * 2010-08-31 2011-02-09 武汉长丰赛博思钢结构工程有限公司 Novel assembly type end-plate connecting node of cold-bending rectangular steel pipe column and H type steel beam
CN202416583U (en) * 2011-12-16 2012-09-05 山东杭萧钢构有限公司 Connection joint between clapboard-through-type box-shaped columns and H-shaped steel beams
CN103643743A (en) * 2013-12-10 2014-03-19 天津三建建筑工程有限公司 Construction method for arranging and machining inner separating plate of formed rectangular steel member
CN103696499A (en) * 2013-12-20 2014-04-02 天津大学 Cast steel joint for connecting steel structure beam and steel structure column
CN104088398A (en) * 2014-07-21 2014-10-08 山东莱钢建设有限公司 Rectangular steel pipe column
CN204199440U (en) * 2014-07-02 2015-03-11 山东科技大学 The node structure that a kind of concrete column is connected with girder steel
CN204781316U (en) * 2015-05-29 2015-11-18 中建钢构江苏有限公司 Diaphragm welding structure in steel column of flat box cross -section
CN205399661U (en) * 2016-02-24 2016-07-27 中建三局集团有限公司 Box post and square tubular column connection structure

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1936207A (en) * 2006-10-30 2007-03-28 北京三杰国际钢结构有限公司 Box-type section beam-column node structure and welding method
JP2010084349A (en) * 2008-09-30 2010-04-15 Ihi Corp Reinforcing construction method of box girder end
CN201738458U (en) * 2010-08-31 2011-02-09 武汉长丰赛博思钢结构工程有限公司 Novel assembly type end-plate connecting node of cold-bending rectangular steel pipe column and H type steel beam
CN202416583U (en) * 2011-12-16 2012-09-05 山东杭萧钢构有限公司 Connection joint between clapboard-through-type box-shaped columns and H-shaped steel beams
CN103643743A (en) * 2013-12-10 2014-03-19 天津三建建筑工程有限公司 Construction method for arranging and machining inner separating plate of formed rectangular steel member
CN103696499A (en) * 2013-12-20 2014-04-02 天津大学 Cast steel joint for connecting steel structure beam and steel structure column
CN204199440U (en) * 2014-07-02 2015-03-11 山东科技大学 The node structure that a kind of concrete column is connected with girder steel
CN104088398A (en) * 2014-07-21 2014-10-08 山东莱钢建设有限公司 Rectangular steel pipe column
CN204781316U (en) * 2015-05-29 2015-11-18 中建钢构江苏有限公司 Diaphragm welding structure in steel column of flat box cross -section
CN205399661U (en) * 2016-02-24 2016-07-27 中建三局集团有限公司 Box post and square tubular column connection structure

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110640406A (en) * 2019-09-30 2020-01-03 中国二十二冶集团有限公司 Method for manufacturing thick plate small space box type bracket
CN111230345A (en) * 2020-01-13 2020-06-05 国创建设工程有限公司 Manufacturing process of bamboo joint steel column
CN111230345B (en) * 2020-01-13 2021-06-11 国创建设工程有限公司 Manufacturing process of bamboo joint steel column
CN113492272A (en) * 2020-04-03 2021-10-12 唐安虎 Manufacturing method and manufacturing equipment of box column
CN113492272B (en) * 2020-04-03 2024-06-04 唐安虎 Manufacturing method and manufacturing equipment of box column
CN114101409A (en) * 2021-11-05 2022-03-01 上海申龙客车有限公司 Bending method of rectangular pipe
CN116927423A (en) * 2023-07-18 2023-10-24 中建钢构股份有限公司 A box-shaped composite column based on hot-rolled channel steel and its preparation process

Also Published As

Publication number Publication date
CN106736271B (en) 2018-08-03

Similar Documents

Publication Publication Date Title
CN106736271B (en) A kind of production method of rolling/compacting rectangle steel tubing string
CN101011781B (en) Welding deformation controlling method in bridge steel pylon manufacturing process
CN207277561U (en) Built-in profile steel high-strength concrete stem superposed column-girder steel group frame
CN102587577A (en) Steel tube-I beam combination steel tube concrete special-shaped columns and manufacture method thereof
CN106836489A (en) A kind of assembled round steel pipe sleeve pipe fiber concrete column connected node and installation method
CN105839667A (en) Construction and manufacturing process of total-prefabricated superimposed assembly type underground pipe gallery
CN103878468B (en) The welding method of large-scale core detection container structure
CN204551732U (en) A kind of steel frame and steel structure module connected node
CN202639082U (en) Combined mould for sizing outer diameters of welded steel tubes
CN204098241U (en) Trapezoidal steel plate interpolation type rectangular steel-tube concrete column and steel beam connecting joint
CN207419849U (en) A kind of heavy wall penetrates through node flange connecting square pipes steel member box column
CN204081262U (en) A kind of huge many brackets steel framework post
CN104139451A (en) Concrete core slab prefabricated internal mold, assembling frame and assembling method
CN112049232B (en) Arc-shaped structure and construction method thereof
CN211816952U (en) Prefabricated post-girder steel mixed frame structure
CN104196172A (en) Crescent-shaped truss and manufacturing method thereof
CN103711200A (en) Assembly type stiff combination frame support structure
CN102699205A (en) Fixed outer diameter combined die for welded steel tubes
CN206929551U (en) The rubber diaphragm sealed gas holder of unistage type of regular polygon thin oil seal gas holder reconstruction
CN207646939U (en) A kind of double-layered precast facade structure of basement
CN203383396U (en) Multi-connection and large-section combined box-type thick plate side column
CN202689338U (en) Steel pipe FRP pipe concrete composite column
CN102121312A (en) Construction process for concrete bargeboard in pseudo-classic architecture
CN206888188U (en) A kind of heavy wall penetrates node square hollow section steel component framework system
CN102888989A (en) Technology for processing complex irregularly-shaped honeycomb steel frame joints and steel frame joints

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant