CN106697642A - Plastic bucket and plastic bucket feeding, discharging and conveying system - Google Patents

Plastic bucket and plastic bucket feeding, discharging and conveying system Download PDF

Info

Publication number
CN106697642A
CN106697642A CN201611015294.0A CN201611015294A CN106697642A CN 106697642 A CN106697642 A CN 106697642A CN 201611015294 A CN201611015294 A CN 201611015294A CN 106697642 A CN106697642 A CN 106697642A
Authority
CN
China
Prior art keywords
framework
bucket
frame
dump gate
bucket body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611015294.0A
Other languages
Chinese (zh)
Other versions
CN106697642B (en
Inventor
邱雪峰
赵帅
王坤
李雪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Mesnac Electromechanical Engineering Co Ltd
Original Assignee
Qingdao Mesnac Electromechanical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Mesnac Electromechanical Engineering Co Ltd filed Critical Qingdao Mesnac Electromechanical Engineering Co Ltd
Priority to CN201611015294.0A priority Critical patent/CN106697642B/en
Publication of CN106697642A publication Critical patent/CN106697642A/en
Application granted granted Critical
Publication of CN106697642B publication Critical patent/CN106697642B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D90/00Component parts, details or accessories for large containers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D90/00Component parts, details or accessories for large containers
    • B65D90/54Gates or closures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D90/00Component parts, details or accessories for large containers
    • B65D90/54Gates or closures
    • B65D90/66Operating devices therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G47/00Article or material-handling devices associated with conveyors; Methods employing such devices
    • B65G47/02Devices for feeding articles or materials to conveyors
    • B65G47/16Devices for feeding articles or materials to conveyors for feeding materials in bulk
    • B65G47/18Arrangements or applications of hoppers or chutes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D2590/00Component parts, details or accessories for large containers
    • B65D2590/54Gates or closures
    • B65D2590/66Operating devices therefor
    • B65D2590/664Operating devices therefor actuating mechanism other than manual, e.g. pneumatic, electropneumatic, hydraulic, electromagnetic
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2201/00Indexing codes relating to handling devices, e.g. conveyors, characterised by the type of product or load being conveyed or handled
    • B65G2201/04Bulk

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chain Conveyers (AREA)

Abstract

本发明提供一种胶斗及胶斗装卸输送系统,其特点是:胶斗的斗体设置进料口、卸料口及卸料门,斗体设置在一框架形底座中间,框架形底座的上部设有与空中输送线配合的吊具,底部设有与地面输送线配合的支撑部,卸料口处铰接的第一卸料门与第二卸料门依靠自身重量闭合。卸料机构的两框架中的底部设置电机,电机通过链轮、链条带动升降架组件导轨上下往复运动,升降架组件中包括向中间延伸出框架的升降臂。两升降臂上升时分别与所述第一卸料门和第二卸料门的倾斜开启臂上的滚筒配合,向上抬起第一卸料门和第二卸料门。使胶斗既能空中吊运又能在地面输送线上运行,胶斗装卸输送系统使用灵活,运输效率高。

The invention provides a rubber hopper and a loading and unloading conveying system for the rubber hopper. The upper part is equipped with a spreader that cooperates with the aerial conveying line, and the bottom is provided with a supporting part that cooperates with the ground conveying line. The hinged first and second discharge doors at the discharge port are closed by their own weight. The bottom in the two frames of the unloading mechanism is provided with a motor, and the motor drives the lifting frame assembly guide rail to reciprocate up and down through the sprocket wheel and the chain. The lifting frame assembly includes a lifting arm extending out of the frame in the middle. When the two lifting arms rise, they cooperate with the rollers on the inclined opening arms of the first discharge door and the second discharge door respectively, and lift the first discharge door and the second discharge door upwards. The rubber bucket can be lifted in the air and run on the ground conveying line, the loading and unloading conveying system of the rubber bucket can be used flexibly, and the transportation efficiency is high.

Description

一种胶斗及胶斗装卸输送系统A rubber hopper and a rubber hopper loading and unloading conveying system

技术领域technical field

本发明属于吊斗设备技术领域,具体说是一种胶斗及胶斗装卸输送系统。The invention belongs to the technical field of bucket equipment, in particular to a rubber bucket and a loading and unloading conveying system for the rubber bucket.

背景技术Background technique

吊斗是生产车间内实现空中吊运的常用设备,现有吊斗一般包括吊具、斗体、加料门和卸料门,所述吊具固定在斗体顶部的正中位置,用于悬挂斗体,所述斗体顶部偏离正中位置的一侧或两侧设有加料口,底部设有卸料口,内部有容纳物料的空腔,上部或顶部设有对应所述加料口的加料门,下部铰接有对应所述卸料口的卸料门。为了配合吊斗卸料车间内还配置有卸料机构,通常卸料机构是由气缸控制。The hanging bucket is a common equipment for aerial lifting in the production workshop. The existing hanging bucket generally includes a spreader, a bucket body, a feeding door and a discharging door. The top of the bucket body is provided with a feeding port on one or both sides deviated from the center position, the bottom is provided with a discharge port, and there is a cavity for containing materials inside, and the upper part or top is provided with a feeding door corresponding to the feeding port. The lower part is hinged with a discharge door corresponding to the discharge port. In order to cooperate with the bucket unloading workshop, there is also an unloading mechanism, which is usually controlled by a cylinder.

现有的吊斗只能在空中运输,不能由地面输送线输送,限制了使用范围,影响了生产效率。另外,现有的卸料机构由气缸控制,气缸速度不可调,不能实现变速要求。The existing bucket can only be transported in the air, and cannot be transported by the ground conveyor line, which limits the scope of use and affects the production efficiency. In addition, the existing unloading mechanism is controlled by an air cylinder, and the speed of the air cylinder cannot be adjusted, so the speed change requirement cannot be realized.

为了适应工厂自动化需求,提供更灵活多变的解决方案,降低企业成本,提高工作效率,目前急需设计一种既能空中吊运又能在地面输送线上输送的胶斗及与之配合的卸料机构,主要用于颗粒或小块状物料输送。In order to meet the needs of factory automation, provide more flexible solutions, reduce enterprise costs, and improve work efficiency, there is an urgent need to design a rubber bucket that can be lifted in the air and transported on the ground conveyor line and a matching unloading bucket. The feeding mechanism is mainly used for conveying granular or small block materials.

发明内容Contents of the invention

本发明针对现有技术存在的上述问题,提供一种胶斗及胶斗装卸输送系统,使胶斗既能空中吊运又能在地面输送线上运行,胶斗装卸输送系统使用灵活,运输效率高。The present invention aims at the above-mentioned problems existing in the prior art, and provides a rubber hopper and a rubber hopper loading and unloading conveying system, so that the rubber hopper can be hoisted in the air and run on the ground conveying line. high.

本发明的目的是通过以下技术方案实现的:The purpose of the present invention is achieved through the following technical solutions:

一种胶斗,包括斗体,斗体上设置进料口、卸料口及卸料门,其特征在于,所述的斗体设置在一框架形底座中间,所述框架形底座的上部设有与空中输送线配合的吊具,所述框架形底座的底部设有与地面输送线配合的支撑部,所述进料口设置在所述斗体顶部,所述卸料口设置在所述斗体底部。A rubber hopper, comprising a bucket body, on which a feed inlet, a discharge port and a discharge door are arranged, and it is characterized in that, the bucket body is arranged in the middle of a frame-shaped base, and the upper part of the frame-shaped base is provided with There is a hanger that cooperates with the aerial conveying line, the bottom of the frame-shaped base is provided with a supporting part that cooperates with the ground conveying line, the feed inlet is arranged on the top of the bucket body, and the discharge outlet is arranged on the The bottom of the bucket.

对上述技术方案的改进:所述的框架形底座为方框形,包括4根相互平行且竖直设置的立柱和两根横梁,所述4根立柱上端的连线为矩形,所述两根横梁相互平行且分别与相邻的两根所述立柱的上端连接,所述支撑部为两根相互平的矩形管,两根矩形管分别与相邻的两根所述立柱的下端连接,且两根所述矩形管的底面位于同一平面上,所述的矩形管与所述横梁的投影垂直,所述吊具为所述框架形底座上部四个角上横向各设置的1根圆钢,4根所述圆钢相互平行且位于同一平面上,所述卸料门的底部高于所述支撑部的底部。Improvement to the above-mentioned technical solution: the frame-shaped base is in the shape of a square frame, including 4 vertical columns parallel to each other and two crossbeams, the connection line at the upper ends of the 4 columns is rectangular, and the two The beams are parallel to each other and are respectively connected to the upper ends of the two adjacent uprights, the support parts are two mutually flat rectangular tubes, and the two rectangular tubes are respectively connected to the lower ends of the two adjacent uprights, and The bottom surfaces of the two rectangular tubes are located on the same plane, the rectangular tubes are perpendicular to the projection of the crossbeam, and the hanger is a round steel set horizontally on the four corners of the upper part of the frame-shaped base. The four round bars are parallel to each other and on the same plane, and the bottom of the discharge door is higher than the bottom of the supporting part.

对上述技术方案的进一步改进:所述斗体包括四面侧壁形成容纳物料的空腔,所述斗体下部前后两侧各铰接有两块偏心板,所述卸料门包括第一卸料门和第二卸料门,所述第一卸料门和第二卸料门分别与前后对应的两块所述偏心板连接,第一卸料门与第二卸料门依靠自身重量关闭所述卸料口,第一卸料门下端前后设置两条向斜下方延伸出框架形底座的第一倾斜开启臂,两条所述第一倾斜开启臂的末端连接一根第一滚筒;第二卸料门下端设置两条向斜下方延伸出框架形底座的第二倾斜开启臂,两条第二倾斜开启臂末端连接一根第二滚筒。A further improvement to the above technical solution: the bucket body includes four side walls to form a cavity for containing materials, two eccentric plates are hinged on the front and rear sides of the lower part of the bucket body, and the discharge door includes a first discharge door and the second discharge door, the first discharge door and the second discharge door are respectively connected with the two eccentric plates corresponding to the front and rear, and the first discharge door and the second discharge door are closed by their own weight. At the discharge port, the lower end of the first discharge door is provided with two first inclined opening arms extending out of the frame-shaped base obliquely downward, and the ends of the two first inclined opening arms are connected to a first roller; The lower end of the material door is provided with two second inclined opening arms extending obliquely downward from the frame-shaped base, and the ends of the two second inclined opening arms are connected with a second roller.

对上述技术方案的进一步改进:所述的斗体与所述框架形底座焊接为一体,所述斗体的上沿与所述框架形底座顶部基本平齐,所述立柱之间通过横向连杆连接。A further improvement to the above technical solution: the bucket body is welded together with the frame-shaped base, the upper edge of the bucket body is substantially flush with the top of the frame-shaped base, and the uprights are connected by transverse connecting rods connect.

一种胶斗装卸输送系统,包括吊轨、吊钩、吊斗、卸料机构及地面输送线,其特征在于,所述吊斗为上述的胶斗,所述吊钩包括方形顶框,所述方形顶框有两条平行边底部各设置一条支撑托杆,两条托杆相互平行并设置在同一平面内,两条托杆分别通过竖直连接杆与方形顶框连接,两条托杆与所述胶斗的吊具匹配,所述卸料机构设置在所述吊轨或/和地面输送线经过的位置。A rubber hopper loading and unloading conveying system, comprising a hanging rail, a hook, a hanging bucket, an unloading mechanism, and a ground conveying line, characterized in that the hanging bucket is the above-mentioned rubber bucket, and the hanging hook includes a square top frame. The above-mentioned square top frame has two parallel sides and a bottom supporting rod respectively, and the two supporting rods are parallel to each other and arranged in the same plane. The two supporting rods are respectively connected with the square top frame through vertical connecting rods. Matched with the hanger of the rubber hopper, the unloading mechanism is arranged at the position where the hanging rail or/and the ground conveying line pass.

对上述技术方案的改进:所述卸料机构包括对称竖直设置的两框架,每一所述框架中均设置电机、升降架组件、导轨、主动链轮和从动链轮及链条,所述电机设置在所述框架内底部,所述电机传动轴连接主动链轮,所述框架内顶部设置所述从动链轮,所述链条连接所述主动链轮与从动链轮,所述导轨竖向设置在所述框架内的中部,所述升降架组件与所述链条连接,并沿所述导轨上下往复运动,所述升降架组件中包括向中间延伸出所述框架的升降臂;两所述框架上的升降臂上升时分别与所述第一倾斜开启臂上的第一滚筒及所述第二倾斜开启臂上的第二滚筒配合,向上抬起第一卸料门和第二卸料门。Improvement to the above technical solution: the unloading mechanism includes two frames symmetrically arranged vertically, and a motor, a lifting frame assembly, a guide rail, a driving sprocket, a driven sprocket and a chain are arranged in each of the frames. The motor is arranged at the bottom of the frame, the drive shaft of the motor is connected to the driving sprocket, the driven sprocket is arranged at the top of the frame, the chain is connected to the driving sprocket and the driven sprocket, and the guide rail Vertically arranged in the middle of the frame, the lifting frame assembly is connected with the chain and reciprocates up and down along the guide rail. The lifting frame assembly includes a lifting arm extending out of the frame in the middle; two When the lifting arm on the frame rises, it cooperates with the first roller on the first inclined opening arm and the second roller on the second inclined opening arm to lift up the first discharge door and the second discharge door. Materials door.

对上述技术方案的进一步改进:所述地面输送线为链条输送机或者滚筒输送机,所述框架由矩形管焊接而成,所述框架底部设有脚杯,可上下调节卸料机高度;所述电机配有变频器,可实现无极变速。A further improvement to the above technical solution: the ground conveying line is a chain conveyor or a roller conveyor, the frame is welded by rectangular tubes, and the bottom of the frame is provided with a foot cup, which can adjust the height of the unloader up and down; The above-mentioned motor is equipped with a frequency converter, which can realize stepless speed change.

对上述技术方案的进一步改进:两所述框架顶部水平设置防尘盖板,防尘盖板通过螺栓固定在两所述框架上,每一所述框架内的上部设置护网。A further improvement to the above technical solution: the tops of the two frames are provided with dust-proof covers horizontally, the dust-proof covers are fixed on the two frames by bolts, and the upper part of each frame is provided with a protective net.

对上述技术方案的进一步改进:本发明的优点和积极效果是:Further improvement to above-mentioned technical scheme: advantage of the present invention and positive effect are:

本发明将胶斗的斗体设置在一框架形底座中间,在框架形底座的上部设有与空中输送线配合的吊具,框架形底底座的底部设有与地面输送线配合的支撑部,这样,胶斗既能由空中输送线输送,又能由地面输送线输送。In the present invention, the bucket body of the rubber bucket is arranged in the middle of a frame-shaped base, and the upper part of the frame-shaped base is provided with a hanger that cooperates with the aerial conveying line, and the bottom of the frame-shaped bottom base is provided with a supporting part that cooperates with the ground conveying line. In this way, the rubber bucket can be transported by both the aerial conveyor line and the ground conveyor line.

如此,物流方案设计更加灵活多变,有利于节约工厂空间,降低企业成本,提高工作效率。In this way, the logistics scheme design is more flexible and changeable, which is conducive to saving factory space, reducing enterprise costs, and improving work efficiency.

本发明的卸料机构采用的电机配有变频器,可实现无极变速。The motor adopted by the unloading mechanism of the present invention is equipped with a frequency converter, which can realize stepless speed change.

附图说明Description of drawings

图1为本发明一种胶斗主视图;Fig. 1 is the front view of a kind of glue hopper of the present invention;

图2为本发明一种胶斗的立体图;Fig. 2 is the perspective view of a kind of glue bucket of the present invention;

图3为本发明一种胶斗在第一卸料门和第二卸料门打开状态的示意图;Fig. 3 is a schematic diagram of a rubber hopper of the present invention in an open state of the first discharge door and the second discharge door;

图4为本发明胶斗装卸输送系统中的卸料机构示意图;Fig. 4 is a schematic diagram of the unloading mechanism in the rubber hopper loading and unloading conveying system of the present invention;

图5为本发明胶斗装卸输送系统中的胶斗在卸料工位上卸料的示意图;Fig. 5 is a schematic diagram of the rubber hopper in the rubber hopper loading and unloading conveying system of the present invention being unloaded at the unloading station;

图6本发明胶斗装卸输送系统空中吊运胶斗的示意图;Fig. 6 is a schematic diagram of the air-lifting rubber hopper of the rubber hopper loading and unloading conveying system of the present invention;

图7为本发明胶斗装卸输送系统中胶斗采用空中吊运与地面输送方式转换过程示意图。Fig. 7 is a schematic diagram of the conversion process of the rubber hopper in the rubber hopper loading and unloading transportation system of the present invention by aerial hoisting and ground transportation.

图中的序号为:1-框架形底座;1.1-圆钢;1.2-横梁;1.3-立柱;1.4-矩形管;2-斗体;2.1-进料口;3-第一卸料门;3.1-第一倾斜开启臂;4-第二卸料门;4.1-第二倾斜开启臂;4.2-第二辊筒;5-框架;6-升降架组件;7-导轨;8-从动链轮;9-链条;10-电机;11-防尘盖板;12-护网;13-升降臂;14-物料输送带;15-吊车;16-吊轨;17-吊钩;18-地面输送线。The serial numbers in the figure are: 1-frame-shaped base; 1.1-round steel; 1.2-beam; 1.3-column; 1.4-rectangular tube; -First inclined opening arm; 4-Second discharge door; 4.1-Second inclined opening arm; 4.2-Second roller; 5-Frame; ;9-chain; 10-motor; 11-dust cover; 12-guard net; 13-lift arm; 14-material conveyor belt; 15-crane; 16-rail; 17-hook; 18-ground conveying Wire.

具体实施方式detailed description

以下结合附图对本发明作进一步详细描述:The present invention is described in further detail below in conjunction with accompanying drawing:

参见图1-图3,本发明一种胶斗的实施例,包括斗体2,斗体2上设置进料口、卸料口及卸料门。斗体2设置在一框架形底座1的中间,框架形底座1的上部设有与空中输送线配合的吊具,在框架形底座1的底部设有与地面输送线18配合的支撑部,进料口2.1设置在斗体2的顶部,卸料口设置在斗体2的底部。Referring to Fig. 1-Fig. 3, an embodiment of a glue hopper of the present invention includes a bucket body 2 on which a material inlet, a material discharge port and a material discharge door are arranged. The bucket body 2 is arranged in the middle of a frame-shaped base 1, the upper part of the frame-shaped base 1 is provided with a hanger that cooperates with the aerial conveying line, and the bottom of the frame-shaped base 1 is provided with a supporting part that cooperates with the ground conveying line 18. The material opening 2.1 is arranged on the top of the bucket body 2, and the discharge opening is arranged on the bottom of the bucket body 2.

具体而言:上述的框架形底座1为方框形,包括4根相互平行且竖直设置的立柱1.3和两根横梁1.2,所述4根立柱1.3上端的连线为矩形,两根横梁1.2相互平行且分别与相邻的两根立柱1.3的上端连接。上述支撑部为两根相互平的矩形管1.4,两根矩形管1.4分别与相邻的两根立柱1.3的下端连接,矩形管1.4与横梁1.2的投影垂直,且两根矩形管1.4的底面位于同一平面上,以保证在地面输送线18(链条输送机或者滚筒输送机)上运行平稳。上述吊具为在框架形底座1上部四个角上横向各设置的1根圆钢1.1,4根所述圆钢1.1相互平行且位于同一平面上,卸料门的底部高于上述矩形管1.4的底部,四个方位的圆钢1.1可实现两个垂直方向的输送。Specifically: the above-mentioned frame-shaped base 1 is a square frame, including 4 parallel and vertically arranged columns 1.3 and two beams 1.2, the connection line of the upper ends of the four columns 1.3 is rectangular, and the two beams 1.2 They are parallel to each other and respectively connected with the upper ends of two adjacent columns 1.3. The above-mentioned supporting parts are two mutually flat rectangular tubes 1.4, and the two rectangular tubes 1.4 are respectively connected to the lower ends of two adjacent columns 1.3, the rectangular tubes 1.4 are perpendicular to the projection of the beam 1.2, and the bottom surfaces of the two rectangular tubes 1.4 on the same plane to ensure smooth operation on the ground conveyor line 18 (chain conveyor or roller conveyor). The above-mentioned hanger is a round steel 1.1 arranged horizontally on the four corners of the upper part of the frame-shaped base 1, and the four round steels 1.1 are parallel to each other and are located on the same plane. The bottom of the discharge door is higher than the above-mentioned rectangular tube 1.4 At the bottom, the round steel 1.1 in four directions can realize the transportation in two vertical directions.

上述斗体2包括四面侧壁形成容纳物料的空腔,在斗体2下部前后两侧各铰接有两块偏心板,偏心板为扇形,同一侧的两块偏心板对称设置,偏心板上端的尖部与斗体2的侧壁铰接。上述卸料门包括第一卸料门3和第二卸料门4,第一卸料门3和第二卸料门4分别与前后对应的两块偏心板的圆弧边连接,第一卸料门与第二卸料门依靠自身重量关闭所述卸料口。第一卸料门3下端前后各设置一条向斜下方延伸出框架形底座1的第一倾斜开启臂3.1,两条所述第一倾斜开启臂3.1的末端连接一根第一滚筒。第二卸料门4下端前后各设置一条向斜下方延伸出框架形底座的第二倾斜开启臂4.1,两条第二倾斜开启臂4.1的末端连接一根第二滚筒4.2。The above-mentioned bucket body 2 includes four side walls to form a cavity for containing materials. Two eccentric plates are hinged on the front and rear sides of the lower part of the bucket body 2. The eccentric plates are fan-shaped, and the two eccentric plates on the same side are arranged symmetrically. The tip is hinged with the side wall of the bucket body 2 . The above-mentioned discharge door includes a first discharge door 3 and a second discharge door 4, the first discharge door 3 and the second discharge door 4 are respectively connected with the arc edges of the two corresponding front and rear eccentric plates, and the first discharge door The material door and the second discharge door rely on their own weight to close the discharge port. The lower end of the first discharge door 3 is respectively provided with a first inclined opening arm 3.1 extending from the frame-shaped base 1 obliquely downward, and the ends of the two first inclined opening arms 3.1 are connected to a first roller. The lower end of the second discharge door 4 is respectively provided with a second inclined opening arm 4.1 extending out of the frame-shaped base obliquely downward, and the ends of the two second inclined opening arms 4.1 are connected to a second drum 4.2.

上述斗体2与框架形底座1焊接为一体,斗体2的上沿与框架形底座2的顶部基本平齐,上述立柱1.3之间过横向连杆连接。The above-mentioned bucket body 2 is welded together with the frame-shaped base 1, the upper edge of the bucket body 2 is basically flush with the top of the frame-shaped base 2, and the above-mentioned upright columns 1.3 are connected by transverse connecting rods.

参见图4-图7,本发明一种胶斗装卸输送系统的实施例,包括吊轨16、吊钩15、吊斗、卸料机构及地面输送线18,吊斗采用上述实施例的胶斗2。如图6、图7所示,上述吊钩15包括方形顶框,所述方形顶框有两条平行边底部各设置一条支撑托杆,两条托杆相互平行并设置在同一平面内,两条托杆分别通过竖直连接杆与方形顶框连接,两条托杆与上述胶斗的吊具匹配,上述卸料机构设置在所述吊轨16或/和地面输送线18经过的位置。Referring to Fig. 4-Fig. 7, an embodiment of a rubber bucket loading and unloading conveying system of the present invention includes a hanging rail 16, a hook 15, a hanging bucket, a discharge mechanism and a ground conveying line 18, and the hanging bucket adopts the rubber bucket of the above-mentioned embodiment 2. As shown in Fig. 6 and Fig. 7, the above-mentioned suspension hook 15 includes a square top frame, and the bottom of the square top frame has two parallel sides and a supporting support rod is respectively arranged, and the two support rods are parallel to each other and arranged in the same plane. The support rods are respectively connected to the square top frame through vertical connecting rods, and the two support rods are matched with the spreader of the above-mentioned rubber bucket. The above-mentioned unloading mechanism is arranged at the position where the suspension rail 16 or/and the ground conveying line 18 passes.

如图4所示,卸料机构包括对称竖直设置的两个框架5,每一个框架5中均设置电机10、升降架组件6、导轨7、主动链轮和从动链轮8及链条9,电机10设置在框架5内底部,电机10的传动轴连接主动链轮,框架5内顶部设置从动链轮8,链条9连接主动链轮与从动链轮8,导轨7竖向设置在框架1内的中部,升降架组件6与链条9连接,升降架组件6沿导轨7上下往复运动,升降架组件6中包括向中间延伸出框架5的升降臂13。As shown in Figure 4, the unloading mechanism includes two frames 5 symmetrically arranged vertically, and a motor 10, a lifting frame assembly 6, a guide rail 7, a driving sprocket, a driven sprocket 8 and a chain 9 are all arranged in each frame 5 , the motor 10 is arranged at the bottom of the frame 5, the drive shaft of the motor 10 is connected to the driving sprocket, the driven sprocket 8 is arranged at the top of the frame 5, the chain 9 is connected to the driving sprocket and the driven sprocket 8, and the guide rail 7 is vertically arranged on the In the middle of the frame 1 , the lifting frame assembly 6 is connected with the chain 9 , and the lifting frame assembly 6 reciprocates up and down along the guide rail 7 . The lifting frame assembly 6 includes a lifting arm 13 extending out of the frame 5 in the middle.

在上述两框架5顶部水平设置防尘盖板11,防尘盖板11通过螺栓固定在两框架5上,每一框架5内的上部设置护网12。上述地面输送线18为链条输送机或者滚筒输送机。A dustproof cover 11 is horizontally arranged on the tops of the above two frames 5, and the dustproof cover 11 is fixed on the two frames 5 by bolts, and a guard net 12 is arranged on the top of each frame 5. The above-mentioned ground conveying line 18 is a chain conveyor or a roller conveyor.

如图5所示,当上述胶斗运动到卸料工位时,防尘盖板11正好位于胶斗进料口上方,两者之间留有一定间隙,升降架组件6由电机10驱动,通过链条9带动,沿着导轨7移动,升降架组件6中的升降臂,与第一倾斜开启臂3.1上的第一滚筒及第二倾斜开启臂4.1上的第二滚筒4.1配合,将第一卸料门3和第二卸料门4向上打开,使物料下落到下方的物料输送带14上,完成卸料动作。物料落下时会产生一定的负压,使得防尘盖板11紧贴于胶斗进料口2.1上方,有效防止粉尘。As shown in Figure 5, when the above-mentioned rubber hopper moves to the unloading station, the dust-proof cover 11 is just above the feed port of the rubber hopper, with a certain gap between the two, and the lifting frame assembly 6 is driven by the motor 10, Driven by the chain 9 and moving along the guide rail 7, the lifting arm in the lifting frame assembly 6 cooperates with the first roller 4.1 on the first inclined opening arm 3.1 and the second roller 4.1 on the second inclined opening arm 4.1. The discharge door 3 and the second discharge door 4 are opened upwards, so that the material falls onto the material conveyor belt 14 below to complete the discharge action. When the material falls, a certain negative pressure will be generated, so that the dust-proof cover 11 is closely attached to the top of the feed port 2.1 of the rubber hopper, effectively preventing dust.

本发明一种胶斗装卸输送系统中的胶斗可以适应两种运输方式:一种是当控制系统发出加料指令,地面输送线18上的胶斗被输送到加料位置,完成加料后,如图6所示,胶斗在指定工位被空中输送线中的吊钩17吊起,由吊车15沿吊轨16吊走,并把胶斗输送到指定的卸料工位上,如图5所示,通过卸料机构将胶斗里的物料卸下。另一种是当控制系统发出加料指令,地面输送线18上的胶斗被输送到加料位置,完成加料后,胶斗由地面输送线18运输到指定的卸料工位上,如图5所示,通过卸料机构将胶斗里的物料卸下。物料卸下后,胶斗的第一卸料门3及第二卸料门4通过自重闭合,这样,加入物料时第一卸料门3及第二卸料门4关闭卸料口更加严密。The rubber hopper in the rubber hopper loading and unloading conveying system of the present invention can be adapted to two transportation modes: one is that when the control system issues a feeding command, the rubber hopper on the ground conveying line 18 is transported to the feeding position, and after the feeding is completed, as shown in the figure As shown in 6, the rubber bucket is hoisted by the hook 17 in the aerial conveying line at the designated station, hoisted away by the crane 15 along the suspension rail 16, and transports the rubber bucket to the designated unloading station, as shown in Figure 5 According to the display, the material in the glue hopper is unloaded through the unloading mechanism. The other is that when the control system issues a feeding command, the rubber hopper on the ground conveying line 18 is transported to the feeding position. After the feeding is completed, the rubber hopper is transported by the ground conveying line 18 to the designated unloading station, as shown in Figure 5 According to the display, the material in the glue hopper is unloaded through the unloading mechanism. After the material is unloaded, the first discharge door 3 and the second discharge door 4 of the rubber hopper are closed by their own weight, so that when adding materials, the first discharge door 3 and the second discharge door 4 close the discharge port more tightly.

当然,本发明胶斗装卸输送系统中的胶斗也可以采用上述两种运输方式交替或接力输送。Of course, the rubber hoppers in the rubber hopper loading and unloading conveying system of the present invention can also be transported alternately or relayed by the above two transportation methods.

当然,上述说明并非是对本发明的限制,本发明也并不限于上述举例,本技术领域的普通技术人员,在本发明的实质范围内,所作出的变化、改型、添加或替换,也应属于本发明的保护范围。Of course, the above description is not a limitation to the present invention, and the present invention is not limited to the above-mentioned examples. Those of ordinary skill in the art, within the scope of the present invention, the changes, modifications, additions or replacements made should also be Belong to the protection scope of the present invention.

Claims (10)

1. a kind of glue bucket, including bucket body, sets charging aperture, discharge port and Dump gate, it is characterised in that described bucket body on bucket body It is arranged in the middle of a framework shape base, the top of the framework shape base is provided with the suspender coordinated with aerial conveying line, the frame The bottom of frame shape base is provided with the supporting part coordinated with ground transport line, and the charging aperture is arranged on the bucket body top, described Discharge port is arranged on the bucket body bottom.
2. according to the glue bucket described in claim 1, it is characterised in that described framework shape base be square frame-shaped, including 4 mutually Column and two crossbeams parallel and be vertically arranged, the line of the 4 root post upper end is rectangle, and two crossbeams are mutually put down Row and connect with the upper end of two adjacent columns respectively, the supporting part is two mutually flat rectangular tubes, two squares Shape pipe is connected with the lower end of two adjacent columns respectively, and the bottom surface of two rectangular tubes is in the same plane, Described rectangular tube is vertical with the projection of the crossbeam, and the suspender is laterally respectively to be set on described four angles in framework shape base top 1 round steel put, 4 round steel are parallel to each other and in the same plane, and the bottom of the Dump gate is higher than the support The bottom in portion.
3. according to the glue bucket described in claim 1 or 2, it is characterised in that the bucket body includes that four surface side walls are formed and accommodates material Cavity, both sides are respectively hinged with two pieces of eccentric disks before and after the bucket body bottom, and the Dump gate includes the first Dump gate and second Dump gate, first Dump gate and the second Dump gate are connected with front and rear corresponding two pieces of eccentric disks respectively, the first discharging Door, by the own wt closing discharge port, sets two and oliquely downward prolongs with the second Dump gate before and after the first Dump gate lower end The first inclination opening arms of framework shape base are stretched out, two described first ends for inclining opening arms connect first roller; Second Dump gate lower end sets two the second inclination opening arms for oliquely downward extending framework shape base, and two second inclinations are opened Open arm end and connect a second tin roller.
4. according to the glue bucket described in claim 1 or 2, it is characterised in that described bucket body is with the framework shape tube chamber welds with base Integrally, the upper edge of the bucket body is substantially flush with the framework shape base top, is connected by transverse link between the column.
5. according to the glue bucket described in claim 3, it is characterised in that described bucket body is one with the framework shape tube chamber welds with base Body, the upper edge of the bucket body is substantially flush with the framework shape base top, is connected by transverse link between the column.
6. a kind of glue bucket handling induction system, including hanger rail, suspension hook, suspension bucket, shedding mechanism and ground transport line, its feature exist In the suspension bucket is the glue bucket described in claim any one of 1-5, and the suspension hook includes square top frame, and the square top frame has Two parallel edges bottom respectively sets a support pressure pin, and two pressure pins are parallel to each other and set in the same plane, two pressure pins It is connected with square top frame by vertical connecting rod respectively, two pressure pins are matched with the suspender of the glue bucket, and the shedding mechanism sets Put the position passed through in the hanger rail or/and ground transport line.
7. according to the glue bucket handling induction system described in claim 6, it is characterised in that the shedding mechanism includes symmetrical vertical Two frameworks for setting, are respectively provided with motor, crane component, guide rail, drive sprocket and driven sprocket and chain in each framework Bar, the motor is arranged on the framework inner bottom part, and the motor transmission shaft connects drive sprocket, and the framework inner top is set The driven sprocket, the chain connects the drive sprocket and driven sprocket, and the guide rail is vertically provided in the framework Middle part, the crane component is connected with the chain, and is pumped along the guide rail, in the crane component Lifting arm including extending from the framework to centre;Lifting arm on framework described in two is inclined with described first respectively when rising The first roller in opening arms and the described second second tin roller inclined in opening arms coordinate, and are lifted up the first Dump gate and the Two Dump gates.
8. according to the glue bucket handling induction system described in claim 6 or 7, it is characterised in that the ground transport line is chain Conveyer or roller conveyor, the framework are welded by rectangular tube, and the base of frame is provided with pin cup, can adjust up and down Unloader is highly;The motor is furnished with frequency converter, is capable of achieving electrodeless variable-speed.
9. according to the glue bucket handling induction system described in claim 6 or 7, it is characterised in that frame roof level sets described in two Dust cover is put, dust cover is bolted on framework described in two, the top in each framework sets protecting wire net.
10. according to the glue bucket handling induction system described in claim 8, it is characterised in that frame roof described in two is horizontally disposed with Dust cover, dust cover is bolted on framework described in two, and the top in each framework sets protecting wire net.
CN201611015294.0A 2016-11-18 2016-11-18 A kind of glue bucket and glue bucket handling induction system Active CN106697642B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611015294.0A CN106697642B (en) 2016-11-18 2016-11-18 A kind of glue bucket and glue bucket handling induction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611015294.0A CN106697642B (en) 2016-11-18 2016-11-18 A kind of glue bucket and glue bucket handling induction system

Publications (2)

Publication Number Publication Date
CN106697642A true CN106697642A (en) 2017-05-24
CN106697642B CN106697642B (en) 2019-02-01

Family

ID=58940639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611015294.0A Active CN106697642B (en) 2016-11-18 2016-11-18 A kind of glue bucket and glue bucket handling induction system

Country Status (1)

Country Link
CN (1) CN106697642B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107444798A (en) * 2017-07-21 2017-12-08 上海宝尼化工机械有限公司 A kind of powder valve
CN108313674A (en) * 2018-01-08 2018-07-24 金玛(通辽)硼材料有限公司 A kind of boron carbide rapid loading device
CN109516114A (en) * 2018-12-28 2019-03-26 湖南恒凯环保科技投资有限公司 A kind of mobile conveying sludge hopper
CN113955517A (en) * 2021-11-17 2022-01-21 九江萍钢钢铁有限公司 Jaw type self-discharging hopper

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86204871U (en) * 1986-07-03 1987-08-26 高坑煤矿 Hoisting type track replacing machine used on narrow-gauge railway transport facilities
JP2002255089A (en) * 2001-03-02 2002-09-11 Sumitomo Heavy Ind Ltd Loading and unloading equipment in bulk-goods loading ship
CN102897481A (en) * 2012-09-27 2013-01-30 北京万向新元科技股份有限公司 Swinging hopper and method of using swinging hopper to transport materials
CN203004005U (en) * 2012-12-05 2013-06-19 周志林 Saw frame lifting structure applied to horizontal type gantry band saw
CN203095520U (en) * 2012-12-18 2013-07-31 杨端禄 Guide rail type hydraulic lifting platform
CN105217230A (en) * 2015-11-04 2016-01-06 长沙开元仪器股份有限公司 Jacking system
CN206901046U (en) * 2016-11-18 2018-01-19 青岛软控机电工程有限公司 A kind of glue bucket and glue bucket handling induction system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86204871U (en) * 1986-07-03 1987-08-26 高坑煤矿 Hoisting type track replacing machine used on narrow-gauge railway transport facilities
JP2002255089A (en) * 2001-03-02 2002-09-11 Sumitomo Heavy Ind Ltd Loading and unloading equipment in bulk-goods loading ship
CN102897481A (en) * 2012-09-27 2013-01-30 北京万向新元科技股份有限公司 Swinging hopper and method of using swinging hopper to transport materials
CN203004005U (en) * 2012-12-05 2013-06-19 周志林 Saw frame lifting structure applied to horizontal type gantry band saw
CN203095520U (en) * 2012-12-18 2013-07-31 杨端禄 Guide rail type hydraulic lifting platform
CN105217230A (en) * 2015-11-04 2016-01-06 长沙开元仪器股份有限公司 Jacking system
CN206901046U (en) * 2016-11-18 2018-01-19 青岛软控机电工程有限公司 A kind of glue bucket and glue bucket handling induction system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107444798A (en) * 2017-07-21 2017-12-08 上海宝尼化工机械有限公司 A kind of powder valve
CN108313674A (en) * 2018-01-08 2018-07-24 金玛(通辽)硼材料有限公司 A kind of boron carbide rapid loading device
CN108313674B (en) * 2018-01-08 2024-06-07 通辽中硼新材料科技有限公司 Quick feeder of boron carbide
CN109516114A (en) * 2018-12-28 2019-03-26 湖南恒凯环保科技投资有限公司 A kind of mobile conveying sludge hopper
CN113955517A (en) * 2021-11-17 2022-01-21 九江萍钢钢铁有限公司 Jaw type self-discharging hopper

Also Published As

Publication number Publication date
CN106697642B (en) 2019-02-01

Similar Documents

Publication Publication Date Title
CN106697642A (en) Plastic bucket and plastic bucket feeding, discharging and conveying system
CN205346399U (en) Portable bag package, dual -purpose shipment of bulk cargo machine
CN206901046U (en) A kind of glue bucket and glue bucket handling induction system
CN208979927U (en) A kind of loading and unloading equipment for transportation
CN216511021U (en) Bucket supporting device of bucket chain conveyor
CN209758259U (en) Automatic elevator for processing rubber band
CN200988688Y (en) Belt conveyor
CN107585598A (en) A kind of online loading machine
CN209796674U (en) Belt conveyor
CN206537898U (en) The handling equipment of horizontal oxidation line
CN216188314U (en) Bidirectional conveyor
CN217481325U (en) Module combination formula dust collector convenient to remove and quick assembly disassembly
CN216072177U (en) Large-traffic continuous vertical lifting equipment and system
CN216189259U (en) Negative electrode material's transportation partial shipment vibrating device
CN214087509U (en) Vertical elevator with self-turning function
CN210854029U (en) Conveyor with adjustable lift
CN213737400U (en) Frozen food material feeding unit
CN208932439U (en) A kind of corner conveying device of changeable transport model
CN211640640U (en) Frame-type rostone mould conveyer
CN209337448U (en) A kind of achievable material bag lifting and the unpowered device drawn off
CN115432391A (en) Special cantilever rubber belt conveyor
CN214691817U (en) Lifting two-way conveyor
CN221739634U (en) An elevated logistics goods lifting machine structure
CN207030178U (en) A kind of c-type high dip angle belt-pressured conveyer
CN116062413B (en) Ton bag material feeding device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant