CN106677504A CN201710095136.9A CN201710095136A CN106677504A CN 106677504 A CN106677504 A CN 106677504A CN 201710095136 A CN201710095136 A CN 201710095136A CN 106677504 A CN106677504 A CN 106677504A
Authority
CN
China
Prior art keywords
welding
way
rod
mode
plate
Prior art date
Application number
CN201710095136.9A
Other languages
Chinese (zh)
Other versions
CN106677504B (en
Inventor
不公告发明人
Original Assignee
南昌首叶科技有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 南昌首叶科技有限公司 filed Critical 南昌首叶科技有限公司
Priority to CN201710095136.9A priority Critical patent/CN106677504B/en
Publication of CN106677504A publication Critical patent/CN106677504A/en
Application granted granted Critical
Publication of CN106677504B publication Critical patent/CN106677504B/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/20Implements for finishing work on buildings for laying flooring
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/20Implements for finishing work on buildings for laying flooring
    • E04F21/24Implements for finishing work on buildings for laying flooring of masses made in situ, e.g. smoothing tools

Abstract

The invention relates to cement laying equipment, in particular to ground cement laying equipment for a construction site. According to the ground cement laying equipment for the construction site, time and labor are saved during cement ground laying, placed cement can be quickly flattened, the cement can be completely compacted. The ground cement laying equipment for the construction site comprises base plates, first guide rails, first sliding rails, first sliding blocks, first supporting feet, vehicle wheels, inserting rods, a top plate, first guide sleeves, first screw rods, first pressing blocks and the like; and the first guide rails are installed on the base plates in a welded mode, and the top plate is installed at the upper ends of the first guide rails in a welded mode. According to the ground cement laying equipment for the construction site, the effects that time and labor are saved during cement ground laying, placed cement can be quickly flattened, and the cement can be completely compacted are achieved.

Description

A kind of construction site ground cement installation apparatus
Technical field
The present invention relates to a kind of cement installation apparatus, more particularly to a kind of construction site ground cement installation apparatus.
Background technology
Cement:Powdery hydraulicity inorganic coagulation material.Add water after stirring into slurry, can harden in atmosphere or in water Preferably hardening, and can the materials such as sand, stone is cemented together securely.Mixture of the early stage lime with volcanic ash and modern times Lime pozzolanic cement is much like, the concrete being made of its cementing rubble, and not only intensity is higher after hardening, and can also resist The erosion of fresh water or brackish water.For a long time, it is used as a kind of important Binder Materials, be widely used in civil construction, water conservancy, The engineerings such as national defence.
At present when construction site is laid to cement, major part be using it is artificial by cement on the ground, then Workman is paved and is compacted using instrument to the cement of ground, but such mode very wastes time and energy, Er Qiecun It is being difficult to pave cement, that is to say, that be difficult to these cement paving and ground to keep smooth, and during compacting It is difficult to more completely be compacted the cement on ground, the cement layer highland on caused ground is uneven.
Therefore need that a kind of laying cement flooring of research and development is time saving and energy saving badly, can quickly pave the cement of placement, can be more The complete construction site being compacted to cement overcomes artificial laying cement flooring at present to deposit with ground cement installation apparatus Wasting time and energy, it is difficult to pave the cement of placement, is difficult to the shortcoming that is more completely compacted to cement.
The content of the invention
(1)The technical problem to be solved
The present invention wastes time and energy to overcome artificial laying cement flooring at present to exist, be difficult to pave the cement of placement, be difficult to compared with It is the shortcoming being completely compacted to cement, the technical problem to be solved in the present invention is to provide the laying time saving province in cement flooring Power, the cement that can quickly pave placement, a kind of construction site surface water that more completely can be compacted to cement Mud installation apparatus.
(2)Technical scheme
In order to solve the above-mentioned technical problem, the invention provides such a construction site ground cement installation apparatus, including Have base plate, the first guide rail, the first slide rail, the first sliding block, the first leg, wheel, inserted link, top board, the first guide pin bushing, the first screw rod, First briquetting, the second leg, fixed pulley, the 3rd leg, electronic reel, bracing wire, the second guide rail, the second guide pin bushing, hopper, rubber Block and push rod, are provided with the first guide rail by way of welding on base plate, the first guide rail upper end is provided with by way of welding Top board, the mode being bolted in base plate is provided with the first slide rail, and slidingtype is connected with the first sliding block on the first slide rail, the One sliding block downside is provided with the first leg by way of welding, and the first leg lower end is rotatably connected with wheel, the first sliding block Outside is provided with slot, and plate outer side is provided with first through hole, first through hole and is placed with inserted link in slot, slided on the first guide rail Formula is connected with the first guide pin bushing, and middle side part is provided with the 3rd leg by way of welding on top board, and the 3rd leg upper end is rotary Electronic reel is connected with, the top board upside left and right sides is provided with the second leg, the rotation of the second leg upper end by way of welding It is rotatable to be connected with fixed pulley, it is wound with two bracing wires on electronic reel, lower side guy is by left side fixed pulley upside and left side the The left side top connection of one guide pin bushing, upper side guy is connected by right side fixed pulley upside with the right side top of the guide pin bushing of right side first, First guide pin bushing outside is provided with the first screwed hole, and the first screw rod is placed with the first screwed hole, and the first screw rod is matched somebody with somebody with the first screwed hole Close, side rotary is connected with the first briquetting in the first screw rod, the second guide rail be installed by way of welding between the first guide pin bushing, Slidingtype is connected with the second guide pin bushing on second guide rail, and the second guide pin bushing front side is provided with hopper, is put in hopper by way of welding Block rubber is equipped with, block rubber upper end is connected with push rod.
Preferably, gearshift is also included, gearshift includes support bar, the first supporting plate, the second slide rail, second Sliding block, the second screw rod and the first nut, are provided with support bar, by weldering between support bar upside by way of welding on base plate The mode for connecing is provided with the first supporting plate, and support bar is located at the first slide rail or so two sides, and the first supporting plate is located on the first slide rail Side, the first supporting plate upside is provided with the second slide rail by way of welding, and the second slide rail inner sliding type is connected with the second sliding block, Second sliding block right-hand member is provided with the first guide rail by way of welding, and the first slide rail upside is provided with a word hole, the second upper end of slide block Second screw rod is installed by way of welding, the second screw rod reaches the second slide rail top, the second screw rod upside by a word hole The first nut is rotary with, the first nut and the second screw rod coordinate.
Preferably, the first motor, first gear and the first tooth bar are also included, bolt is passed through on the second slide rail inner underside wall The mode of connection is provided with the first tooth bar, bolted mode is passed on left in the second sliding block and is provided with the first motor, first First motor output shaft of motor front side left end is connected with first gear by shaft coupling, and first gear is engaged with the first tooth bar.
Preferably, extruding device is also included, extruding device includes the first cylinder, L-shaped bar, filling tube, hopper, valve Door, the first pushing block, fix bar, head rod and plate is paved, hopper passes on left bolted mode and is provided with the first gas Cylinder, the mode that the first Telescopic-cylinder bar upper end of the first cylinder upper end is bolted is provided with L-shaped bar, and L-shaped bar right side is logical The mode for crossing welding is arranged on push rod upper end, and the interior right side of block rubber is connected with filling tube, and filling tube upper end is bolted Mode is provided with hopper, and the mode that hopper lower section is bolted is provided with valve, and block rubber downside is connected with the first pushing block, Hopper lower right-hand side is provided with fix bar by way of welding, and head rod right-hand member is provided with first by way of welding Connecting rod, head rod lower end is provided with by way of welding and paves plate.
Preferably, the second connecting rod, the 3rd screw rod and the second briquetting are also included, it is empty that head rod downside is provided with first Groove, is placed with the second connecting rod in the first dead slot, the second connecting rod lower end is provided with by way of welding and paves plate, and first connects Extension bar lower right-hand side is provided with the second screwed hole, and the 3rd screw rod is placed with the second screwed hole, and the 3rd screw rod is matched somebody with somebody with the second screwed hole Close, the 3rd screw rod left end is rotatably connected with the second briquetting.
Preferably, also include control blanking device, control blanking device include the second supporting plate, the 3rd connecting rod, First fixed plate, the 3rd slide rail, the 3rd sliding block, first baffle, rubber blanket and the second cylinder, hopper lower left is provided with control blanking Device, hopper left side lower section is provided with the second supporting plate by way of welding, and the second supporting plate left end is by way of welding 3rd connecting rod is installed, the 3rd connecting rod lower end is provided with the first fixed plate by way of welding, right in the first fixed plate The mode that side is bolted is provided with the 3rd slide rail, and the 3rd slide rail inner sliding type is connected with the 3rd sliding block, on the 3rd sliding block End is provided with first baffle by way of welding, and first baffle blocks the feed opening of hopper lower end, and first baffle upside is installed There is a rubber blanket, the mode that the first fixed plate upside left is bolted is provided with the second cylinder, the of the second cylinder right-hand member The mode that two Telescopic-cylinder bars are bolted is arranged on first baffle left end.
Preferably, swash plate is also included, some second through holes not of uniform size is provided with first baffle and rubber blanket, the Two through hole inner undersides are provided with swash plate by way of welding.Preferably, mobile device is also included, mobile device includes Two tooth bars, contiguous block, the second motor, second gear, the first travel switch, the 4th connecting rod and the second travel switch, second leads The mode that rail upside is bolted is provided with the second tooth bar, the second guide pin bushing upside right company of being provided with by way of welding Block is connect, the mode that contiguous block right side is bolted is provided with the second motor, the second motor output shaft on front side of the second motor Second gear is connected with by shaft coupling, second gear is engaged with the second tooth bar, the side that the second motor right side is bolted Formula is provided with the first travel switch, and the second guide pin bushing upside left is provided with the 4th connecting rod, the 4th connection by way of welding The mode that bar left end is bolted is provided with the second travel switch.Preferably, also include the 3rd guide pin bushing, the 4th screw rod and 3rd briquetting, the first guide pin bushing front side is provided with the 3rd guide pin bushing by way of welding, and the second guide rail, the 3rd are cased with the 3rd guide pin bushing Guide pin bushing right side is provided with the 3rd screwed hole, and the 4th screw rod is placed with the 3rd screwed hole, and the 4th screw rod and the 3rd screwed hole coordinate, the Four screw rod lower ends are rotatably connected with the 3rd briquetting.Preferably, also include and be automatically stopped blanking device, be automatically stopped blanking dress Put and include the 4th slide rail, Four-slider, the second pushing block, block, the first spring, the first mobile bar, touch panel, second baffle and rubber Glue ring, hopper lower left is provided with and is automatically stopped blanking device, and the mode being bolted in the second supporting plate is provided with the 4th Slide rail, the 4th slide rail inner sliding type is connected with Four-slider, and Four-slider lower end is provided with the second pushing block by way of welding, Second supporting plate downside right is provided with block by way of welding, and the second pushing block right side is provided with the by way of welding One spring, the first spring right-hand member is arranged on baffle plate left side by way of welding, and the second pushing block lower end is pacified by way of welding Equipped with the first mobile bar, the 3rd connecting rod middle part is provided with third through-hole, and the first mobile bar reaches the 3rd connection by third through-hole Bar left, the first mobile bar left end is provided with touch panel by way of welding, and the first mobile bar right-hand member is pacified by way of welding Equipped with second baffle, rubber ring is installed in the feed opening inner left wall of hopper lower end, second baffle is put in rubber ring.It is preferred that Ground, also includes the 5th connecting rod and brush block, and the 5th connection is provided with by way of welding in the inner left wall on the downside of hopper Bar, the 5th connecting rod is located at rubber ring top, and the 5th connecting rod downside is provided with some brush blocks.Preferably, also include and make real Device, makes real device and includes the second fixed plate, fixed case, the 5th slide rail, the 5th sliding block, second spring, the second mobile bar, bat Solid plate, push pedal, the 3rd motor, rotating shaft, runner, cam and transmission article, the second guide pin bushing downside right are provided with and make real device, and second leads Set downside right is provided with the second fixed plate by way of welding, and the second fixed plate downside is provided with solid by way of welding Determine case, the mode being bolted on fixed case inner underside wall is symmetrically installed with the 5th slide rail, and the 5th slide rail inner sliding type connects The 5th sliding block is connected to, the 5th upper end of slide block is provided with second spring by way of welding, and second spring upper end is by welding Mode is arranged in the 5th slide rail upper inside walls, and the 5th sliding block front side is provided with the second mobile bar, second by way of welding Mobile bar lower end is provided with by way of welding and makes real plate, and the second mobile bar upper end is provided with push pedal by way of welding, Push pedal top is provided with the 3rd motor by way of welding, after the mode that the 3rd motor is bolted is arranged on fixed case On the inwall of side, the 3rd motor output shaft on front side of the 3rd motor is connected with rotating shaft by shaft coupling, and push pedal top in right side also is provided with Rotating shaft, right side rotating shaft is located in same horizontal line with left side rotating shaft, and runner is also provided with the rotating shaft of right side, is connected between runner Transmission bar, runner front side is connected with cam, the angle of left cam and right cam 180 degree each other.Preferably, is also included Three mobile bars, the 5th screw rod and the 4th briquetting, are provided with the second dead slot in the second mobile bar, the 3rd movement is placed with the second dead slot Bar, the 3rd mobile bar lower end is provided with by way of welding and makes real plate, and the second mobile bar downside right is provided with the 4th screwed hole, The 5th screw rod is placed with 4th screwed hole, the 5th screw rod and the 4th screwed hole coordinate, and the 5th screw rod left end is rotatably connected with 4th briquetting.Preferably, the material of base plate is stainless steel.Preferably, the material of top board is Q235 steel.Preferably, the second motor It is servomotor with the 3rd motor.
(3)Beneficial effect
Invention achieves laying cement flooring it is time saving and energy saving, can quickly pave the cement of placement, can be more complete right The effect that cement is compacted, drives hopper to move the side for carrying out cement laying on the ground by using mobile second guide pin bushing Formula, is not only able to avoid conventional cement from laying wasting time and energy for presence, so as to save many times, additionally it is possible to make the paving of cement It is provided with preferable planarization.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the invention.
Fig. 2 is the first main structure diagram of gearshift of the present invention.
Fig. 3 is second main structure diagram of gearshift of the present invention.
Fig. 4 is the main structure diagram of extruding device of the present invention.
Fig. 5 is the main structure diagram of head rod of the present invention.
Fig. 6 is the main structure diagram of present invention control blanking device.
Fig. 7 is the main structure diagram of first baffle of the present invention.
Fig. 8 is the main structure diagram of mobile device of the present invention.
Fig. 9 is the main structure diagram of the 3rd guide pin bushing of the invention.
Figure 10 is the first main structure diagram that the present invention is automatically stopped blanking device.
Figure 11 is second main structure diagram that the present invention is automatically stopped blanking device.
Figure 12 is second main structure diagram of the invention.
Figure 13 is the main structure diagram that the present invention makes real device.
Figure 14 is the main structure diagram of the second mobile bar of the invention.
Mark in accompanying drawing for:1- base plates, the guide rails of 2- first, the slide rails of 21- first, the sliding blocks of 22- first, the legs of 23- first, 24- wheels, 25- slots, 26- first through hole, 27- inserted links, 3- top boards, the guide pin bushings of 31- first, the screwed holes of 32- first, 33- first Screw rod, the briquettings of 34- first, the legs of 35- second, 36- fixed pulleys, the legs of 37- the 3rd, the electronic reels of 38-, 39- bracing wires, 4- Two guide rails, the guide pin bushings of 5- second, 6- hoppers, 7- block rubbers, 8- push rods, 9- gearshifts, 91- support bars, the supporting plates of 92- first, The slide rails of 93- second, the sliding blocks of 94- second, the word holes of 95- mono-, the screw rods of 96- second, the nuts of 97- first, the motors of 971- first, 972- One gear, the tooth bars of 973- first, 10- extruding devices, the cylinders of 101- first, 102-L shape bars, 103- filling tubes, 104- hoppers, 105- valves, the pushing blocks of 106- first, 107- fix bars, 108- head rods, 109- paves plate, the dead slots of 1081- first, The connecting rods of 1082- second, the screwed holes of 1083- second, the screw rods of 1084- the 3rd, the briquettings of 1085- second, 11- control blanking devices, The supporting plates of 111- second, the connecting rods of 112- the 3rd, the fixed plates of 113- first, the slide rails of 114- the 3rd, the sliding blocks of 115- the 3rd, 116- One baffle plate, 117- rubber blankets, the cylinders of 118- second, the through holes of 1161- second, 1162- swash plates, 12- mobile devices, the teeth of 121- second Bar, 122- contiguous blocks, the motors of 123- second, 124- second gears, the travel switches of 125- first, the connecting rods of 126- the 4th, 127- Second travel switch, the guide pin bushings of 1231- the 3rd, the screwed holes of 1232- the 3rd, the screw rods of 1233- the 4th, the briquettings of 1234- the 3rd, 13- is certainly Dynamic stopping blanking device, the slide rails of 131- the 4th, 132- Four-sliders, the pushing blocks of 133- second, 134- blocks, the springs of 135- first, 136- third through-holes, the mobile bars of 137- first, 138- touch panels, 139- second baffles, 1310- rubber rings, 1391- the 5th is connected Bar, 1392- brush blocks, 14- makes real device, the fixed plates of 141- second, 142- fixed cases, the slide rails of 143- the 5th, the sliding blocks of 144- the 5th, 145- second springs, the mobile bars of 146- second, 147- makes real plate, 148- push pedals, the motors of 149- the 3rd, 1410- rotating shafts, 1411- Runner, 1412- cams, 1413- transmission bars, the dead slots of 1461- second, the mobile bars of 1462- the 3rd, the screwed holes of 1463- the 4th, The screw rods of 1464- the 5th, the briquettings of 1465- the 4th.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of construction site ground cement installation apparatus, as represented in figures 1 through 14, include base plate 1, the first guide rail 2, first and slide Rail 21, the first sliding block 22, the first leg 23, wheel 24, inserted link 27, top board 3, the first guide pin bushing 31, the first screw rod 33, the first briquetting 34th, the second leg 35, fixed pulley 36, the 3rd leg 37, electronic reel 38, bracing wire 39, the second guide rail 4, the second guide pin bushing 5, material Case 6, block rubber 7 and push rod 8, are provided with the first guide rail 2 by way of welding on base plate 1, the upper end of the first guide rail 2 is by welding Mode top board 3 is installed, the mode being bolted in base plate 1 is provided with the first slide rail 21, is slided on the first slide rail 21 Formula is connected with the first sliding block 22, and the downside of the first sliding block 22 is provided with the first leg 23 by way of welding, under the first leg 23 End is rotary to be connected with wheel 24, and the outside of the first sliding block 22 is provided with slot 25, and the outside of base plate 1 is provided with first through hole 26, and first leads to Inserted link 27 is placed with hole 26 and in slot 25, slidingtype is connected with the first guide pin bushing 31, middle side part on top board 3 on the first guide rail 2 The 3rd leg 37 is installed by way of welding, the upper end of the 3rd leg 37 is rotatably connected with electronic reel 38, on top board 3 The side left and right sides is provided with the second leg 35 by way of welding, and the upper end of the second leg 35 is rotatably connected with fixed pulley 36, Two bracing wires 39 are wound with electronic reel 38, lower side guy 39 is by the upside of left side fixed pulley 36 and the first guide pin bushing of left side 31 Left side top connection, upper side guy 39 is connected by the upside of right side fixed pulley 36 with the right side top of the first guide pin bushing of right side 31, the The outside of one guide pin bushing 31 is provided with the first screwed hole 32, and the first screw rod 33, the first screw rod 33 and first are placed with the first screwed hole 32 Screwed hole 32 coordinates, and side rotary is connected with the first briquetting 34 in the first screw rod 33, the side between the first guide pin bushing 31 by welding Formula is provided with the second guide rail 4, and slidingtype is connected with the second guide pin bushing 5, the side that the front side of the second guide pin bushing 5 passes through welding on the second guide rail 4 Formula is provided with hopper 6, hopper 6 and is placed with block rubber 7, and the upper end of block rubber 7 is connected with push rod 8.
Gearshift 9 is also included, gearshift 9 includes support bar 91, the first supporting plate 92, the second slide rail 93, Two sliding blocks 94, the second screw rod 96 and the first nut 97, support bar 91, support bar 91 are provided with base plate 1 by way of welding First supporting plate 92 is installed by way of welding, support bar 91 is located at the side of the first slide rail 21 or so two, first between upside Supporting plate 92 is located at the top of the first slide rail 21, and the upside of the first supporting plate 92 is provided with the second slide rail 93 by way of welding, the The inner sliding type of two slide rail 93 is connected with the second sliding block 94, and the right-hand member of the second sliding block 94 is provided with the first guide rail 2 by way of welding, The upside of first slide rail 21 is provided with a word hole 95, and the upper end of the second sliding block 94 is provided with the second screw rod 96, second by way of welding Screw rod 96 reaches the top of the second slide rail 93 by a word hole 95, and the upside of the second screw rod 96 is rotary with the first nut 97, the first nut 97 Coordinate with the second screw rod 96.
The first motor 971, the tooth bar 973 of first gear 972 and first are also included, is passed through on the inner underside wall of the second slide rail 93 Bolted mode is provided with the first tooth bar 973, and passing on left bolted mode in the second sliding block 94 is provided with first Motor 971, the output shaft of the first motor 971 of the front side left end of the first motor 971 is connected with first gear 972 by shaft coupling, the One gear 972 is engaged with the first tooth bar 973.
Extruding device 10 is also included, extruding device 10 includes the first cylinder 101, L-shaped bar 102, filling tube 103, material Bucket 104, valve 105, the first pushing block 106, fix bar 107, head rod 108 and plate 109 is paved, hopper 6 passes on left spiral shell Tether the mode for connecing and the first cylinder 101 is installed, the expansion link upper end of the first cylinder 101 of the upper end of the first cylinder 101 passes through bolt The mode of connection is provided with L-shaped bar 102, and the right side of L-shaped bar 102 is arranged on the upper end of push rod 8 by way of welding, in block rubber 7 Right side is connected with filling tube 103, and the mode that the upper end of filling tube 103 is bolted is provided with hopper 104, the lower section of hopper 104 The mode being bolted is provided with valve 105, and the downside of block rubber 7 is connected with the first pushing block 106, and the lower right-hand side of hopper 6 leads to The mode for crossing welding is provided with fix bar 107, and the right-hand member of head rod 108 is provided with head rod by way of welding 108, the lower end of head rod 108 is provided with by way of welding and paves plate 109.
The second connecting rod 1082, the 3rd screw rod 1084 and the second briquetting 1085 are also included, the downside of head rod 108 is opened There is the first dead slot 1081, the second connecting rod 1082 is placed with the first dead slot 1081, the lower end of the second connecting rod 1082 is by welding Mode be provided with and pave plate 109, the lower right-hand side of head rod 108 is provided with the second screwed hole 1083, the second screwed hole 1083 The 3rd screw rod 1084 is inside placed with, the 3rd screw rod 1084 coordinates with the second screwed hole 1083, and the left end of the 3rd screw rod 1084 is rotary It is connected with the second briquetting 1085.
Control blanking device 11 is also included, control blanking device 11 includes the second supporting plate 111, the 3rd connecting rod 112nd, the first fixed plate 113, the 3rd slide rail 114, the 3rd sliding block 115, first baffle 116, the cylinder 118 of rubber blanket 117 and second, The lower left of hopper 6 is provided with control blanking device 11, and the left side of hopper 6 lower section is provided with the second supporting plate 111 by way of welding, The left end of second supporting plate 111 is provided with the 3rd connecting rod 112 by way of welding, and the lower end of the 3rd connecting rod 112 is by welding Mode the first fixed plate 113 is installed, the mode that right side is bolted in the first fixed plate 113 is provided with the 3rd slide rail 114, the inner sliding type of the 3rd slide rail 114 is connected with the 3rd sliding block 115, and the upper end of the 3rd sliding block 115 is provided with by way of welding First baffle 116, first baffle 116 blocks the feed opening of the lower end of hopper 6, and the upside of first baffle 116 is provided with rubber blanket 117, The mode that the upside left of first fixed plate 113 is bolted is provided with the second cylinder 118, the of the right-hand member of the second cylinder 118 The mode that the expansion link of two cylinder 118 is bolted is arranged on the left end of first baffle 116.
Swash plate 1162 is also included, some second through holes not of uniform size are provided with first baffle 116 and rubber blanket 117 1161, the inner underside of the second through hole 1161 is provided with swash plate 1162 by way of welding.
Also include mobile device 12, mobile device 12 include the second tooth bar 121, contiguous block 122, the second motor 123, Second gear 124, the first travel switch 125, the 4th connecting rod 126 and the second travel switch 127, the upside of the second guide rail 4 pass through Bolted mode is provided with the second tooth bar 121, and the upside right of the second guide pin bushing 5 is provided with contiguous block by way of welding 122, the mode that the right side of contiguous block 122 is bolted is provided with the second motor 123, the second electricity of the front side of the second motor 123 The output shaft of machine 123 is connected with second gear 124 by shaft coupling, and second gear 124 is engaged with the second tooth bar 121, the second motor The mode that 123 right sides are bolted is provided with the first travel switch 125, the side that the upside left of the second guide pin bushing 5 passes through welding Formula is provided with the 4th connecting rod 126, and the mode that the left end of the 4th connecting rod 126 is bolted is provided with the second travel switch 127。
The 3rd guide pin bushing 1231, the 4th screw rod 1233 and the 3rd briquetting 1234 are also included, the front side of the first guide pin bushing 31 is by weldering The mode for connecing is provided with the 3rd guide pin bushing 1231, is cased with the second guide rail 4 in the 3rd guide pin bushing 1231, and the right side of the 3rd guide pin bushing 1231 is provided with the Three screwed holes 1232, the 4th screw rod 1233, the 4th screw rod 1233 and the 3rd screwed hole 1232 are placed with the 3rd screwed hole 1232 Coordinate, the lower end of the 4th screw rod 1233 is rotatably connected with the 3rd briquetting 1234.
Also include and be automatically stopped blanking device 13, be automatically stopped blanking device 13 and include the 4th slide rail 131, the 4th cunning Block 132, the second pushing block 133, block 134, the first spring 135, the first mobile bar 137, touch panel 138, second baffle 139 and rubber Ring 1310, the lower left of hopper 6 is provided with and is automatically stopped blanking device 13, and the mode being bolted in the second supporting plate 111 is pacified Equipped with the 4th slide rail 131, the inner sliding type of the 4th slide rail 131 is connected with Four-slider 132, and the lower end of Four-slider 132 is by welding Mode the second pushing block 133 is installed, the downside right of the second supporting plate 111 is provided with block 134, second by way of welding The right side of pushing block 133 is provided with the first spring 135 by way of welding, and the right-hand member of the first spring 135 is installed by way of welding On the left of baffle plate, the lower end of the second pushing block 133 is provided with the first mobile bar 137, the middle part of the 3rd connecting rod 112 by way of welding Third through-hole 136 is provided with, the first mobile bar 137 reaches the left of the 3rd connecting rod 112, the first mobile bar by third through-hole 136 137 left ends are provided with touch panel 138 by way of welding, and the right-hand member of the first mobile bar 137 is provided with second by way of welding Baffle plate 139, is provided with rubber ring 1310 in the feed opening inner left wall of the lower end of hopper 6, second baffle 139 puts in rubber ring 1310 It is interior.
The 5th connecting rod 1391 and brush block 1392 are also included, in the inner left wall of the downside of hopper 6 by way of welding 5th connecting rod 1391 is installed, the 5th connecting rod 1391 is located at the top of rubber ring 1310, and the downside of the 5th connecting rod 1391 is installed There are some brush blocks 1392.
Also include and make real device 14, make real device 14 and include the second fixed plate 141, fixed case 142, the 5th slide rail 143rd, the 5th sliding block 144, second spring 145, the second mobile bar 146, make real plate 147, push pedal 148, the 3rd motor 149, rotating shaft 1410th, runner 1411, cam 1412 and transmission bar 1413, the downside right of the second guide pin bushing 5 are provided with and make real device 14, the second guide pin bushing 5 Downside right is provided with the second fixed plate 141 by way of welding, and the downside of the second fixed plate 141 is installed by way of welding There is fixed case 142, the mode being bolted on the inner underside wall of fixed case 142 is symmetrically installed with the 5th slide rail 143, and the 5th slides The inner sliding type of rail 143 is connected with the 5th sliding block 144, and the upper end of the 5th sliding block 144 is provided with second spring by way of welding 145, the upper end of second spring 145 is arranged in the upper inside walls of the 5th slide rail 143 by way of welding, the front side of the 5th sliding block 144 Second mobile bar 146 is installed by way of welding, the lower end of the second mobile bar 146 is provided with by way of welding and makes real plate 147, the upper end of the second mobile bar 146 is provided with push pedal 148 by way of welding, and the top of push pedal 148 is pacified by way of welding Equipped with the 3rd motor 149, the mode that the 3rd motor 149 is bolted is arranged on the rear side inwall of fixed case 142, the 3rd electricity The output shaft of 3rd motor 149 of the front side of machine 149 is connected with rotating shaft 1410 by shaft coupling, and the top of right side push pedal 148 also is provided with turning Axle 1410, right side rotating shaft 1410 is located in same horizontal line with left side rotating shaft 1410, and runner is also provided with right side rotating shaft 1410 1411, transmission bar 1413 is connected between runner 1411, the front side of runner 1411 is connected with cam 1412, left cam 1412 and the right side The angle of side cam 1412 180 degree each other.
The 3rd mobile bar 1462, the 5th screw rod 1464 and the 4th briquetting 1465 are also included, is provided with the second mobile bar 146 Second dead slot 1461, is placed with the 3rd mobile bar 1462 in the second dead slot 1461, the lower end of the 3rd mobile bar 1462 is by welding Mode is provided with and makes real plate 147, and the downside right of the second mobile bar 146 is provided with the 4th screwed hole 1463, in the 4th screwed hole 1463 The 5th screw rod 1464 is placed with, the 5th screw rod 1464 coordinates with the 4th screwed hole 1463, and the left end of the 5th screw rod 1464 rotatably connects It is connected to the 4th briquetting 1465.
The material of base plate 1 is stainless steel.The material of top board 3 is Q235 steel.Second motor 123 and the 3rd motor 149 are to watch Take motor.
Operation principle:When user needs to carry out the ground in construction site cement laying, user will go back equipment by car Wheel 24 is carried out on the position of cement laying required for moving to, and then unplugs inserted link 27, wheel 24 is pushed away by the first leg 23 Dynamic first sliding block 22 is moved up and moved up in the first slide rail 21, base plate 1 is touched ground, and cement is poured on into hopper In 6, then block rubber 7 and push rod 8 are put into hopper 6, then open electronic reel 38, make electronic reel 38 counterclockwise Rotation, the coiling of electronic reel 38 pulls on bracing wire 39, left and right sides bracing wire 39 is all moved up, and bracing wire 39 pulls first to lead Set 31 is moved up on the first guide rail 2, moves to real on desired position, the electronic reel 38 of closing, then rotates first Screw rod 33, the first screw rod 33 is by the way that in the first guide pin bushing of cooperation precession 31 with the first screwed hole 32, the first screw rod 33 promotes first Briquetting 34 pushes down the first guide rail 2, and so as to the first guide pin bushing 31 is fixed on this position on the first guide rail 2, then user pushes away Dynamic second guide pin bushing 5 is moved on the second guide rail 4, while promoting push rod 8, push rod 8 promotes block rubber 7, block rubber 7 to promote hopper 6 Interior cement outflow, flows on ground, so as to realize the simple laying to cement.
Second screw rod 96 reaches the top of the second slide rail 93 by a word hole 95, and the upside of the second screw rod 96 is rotary with the first nut 97, the first nut 97 coordinates with the second screw rod 96, and after cement is laid to a bottom surface, workman removable second is slided Block 94 is moved in the second slide rail 93, and the second sliding block 94 drives the first guide rail 2 to move, when next ground is moved to, rotation First nut 97, the first nut 97 is rotated down by the cooperation with the first screw rod 33, and the first nut 97 pushes down the second slide rail 93 Upside, the second sliding block 94 is fixed on this position on the second slide rail 93, is then carrying out the laying of cement.
Because the first motor 971, the tooth bar 973 of first gear 972 and first are also included, on the inner underside wall of the second slide rail 93 The mode being bolted is provided with the first tooth bar 973, and passing on left bolted mode in the second sliding block 94 is provided with First motor 971, the output shaft of the first motor 971 of the front side left end of the first motor 971 is connected with first gear by shaft coupling 972, first gear 972 is engaged with the first tooth bar 973, when user to the second sliding block 94 during moving, Yong Huke To open the first motor 971, the first motor 971 drives first gear 972 to rotate, and first gear 972 is revolved on the first tooth bar 973 Turn, so as to drive the second sliding block 94 to be moved in the second slide rail 93.
Because also including extruding device 10, extruding device 10 includes the first cylinder 101, L-shaped bar 102, filling tube 103rd, hopper 104, valve 105, the first pushing block 106, fix bar 107, head rod 108 and plate 109 is paved, the left side of hopper 6 The mode being bolted is provided with the first cylinder 101, and the expansion link upper end of the first cylinder 101 of the upper end of the first cylinder 101 leads to Cross bolted mode and L-shaped bar 102 is installed, the right side of L-shaped bar 102 is arranged on the upper end of push rod 8, rubber by way of welding Right side is connected with filling tube 103 in blob of viscose 7, and the mode that the upper end of filling tube 103 is bolted is provided with hopper 104, hopper The mode that 104 lower sections are bolted is provided with valve 105, and the downside of block rubber 7 is connected with the first pushing block 106, the right side of hopper 6 Lower section is provided with fix bar 107 by way of welding, and the right-hand member of head rod 108 is provided with the first company by way of welding Extension bar 108, the lower end of head rod 108 is provided with by way of welding and paves plate 109, when user is when push rod 8 is promoted Wait, user can control the first cylinder 101 to shorten, the expansion link of the first cylinder 101 will drive L-shaped bar 102 to move down, L-shaped Bar 102 drives push rod 8 to move down, and push rod 8 promotes block rubber 7 to move down, and block rubber 7 promotes pushing block by the water in hopper 6 Mud is pressed onto on ground, is paved plate 109 during mobile second guide pin bushing 5 and will also be flowed to the cement on ground and pave, when hopper 6 After interior cement is using finishing, controllable first cylinder 101 extends, and drives block rubber 7 to move up, and then opens valve 105, Cement is put into from hopper 104, cement will be flowed into hopper 6 from filling tube 103, the second guide pin bushing 5 is then promoted simultaneously It is mobile, the laying of cement is carried out to ground again.
Because the second connecting rod 1082, the 3rd screw rod 1084 and the second briquetting 1085 are also included, under head rod 108 Side is provided with the first dead slot 1081, and the second connecting rod 1082 is placed with the first dead slot 1081, and the lower end of the second connecting rod 1082 passes through The mode of welding is provided with paves plate 109, and the lower right-hand side of head rod 108 is provided with the second screwed hole 1083, the second screwed hole The 3rd screw rod 1084 is placed with 1083, the 3rd screw rod 1084 coordinates with the second screwed hole 1083, the rotation of the left end of the 3rd screw rod 1084 It is rotatable to be connected with the second briquetting 1085, when the thickness that user needs thickness or control cement to paving to lay, Yong Huke Moved in the first dead slot 1081 with by the second connecting rod 1082, when then moving to user desired position, rotate the 3rd spiral shell Bar 1084, the 3rd screw rod 1084 by the first dead slot of cooperation precession 1081 with the second screwed hole 1083 with the second connecting rod 1082 contacts, so as to the second connecting rod 1082 is fixed on this position in the first dead slot 1081.
Because also including control blanking device 11, control blanking device 11 includes the second supporting plate 111, the 3rd connection Bar 112, the first fixed plate 113, the 3rd slide rail 114, the 3rd sliding block 115, first baffle 116, the cylinder of rubber blanket 117 and second 118, the lower left of hopper 6 is provided with control blanking device 11, and the left side of hopper 6 lower section is provided with the second supporting plate by way of welding 111, the left end of the second supporting plate 111 is provided with the 3rd connecting rod 112 by way of welding, and the lower end of the 3rd connecting rod 112 passes through The mode of welding is provided with the first fixed plate 113, and the mode that right side is bolted in the first fixed plate 113 is provided with the 3rd Slide rail 114, the inner sliding type of the 3rd slide rail 114 is connected with the 3rd sliding block 115, and the upper end of the 3rd sliding block 115 is pacified by way of welding Equipped with first baffle 116, first baffle 116 blocks the feed opening of the lower end of hopper 6, and the upside of first baffle 116 is provided with rubber blanket 117, the mode that the upside left of the first fixed plate 113 is bolted is provided with the second cylinder 118, the right-hand member of the second cylinder 118 The mode that is bolted of the expansion link of the second cylinder 118 be arranged on the left end of first baffle 116, when user needs control to water During the amount that mud falls, user can control the second cylinder 118 to elongate or shorten, and the second cylinder 118 drives first baffle 116 to pass through 3rd sliding block 115 is moved and moved left and right in the 3rd slide rail 114, and second baffle 139 and rubber blanket 117 will block hopper 6 Feed opening only retains less feed opening, so as to the amount to blanking is controlled.
Because also including swash plate 1162, some not of uniform size second are provided with first baffle 116 and rubber blanket 117 Through hole 1161, the inner underside of the second through hole 1161 is provided with swash plate 1162 by way of welding, enters when in the discharge quantity to cement When row control, user can elongate or shorten the second cylinder of cylinder 118, so as to second on second baffle 139 be led to Hole 1161 is directed at the feed opening of hopper 6, and being directed at the second different through holes 1161 can more be accurately controlled the discharge quantity of cement, Cement will be flowed on swash plate 1162 and then is flowed on ground from outflow in the second through hole 1161.
Because also including mobile device 12, mobile device 12 includes the second tooth bar 121, contiguous block 122, the second motor 123rd, second gear 124, the first travel switch 125, the 4th connecting rod 126 and the second travel switch 127, the upside of the second guide rail 4 The mode being bolted is provided with the second tooth bar 121, and the upside right of the second guide pin bushing 5 is provided with connection by way of welding Block 122, the mode that the right side of contiguous block 122 is bolted is provided with the second motor 123, the second of the front side of the second motor 123 The output shaft of motor 123 is connected with second gear 124 by shaft coupling, and second gear 124 is engaged with the second tooth bar 121, the second electricity The mode that the right side of machine 123 is bolted is provided with the first travel switch 125, and the upside left of the second guide pin bushing 5 is by welding Mode is provided with the 4th connecting rod 126, and the mode that the left end of the 4th connecting rod 126 is bolted is provided with the second travel switch 127, when user moves to the second guide pin bushing 5, user can open the second motor 123, and the second motor 123 drives the second tooth Wheel 124 rotates, and second gear 124 rotates on the second tooth bar 121, so that drive the second guide pin bushing 5 to be moved on the second guide rail 4, When the second guide pin bushing 5 is moved to the first travel switch 125 is touched on the first guide rail 2 of right side, the first travel switch 125 is connect Logical, the second motor 123 of control stops the rotation, and then moving the first guide rail 2 and making it into next-hop needs to carry out cement laying Ground, then drives the second guide pin bushing 5 to move in opening the second motor 123, the second travel switch 127 during current movement When touching the first guide rail 2 of left side, the second travel switch 127 is switched on, and the second motor 123 of control stops the rotation.
When user needs to carry out the laying of cement to the ground of different length, user can move left and right base plate 1, base plate 1 the first guide rail 2 of drive is moved, and the first guide rail 2 drives the first guide pin bushing 31 to move, so that the 3rd guide pin bushing 1231 is moved, the 3rd leads Set 1231 is moved on the second guide rail 4, when moving on desired position, rotates the 4th screw rod 1233, the 4th screw rod 1233 By the way that in the guide pin bushing 1231 of cooperation precession the 3rd with the 3rd screwed hole 1232, the 4th screw rod 1233 promotes the 3rd briquetting 1234, will 3rd guide pin bushing 1231 is fixed on this position on the second guide rail 4.
Because also include being automatically stopped blanking device 13, it is automatically stopped blanking device 13 and includes the 4th slide rail 131, Four-slider 132, the second pushing block 133, block 134, the first spring 135, the first mobile bar 137, touch panel 138, the and of second baffle 139 Rubber ring 1310, the lower left of hopper 6 is provided with and is automatically stopped blanking device 13, the side being bolted in the second supporting plate 111 Formula is provided with the 4th slide rail 131, and the inner sliding type of the 4th slide rail 131 is connected with Four-slider 132, and the lower end of Four-slider 132 passes through The mode of welding is provided with the second pushing block 133, and the downside right of the second supporting plate 111 is provided with block 134 by way of welding, The right side of second pushing block 133 is provided with the first spring 135 by way of welding, and the right-hand member of the first spring 135 is by way of welding Installed in baffle plate left side, the lower end of the second pushing block 133 is provided with the first mobile bar 137, the 3rd connecting rod 112 by way of welding Middle part is provided with third through-hole 136, and the first mobile bar 137 reaches the left of the 3rd connecting rod 112 by third through-hole 136, and first moves The left end of lever 137 is provided with touch panel 138 by way of welding, and the right-hand member of the first mobile bar 137 is provided with by way of welding Second baffle 139, is provided with rubber ring 1310 in the feed opening inner left wall of the lower end of hopper 6, second baffle 139 puts in rubber ring In 1310, when the second guide pin bushing 5 drive hopper 6 move to soon touch the first guide rail 2 of left side when, touch panel 138 is into contact with the One guide rail 2, then promotes touch panel 138 to move right, and touch panel 138 promotes the first mobile bar 137, the first mobile bar 137 to promote the One pushing block 106, the first pushing block 106 is moved by Four-slider 132 in the 4th slide rail 131, and the 4th pushing block promotes the first spring 135, the first spring 135 is now compressive state, and the first mobile bar 137 will promote second baffle 139, second baffle 139 simultaneously Put in the feed opening of hopper 6 by rubber ring 1310, the cement blocked in hopper 6 does not fall out.When the second guide pin bushing 5 depart from During the contact of the first guide rail 2, the first spring 135 will recover from compressive state, drive the second pushing block 133 to pass through Four-slider 132 Moved in the 4th slide rail 131 and be moved to the left, the second pushing block 133 promotes the first mobile bar 137 to be moved to the left, so as to drive the Two baffle plates 139 will not block the feed opening of hopper 6.
Because also including the 5th connecting rod 1391 and brush block 1392, by welding in the inner left wall of the downside of hopper 6 Mode is provided with the 5th connecting rod 1391, and the 5th connecting rod 1391 is located at the top of rubber ring 1310, the downside of the 5th connecting rod 1391 Some brush blocks 1392 are installed, during second baffle 139 is mobile in the feed opening of hopper 6, least a portion of water can be carried Mud, and these cement easily solidify in the place of rubber ring 1310, so during second baffle 139 is moved, second gear By contact brush block 1392, brush block 1392 will brush off the cement on rubber blanket 117 to the rubber blanket 117 of the top of plate 139.
Because also include making real device 14, make real device 14 and include the second fixed plate 141, fixed case 142, the 5th cunning Rail 143, the 5th sliding block 144, second spring 145, the second mobile bar 146, make real plate 147, push pedal 148, the 3rd motor 149, turn Axle 1410, runner 1411, cam 1412 and transmission bar 1413, the downside right of the second guide pin bushing 5 are provided with and make real device 14, the second guide pin bushing 5 downsides right are provided with the second fixed plate 141 by way of welding, and the downside of the second fixed plate 141 is pacified by way of welding Equipped with fixed case 142, the mode being bolted on the inner underside wall of fixed case 142 is symmetrically installed with the 5th slide rail 143, the 5th The inner sliding type of slide rail 143 is connected with the 5th sliding block 144, and the upper end of the 5th sliding block 144 is provided with second spring by way of welding 145, the upper end of second spring 145 is arranged in the upper inside walls of the 5th slide rail 143 by way of welding, the front side of the 5th sliding block 144 Second mobile bar 146 is installed by way of welding, the lower end of the second mobile bar 146 is provided with by way of welding and makes real plate 147, the upper end of the second mobile bar 146 is provided with push pedal 148 by way of welding, and the top of push pedal 148 is pacified by way of welding Equipped with the 3rd motor 149, the mode that the 3rd motor 149 is bolted is arranged on the rear side inwall of fixed case 142, the 3rd electricity The output shaft of 3rd motor 149 of the front side of machine 149 is connected with rotating shaft 1410 by shaft coupling, and the top of right side push pedal 148 also is provided with turning Axle 1410, right side rotating shaft 1410 is located in same horizontal line with left side rotating shaft 1410, and runner is also provided with right side rotating shaft 1410 1411, transmission bar 1413 is connected between runner 1411, the front side of runner 1411 is connected with cam 1412, left cam 1412 and the right side The angle of side cam 1412 180 degree each other, when when carrying out cement and laying, can also be laid using 14 pairs, device is made real Cement made real, user can open the 3rd motor 149 while cement is laid, and the 3rd motor 149 is with moving cam 1412 and runner 1411 rotate, runner 1411 by be driven bar 1413 drive right side runner 1411 and cam 1412 rotate, left side Cam 1412 is rotated to when contact with push pedal 148, and push pedal 148 will be moved down, and push pedal 148 drives the second mobile bar 146 Moved down in the 5th slide rail 143 by the 5th sliding block 144, while the 5th sliding block 144 pulls on second spring 145, second Spring 145 will be in extended state, and promotion is also made real plate 147 and moved down by push pedal 148, so as to enter to the cement for laying Row makes real, and when cam 1412 departs from the contact with push pedal 148, second spring 145 will restore to the original state state, the 5th sliding block of pulling 144 move up, and the 5th sliding block 144 pulls the second mobile bar 146 and makes real plate 147 and moves up, and because two cams 1412 180 degrees each other, so made real at one during plate 147 goes back upwards, just have another and make real plate 147 to moving down It is dynamic that cement is made real.
When the height and thickness that user's needs regulation makes real or the compaction rate for making real, user can be in the second dead slot Mobile 3rd mobile bar 1462 in 1461, when moving to required position, rotates the 5th screw rod 1464, the 5th screw rod 1464 by with In second dead slot of cooperation precession 1461 of the 4th screwed hole 1463, the 5th screw rod 1464 promotes the 4th briquetting 1465, the 4th briquetting 1465 push down the 3rd mobile bar 1462, so as to the 3rd mobile bar 1462 is fixed on this position in the second mobile bar 146.
Because the material of base plate 1 is stainless steel, stainless steel corrosion resistance and acid resistance are strong, can extension fixture the use longevity Life.Because the material of top board 3 is Q235 steel, Q235 steel hardness is high, it is not easy to deforms, makes the service life of device longer.Because Second motor 123 and the 3rd motor 149 are servomotor, and anti-overload ability is strong, and high speed performance is good, can be precisely controlled its rotating speed.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations, improvement can also be made and substituted, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (16)

1. a kind of construction site ground cement installation apparatus, it is characterised in that include base plate(1), the first guide rail(2), One slide rail(21), the first sliding block(22), the first leg(23), wheel(24), inserted link(27), top board(3), the first guide pin bushing(31)、 First screw rod(33), the first briquetting(34), the second leg(35), fixed pulley(36), the 3rd leg(37), electronic reel (38), bracing wire(39), the second guide rail(4), the second guide pin bushing(5), hopper(6), block rubber(7)And push rod(8), base plate(1)It is upper logical The mode for crossing welding is provided with the first guide rail(2), the first guide rail(2)Upper end is provided with top board by way of welding(3), base plate (1)The mode being inside bolted is provided with the first slide rail(21), the first slide rail(21)Upper slidingtype is connected with the first sliding block (22), the first sliding block(22)Downside is provided with the first leg by way of welding(23), the first leg(23)Lower end is rotary It is connected with wheel(24), the first sliding block(22)Outside is provided with slot(25), base plate(1)Outside is provided with first through hole(26), first Through hole(26)Interior and slot(25)Inside it is placed with inserted link(27), the first guide rail(2)Upper slidingtype is connected with the first guide pin bushing(31), top Plate(3)Upper middle side part is provided with the 3rd leg by way of welding(37), the 3rd leg(37)Upper end is rotatably connected with electricity Dynamic reel(38), top board(3)The upside left and right sides is provided with the second leg by way of welding(35), the second leg(35) Upper end is rotatably connected with fixed pulley(36), electronic reel(38)On be wound with two bracing wires(39), lower side guy(39)Pass through Left side fixed pulley(36)Upside and the guide pin bushing of left side first(31)Left side top connection, upper side guy(39)By right side fixed pulley (36)Upside and the guide pin bushing of right side first(31)Right side top connection, the first guide pin bushing(31)Outside is provided with the first screwed hole(32), First screwed hole(32)Inside it is placed with the first screw rod(33), the first screw rod(33)With the first screwed hole(32)Coordinate, the first screw rod (33)Interior side rotary is connected with the first briquetting(34), the first guide pin bushing(31)Between welding by way of the second guide rail is installed (4), the second guide rail(4)Upper slidingtype is connected with the second guide pin bushing(5), the second guide pin bushing(5)Front side is provided with by way of welding Hopper(6), hopper(6)Inside it is placed with block rubber(7), block rubber(7)Upper end is connected with push rod(8).
2. a kind of construction site ground cement installation apparatus according to claim 1, it is characterised in that also include position Moving device(9), gearshift(9)Include support bar(91), the first supporting plate(92), the second slide rail(93), the second sliding block (94), the second screw rod(96)With the first nut(97), base plate(1)On welding by way of support bar is installed(91), support Bar(91)The first supporting plate is installed by way of welding between upside(92), support bar(91)Positioned at the first slide rail(21)It is left Right two sides, the first supporting plate(92)Positioned at the first slide rail(21)Top, the first supporting plate(92)Pacified by way of welding upside Equipped with the second slide rail(93), the second slide rail(93)Inner sliding type is connected with the second sliding block(94), the second sliding block(94)Right-hand member passes through The mode of welding is provided with the first guide rail(2), the first slide rail(21)Upside is provided with a word hole(95), the second sliding block(94)Upper end leads to The mode for crossing welding is provided with the second screw rod(96), the second screw rod(96)By a word hole(95)Reach the second slide rail(93)On Side, the second screw rod(96)Upside is rotary with the first nut(97), the first nut(97)With the second screw rod(96)Coordinate.
3. a kind of construction site ground cement installation apparatus according to claim 2, it is characterised in that also include One motor(971), first gear(972)With the first tooth bar(973), the second slide rail(93)It is bolted on inner underside wall Mode is provided with the first tooth bar(973), the second sliding block(94)Inside pass on left bolted mode and the first motor is installed (971), the first motor(971)First motor of front side left end(971)Output shaft is connected with first gear by shaft coupling (972), first gear(972)With the first tooth bar(973)Engagement.
4. a kind of construction site ground cement installation apparatus according to claim 3, it is characterised in that also include crowded Material device(10), extruding device(10)Include the first cylinder(101), L-shaped bar(102), filling tube(103), hopper(104)、 Valve(105), the first pushing block(106), fix bar(107), head rod(108)With pave plate(109), hopper(6)Left side The mode being bolted is provided with the first cylinder(101), the first cylinder(101)First cylinder of upper end(101)Expansion link The mode that upper end is bolted is provided with L-shaped bar(102), L-shaped bar(102)Right side is arranged on push rod by way of welding (8)Upper end, block rubber(7)Interior right side is connected with filling tube(103), filling tube(103)The mode that upper end is bolted is pacified Equipped with hopper(104), hopper(104)The mode that lower section is bolted is provided with valve(105), block rubber(7)Downside connects It is connected to the first pushing block(106), hopper(6)Lower right-hand side is provided with fix bar by way of welding(107), head rod (108)Right-hand member is provided with head rod by way of welding(108), head rod(108)The side that lower end passes through welding Formula is provided with paves plate(109).
5. a kind of construction site ground cement installation apparatus according to claim 4, it is characterised in that also include Two connecting rods(1082), the 3rd screw rod(1084)With the second briquetting(1085), head rod(108)Downside is provided with the first dead slot (1081), the first dead slot(1081)Inside it is placed with the second connecting rod(1082), the second connecting rod(1082)Lower end is by welding Mode is provided with paves plate(109), head rod(108)Lower right-hand side is provided with the second screwed hole(1083), the second screwed hole (1083)Inside it is placed with the 3rd screw rod(1084), the 3rd screw rod(1084)With the second screwed hole(1083)Coordinate, the 3rd screw rod (1084)Left end is rotatably connected with the second briquetting(1085).
6. a kind of construction site ground cement installation apparatus according to claim 5, it is characterised in that also include control Blanking device processed(11), control blanking device(11)Include the second supporting plate(111), the 3rd connecting rod(112), first fix Plate(113), the 3rd slide rail(114), the 3rd sliding block(115), first baffle(116), rubber blanket(117)With the second cylinder(118), Hopper(6)Lower left is provided with control blanking device(11), hopper(6)Left side lower section is provided with the second support by way of welding Plate(111), the second supporting plate(111)Left end is provided with the 3rd connecting rod by way of welding(112), the 3rd connecting rod (112)Lower end is provided with the first fixed plate by way of welding(113), the first fixed plate(113)Interior right side is connected by bolt The mode for connecing is provided with the 3rd slide rail(114), the 3rd slide rail(114)Inner sliding type is connected with the 3rd sliding block(115), the 3rd sliding block (115)Upper end is provided with first baffle by way of welding(116), first baffle(116)Block hopper(6)The blanking of lower end Mouthful, first baffle(116)Upside is provided with rubber blanket(117), the first fixed plate(113)The side that upside left is bolted Formula is provided with the second cylinder(118), the second cylinder(118)Second cylinder of right-hand member(118)The side that expansion link is bolted Formula is arranged on first baffle(116)Left end.
7. a kind of construction site ground cement installation apparatus according to claim 6, it is characterised in that also include tiltedly Plate(1162), first baffle(116)And rubber blanket(117)On be provided with some second through holes not of uniform size(1161), second leads to Hole(1161)Inner underside is provided with swash plate by way of welding(1162).
8. a kind of construction site ground cement installation apparatus according to claim 7, it is characterised in that also include shifting Dynamic device(12), mobile device(12)Include the second tooth bar(121), contiguous block(122), the second motor(123), second gear (124), the first travel switch(125), the 4th connecting rod(126)With the second travel switch(127), the second guide rail(4)Upside leads to Cross bolted mode and the second tooth bar is installed(121), the second guide pin bushing(5)Upside right company of being provided with by way of welding Connect block(122), contiguous block(122)The mode that right side is bolted is provided with the second motor(123), the second motor(123) Second motor of front side(123)Output shaft is connected with second gear by shaft coupling(124), second gear(124)With the second tooth Bar(121)Engagement, the second motor(123)The mode that right side is bolted is provided with the first travel switch(125), second leads Set(5)Upside left is provided with the 4th connecting rod by way of welding(126), the 4th connecting rod(126)Left end passes through bolt The mode of connection is provided with the second travel switch(127).
9. a kind of construction site ground cement installation apparatus according to claim 8, it is characterised in that also include Three guide pin bushings(1231), the 4th screw rod(1233)With the 3rd briquetting(1234), the first guide pin bushing(31)Pacified by way of welding front side Equipped with the 3rd guide pin bushing(1231), the 3rd guide pin bushing(1231)Inside it is cased with the second guide rail(4), the 3rd guide pin bushing(1231)Right side is provided with the 3rd Screwed hole(1232), the 3rd screwed hole(1232)Inside it is placed with the 4th screw rod(1233), the 4th screw rod(1233)With the 3rd screw thread Hole(1232)Coordinate, the 4th screw rod(1233)Lower end is rotatably connected with the 3rd briquetting(1234).
10. a kind of construction site ground cement installation apparatus according to claim 9, it is characterised in that also include It is automatically stopped blanking device(13), it is automatically stopped blanking device(13)Include the 4th slide rail(131), Four-slider(132), Two pushing blocks(133), block(134), the first spring(135), the first mobile bar(137), touch panel(138), second baffle(139)With Rubber ring(1310), hopper(6)Lower left is provided with and is automatically stopped blanking device(13), the second supporting plate(111)It is interior by bolt The mode of connection is provided with the 4th slide rail(131), the 4th slide rail(131)Inner sliding type is connected with Four-slider(132), the 4th slides Block(132)Lower end is provided with the second pushing block by way of welding(133), the second supporting plate(111)Downside right is by welding Mode block is installed(134), the second pushing block(133)Right side is provided with the first spring by way of welding(135), first Spring(135)Right-hand member is arranged on baffle plate left side, the second pushing block by way of welding(133)Installed by way of welding lower end There is the first mobile bar(137), the 3rd connecting rod(112)Middle part is provided with third through-hole(136), the first mobile bar(137)By Three through holes(136)Reach the 3rd connecting rod(112)Left, the first mobile bar(137)Left end is provided with tactile by way of welding Plate(138), the first mobile bar(137)Right-hand member is provided with second baffle by way of welding(139), hopper(6)Under lower end Rubber ring is installed in material mouth inner left wall(1310), second baffle(139)Put in rubber ring(1310)It is interior.
11. a kind of construction site ground cement installation apparatus according to claim 10, it is characterised in that also include 5th connecting rod(1391)With brush block(1392), hopper(6)In the inner left wall of downside the 5th is provided with by way of welding Connecting rod(1391), the 5th connecting rod(1391)Positioned at rubber ring(1310)Top, the 5th connecting rod(1391)Downside is provided with Some brush blocks(1392).
12. a kind of construction site ground cement installation apparatus according to claim 1, it is characterised in that also include Make real device(14), make real device(14)Include the second fixed plate(141), fixed case(142), the 5th slide rail(143), the 5th Sliding block(144), second spring(145), the second mobile bar(146), make real plate(147), push pedal(148), the 3rd motor(149)、 Rotating shaft(1410), runner(1411), cam(1412)With transmission bar(1413), the second guide pin bushing(5)Downside right is provided with and makes real dress Put(14), the second guide pin bushing(5)Downside right is provided with the second fixed plate by way of welding(141), the second fixed plate(141) Downside is provided with fixed case by way of welding(142), fixed case(142)The mode pair being bolted on inner underside wall Title is provided with the 5th slide rail(143), the 5th slide rail(143)Inner sliding type is connected with the 5th sliding block(144), the 5th sliding block(144) Upper end is provided with second spring by way of welding(145), second spring(145)Upper end is arranged on the by way of welding Five slide rails(143)In upper inside walls, the 5th sliding block(144)Front side is provided with the second mobile bar by way of welding(146), the Two mobile bars(146)Lower end is provided with by way of welding and makes real plate(147), the second mobile bar(146)Upper end is by welding Mode push pedal is installed(148), push pedal(148)Top is provided with the 3rd motor by way of welding(149), the 3rd motor (149)The mode being bolted is arranged on fixed case(142)On rear side inwall, the 3rd motor(149)3rd electricity of front side Machine(149)Output shaft is connected with rotating shaft by shaft coupling(1410), right side push pedal(148)Top also is provided with rotating shaft(1410), it is right Side rotating shaft(1410)With left side rotating shaft(1410)In same horizontal line, right side rotating shaft(1410)On runner is also installed (1411), runner(1411)Between be connected with transmission bar(1413), runner(1411)Front side is connected with cam(1412), left side is convex Wheel(1412)With right cam(1412)Angle 180 degree each other.
13. a kind of construction site ground cement installation apparatus according to claim 1, it is characterised in that also include 3rd mobile bar(1462), the 5th screw rod(1464)With the 4th briquetting(1465), the second mobile bar(146)Inside it is provided with the second dead slot (1461), the second dead slot(1461)Inside it is placed with the 3rd mobile bar(1462), the 3rd mobile bar(1462)Lower end is by welding Mode is provided with and makes real plate(147), the second mobile bar(146)Downside right is provided with the 4th screwed hole(1463), the 4th screwed hole (1463)Inside it is placed with the 5th screw rod(1464), the 5th screw rod(1464)With the 4th screwed hole(1463)Coordinate, the 5th screw rod (1464)Left end is rotatably connected with the 4th briquetting(1465).
A kind of 14. construction site ground cement installation apparatus according to claim 1, it is characterised in that base plate(1)'s Material is stainless steel.
15. a kind of construction site ground cement installation apparatus according to claim 1, it is characterised in that top board(3)'s Material is Q235 steel.
A kind of 16. construction site ground cement installation apparatus according to claim 1, it is characterised in that the second motor (123)With the 3rd motor(149)It is servomotor.
CN201710095136.9A 2017-02-22 2017-02-22 A kind of construction site ground cement installation apparatus CN106677504B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710095136.9A CN106677504B (en) 2017-02-22 2017-02-22 A kind of construction site ground cement installation apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710095136.9A CN106677504B (en) 2017-02-22 2017-02-22 A kind of construction site ground cement installation apparatus

Publications (2)

Publication Number Publication Date
CN106677504A true CN106677504A (en) 2017-05-17
CN106677504B CN106677504B (en) 2018-03-16

Family

ID=58861237

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710095136.9A CN106677504B (en) 2017-02-22 2017-02-22 A kind of construction site ground cement installation apparatus

Country Status (1)

Country Link
CN (1) CN106677504B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100256A (en) * 2017-05-27 2017-08-29 南昌诺义弘科技有限公司 A kind of transport of cement blanking equipment for urban architecture irrigation canals and ditches
CN107100221A (en) * 2017-05-27 2017-08-29 南昌叁润科技有限公司 A kind of construction site ground irrigation canals and ditches excavating equipment
CN107581778A (en) * 2017-09-29 2018-01-16 范中麟 A kind of adjustable smart home dining table
CN107806900A (en) * 2017-10-19 2018-03-16 太原双鼎科技有限公司 A kind of environment monitoring device
CN108222473A (en) * 2018-01-03 2018-06-29 赖文焘 A kind of automatic paved equipment of ground cement traveling for building
CN108842572A (en) * 2018-06-07 2018-11-20 黄玉发 A kind of construction cement flooring installation apparatus
CN109339420A (en) * 2018-11-28 2019-02-15 杭州嘉淼技术服务有限公司 A kind of automatic equipment for being laid with waterproof layer in construction site
CN111379403A (en) * 2020-03-30 2020-07-07 温州职业技术学院 Quick laying device of floor for interior design

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1655424A2 (en) * 2004-11-08 2006-05-10 Herbert Wörle Adjustable dressing and screeding rails
CN204139564U (en) * 2014-10-13 2015-02-04 袁媛 A kind of ground tile paving feeding device of building operations
CN205000608U (en) * 2015-09-30 2016-01-27 付文轻 Automatic mechanical float of preparation screed -coat on wall
CN106760544A (en) * 2017-02-22 2017-05-31 南昌叁润科技有限公司 A kind of construction site wall cement installation apparatus

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1655424A2 (en) * 2004-11-08 2006-05-10 Herbert Wörle Adjustable dressing and screeding rails
CN204139564U (en) * 2014-10-13 2015-02-04 袁媛 A kind of ground tile paving feeding device of building operations
CN205000608U (en) * 2015-09-30 2016-01-27 付文轻 Automatic mechanical float of preparation screed -coat on wall
CN106760544A (en) * 2017-02-22 2017-05-31 南昌叁润科技有限公司 A kind of construction site wall cement installation apparatus

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100256A (en) * 2017-05-27 2017-08-29 南昌诺义弘科技有限公司 A kind of transport of cement blanking equipment for urban architecture irrigation canals and ditches
CN107100221A (en) * 2017-05-27 2017-08-29 南昌叁润科技有限公司 A kind of construction site ground irrigation canals and ditches excavating equipment
CN107100256B (en) * 2017-05-27 2019-04-30 湖北宇隆建设工程有限责任公司 A kind of transport of cement blanking equipment for urban architecture irrigation canals and ditches
CN107581778A (en) * 2017-09-29 2018-01-16 范中麟 A kind of adjustable smart home dining table
CN107806900A (en) * 2017-10-19 2018-03-16 太原双鼎科技有限公司 A kind of environment monitoring device
CN108222473A (en) * 2018-01-03 2018-06-29 赖文焘 A kind of automatic paved equipment of ground cement traveling for building
CN108222473B (en) * 2018-01-03 2020-04-21 平庆义 Ground cement advances automatic system equipment that paves for building
CN108842572A (en) * 2018-06-07 2018-11-20 黄玉发 A kind of construction cement flooring installation apparatus
CN109339420A (en) * 2018-11-28 2019-02-15 杭州嘉淼技术服务有限公司 A kind of automatic equipment for being laid with waterproof layer in construction site
CN111379403A (en) * 2020-03-30 2020-07-07 温州职业技术学院 Quick laying device of floor for interior design

Also Published As

Publication number Publication date
CN106677504B (en) 2018-03-16

Similar Documents

Publication Publication Date Title
CN107794830B (en) A kind of municipal administration road asphalt laying apparatus
CN102277955B (en) Intelligent brick paving machine
CN206216912U (en) A kind of vibration lift formula cement mortar Efficient Agitator for building
CN107433686A (en) A kind of build concrete high-efficiency stirring equipment
CN206123935U (en) High -efficient compounding device of cement for building
CN206926084U (en) A kind of hydraulic engineering concrete high-efficiency stirrer
CN205685542U (en) A kind of bridge construction cement mortar agitating device
CN205700679U (en) A kind of cement for building recycles breaker
CN205572707U (en) Repair with cement rapid mixing device on bridge surface
CN103290753A (en) Nano-composite environment-friendly water permeable brick and production method thereof
CN107097346A (en) A kind of land photovoltaic plant, which is built, uses cement stirring device
CN107175022A (en) A kind of road and bridge construction raw material blending device
CN201276668Y (en) Movable non-mold fast concrete paver
CN106142348A (en) A kind of construction site cement highly efficient agitating device
CN101619558B (en) Air entraining vacuum concrete roadway and constructing method thereof
CN107558336A (en) A kind of municipal cement flooring laying apparatus
CN106045399B (en) A kind of water-permeable brick and preparation method thereof
CN205735511U (en) A kind of bridge construction cement stirring device
CN205651502U (en) High -efficient agitating unit of cement for building
CN107023712A (en) A kind of transport burial equipment buried for underground piping
CN103452221B (en) Concrete Construction Method of Inclined Room Face
CN108086114A (en) A kind of high efficiency road pitch repair apparatus
CN106702865B (en) The full-automatic road dental calculus laydown machine of town road gardens construction
CN107338702A (en) A kind of bridge highway pavement tethered sliding formula concrete speading device
CN206693011U (en) One kind paves uniform bituminous concrete paver

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Xiang Yi

Inventor after: Deng Shouye

Inventor before: The inventor has waived the right to be mentioned

Inventor after: Xiang Yi

Inventor after: Deng Shouye

Inventor before: The inventor has waived the right to be mentioned

TA01 Transfer of patent application right

Effective date of registration: 20180209

Address after: 250000 Station Street, Tianqiao District, Ji'nan, Shandong Province, No. 89

Applicant after: China Railway ten Bureau Group Co., Ltd. Ji'nan survey and Design Institute

Address before: 330038 Avenue in Jiangxi province Nanchang Honggutan Red Valley No. 1568 Red Valley Comprehensive office building and commercial triumph do business six 301-15 room (third floor)

Applicant before: Nanchang first leaf Technology Co., Ltd.

Effective date of registration: 20180209

Address after: 250000 Station Street, Tianqiao District, Ji'nan, Shandong Province, No. 89

Applicant after: China Railway ten Bureau Group Co., Ltd. Ji'nan survey and Design Institute

Address before: 330038 Avenue in Jiangxi province Nanchang Honggutan Red Valley No. 1568 Red Valley Comprehensive office building and commercial triumph do business six 301-15 room (third floor)

Applicant before: Nanchang first leaf Technology Co., Ltd.

CB03 Change of inventor or designer information
TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180316

Termination date: 20190222

CF01 Termination of patent right due to non-payment of annual fee