CN106682804A - Gas pipe network planning auxiliary decision-making system - Google Patents

Gas pipe network planning auxiliary decision-making system Download PDF

Info

Publication number
CN106682804A
CN106682804A CN201510760868.6A CN201510760868A CN106682804A CN 106682804 A CN106682804 A CN 106682804A CN 201510760868 A CN201510760868 A CN 201510760868A CN 106682804 A CN106682804 A CN 106682804A
Authority
CN
China
Prior art keywords
planning
submodule
management
pipe network
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510760868.6A
Other languages
Chinese (zh)
Inventor
冯军
韩金丽
曹育军
刘燕
雷岩
李持佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Gas Group Co Ltd
Original Assignee
Beijing Gas Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Gas Group Co Ltd filed Critical Beijing Gas Group Co Ltd
Priority to CN201510760868.6A priority Critical patent/CN106682804A/en
Publication of CN106682804A publication Critical patent/CN106682804A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses a gas pipe network planning auxiliary decision-making system, and the system comprises an external system application interface module, a basic data management module, a plan design module, and a plan issuing module. The external system application interface module is used for connecting an external system, achieving the data interaction of an auxiliary decision-making system and the external system, and enables the format of interaction data to be converted into a format which can be recognized by the auxiliary decision-making system and the external system. The basic data management module stores and maintains a pipe network model and pipe network load data, and builds the correlation between a current situation pipe network model and current situation current situation pipe network load data. The plan design module is used for obtaining a planning task, drawing a pipe network planning map, carrying out the simulation, evaluating the planning task according to a simulation result of a simulation calculation submodule, and selecting a qualified planning task. A plan issuing management submodule of the plan issuing module selects an issuable planning task from the qualified planning tasks selected form a design management submodule for issuing.

Description

A kind of gas ductwork plans aid decision-making system
Technical field
The invention belongs to data management decision-making technic field, is specifically designed a kind of gas ductwork planning aid decision System.
Background technology
Planning is the starting point of gas enterprise business, pipe network aid decision-making system as planning it is information-based, Standardization, scientific support system, on the one hand, for planning and designing organization and management offer basis can Workflow depending on changing interface, standard, on the other hand, the demonstration and plan for capital construction demand provides science Decision-making foundation.
Planning and designing personnel are connected to after planning tasks, first have to collect basic data.Basic data one is to wrap Include present situation external channeling and trend, i.e. pipe network topological diagram.Pipe network topological diagram will not only include pipe network physical location, And to include its natural quality such as information such as maximum pressure level system, caliber, tubing.To be collected for second Basic data is pipe network information on load, maximum pipe network information on load is important to notice that in planning and designing, i.e., Load peak.On the one hand information on load carries out Theoretical Calculation and gets by pipe network topological diagram, on the other hand passes through The information such as terminal temperature difference quantity, type, consumption history by using steam application rule calculate come.
Basic data collect it is complete after, planning and designing personnel by graphics software, with the pipe in basic data Graphic plotting is carried out based on net topology figure.Different pattern lines represents different pipe network types.When completing After graphic plotting, graphical content is exported as into simulation software professional format through professional means.It is soft using emulating Part, is iterated calculating after design of pipe networks topology information and information on load are overlapped, planned with secondary checking Whether design meets requirement, changes recalculated after pipe network blue print if necessary.
In real work, planning and designing difficulty is got over the continuous expansion of gas ductwork scale and number of users Come bigger.While gas ductwork operation level is improved constantly with society to the raising of safety management level, So as to requirement of the opposite direction to planning and designing and engineering construction also more and more higher.
The content of the invention
In view of this, the invention provides a kind of gas ductwork planning aid decision-making system, can be planned Design, planning are issued, and carry out aid decision to gas ductwork planning.
In order to achieve the above object, the technical scheme is that:Including external system AIM, Basic data management module, planning and designing module and planning release module.
External system AIM is used to connect external system, realizes aid decision-making system and external system Data interaction, be the form that aid decision-making system and external system are recognized by the format conversion of interaction data; External system includes:GIS-Geographic Information System, Subscriber Management System, work condition inspection system, project management system, User's development system.
Basic data management module includes model management submodule and load management submodule.
Pipe net leakage rate is stored and safeguarded in model management submodule, and pipe net leakage rate is obtained by GIS-Geographic Information System.
Pipe network load data is stored and safeguarded in load management submodule, and sets up present situation pipe net leakage rate and present situation Association between pipe network load data.
Planning and designing module includes design management submodule, design drawing submodule and simulation calculation submodule.
Design management submodule is used to obtain planning tasks, planning tasks is sent to design drawing submodule and is drawn Pipe network planning chart, and planning tasks are evaluated according to the simulation result of simulation calculation submodule, select conjunction The planning tasks of lattice;Planning tasks include blue print, design content and technical-economic index table.
Design drawing submodule is used for according to the planning tasks in design management submodule, from model management submodule Middle selection pipe net leakage rate, and related pipe network load data is extracted from load management submodule, draw pipe network rule Figure is drawn, and pipe network planning chart is committed to into simulation calculation submodule.
Simulation calculation submodule according to the network topology in pipe network planning chart and actual user with gas position and Rule, by the actual gas ductwork operational management situation of simulation, by detection gas conflict, superpressure, mistake Pressure phenomenon finds out the supply weak link of the pipe network that pipe network planning chart is planned, will supply weak link as imitative True result is sent to design management submodule.
Planning release module includes that planning release management submodule, planning information are issued submodule and planned auxiliary Help decision-making submodule.
Choosing in the qualified planning tasks that planning release management submodule is selected from design management submodule can With the planning tasks issued, send to planning information and issue submodule, issued.
Beneficial effect:
The system can collect basic data, carry out planning and designing, plans that issue concentrates on a system Carry out, and aid decision is carried out to gas ductwork planning such that it is able to obtain a suitable programme simultaneously Issued.
Description of the drawings
Fig. 1 is the system Organization Chart.
Specific embodiment
Develop simultaneously below in conjunction with the accompanying drawings embodiment, describes the present invention.
A kind of gas ductwork plans aid decision-making system, including external system AIM, basic data Management module, planning and designing module and planning release module.
External system AIM is used to connect external system, realizes aid decision-making system and external system Data interaction, be the form that aid decision-making system and external system are recognized by the format conversion of interaction data; External system includes:GIS-Geographic Information System, Subscriber Management System, work condition inspection system, project management system, User's development system.
Basic data management module includes model management submodule and load management submodule.
Pipe net leakage rate is stored and safeguarded in model management submodule, and pipe net leakage rate is obtained by GIS-Geographic Information System.
Pipe network load data is stored and safeguarded in load management submodule, and sets up present situation pipe net leakage rate and present situation Association between pipe network load data.
Planning and designing module includes design management submodule, design drawing submodule and simulation calculation submodule.
Design management submodule is used to obtain planning tasks, planning tasks is sent to design drawing submodule and is drawn Pipe network planning chart, and planning tasks are evaluated according to the simulation result of simulation calculation submodule, select conjunction The planning tasks of lattice;Planning tasks include blue print, design content and technical-economic index table.
Design drawing submodule is used for according to the planning tasks in design management submodule, from model management submodule Middle selection pipe net leakage rate, and related pipe network load data is extracted from load management submodule, draw pipe network rule Figure is drawn, and pipe network planning chart is committed to into simulation calculation submodule.
Simulation calculation submodule according to the network topology in pipe network planning chart and actual user with gas position and Rule, by the actual gas ductwork operational management situation of simulation, by detection gas conflict, superpressure, mistake Pressure phenomenon finds out the supply weak link of the pipe network that pipe network planning chart is planned, will supply weak link as imitative True result is sent to design management submodule.
Planning release module includes that planning release management submodule, planning information are issued submodule and planned auxiliary Help decision-making submodule.
Choosing in the qualified planning tasks that planning release management submodule is selected from design management submodule can With the planning tasks issued, send to planning information and issue submodule, issued.
To sum up, presently preferred embodiments of the present invention is these are only, is not intended to limit the protection model of the present invention Enclose.All any modification, equivalent substitution and improvements within the spirit and principles in the present invention, made etc., Should include within protection scope of the present invention.

Claims (1)

1. a kind of gas ductwork plans aid decision-making system, it is characterised in that including external system application interface Module, basic data management module, planning and designing module and planning release module
The external system AIM be used for connect external system, realize the aid decision-making system with The data interaction of external system, is that aid decision-making system and external system are recognized by the format conversion of interaction data Form;The external system includes:GIS-Geographic Information System, Subscriber Management System, work condition inspection system, Project management system, user's development system;
The basic data management module includes model management submodule and load management submodule;
Pipe net leakage rate is stored and safeguarded in the model management submodule, and the pipe net leakage rate is by geography information system Obtain in system;
Store and safeguard pipe network load data in the load management submodule, and set up present situation pipe net leakage rate with Association between present situation pipe network load data;
The planning and designing module includes design management submodule, design drawing submodule and simulation calculation submodule Block;
The design management submodule is used to obtain planning tasks, and planning tasks are sent to design drawing submodule Pipe network planning chart is drawn, and the simulation result according to the simulation calculation submodule is evaluated planning tasks, Select qualified planning tasks;Planning tasks include blue print, design content and technical-economic index table;
The design drawing submodule is used for according to the planning tasks in the design management submodule, from the mould Pipe net leakage rate is chosen in type management submodule, and related pipe network load data is extracted from load management submodule, Pipe network planning chart is drawn, and pipe network planning chart is committed to into the simulation calculation submodule;
The simulation calculation submodule uses gas position according to the network topology in pipe network planning chart and actual user Put and rule, by the actual gas ductwork operational management situation of simulation, by detection gas conflict, superpressure, Decompression phenomenon finds out the supply weak link of the pipe network that the pipe network planning chart is planned, will supply weak link The design management submodule is sent to as simulation result;
The planning release module includes that planning release management submodule, planning information issue submodule and rule Draw aid decision submodule;
The qualified planning tasks that the planning release management submodule is selected from the design management submodule The planning tasks that middle selection can be issued, send to the planning information and issue submodule, are issued.
CN201510760868.6A 2015-11-10 2015-11-10 Gas pipe network planning auxiliary decision-making system Pending CN106682804A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510760868.6A CN106682804A (en) 2015-11-10 2015-11-10 Gas pipe network planning auxiliary decision-making system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510760868.6A CN106682804A (en) 2015-11-10 2015-11-10 Gas pipe network planning auxiliary decision-making system

Publications (1)

Publication Number Publication Date
CN106682804A true CN106682804A (en) 2017-05-17

Family

ID=58863635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510760868.6A Pending CN106682804A (en) 2015-11-10 2015-11-10 Gas pipe network planning auxiliary decision-making system

Country Status (1)

Country Link
CN (1) CN106682804A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102890792A (en) * 2011-07-20 2013-01-23 北京源汇远科技有限公司 Municipal drainage pipe network decision evaluation method
CN104156827A (en) * 2014-08-15 2014-11-19 国家电网公司 Technical collaboration and dynamic intelligent management system for power planning
CN105574652A (en) * 2015-12-10 2016-05-11 国网山东省电力公司经济技术研究院 Planning big data management and control system of smart power distribution network and method
CN110210697A (en) * 2018-11-21 2019-09-06 北京域天科技有限公司 A kind of emergency communication intelligent emergent DSS

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102890792A (en) * 2011-07-20 2013-01-23 北京源汇远科技有限公司 Municipal drainage pipe network decision evaluation method
CN104156827A (en) * 2014-08-15 2014-11-19 国家电网公司 Technical collaboration and dynamic intelligent management system for power planning
CN105574652A (en) * 2015-12-10 2016-05-11 国网山东省电力公司经济技术研究院 Planning big data management and control system of smart power distribution network and method
CN110210697A (en) * 2018-11-21 2019-09-06 北京域天科技有限公司 A kind of emergency communication intelligent emergent DSS

Similar Documents

Publication Publication Date Title
Zuo et al. Green building evaluation from a life-cycle perspective in Australia: A critical review
Medjroubi et al. Open data in power grid modelling: new approaches towards transparent grid models
US9679038B2 (en) Systems and methods for construction field management and operations with building information modeling
Vugrin et al. Optimal recovery sequencing for enhanced resilience and service restoration in transportation networks
Yang et al. Building integrated photovoltaics (BIPV): Costs, benefits, risks, barriers and improvement strategy
Conte et al. Beyond the buildingcentric approach: A vision for an integrated evaluation of sustainable buildings
CN105005659B (en) cable laying method and system
Dehghan et al. Multi-objective robust transmission expansion planning using information-gap decision theory and augmented ɛ-constraint method
Wu et al. The impact of urbanization policy on land use change: A scenario analysis
CN101877015B (en) The three-dimensional labeling method of part processing
CN104504497B (en) BIM engineering information management system and method
CN102495868B (en) Method for realizing graphic monitoring of electric energy collection and monitoring system
CN102411765B (en) Three-dimensional power grid construction method and device
Li et al. Smart manufacturing standardization: Architectures, reference models and standards framework
You et al. A survey on next-generation power grid data architecture
Unsihuay-Vila et al. Multistage expansion planning of generation and interconnections with sustainable energy development criteria: A multiobjective model
CN105224747B (en) Urban waterlogging model building method based on CAD engineering drawings information and design of pipe networks computational chart
CN103970887B (en) A kind of information flow display system and method based on GIS power distribution network figures
CN105912651B (en) Data interactive method and corresponding Web-BIM engineering information integrated management system based on IFC
CN104598671B (en) A kind of digital electric network construction method based on online data
Agugiaro Energy planning tools and CityGML-based 3D virtual city models: experiences from Trento (Italy)
CN103995837A (en) Personalized tourist track planning method based on group footprints
Damci et al. Resource leveling in line‐of‐balance scheduling
CN102622463B (en) Drawing-model uniformity based method for automatic check of design drawings
CN101483342A (en) Geographical information system used for electric system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170517