CN106677702B - A kind of construction of hydro project drilling machine - Google Patents

A kind of construction of hydro project drilling machine Download PDF

Info

Publication number
CN106677702B
CN106677702B CN201710121422.8A CN201710121422A CN106677702B CN 106677702 B CN106677702 B CN 106677702B CN 201710121422 A CN201710121422 A CN 201710121422A CN 106677702 B CN106677702 B CN 106677702B
Authority
CN
China
Prior art keywords
filter box
lifting
drilling
arm
pressing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710121422.8A
Other languages
Chinese (zh)
Other versions
CN106677702A (en
Inventor
雷俊霆
廖鸿景
徐晓凤
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuzhong, Suzhou City Technology Park Management Co., Ltd
Original Assignee
Guangdong Hongyi Construction Technology Development Co Ltd
Shenzhen Jing Fang Ying Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Hongyi Construction Technology Development Co Ltd, Shenzhen Jing Fang Ying Technology Co Ltd filed Critical Guangdong Hongyi Construction Technology Development Co Ltd
Priority to CN201710121422.8A priority Critical patent/CN106677702B/en
Publication of CN106677702A publication Critical patent/CN106677702A/en
Application granted granted Critical
Publication of CN106677702B publication Critical patent/CN106677702B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterized by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/01Arrangements for handling drilling fluids or cuttings outside the borehole, e.g. mud boxes
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/06Arrangements for treating drilling fluids outside the borehole
    • E21B21/063Arrangements for treating drilling fluids outside the borehole by separating components
    • E21B21/065Separating solids from drilling fluids
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B3/00Rotary drilling
    • E21B3/02Surface drives for rotary drilling

Abstract

The invention discloses a kind of construction of hydro project drilling machines, including pedestal, filtered water tank is equipped on the left of pedestal upper end, suction hose is equipped in the middle part of filtered water tank, suction hose upper end is connected with pulsating pump, pulsating pump upper end is connected with aqueduct, No.1 hydraulic cylinder is equipped in the middle part of filtered water tank right end, pressing filter box is equipped on the right side of pedestal upper end, pressing plate is equipped with inside pressing filter box upper end, pressing filter box bottom inner portion is equipped with filter plate, filter plate lower end is equipped with spray head, spray head lower end is connected with distributive pipe, it is equipped on the left of pressing filter box upper end and draws dredge pump, draw dredge pump upper end and is connected with mud guide pipe, No.1 lifting arm is equipped in the middle part of pressing filter box right end, No.1 lifting arm upper end is connected with lifting large arm, lifting large arm upper end is connected with No. two lifting arms, lifting large arm and No. two lifting arm right ends are connected with drilling pipe.The present invention realizes drilling of the drilling rod on harder soil, increases water conservancy construction drilling well working efficiency, while also achieving the efficient water-removing recycling to soil is generated in boring procedure, practical.

Description

A kind of construction of hydro project drilling machine
Technical field
The present invention relates to hydraulic engineering technical field, specifically a kind of construction of hydro project drilling machine.
Background technique
Engineering driller is one of drilling machine classification and extension, as its name suggests, engineering driller be for skyscraper, harbour, The drilling machine of the large-diameter bored pile construction of the engineerings such as harbour, dam, electric power, bridge.
Engineering driller classification: impact drill makes drill bit impact shaft bottom with kata-rocks by the up-and-down movement of drilling tool Layer.Its structure is simple, does not have circulation well cleanup system, removing and the drilling machine of landwaste cannot carry out simultaneously, thus effect is lower.Revolution Churn, the pore-forming by the rotary motion broken rock of drilling tool.Combinationdrill has 2 kinds: one is will impact to make with revolution With the water drilling rig for being combined together drilling, such as Pneumatic down-hole hammer.Down-hole hammer drilling tool is made of cylinder sleeve and piston etc..By sky Air compressor provides pressure-air and piston is pushed to pump, and drill hammer is to enhance the ability that drill bit creeps into rock stratum.Separately One is beater mechanism is added on the basis of turntable rotary drill, based on rotary drilling, rushed when encountering boulder bed The dual-purpose water drilling rig for hitting drilling, to the adaptable of various stratum.
Chinese patent (Authorization Notice No.: CN205936394U) discloses a kind of water conservancy construction drilling machine, including car body, Auger stem, although the device realizes the drilling well needs to water conservancy construction to a certain extent, in actual use process In only by auger stem realize drill, efficiency is still low, is unable to satisfy the drilling well needs of harder soil, the practicability is poor.
Summary of the invention
The purpose of the present invention is to provide a kind of construction of hydro project drilling machines, to solve to propose in above-mentioned background technique The problem of.
To achieve the above object, the invention provides the following technical scheme:
A kind of construction of hydro project drilling machine, including pedestal, pedestal lower end two sides are connected with traveling wheel, on pedestal End left side is equipped with filtered water tank, is equipped with suction hose in the middle part of filtered water tank, suction hose upper end is connected with pulsating pump, and pulsating pump upper end is connected with Aqueduct, the filtered water tank right end middle part are equipped with No.1 hydraulic cylinder, and No.1 hydraulic cylinder right end is connected with hydraulic axis, hydraulic axis right end It is connected with push plate, pressing filter box is equipped on the right side of the pedestal upper end, is equipped with pressing plate inside pressing filter box upper end, pressing plate upper end is connected with two Number hydraulic cylinder, the pressing filter box bottom inner portion are equipped with filter plate, and filter plate lower end is equipped with spray head, and spray head lower end is connected with distributive pipe, institute It states to be equipped on the left of pressing filter box upper end and draws dredge pump, draw dredge pump upper end and be connected with mud guide pipe, be equipped with No.1 in the middle part of the pressing filter box right end Lifting arm, No.1 lifting arm upper end are connected with lifting large arm, and lifting large arm upper end is connected with No. two lifting arms, the lifting large arm It is connected with drilling pipe with No. two lifting arm right ends, is equipped with drilling rod inside drilling pipe, drilling rod upper end is connected with rotating electric machine.
As a further solution of the present invention: lower end is connected with baffle on the right side of the pressing filter box.
As a further solution of the present invention: soil case is equipped on the right side of the pedestal upper end.
As a further solution of the present invention: described to draw dredge pump pressing filter box is connected with by pipeline.
As a further solution of the present invention: the distributive pipe is connected with pulsating pump.
As further scheme of the invention: the filtered water tank and pressing filter box bottom end are connected with siphunculus.
Compared with prior art, the beneficial effects of the present invention are:
A kind of construction of hydro project drilling machine, it is structurally reasonable, it is novel in design, pass through the filtered water tank being equipped with and water suction Pump realizes drilling of the drilling rod on harder soil, considerably increase water conservancy construction drilling well working efficiency, while by being equipped with Pressing filter box realizes the efficient water-removing recycling to soil is generated in boring procedure, practical.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of construction of hydro project drilling machine.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, in the embodiment of the present invention, a kind of construction of hydro project drilling machine, including pedestal 1, the pedestal 1 Lower end two sides are connected with traveling wheel 25, for driving the traveling of whole device, are equipped with filtered water tank 3, filtered water tank on the left of 1 upper end of pedestal 3 and 18 bottom end of pressing filter box be connected with siphunculus, check valve is additionally provided in the siphunculus, so that the water in pressing filter box 18 may only It is entered in filtered water tank 3 and is recycled by siphunculus, saved water resource, realize recycling for water in filtered water tank 3, clear water Suction hose 2 is equipped in the middle part of case 3,2 upper end of suction hose is connected with pulsating pump 4, and 4 upper end of pulsating pump is connected with aqueduct 8, the diversion 8 right end of pipe is connected with drilling pipe 13, and the rotation for allowing water to follow drilling rod 14 drills, and sets in the middle part of 3 right end of filtered water tank There is No.1 hydraulic cylinder 24,24 right end of No.1 hydraulic cylinder is connected with hydraulic axis 22, and 22 right end of hydraulic axis is connected with push plate 21, to make Push plate 21 is obtained as hydraulic axis 22 moves left and right, and then the soil after filters pressing is pushed in soil case 16, on the pedestal 1 End right side is equipped with pressing filter box 18, and 18 right side lower end of pressing filter box is connected with baffle 17, for realizing soil case 16 and pressing filter box 18 it Between separate, pressing plate 6 is equipped with inside 18 upper end of pressing filter box, to press the soil that dredge pump 5 is drawn into pressing filter box 18 is drawn Filter, 6 upper end of pressing plate are connected with No. two hydraulic cylinders 9, and 18 bottom inner portion of pressing filter box is equipped with filter plate 20, so that containing in soil Some moisture is filtered under the action of filter plate 20, and 20 lower end of filter plate is equipped with spray head 19, and 19 lower end of spray head is connected with distributive pipe 23, distributive pipe 23 is connected with pulsating pump 4, so that the clear water in filtered water tank 3 is sucked out, guides to spray head by the effect of distributive pipe 23 In 19, then filter plate 20 is rinsed, soil plug is avoided to live filter plate 20, increases the functional reliability of filter plate 20, it is described It is equipped on the left of 18 upper end of pressing filter box and draws dredge pump 5, draw dredge pump 5 by pipeline and be connected with pressing filter box 18, draw 5 upper end of dredge pump and be connected with and draw Mud pipe 7,18 right end of the pressing filter box middle part are equipped with No.1 lifting arm 15, and 15 upper end of No.1 lifting arm is connected with lifting large arm 10, Lifting 10 upper end of large arm is connected with No. two lifting arms 11, and the lifting large arm 10 and No. two 11 right ends of lifting arm are connected with drilling pipe 13, the aqueduct 7 and mud guide pipe 7 are respectively connected with drilling pipe 13, provide required water when drilling rod 14 drills, and by drilling rod Generated soil is guided in pressing filter box 18 when 14 drilling, drilling rod 14 is equipped with inside drilling pipe 13,14 upper end of drilling rod is connected with rotation Motor 12, is the powered rotation source of drilling rod 14, and the rotating electric machine 12 is connected with power supply device, 1 upper end of pedestal right side Equipped with soil case 16, generated soil recycle and topples over when for that will drill.
A kind of construction of hydro project drilling machine, in use, by the effect of traveling wheel 25 that whole device is mobile To the place of required drilling, later by the effect of No.1 lifting arm 15, lifting large arm 10 and No. two lifting arms 11 by drilling pipe 13 are moved to the required position to drill, while starting rotating electric machine 12, so that rotating electric machine 12 drives the rotation of drilling rod 14 to realize Water in filtered water tank 3 is passed through aqueduct 8 with dredge pump 5, pulsating pump 4 is drawn by the purpose of drilling, simultaneously, starting pulsating pump 4 Effect is drawn onto drilling pipe 13, and the drilling convenient for drilling rod to harder soil, water and mud are mixed under the action of drilling rod later, is led to The effect of mud guide pipe 7 is crossed, the mixture of these mud and water is flowed under the action of drawing dredge pump 5 in pressing filter box 18, starts two later Number hydraulic cylinder 9, so that No. two hydraulic cylinders 9 make mud and aqueous mixtures carry out filters pressing with dynamic pressure plate 6, water is from the logical of 20 lower end of filter plate Pipe is recovered in filtered water tank 3 and utilizes again, when soil is pressed into bulk, starts No.1 hydraulic cylinder 24, No.1 hydraulic cylinder 24 drives Hydraulic axis 22 is pushed to push plate 21 in soil case 16 blocky soil to recycle, and when filter plate is blocked by 20 soil, leads to The effect for crossing distributive pipe 23 guides the water in filtered water tank 3 into spray head 19, and spray head sprays water and cleans to filter plate 20 later, avoids Filter plate 20 is obstructed with soil, and operation is reliable, and the siphunculus that the water after rinsing passes through filtered water tank 3 again and 18 bottom end of pressing filter box is equipped with Effect recycled.The present invention, it is structurally reasonable, it is novel in design, drilling rod is realized by the filtered water tank 3 and pulsating pump 4 that are equipped with Drilling on harder soil considerably increases water conservancy construction drilling well working efficiency, while the pressing filter box 18 by being equipped with is realized The efficient water-removing that soil is generated in boring procedure is recycled, it is practical.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (4)

1. a kind of construction of hydro project drilling machine, including pedestal (1), which is characterized in that pedestal (1) the lower end two sides connection Have traveling wheel (25), be equipped with filtered water tank (3) on the left of pedestal (1) upper end, is equipped with suction hose (2) in the middle part of filtered water tank (3), suction hose (2) upper end is connected with pulsating pump (4), and pulsating pump (4) upper end is connected with aqueduct (8), is equipped in the middle part of filtered water tank (3) right end No.1 hydraulic cylinder (24), No.1 hydraulic cylinder (24) right end are connected with hydraulic axis (22), and hydraulic axis (22) right end is connected with push plate (21), pressing filter box (18) are equipped on the right side of pedestal (1) upper end, are equipped with pressing plate (6) inside pressing filter box (18) upper end, pressing plate (6) Upper end is connected with No. two hydraulic cylinders (9), and pressing filter box (18) bottom inner portion is equipped with filter plate (20), and filter plate (20) lower end is equipped with spray Head (19), spray head (19) lower end are connected with distributive pipe (23), are equipped on the left of pressing filter box (18) upper end and are drawn dredge pump (5), draw mud Pump (5) upper end is connected with mud guide pipe (7), is equipped with No.1 lifting arm (15) in the middle part of pressing filter box (18) right end, No.1 lifting arm (15) upper end is connected with lifting large arm (10), and lifting large arm (10) upper end is connected with No. two lifting arms (11), the lifting large arm (10) it is connected with drilling pipe (13) with No. two lifting arm (11) right ends, is equipped with drilling rod (14) inside drilling pipe (13), drilling rod (14) upper end It is connected with rotating electric machine (12), lower end is connected with baffle (17) on the right side of the pressing filter box (18), is set on the right side of pedestal (1) upper end There are soil case (16).
2. a kind of construction of hydro project drilling machine according to claim 1, which is characterized in that described draw dredge pump (5) lead to Piping is connected with pressing filter box (18).
3. a kind of construction of hydro project drilling machine according to claim 1, which is characterized in that the distributive pipe (23) is even It is connected to pulsating pump (4).
4. a kind of construction of hydro project drilling machine according to claim 1, which is characterized in that the filtered water tank (3) and Pressing filter box (18) bottom end is connected with siphunculus.
CN201710121422.8A 2017-03-02 2017-03-02 A kind of construction of hydro project drilling machine Active CN106677702B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710121422.8A CN106677702B (en) 2017-03-02 2017-03-02 A kind of construction of hydro project drilling machine

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN201811309794.4A CN109209226A (en) 2017-03-02 2017-03-02 Construction of hydro project drilling machine suitable for the drilling on harder soil
CN201811059484.1A CN109538117A (en) 2017-03-02 2017-03-02 A kind of construction of hydro project drilling machine
CN201710121422.8A CN106677702B (en) 2017-03-02 2017-03-02 A kind of construction of hydro project drilling machine
CN201811334628.XA CN109281611A (en) 2017-03-02 2017-03-02 The construction of hydro project drilling machine of efficient water-removing recycling soil

Related Child Applications (3)

Application Number Title Priority Date Filing Date
CN201811334628.XA Division CN109281611A (en) 2017-03-02 2017-03-02 The construction of hydro project drilling machine of efficient water-removing recycling soil
CN201811309794.4A Division CN109209226A (en) 2017-03-02 2017-03-02 Construction of hydro project drilling machine suitable for the drilling on harder soil
CN201811059484.1A Division CN109538117A (en) 2017-03-02 2017-03-02 A kind of construction of hydro project drilling machine

Publications (2)

Publication Number Publication Date
CN106677702A CN106677702A (en) 2017-05-17
CN106677702B true CN106677702B (en) 2018-12-14

Family

ID=58861541

Family Applications (4)

Application Number Title Priority Date Filing Date
CN201811334628.XA Withdrawn CN109281611A (en) 2017-03-02 2017-03-02 The construction of hydro project drilling machine of efficient water-removing recycling soil
CN201710121422.8A Active CN106677702B (en) 2017-03-02 2017-03-02 A kind of construction of hydro project drilling machine
CN201811309794.4A Withdrawn CN109209226A (en) 2017-03-02 2017-03-02 Construction of hydro project drilling machine suitable for the drilling on harder soil
CN201811059484.1A Pending CN109538117A (en) 2017-03-02 2017-03-02 A kind of construction of hydro project drilling machine

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201811334628.XA Withdrawn CN109281611A (en) 2017-03-02 2017-03-02 The construction of hydro project drilling machine of efficient water-removing recycling soil

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN201811309794.4A Withdrawn CN109209226A (en) 2017-03-02 2017-03-02 Construction of hydro project drilling machine suitable for the drilling on harder soil
CN201811059484.1A Pending CN109538117A (en) 2017-03-02 2017-03-02 A kind of construction of hydro project drilling machine

Country Status (1)

Country Link
CN (4) CN109281611A (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109281611A (en) * 2017-03-02 2019-01-29 吴彬 The construction of hydro project drilling machine of efficient water-removing recycling soil
CN107246160A (en) * 2017-06-15 2017-10-13 柳州市文宇科技服务有限公司 A kind of breaker of disintegrating machine
CN109203255A (en) * 2017-07-17 2019-01-15 杨伟刚 A kind of drilling equipment
CN107675709B (en) * 2017-09-27 2019-05-17 惠州市水电建筑工程有限公司 A kind of multi-functional construction of hydro project dredging drill hole equipment
CN107654188B (en) * 2017-10-18 2019-05-21 胜利油田盛辉石油技术开发有限责任公司 A kind of oil exploration equipment with drill bit cleaning and accurately detecting
CN110725647A (en) * 2019-10-23 2020-01-24 徐州市盖力工程机械有限公司 Portable screw rod drilling machine
CN111608573B (en) * 2020-06-11 2020-12-15 中聚信海洋工程装备有限公司 Drilling equipment with water absorption function

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1995688A (en) * 2006-01-05 2007-07-11 孙孝庆 Oscillatory auger hole and dredging device
CN203383723U (en) * 2013-08-07 2014-01-08 黄朝阳 Spiral drilling machine for continuous forming of concrete piles
CN203742432U (en) * 2013-12-26 2014-07-30 深圳市工勘岩土工程有限公司 Large-diameter rotary excavating drilled pile hard rock drilling rig
CN105016592A (en) * 2015-08-05 2015-11-04 浙江绩丰岩土技术股份有限公司 Slurry recycling circulation system and slurry recycling method thereof
CN106194082A (en) * 2016-08-25 2016-12-07 重庆建工住宅建设有限公司 A kind of building pile foundation construction slurry processing means

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6260633B1 (en) * 2000-03-06 2001-07-17 Michael D. Machek Soil sampling apparatus removably attachable to a vehicle
US7503134B2 (en) * 2000-11-27 2009-03-17 Buckner Lynn A Inclined slope vacuum excavation container
DE10328609B3 (en) * 2003-06-25 2004-12-02 Bauer Maschinen Gmbh Wet-drilling tool for drilling a hole in the ground comprises a passage device having a tubular dome with an inlet opening above a collecting container and a connecting rod connection for a boring rod
CN201449340U (en) * 2009-05-08 2010-05-05 江苏赛摩集团有限公司 Spiral sampler
CN203081288U (en) * 2013-02-17 2013-07-24 胡忠夫 Drilling device
CN203856401U (en) * 2014-05-06 2014-10-01 安徽送变电工程公司 Drill hole-forming machine for rock foundation pit
CN204646086U (en) * 2015-01-12 2015-09-16 覃炳德 A kind of water drilling Spiral digging machine
CN204716130U (en) * 2015-06-17 2015-10-21 黄朝阳 For the long-spiral drilling machine of shaping long spire hole-expanding pile
CN205329748U (en) * 2016-01-04 2016-06-22 潘小平 Sediment removal device is used in hydraulic engineering construction
CN205936394U (en) * 2016-06-16 2017-02-08 安静利 Drilling machine for water conservancy construction
CN205776457U (en) * 2016-07-13 2016-12-07 李玉军 Hydraulic engineering silt remover
CN109281611A (en) * 2017-03-02 2019-01-29 吴彬 The construction of hydro project drilling machine of efficient water-removing recycling soil

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1995688A (en) * 2006-01-05 2007-07-11 孙孝庆 Oscillatory auger hole and dredging device
CN203383723U (en) * 2013-08-07 2014-01-08 黄朝阳 Spiral drilling machine for continuous forming of concrete piles
CN203742432U (en) * 2013-12-26 2014-07-30 深圳市工勘岩土工程有限公司 Large-diameter rotary excavating drilled pile hard rock drilling rig
CN105016592A (en) * 2015-08-05 2015-11-04 浙江绩丰岩土技术股份有限公司 Slurry recycling circulation system and slurry recycling method thereof
CN106194082A (en) * 2016-08-25 2016-12-07 重庆建工住宅建设有限公司 A kind of building pile foundation construction slurry processing means

Also Published As

Publication number Publication date
CN109538117A (en) 2019-03-29
CN106677702A (en) 2017-05-17
CN109209226A (en) 2019-01-15
CN109281611A (en) 2019-01-29

Similar Documents

Publication Publication Date Title
CN106761399B (en) Multifunctional drilling machine and construction method thereof
CN102536121B (en) Pulse type underground pressurization jet flow drilling method and device
CN103061673B (en) Multifunctional micropile rig
CN101435312B (en) Multifunctional hammer drill
CN100575623C (en) Saw grooving machine
CN102828690B (en) Walking dual-swing downhole drill
CN103883247B (en) A kind of high-frequency reciprocating torsion generator
CN201695948U (en) Multifunctional open-air hydraulic drill rig
CN204294586U (en) Pipe dredging device
CN102678040B (en) Drilling device and method for baseplate in coal mine roadway
CN104819858B (en) Test device for evaluating reliability of downhole tool of horizontal well
CN104929123B (en) A kind of pile sinking staving press
CN201660892U (en) Static-pressure pile planting hole leading machine
CN102003139B (en) Single body large-diameter pneumatic down-the-hole hammer
CN102121350B (en) Impulse type hydraulic rock drill
CN201843506U (en) Multi-functional long spiral rotary drilling rig
CN102913130A (en) Full-hydraulic rock-drilling excavator using hydraulic excavator for production
CN103306323B (en) crankshaft trencher
US9016378B2 (en) Shale gas operation method
CN102094668B (en) High-pressure hydraulic tunneling, pressure releasing and protrusion removing method for upper drainage roadway
CN105040682A (en) Implementation method for composite pile one-time molding equipment
CN201952802U (en) Pile hole cleaning tool for concrete tubular pile
CN204457441U (en) A kind of two-way reamer for no-dig technique horizontal directional drill
CN205369357U (en) Multi -functional brill explodes machine
CN104746513B (en) Five axle SMW engineering method stake machines

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Lei Junting

Inventor after: Liao Hongjing

Inventor after: Xu Xiaofeng

Inventor after: Other inventors request not to publish names

Inventor before: The inventor has waived the right to be mentioned

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181105

Address after: 518000 9E, West edge of Ai Di building, 5003 riverside street, Futian District, Shenzhen, Guangdong

Applicant after: Shenzhen Jing Fang Ying Technology Co., Ltd.

Applicant after: Liao Hongjing

Applicant after: Xu Xiaofeng

Applicant after: Guangdong Hongyi Building Technology Development Co., Ltd.

Address before: 230000 B-1014, 10 floor, business office building, Wo Ye garden, Shushan District, Hefei, Anhui.

Applicant before: HEFEI WISDOM LONGTUTENG INTELLECTUAL PROPERTY CO., LTD.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191118

Address after: Li Lu Suzhou city in Jiangsu province 215000 Wuzhong District No. 99

Patentee after: Wuzhong, Suzhou City Technology Park Management Co., Ltd

Address before: 518000 West Block 9E, Aidi Building, No. 5003 Binhe Street, Nanyuan Street, Futian District, Shenzhen City, Guangdong Province

Co-patentee before: Liao Hongjing

Patentee before: Shenzhen Jing Fang Ying Technology Co., Ltd.

Co-patentee before: Xu Xiaofeng

Co-patentee before: Guangdong Hongyi Construction Technology Development Co., Ltd.