CN106677169B - It is adapted to the squeezed screw thread pile construction method that spins of severe cold weather - Google Patents

It is adapted to the squeezed screw thread pile construction method that spins of severe cold weather Download PDF

Info

Publication number
CN106677169B
CN106677169B CN201710034868.7A CN201710034868A CN106677169B CN 106677169 B CN106677169 B CN 106677169B CN 201710034868 A CN201710034868 A CN 201710034868A CN 106677169 B CN106677169 B CN 106677169B
Authority
CN
China
Prior art keywords
concrete
stake
well
casing
drilling rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710034868.7A
Other languages
Chinese (zh)
Other versions
CN106677169A (en
Inventor
樊军让
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Yuanji Geotechnical Development Co.,Ltd.
Original Assignee
Shaanxi Long Pole Machinery Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Long Pole Machinery Equipment Co Ltd filed Critical Shaanxi Long Pole Machinery Equipment Co Ltd
Priority to CN201710034868.7A priority Critical patent/CN106677169B/en
Publication of CN106677169A publication Critical patent/CN106677169A/en
Application granted granted Critical
Publication of CN106677169B publication Critical patent/CN106677169B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Abstract

The squeezed screw thread pile construction method that spins for being adapted to severe cold weather is provided, save the concrete delivery pipe being arranged inside drilling rod, the efferent duct of concrete mixer is directly placed into the pillar being arranged in stake well and is poured concrete, effectively shorten concrete conveyance when outer distance, concrete caused by avoiding because of severe cold weather freezes blocking in delivery pipe leads to be unable to the technical problem of normal construction.

Description

It is adapted to the squeezed screw thread pile construction method that spins of severe cold weather
Technical field
The invention belongs to technical field of civil engineering, and in particular to a kind of squeezed Screw Pile of spinning for being adapted to severe cold weather is applied Engineering method.
Background technique
Squeezed screw thread (screw rod) construction method that spins is the mature stake method of current application, because that it is with following advantage is extensive Using: first is that because its pile body has shallow thread, therefore friction stress can be changed to shearing stress, to do the bearing capacity of high stake; Second is that stake soil combination roughness is greater than general pile body, ultimate bearing capacity can achieve 1.5-2 times of general stake;Third is that can reach To stake end without loosened soil, rotary squeezing bored concrete pile bulk settling, which is less than, takes great soil group type stake, end resistance be effectively played;Fourth is that spiral shell The presence of tooth makes pile body not lose cohesive strength, and rotary squeezing bored concrete pile constructively takes the shape that pile body has shallow thread Formula makes stake under vertical uniform load q, does not occur soil body void region between thread and thread, will not therefore cause bearing capacity Loss shows the stress characteristic of the whole stress of stake soil, compatible deformation, and showing pile body surface, there are shallow threads for improving stake Bearing capacity, reduce sedimentation important in inhibiting, the result of finite element stimulation also demonstrates this important function.The construction Although method have many advantages, such as it is above-mentioned, there is also its limitation, when requirement of engineering is especially severe cold weather construction in winter, It can not be just normally carried out using the construction method.It is well known that in order to continuously to being poured concrete in stake well, usually inside drilling rod Equipped with concrete delivery pipe, which is connected to concrete mixer efferent duct, and outlet end is placed in drilling rod Inside is close to the position of rod bit.When stake well gets into predetermined depth, drilling rod bores and is lifted certain altitude under stopping, starting at this time Concrete mixer, concrete is entered in the concrete delivery pipe inside drilling rod by concrete mixer efferent duct, in concrete Under Gravitative Loads, concrete reaches drilling rod and enters in a well close to bit head position and along drill bit periphery, when concrete is in stake well Height when reaching setting height, promote drilling rod again and repeat before the step of, gradually stake well is filled up with concrete;One After the completion of stake well construction, need drilling-machine shifter to continue to next station to drill out a well, then transportable concrete pump truck arrives again Right position, which is set, supplies concrete to stake well.In this work progress, there are the technical problems that two o'clock can not overcome at present: first is that drilling rod Internal concrete delivery pipe outlet end apart from rod bit apart from close, when drill bit continuous work and ground level underlying geological shape When state is poor, drill bit is easy to fever and generates heat, the inevasible concrete delivery pipe being transmitted to inside drilling rod of the heat At outlet end, the solidification of concrete heat causes to block at concrete delivery pipe outlet end, causes construction and security risk;Second is that According to the depth of stake well, the length of usual drilling rod can be greater than the depth of stake well, and when drilling rod is lifted to the limit, concrete mixer is defeated Outlet pipe is in order to achieve the purpose that be connected to drilling rod inner concrete delivery pipe input end, and the length of concrete mixer efferent duct is very Long, when upper station casting concrete has residual and meets severe cold weather inside it, remaining concrete is easy to pumping Freeze in vehicle efferent duct and extremely difficult removing, influences the normal work of concrete mixer when next station.Drawbacks described above constrains The using area of squeezed screw thread (screw rod) method of spinning and time in season, it is therefore necessary to propose to improve.
Summary of the invention
Present invention solves the technical problem that: a kind of squeezed screw thread pile construction method that spins being adapted to severe cold weather is provided, is saved The concrete delivery pipe being arranged inside drilling rod is removed, the efferent duct of concrete mixer is directly placed into the pillar being arranged in stake well Be poured concrete, effectively shorten concrete conveyance when outer distance, concrete is in delivery pipe caused by avoiding because of severe cold weather In freeze blocking and lead to be unable to the technical problem of normal construction.
The technical solution adopted by the present invention: it is adapted to the novel construction method of the squeezed Screw Pile of whirl spraying of severe cold weather, under including State step:
1) suitable drilling rod is selected according to stake well, and need not setting concrete delivery pipe inside drilling rod;
2) well is formed using the routine techniques for squeezed Screw Pile method of spinning, then directly promotes drilling rod Dao stake well outside Portion;
3) mantle rock of stake bottom is tamped using conventional tamping unit;
4) be arranged in stake well outer diameter be less than the casing of stake well internal diameter and make casing lower end and stake bottom keep away from From;
5) concrete mixer is placed in outside a well suitable position and outputs it pipe and be directly placed into casing upper port, started Concrete mixer, concrete are directly entered in casing;
6) concrete entered in casing is fallen using self weight, and enters a bottom from casing lower port, with coagulation The gap of the continuous injection of soil, casing lower end and stake bottom is filled and between casing excircle and stake well inner wall Filling is turned in gap, solves the segregation phenomenon that concrete is generated because of stake well depth;
7) after concrete fills well, casing is promoted to outside a well, then be inserted into reinforcing bar in the concrete into stake well Cage, to concrete setting.
Above-mentioned steps 4) in, the casing lower end is the one third of stake well depth at a distance from stake bottom, (specifically may be used With reference to the data in terms of concrete underwater grouting).
Above-mentioned steps 5) in, the hopper with taper inclination angle, the output of the concrete mixer are set at casing upper port Pipe is placed in hopper.
Above-mentioned steps 4) in, the outer diameter of the casing and the internal diameter ratio of stake well are 1:2-5.
Above-mentioned steps 3) in, the tamping unit is that hoist engine driving compacting long tube tamps the mantle rock of stake bottom.
The present invention compared with prior art the advantages of:
1, the concrete delivery pipe being arranged inside drilling rod is saved, the efferent duct of concrete mixer is directly placed into and is arranged in stake Concrete is poured in pillar in well, effectively shorten concrete conveyance when outer distance, avoid mixing caused by because of severe cold weather Solidifying soil freezes blocking in delivery pipe leads to the technical problem for being unable to normal construction;
2, the concrete delivery pipe being arranged inside drilling rod is saved, it can be to avoid in the prior art because Driller Exothermic passes heat It is delivered to blocking caused by drilling rod inner concrete delivery pipe outlet end;
3, casing is set in stake well, is fallen into the concrete in casing using self weight, and enter from casing lower port Stake bottom, with the continuous injection of concrete, the gap of casing lower end and stake bottom is filled and to casing excircle Filling is turned in gap between stake well inner wall, solves the segregation phenomenon that concrete is generated because of stake well depth;
4, the concrete delivery pipe being arranged inside drilling rod is saved, applying for squeezed screw thread (screw rod) construction method that spins just is expanded Work area domain and time in season, effectively save enterprise construction cost greatly improve working efficiency;
5, hopper with angle is set at casing upper port, effectively prevent the surface dust of a well head is secondary to enter in stake well Portion.
Specific embodiment
A kind of embodiment of the invention is described below.
It is adapted to the squeezed screw thread pile construction method that spins of severe cold weather, includes following step:
1) suitable drilling rod is selected according to stake well, and need not setting concrete delivery pipe inside drilling rod;
2) well is formed using the routine techniques for squeezed Screw Pile method of spinning, then will bores -5 bars and is directly promoted to stake well It is external;
3) mantle rock of stake bottom is tamped using conventional tamping unit;The tamping unit is that hoist engine driving is rammed True length pipe tamps the mantle rock of stake bottom, is not limited to such mode, is as long as the surface dust of stake bottom can be tamped It can;
4) be arranged in stake well outer diameter be less than the casing of stake well internal diameter and make casing lower end and stake bottom keep away from From;Specifically, the casing lower end (specifically refers to concrete water for the one third of stake well depth at a distance from stake bottom Data in terms of lower perfusion);The outer diameter of the casing and the internal diameter ratio of stake well are 1:2-5 (1:2;1-3;1-5), between the two Gap needs to guarantee that concrete smoothly turns over filling between casing and stake well;
5) concrete mixer is placed in outside a well suitable position and outputs it pipe and be directly placed into casing upper port, started Concrete mixer, concrete are directly entered in casing;Hopper with taper (45 degree) inclination angle is set at casing upper port, it is described The efferent duct of concrete mixer is placed in hopper, effectively prevent the surface dust of a well head is secondary to enter inside stake well;
6) concrete entered in casing is fallen using self weight, and enters a bottom from casing lower port, with coagulation The gap of the continuous injection of soil, casing lower end and stake bottom is filled and between casing excircle and stake well inner wall Filling is turned in gap, solves the segregation phenomenon that concrete is generated because of stake well depth;
7) after concrete fills well, casing is promoted to outside a well, then be inserted into reinforcing bar in the concrete into stake well Cage, to concrete setting.
Squeezed screw thread (screw rod) method of spinning is a kind of mature well known pile making method, and concrete operations process is no longer superfluous herein It states;Severe cold weather described in above-mentioned technical proposal, typically referring to subzero can lead to the weather temperature that concrete freezes.
Above-described embodiment, only presently preferred embodiments of the present invention, is not intended to limit the invention practical range, therefore all with this The equivalence changes that content described in invention claim is done should all be included within scope of the invention as claimed.

Claims (2)

1. being adapted to the squeezed screw thread pile construction method that spins of severe cold weather, it is characterised in that include following step:
1) suitable drilling rod is selected according to stake well, and need not setting concrete delivery pipe inside drilling rod;
2) well is formed using the routine techniques for squeezed Screw Pile method of spinning, then directly promotes drilling rod to outside stake well;
3) mantle rock of stake bottom is tamped using conventional tamping unit;
4) outer diameter is arranged in stake well to be less than the casing of stake well internal diameter and casing lower end is made to keep at a distance with stake bottom;
5) concrete mixer is placed in outside a well suitable position and outputs it pipe and be directly placed into casing upper port, start coagulation Native pump truck, concrete are directly entered in casing;
6) concrete entered in casing is fallen using self weight, and enters a bottom from casing lower port, with concrete The gap of constantly injection, casing lower end and stake bottom is filled and to the gap between casing excircle and stake well inner wall Filling is turned over, the segregation phenomenon that concrete is generated because of stake well depth is solved;
7) after concrete fills well, casing is promoted to outside a well, then be inserted into steel reinforcement cage in the concrete into stake well, to Concrete setting;
Above-mentioned steps 4) in, the casing lower end is the one third of stake well depth at a distance from stake bottom;The casing The internal diameter of outer diameter and stake well ratio is 1:2-5;
Above-mentioned steps 5) in, the hopper with taper inclination angle is set at casing upper port, and the efferent duct of the concrete mixer is set In in hopper.
2. the squeezed screw thread pile construction method that spins according to claim 1 for being adapted to severe cold weather, it is characterised in that: above-mentioned In step 3), the tamping unit is that hoist engine driving compacting long tube tamps the mantle rock of stake bottom.
CN201710034868.7A 2017-01-17 2017-01-17 It is adapted to the squeezed screw thread pile construction method that spins of severe cold weather Active CN106677169B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710034868.7A CN106677169B (en) 2017-01-17 2017-01-17 It is adapted to the squeezed screw thread pile construction method that spins of severe cold weather

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710034868.7A CN106677169B (en) 2017-01-17 2017-01-17 It is adapted to the squeezed screw thread pile construction method that spins of severe cold weather

Publications (2)

Publication Number Publication Date
CN106677169A CN106677169A (en) 2017-05-17
CN106677169B true CN106677169B (en) 2019-05-31

Family

ID=58859286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710034868.7A Active CN106677169B (en) 2017-01-17 2017-01-17 It is adapted to the squeezed screw thread pile construction method that spins of severe cold weather

Country Status (1)

Country Link
CN (1) CN106677169B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06136745A (en) * 1992-04-28 1994-05-17 J D F:Kk Construction method for hollow widened bottom cast-in-place concrete pile
CN100402759C (en) * 2006-04-26 2008-07-16 万军 Screw-thread bored concrete pile piling method
CN101250880B (en) * 2007-12-19 2010-12-08 中铁大桥局集团第一工程有限公司 Method for embedding and fixing steel tube concrete pile and steel tube pile anchor
CN102425160A (en) * 2011-08-31 2012-04-25 中国建筑第二工程局有限公司 Method for constructing engineering pile by combining rotary drilling rig with manual pile base chambering
CN104631442B (en) * 2014-12-24 2016-11-02 福建工程学院 Full-sleeve fetches earth and vibrates squeezed cast-in-place pile construction method
CN104762957B (en) * 2015-04-22 2016-05-18 中冶成都勘察研究总院有限公司 A kind of spiral pore-forming rams the construction method that expands CFG stake

Also Published As

Publication number Publication date
CN106677169A (en) 2017-05-17

Similar Documents

Publication Publication Date Title
CN100476082C (en) Post-grouting construction method for long helical bore grouting pile and grouting device thereof
CN107386281B (en) Screw rod uplift pile and its construction method under a kind of upper straight rod suitable for seasonal frozen soil region
CN110331992A (en) A kind of hole daguanpeng construction method
CN104711987B (en) A kind of deep covering layer sleeving valve tube method controllable grouting method
CN105350988B (en) Tunnel Base reinforcement means
CN206784372U (en) Injection forming club-footed pile
CN103195060B (en) Soft soil foundation prestressing bolt anchorage structure and uses thereof
CN108867625A (en) Long auger guncreting pile grouting behind shaft or drift lining handles construction method and its postposition grouting device
CN201241344Y (en) Controllable capsule type expansion device
CN101324064B (en) Controllable expansion extrusion soil body apparatus for geotechnical engineering and use thereof
CN109024721A (en) A kind of underpinning and improve the method that ability is cut in the bending resistance of existing building rigid foundation
CN103911993B (en) A kind of PHA anchor pole and construction method thereof
CN105297710A (en) High-pressure-jetting cement soil twist drill and reamed reinforced concrete grouting combined pile and manufacturing method
CN104790982A (en) Enclosed mud for underground excavation tunnel ultra-deep hole grouting
CN107191188A (en) The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section, constructing device and method
WO2022126807A1 (en) Concrete building pile foundation preparation system and preparation method
CN109440757A (en) A kind of foundation reinforcement method for karst region
CN106677169B (en) It is adapted to the squeezed screw thread pile construction method that spins of severe cold weather
CN102979087B (en) Construction method for rotary excavation pile
CN101100858A (en) Construction method for drilling tool center pumping concrete post mudjack concrete pouring pile and construction device thereof
CN105134069B (en) One kind is related to gas vertical and passes through the anti-well method construction technology in strong rich water rock stratum
CN2154288Y (en) Tube type mud auto-anchor solum anchor rod
CN103556555B (en) Reinforce the construction method of the nail shape drilled pile composite foundation structure of embankment widening
CN209066518U (en) A kind of constructing structure of section of stake forced-landing tilt correcting structure and miniature steel pipe pile
CN104832085B (en) A kind of deep covering layer pipe-following drilling method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220819

Address after: Room 1803, Building F, Changhe International, Fengcheng Eighth Road, Economic and Technological Development Zone, Xi'an City, Shaanxi Province 710018

Patentee after: Shaanxi Yuanji Geotechnical Development Co.,Ltd.

Address before: Environmental Protection New Material Industrial Park, Qianyang County, Baoji City, Shaanxi Province, 721100

Patentee before: SHAANXI LONGJI MACHINERY EQUIPMENT CO.,LTD.

TR01 Transfer of patent right