CN106655060B - Quadripartion deicing high-voltage power transmission line robot - Google Patents

Quadripartion deicing high-voltage power transmission line robot Download PDF

Info

Publication number
CN106655060B
CN106655060B CN201710122215.4A CN201710122215A CN106655060B CN 106655060 B CN106655060 B CN 106655060B CN 201710122215 A CN201710122215 A CN 201710122215A CN 106655060 B CN106655060 B CN 106655060B
Authority
CN
China
Prior art keywords
shaft
deicing
gear
box
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710122215.4A
Other languages
Chinese (zh)
Other versions
CN106655060A (en
Inventor
张波
蔡明智
王茁
王涛
李宁
兰荻
邢泽阳
周剑琦
形家轩
王程
李文琦
谢敏燕
王大欢
傅质彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Engineering University
Original Assignee
Harbin Engineering University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Engineering University filed Critical Harbin Engineering University
Priority to CN201710122215.4A priority Critical patent/CN106655060B/en
Publication of CN106655060A publication Critical patent/CN106655060A/en
Application granted granted Critical
Publication of CN106655060B publication Critical patent/CN106655060B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/16Devices for removing snow or ice from lines or cables

Landscapes

  • Manipulator (AREA)

Abstract

The present invention provides a kind of quadripartion deicing high-voltage power transmission line robot, two 6DOF arms, deicer, intermediate supports arms including robot support platform, the both ends for being separately mounted to robot support platform, cooperated using two 6DOF arms and two deicers and intermediate supports arm, the deicing task of single-phase quadripartion high voltage transmission line can be achieved, be generally used for the transmission line of electricity of 500Kv.One robot can once remove single-phase quadripartion power transmission line, and deicing robot can not only cross quadripartion damping conductor spacer, but also can cross shaft tower, can be aligned across continuous three shaft towers, can also be arranged into broken line.The present invention can easily cross over quadripartion damping conductor spacer;Whether shaft tower is arranged in a straight line, is in the shaft tower of angle point, and the present invention can be directed across shaft tower and not have to interruption deicing operation;Deicing robot is light-weight, volume is relatively small.

Description

四分裂高压输电线路除冰机器人Four-split high-voltage transmission line deicing robot

技术领域technical field

本发明涉及一种四分裂高压输电线路除冰机器人,属于除冰机器人技术领域。The invention relates to a four-split high-voltage transmission line deicing robot, which belongs to the technical field of deicing robots.

背景技术Background technique

由于极端天气,多地气候骤变,不管北方还是南方都面临着冰雪天气,高压电线上结冰后,冰越结越厚,电线不堪重负,最后被压断或者高压电塔被压垮,给高压输电线路等高空设备带来了很大伤害。尤其是因雪灾导致的电力设施损毁,给工农业生产和交通运输带来了巨大损失。因此,研究高压线除冰设备具有重大意义。Due to extreme weather and sudden changes in the climate in many places, both the north and the south are facing ice and snow weather. After the high-voltage power lines freeze, the ice becomes thicker and thicker. It has brought great damage to high-altitude equipment such as high-voltage transmission lines. In particular, the damage to power facilities caused by snow disasters has brought huge losses to industrial and agricultural production and transportation. Therefore, it is of great significance to study high-voltage line deicing equipment.

通过总结国内外的各种除冰技术研究工作,高压线路除冰基本上分为机械除冰法与热力融冰法两种。机械除冰方法有强力震动法、滑轮铲刮法,该方法价格低廉,但是除冰效率低;热力融冰主要有三相短路融冰、带负荷融冰等方法,与机械除冰相比,除冰速度快,安全性高,但是只能用于局部线路。国内外对高压线除冰机器人进行了许多研究,但目前真正投入使用的高压线除冰机器人基本没有。主要原因是在寒冷天气下,除冰机器人在高空环境中作业,不仅要承受住低温、大风的考验,还要克服高压线的挠曲进行爬行。By summarizing the research work of various deicing technologies at home and abroad, the deicing of high-voltage lines is basically divided into two types: mechanical deicing method and thermal deicing method. Mechanical deicing methods include strong vibration method and pulley scraping method. This method is cheap, but the deicing efficiency is low; thermal deicing mainly includes three-phase short circuit deicing and load deicing. Compared with mechanical deicing, deicing Ice is fast and safe, but it can only be used on local lines. A lot of research has been done on high-voltage line deicing robots at home and abroad, but there are basically no high-voltage line deicing robots that are actually put into use. The main reason is that in cold weather, deicing robots work in a high-altitude environment, not only have to withstand the test of low temperature and strong wind, but also overcome the deflection of high-voltage lines to crawl.

一般,除冰机器人都具有行走和除冰两个机构,行走机构需要可靠的抓住高压线行走越障;除冰机构通过敲击或者铲刮除去积冰。除冰机器人的主要技术难点是越障,障碍包括阻尼间隔棒、杆塔等,因此,为了达到降低成本、操作简单、提高效率的目的,应该设计一种可以跨越杆塔的除冰机器人,从而减少工作人员反复的攀登杆塔安装或者卸下机器人的次数。Generally, a deicing robot has two mechanisms of walking and deicing. The walking mechanism needs to reliably grasp the high-voltage line to walk and overcome obstacles; the deicing mechanism removes ice accumulation by knocking or scraping. The main technical difficulty of the deicing robot is overcoming obstacles, which include damping spacers, pole towers, etc. Therefore, in order to achieve the purpose of reducing costs, simple operation, and improving efficiency, a deicing robot that can cross pole towers should be designed to reduce work The number of times people repeatedly climb the tower to install or remove the robot.

发明内容Contents of the invention

本发明的目的是为了提供一种四分裂高压输电线路除冰机器人。The purpose of the present invention is to provide a four-split high-voltage transmission line deicing robot.

本发明的目的是这样实现的:包括机器人支撑平台、对称设置在支撑平台上的两个结构相同的六自由度手臂、设置在每个六自由度手臂上端部的除冰装置,所述机器人支撑平台包括支撑板、对称设置在支撑板两侧的两根直线导轨、安装在每根导轨上的滑块、与滑块固连的控制箱连接件、设置在两个控制箱连接件之间的控制箱、安装在支撑板一端的丝杠电机、与丝杠电机输出端连接的齿轮b、与直线导轨平行设置在支撑板上的丝杠、安装在丝杠端部的齿轮a,所述齿轮b与齿轮a啮合,所述控制箱位于支撑板的下方;The purpose of the present invention is achieved in that it includes a robot support platform, two structurally identical six-degree-of-freedom arms symmetrically arranged on the support platform, and a deicing device arranged at the upper end of each six-degree-of-freedom arm. The platform includes a support plate, two linear guide rails symmetrically arranged on both sides of the support plate, a slider installed on each guide rail, a control box connection piece fixedly connected to the slider, and a control box connection piece arranged between the two control box connection pieces. The control box, the lead screw motor installed at one end of the support plate, the gear b connected to the output end of the lead screw motor, the lead screw arranged on the support plate parallel to the linear guide rail, the gear a installed at the end of the lead screw, the gear b meshes with gear a, and the control box is located under the support plate;

每个六自由度手臂包括设置在支撑板下端的肩部回转托架、安装在肩部回转托架内的肩部回转、与肩部回转的输出轴连接的肩部回转轴、与肩部回转轴上端连接的关节连接架、与关节连接架铰接的肩部俯仰、与肩部俯仰上端固连的连杆a、安装在连杆a端部的肘部俯仰、与肘部俯仰铰接连接的连杆b和连杆c、设置在连杆b和连杆c端部间的腕部俯仰、与腕部俯仰铰接的腕部连接件、与腕部连接件固连的腕部回转拖箱、设置在腕部回转拖箱内的腕部回转、与腕部回转输出轴连接的腕部回转轴、与腕部回转轴上端连接的行走机构,所述行走机构包括与腕部回转轴上端固连的驱动箱、安装在驱动箱内的驱动电机、安装在电机输出轴上的齿轮A、通过轴承安装在驱动箱内的驱动轴、安装在驱动轴的齿轮B,齿轮A与齿轮B啮合,所述驱动轴的两端伸出至驱动箱外且驱动轴的两端分别设置有在电缆上行走的驱动轮;Each six-degree-of-freedom arm includes a shoulder rotary bracket arranged at the lower end of the support plate, a shoulder rotary shaft installed in the shoulder rotary bracket, a shoulder rotary shaft connected with the output shaft of the shoulder rotary, and a shoulder rotary shaft connected to the shoulder rotary The joint connecting frame connected to the upper end of the rotating shaft, the shoulder pitch hinged with the joint connecting frame, the connecting rod a fixedly connected with the upper end of the shoulder pitch, the elbow pitch installed at the end of the connecting rod a, the connecting rod hingedly connected with the elbow pitch Rod b and connecting rod c, wrist pitch arranged between the ends of connecting rod b and connecting rod c, wrist connecting piece articulated with wrist pitching, wrist swivel drag box fixedly connected with wrist connecting piece, setting The wrist rotation in the wrist rotation drag box, the wrist rotation shaft connected with the wrist rotation output shaft, and the running mechanism connected with the upper end of the wrist rotation shaft, the walking mechanism includes a fixed connection with the upper end of the wrist rotation shaft The drive box, the drive motor installed in the drive box, the gear A installed on the output shaft of the motor, the drive shaft installed in the drive box through the bearing, the gear B installed on the drive shaft, the gear A and the gear B mesh, the The two ends of the drive shaft protrude out of the drive box and the two ends of the drive shaft are respectively provided with drive wheels running on the cable;

所述除冰装置包括安装在驱动箱上端的安装板、通过电机支架设置在安装板上的除冰机构电机、安装在除冰电机输出轴上的除冰主动齿轮、通过轴承座设置在安装板上的除冰机构转轴、安装在除冰机构转轴上的除冰从动齿轮、设置在除冰机构转轴端部上的敲击架连接件、设置在敲击架连接件两端的敲击架a和敲击架b,除冰主动齿轮与除冰从动齿轮啮合,敲击架a和敲击架b均是十字型结构,且在敲击架a与敲击架b之间对称设置有四根敲击杆轴,每个敲击杆轴上安装有敲击杆。The deicing device includes a mounting plate mounted on the upper end of the drive box, a deicing mechanism motor mounted on the mounting plate through a motor bracket, a deicing driving gear mounted on the output shaft of the deicing motor, and a deicing drive gear mounted on the mounting plate through a bearing seat. The shaft of the deicing mechanism on the top, the deicing driven gear installed on the shaft of the deicing mechanism, the knocking frame connecting piece arranged on the end of the rotating shaft of the deicing mechanism, the knocking frame a arranged at both ends of the knocking frame connecting piece and the knocking frame b, the deicing driving gear meshes with the deicing driven gear, the knocking frame a and the knocking frame b are both cross-shaped structures, and there are four symmetrically arranged between the knocking frame a and the knocking frame b. There are root knocking bar shafts, and a knocking bar is installed on each knocking bar shaft.

本发明还包括这样一些结构特征:The present invention also includes such structural features:

1.在机器人支撑平台中间位置还设置有中间支撑臂,中间支撑臂包括安装在支撑板中间位置的底部固定架、与底部固定架两端连接的支撑杆、同时与两个支撑杆连接的顶部连接件、安装在顶部连接件上的齿轮箱托架、安装在齿轮箱托架内的齿轮箱、与齿轮箱输出轴连接的中间回转轴、与中间回转轴上端部固连的轴支架、安装在轴支架上的从动轴、安装在从动轴两端的两个与电缆配合的从动轮。1. There is also an intermediate support arm in the middle of the robot support platform. The intermediate support arm includes a bottom fixed frame installed in the middle of the support plate, a support rod connected to both ends of the bottom fixed frame, and a top connected to the two support rods at the same time. Connecting piece, gearbox bracket installed on the top connecting piece, gearbox installed in the gearbox bracket, intermediate rotary shaft connected with the output shaft of the gearbox, shaft bracket fixedly connected to the upper end of the intermediate rotary shaft, installation The driven shaft on the shaft support, the two driven wheels that are installed on the two ends of the driven shaft and cooperate with the cables.

2.所述肩部回转、腕部回转和齿轮箱的结构相同,均包括一号方形箱体、外置在方形箱体侧面上的一号电机、与一号电机输出轴连接的且水平设置在一号方形箱体内的一号蜗杆、竖直安装在一号方形箱体内的一号蜗轮轴、安装在一号蜗轮轴的上的一号蜗轮,一号蜗杆与一号蜗轮啮合,且一号蜗轮轴的上端部伸出至一号方形箱体外作为输出轴。2. The structure of the shoulder rotation, wrist rotation and the gear box are the same, all including the No. 1 square box, the No. 1 motor externally placed on the side of the square box, and the No. 1 motor output shaft connected and horizontally arranged The No. 1 worm in the No. 1 square box, the No. 1 worm gear shaft installed vertically in the No. 1 square box, the No. 1 worm wheel installed on the No. 1 worm shaft, the No. 1 worm meshes with the No. 1 worm wheel, and a The upper end of No. worm gear shaft stretches out to outside No. 1 square casing as output shaft.

3.所述肩部俯仰、肘部俯仰和腕部俯仰的结构相同,均包括二号方形箱体、外置在二号方形箱体侧面的二号电机、与二号电机输出轴连接的且水平设置在二号方形箱体内的二号蜗杆、水平设置在二号方形箱体内的二号蜗轮轴、安装在二号蜗轮轴上的二号蜗轮,二号蜗轮与二号蜗杆啮合,且二号蜗轮轴的一端部伸出至二号方形箱体外部作为输出轴。3. The structures of the shoulder pitch, elbow pitch and wrist pitch are the same, all including the No. 2 square box, the No. 2 motor externally placed on the side of the No. 2 square box, and the motor connected to the output shaft of the No. 2 motor. The No. 2 worm that is horizontally arranged in the No. 2 square box, the No. 2 worm gear shaft that is horizontally arranged in the No. 2 square box, and the No. 2 worm gear installed on the No. 2 worm shaft. The No. 2 worm gear meshes with the No. 2 worm, and the No. One end of No. worm gear shaft stretches out to the No. 2 square casing outside as output shaft.

与现有技术相比,本发明的有益效果是:本发明包括机器人支撑平台、6自由度手臂、除冰装置、中间支撑臂,两个6自由度手臂分别安装在机器人支撑平台的两端,两个除冰装置分别安装在两个6自由度手臂末端,中间支撑臂起到类似于张紧轮的作用。本发明采用两个6自由度手臂和两个除冰装置以及中间支撑臂相互配合,可以实现单相四分裂高压输电线的除冰任务,一般应用于500Kv的输电线路。一个机器人一次可以清除单相四分裂输电线,除冰机器人不但可以越过四分裂阻尼间隔棒,而且还可以越过杆塔,跨越连续的三个杆塔可以成直线排列,也可以成折线排列。本发明相对于其他输电线除冰机器人,具有很大优点:轻松跨越四分裂阻尼间隔棒;不论是杆塔直线排列,还是处于角点的杆塔,本发明都可以直接越过杆塔而不用间断除冰作业;除冰机器人重量轻、体积相对较小。具体的说是:Compared with the prior art, the beneficial effects of the present invention are: the present invention includes a robot support platform, a 6-degree-of-freedom arm, a deicing device, and an intermediate support arm, and two 6-degree-of-freedom arms are respectively installed at both ends of the robot support platform, The two deicing devices are respectively installed at the ends of the two 6-DOF arms, and the middle support arm acts like a tension wheel. The present invention uses two arms with 6 degrees of freedom, two deicing devices and an intermediate support arm to cooperate with each other, and can realize the task of deicing single-phase four-split high-voltage transmission lines, and is generally applied to 500Kv transmission lines. One robot can clear single-phase four-split transmission lines at one time, and the deicing robot can not only cross the four-split damping spacers, but also cross the towers. The three consecutive towers can be arranged in a straight line or in a zigzag line. Compared with other transmission line deicing robots, the present invention has great advantages: it can easily cross the four-split damping spacers; whether the poles and towers are arranged in a straight line or at a corner point, the present invention can directly cross the poles and towers without intermittent deicing operations ; The deicing robot is light in weight and relatively small in size. Specifically:

1、本发明相对于其他输电线除冰机器人,具有很大优点,其明显的增强了除冰机器人的越障能力,不但可以越过四分裂阻尼间隔棒,而且还可以越过杆塔,跨越连续的三个杆塔可以成直线排列,也可以成折线排列;1. Compared with other transmission line deicing robots, the present invention has great advantages. It significantly enhances the obstacle surmounting ability of the deicing robot. The towers can be arranged in a straight line or in a zigzag line;

2、本发明自动化程度高:本发明可以直接越过杆塔而不用间断除冰作业,避免了线路工人每到一个杆塔就需要反复登杆/塔安装和卸载机器人;2. The present invention has a high degree of automation: the present invention can directly cross the pole tower without intermittent deicing operations, avoiding the need for line workers to repeatedly climb poles/towers to install and unload robots every time they reach a pole tower;

3、本发明设计结构独特,重量轻、体积小、可靠性高,一般应用在500Kv四分裂高压输电线路上,安装除冰机器人到达电缆上操作方便。3. The invention has a unique design structure, light weight, small volume, and high reliability. It is generally used on 500Kv four-split high-voltage transmission lines, and it is easy to operate when installing a deicing robot on the cable.

附图说明Description of drawings

图1是本发明的四分裂高压输电线路除冰机器人轴测图;Fig. 1 is an axonometric view of a four-split high-voltage transmission line deicing robot of the present invention;

图2是本发明的机器人支撑平台Ⅰ的结构示意图;Fig. 2 is the structural representation of robot support platform I of the present invention;

图3是本发明的6自由度手臂Ⅱ下半部分的结构示意图;Fig. 3 is a structural schematic diagram of the lower half of the 6-DOF arm II of the present invention;

图4是本发明的6自由度手臂Ⅱ上半部分的结构示意图;Fig. 4 is a structural schematic diagram of the upper half of the 6-DOF arm II of the present invention;

图5是本发明的肩部回转Ⅱ-1的结构示意图;Fig. 5 is a structural schematic diagram of shoulder rotation II-1 of the present invention;

图6是本发明的肘部俯仰Ⅱ-9的结构示意图;Fig. 6 is the structural representation of elbow pitch II-9 of the present invention;

图7是本发明的行走机构Ⅱ-18的结构示意图;Fig. 7 is the structural representation of running mechanism II-18 of the present invention;

图8是本发明的除冰装置Ⅲ的结构示意图;Fig. 8 is a schematic structural view of the deicing device III of the present invention;

图9是本发明的中间支撑臂Ⅳ的结构示意图。Fig. 9 is a schematic structural view of the intermediate support arm IV of the present invention.

具体实施方式Detailed ways

下面结合附图与具体实施方式对本发明作进一步详细描述。The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

结合图1至图8,本发明的四分裂高压输电线路除冰机器人包括机器人支撑平台Ⅰ、6自由度手臂Ⅱ、除冰装置Ⅲ、中间支撑臂Ⅳ。两个6自由度手臂分别安装在机器人支撑平台的两端,两个除冰装置分别安装在两个6自由度手臂末端,中间支撑臂起到类似于张紧轮的作用。1 to 8, the four-split high-voltage transmission line deicing robot of the present invention includes a robot support platform I, a 6-degree-of-freedom arm II, a deicing device III, and an intermediate support arm IV. The two 6-DOF arms are respectively installed at both ends of the robot support platform, and the two deicing devices are respectively installed at the ends of the two 6-DOF arms. The middle support arm acts like a tension wheel.

如图2所示,机器人支撑平台Ⅰ主要由:控制箱Ⅰ-1、控制箱连接件Ⅰ-2、THK直线导轨Ⅰ-3、丝杠Ⅰ-4、深沟球轴承Ⅰ-5、丝杠座Ⅰ-6、直齿轮aⅠ-7、锁紧挡圈Ⅰ-8、电机座Ⅰ-9、支撑板Ⅰ-10、齿轮bⅠ-11、丝杠电机Ⅰ-12、THK直线导轨滑块Ⅰ-13、丝杠螺母Ⅰ-14、丝杠螺母座Ⅰ-15等构成。所述的THK直线导轨有两个,分别安装在支撑板两侧,所述THK直线导轨滑块总共有四个,每个THK导轨上分别布置两个滑块,每侧两个滑块分别安装一个控制箱连接件,所述的控制箱连接件有两个并与控制箱连接,控制箱内部有控制器、驱动器、电源等,所述丝杠座有两个,对称安装在支撑板两端,丝杠两端安装在丝杠座上,丝杠其中一端安装直齿轮a,电机座安装在支撑板一端,丝杠电机安装在电机座上,电机输出安装齿轮b,齿轮a与齿轮b啮合传递运动至丝杠,丝杠螺母安装在丝杠座中,丝杠座安装在一侧的控制箱连接件上,这样就可以使控制箱在支撑板下方往复运动,从而改变除冰机器人在不同工作过程中的重心位置,使重心处在最有利于翻越障碍的位置。控制箱Ⅰ-1内部有控制器、驱动器、电源等,控制箱重量大约为20Kg,通过上述机构,可以使控制箱在支撑板Ⅰ-10下方往复运动,从而调节除冰机器人在不同工作过程中的重心位置,使重心处在最有利于翻越障碍的位置。As shown in Figure 2, the robot support platform Ⅰ is mainly composed of: control box Ⅰ-1, control box connector Ⅰ-2, THK linear guide Ⅰ-3, lead screw Ⅰ-4, deep groove ball bearing Ⅰ-5, lead screw Seat Ⅰ-6, spur gear aⅠ-7, locking retaining ring Ⅰ-8, motor seat Ⅰ-9, support plate Ⅰ-10, gear bⅠ-11, lead screw motor Ⅰ-12, THK linear guide rail slider Ⅰ- 13. Lead screw nut Ⅰ-14, lead screw nut seat Ⅰ-15 and so on. There are two THK linear guide rails, which are respectively installed on both sides of the support plate. There are four THK linear guide rail sliders in total. Two sliders are arranged on each THK guide rail, and two sliders are installed on each side respectively. A control box connector, the control box connector has two and is connected with the control box, the control box has a controller, a driver, a power supply, etc., and there are two screw seats, which are symmetrically installed at both ends of the support plate , Both ends of the lead screw are installed on the lead screw seat, one end of the lead screw is installed with spur gear a, the motor seat is installed at one end of the support plate, the lead screw motor is installed on the motor seat, the motor output is installed with gear b, and gear a meshes with gear b The movement is transmitted to the lead screw, the lead screw nut is installed in the lead screw seat, and the lead screw seat is installed on the connecting piece of the control box on one side, so that the control box can reciprocate under the support plate, thus changing the deicing robot in different positions. The position of the center of gravity during the working process makes the center of gravity in the most favorable position for overcoming obstacles. Inside the control box Ⅰ-1 are controllers, drivers, power supplies, etc. The weight of the control box is about 20Kg. Through the above mechanism, the control box can reciprocate under the support plate Ⅰ-10, thereby adjusting the deicing robot in different working processes. The position of the center of gravity, so that the center of gravity is in the most favorable position for overcoming obstacles.

如图3、图4所示,6自由度手臂Ⅱ主要由:肩部回转Ⅱ-1、肩部回转托架Ⅱ-2、回转轴Ⅱ-3、圆锥滚子轴承Ⅱ-4、轴承套筒Ⅱ-5、关节连接件Ⅱ-6、肩部俯仰Ⅱ-7、连杆aⅡ-8、肘部俯仰Ⅱ-9、连杆b和cⅡ-10、腕部俯仰Ⅱ-11、腕部连接件Ⅱ-12、腕部回转拖箱Ⅱ-13、腕部回转Ⅱ-14、支撑板Ⅱ-15、腕部轴承套筒Ⅱ-16、圆锥滚子轴承Ⅱ-17、行走机构Ⅱ-18。其中肩部俯仰Ⅱ-7、肘部俯仰Ⅱ-9、腕部俯仰Ⅱ-11为相同的模块化结构;肩部回转Ⅱ-1和腕部回转Ⅱ-14结构基本相同。肩部回转托架Ⅱ-2安装在机器人支撑平台下部,用于安装肩部回转Ⅱ-1,轴承套筒Ⅱ-5安装在机器人支撑平台上表面,用于固定回转轴Ⅱ-3,这样就可以将6自由度机械手臂Ⅱ和机器人支撑平台Ⅰ连接起来。腕部回转Ⅱ-14的作用是控制行走机构Ⅱ-18回转,以避免和高压线缆干涉,顺利运动到线缆上方。两个6自由度手臂Ⅱ安装在机器人支撑平台Ⅰ的两端,关节形式的机械手臂使得除冰机器人的跨越障碍能力大大增强。具体的说:肩部回转安装在机器人支撑平台上,肩部回转的输出轴与回转轴连接,回转轴通过轴承套筒固定,关节连接件将回转轴和肩部俯仰连接起来,连杆a将肩部俯仰和肘部俯仰连接起来,连杆b、连杆c将肘部俯仰和腕部俯仰连接起来,腕部连接件将腕部俯仰和腕部回转连接起来,腕部轴承套筒安装在腕部回转上,回转轴安装在腕部轴承套筒内并与腕部回转的输出轴连接,行走机构连接件将回转轴和行走机构连接起来;所述的肩部回转包括齿轮箱托架、齿轮箱、蜗轮轴、蜗轮、蜗杆、蜗杆轴承座、电机,齿轮箱托架将齿轮箱安装在机器人支撑平台上,输出轴竖直向上,蜗轮安装在输出轴上,蜗杆一端安装在齿轮箱上,一端安装在蜗杆轴承座上,蜗杆轴承座安装在齿轮箱侧面,电机安装在齿轮箱体外侧,并与蜗杆一端连接起来;所述的肩部俯仰、肘部俯仰、腕部俯仰为相同的模块化结构,包括箱体、电机、蜗杆、蜗杆轴承座、蜗轮轴、蜗轮,电机安装在箱体外侧并与蜗杆连接,蜗杆一端安装到箱体上,一端安装到蜗杆轴承座上,蜗轮安装到蜗轮轴上,蜗轮轴安装在两侧箱体上并对外传递运动;腕部回转和肩部回转结构一致;所述行走机构包括驱动箱、驱动电机、电机座、驱动轴、齿轮A、齿轮B、驱动轮,电机座安装在驱动箱底板上,电机安装在电机座上,电机输出轴连接齿轮a,齿轮b安装在驱动轴上,驱动轴安装在两侧驱动箱体上并每端分别安装一个驱动轮,驱动轮在电缆滚动行走。As shown in Figure 3 and Figure 4, the 6-DOF arm II is mainly composed of: shoulder rotation II-1, shoulder rotation bracket II-2, rotary shaft II-3, tapered roller bearing II-4, bearing sleeve Ⅱ-5, joint connection part Ⅱ-6, shoulder pitch Ⅱ-7, link a Ⅱ-8, elbow pitch Ⅱ-9, link b and c Ⅱ-10, wrist pitch Ⅱ-11, wrist link Ⅱ-12, Wrist Swivel Trailer Ⅱ-13, Wrist Swivel Ⅱ-14, Support Plate Ⅱ-15, Wrist Bearing Sleeve Ⅱ-16, Tapered Roller Bearing Ⅱ-17, Traveling Mechanism Ⅱ-18. Among them, shoulder pitch II-7, elbow pitch II-9, and wrist pitch II-11 have the same modular structure; shoulder rotation II-1 and wrist rotation II-14 have basically the same structure. The shoulder slewing bracket Ⅱ-2 is installed on the lower part of the robot support platform for installing the shoulder slewing Ⅱ-1, and the bearing sleeve Ⅱ-5 is installed on the upper surface of the robot support platform to fix the slewing shaft Ⅱ-3, so that The 6-DOF robotic arm II can be connected with the robot support platform I. The function of the wrist rotation II-14 is to control the rotation of the traveling mechanism II-18, so as to avoid interference with the high-voltage cable and move smoothly to the top of the cable. Two 6-DOF arms II are installed at both ends of the robot support platform I, and the articulated mechanical arms greatly enhance the ability of the deicing robot to cross obstacles. Specifically: the shoulder rotation is installed on the robot support platform, the output shaft of the shoulder rotation is connected with the rotary shaft, the rotary shaft is fixed by the bearing sleeve, the joint joint connects the rotary shaft and the pitch of the shoulder, and the connecting rod a will The shoulder pitch is connected with the elbow pitch, the connecting rod b and the connecting rod c are connected with the elbow pitch and the wrist pitch, the wrist joint is connected with the wrist pitch and the wrist rotation, and the wrist bearing sleeve is installed on On the wrist rotation, the rotary shaft is installed in the wrist bearing sleeve and connected with the output shaft of the wrist rotation, and the traveling mechanism connecting piece connects the rotary shaft and the traveling mechanism; the shoulder rotation includes the gear box bracket, Gearbox, worm gear shaft, worm wheel, worm, worm bearing housing, motor, gearbox bracket Install the gearbox on the robot support platform, the output shaft is vertically upward, the worm wheel is installed on the output shaft, and one end of the worm is installed on the gearbox , one end is installed on the worm bearing seat, the worm bearing seat is installed on the side of the gearbox, the motor is installed outside the gearbox body, and connected with one end of the worm; the shoulder pitch, elbow pitch, and wrist pitch are the same Modular structure, including box, motor, worm, worm bearing seat, worm gear shaft, worm gear, the motor is installed outside the box and connected to the worm, one end of the worm is installed on the box, the other end is installed on the worm bearing seat, and the worm gear is installed To the worm gear shaft, the worm gear shaft is installed on both sides of the box and transmits the motion to the outside; the wrist rotation and shoulder rotation structure are consistent; the walking mechanism includes a drive box, a drive motor, a motor seat, a drive shaft, gear A, gear B. Drive wheel, the motor seat is installed on the bottom plate of the drive box, the motor is installed on the motor seat, the output shaft of the motor is connected to gear a, the gear b is installed on the drive shaft, the drive shaft is installed on the drive box on both sides and each end is separately A driving wheel is installed, and the driving wheel rolls and walks on the cable.

图5为肩部回转Ⅱ-1的结构,包括前箱体Ⅱ-1-1、深沟球轴承Ⅱ-1-2、左箱体Ⅱ-1-3、圆锥滚子轴承Ⅱ-1-4、蜗轮轴Ⅱ-1-5、上箱体Ⅱ-1-6、蜗杆Ⅱ-1-7、蜗杆轴承座Ⅱ-1-8、后箱体Ⅱ-1-9、电机Ⅱ-1-10、右箱体Ⅱ-1-11、联轴器Ⅱ-1-12、下箱体Ⅱ-1-13、圆锥滚子轴承Ⅱ-1-14。肩部回转Ⅱ-1负责为整个机械手臂的下部回转轴提供自由度,当跨越不在一条直线的三个杆塔时用到这一肩部回转自由度。Figure 5 shows the structure of the shoulder rotation Ⅱ-1, including the front case Ⅱ-1-1, deep groove ball bearing Ⅱ-1-2, left case Ⅱ-1-3, tapered roller bearing Ⅱ-1-4 , worm gear shaft Ⅱ-1-5, upper box Ⅱ-1-6, worm screw Ⅱ-1-7, worm bearing seat Ⅱ-1-8, rear box Ⅱ-1-9, motor Ⅱ-1-10, Right box Ⅱ-1-11, coupling Ⅱ-1-12, lower box Ⅱ-1-13, tapered roller bearing Ⅱ-1-14. Shoulder Rotation II-1 is responsible for providing a degree of freedom for the lower rotary axis of the entire robotic arm. This shoulder rotation degree of freedom is used when crossing three towers that are not in a straight line.

图6为肘部俯仰Ⅱ-9的结构,包括蜗杆Ⅱ-9-1、前箱体Ⅱ-9-2、左箱体Ⅱ-9-3、深沟球轴承Ⅱ-9-4、上箱体Ⅱ-9-5、圆锥滚子轴承Ⅱ-9-6、右箱体Ⅱ-9-7、联轴器Ⅱ-9-8、驱动电机Ⅱ-9-9、右箱体Ⅱ-9-10、蜗杆轴承座Ⅱ-9-11、蜗轮轴Ⅱ-9-12、下箱体Ⅱ-9-13。上述肩部俯仰Ⅱ-7、腕部俯仰Ⅱ-11与肘部俯仰Ⅱ-9为相同的模块化结构,蜗轮轴安装在两侧箱体上并对外传递运动,这种关节形式的手臂可以使除冰机器人相对更加灵活,可以跨越可能遇到的各种障碍形式;Figure 6 shows the structure of elbow pitch II-9, including worm screw II-9-1, front box II-9-2, left box II-9-3, deep groove ball bearing II-9-4, upper box Body Ⅱ-9-5, tapered roller bearing Ⅱ-9-6, right box Ⅱ-9-7, coupling Ⅱ-9-8, driving motor Ⅱ-9-9, right box Ⅱ-9- 10. Worm bearing seat II-9-11, worm gear shaft II-9-12, lower box II-9-13. The above-mentioned shoulder pitch II-7, wrist pitch II-11 and elbow pitch II-9 have the same modular structure, and the worm gear shaft is installed on both sides of the box and transmits the movement to the outside. This joint form of the arm can make The deicing robot is relatively more flexible and can cross various obstacles that may be encountered;

图7为行走机构Ⅱ-18,行走机构包括驱动箱Ⅱ-18-1、驱动电机Ⅱ-18-2、电机座Ⅱ-18-3、齿轮AⅡ-18-4、锁死螺母Ⅱ-18-5、轴套Ⅱ-18-6、驱动轮Ⅱ-18-7、驱动轮螺母Ⅱ-18-8、圆锥滚子轴承Ⅱ-18-9、齿轮BⅡ-18-10、驱动轴Ⅱ-18-11。驱动轴每端分别安装一个驱动轮,驱动电机经过齿轮传动带动驱动轮转动,两个行走机构分别安装在6自由度机械手臂末端,驱动轮在电缆上方滚动行走。Fig. 7 is traveling mechanism Ⅱ-18, and traveling mechanism includes driving box Ⅱ-18-1, driving motor Ⅱ-18-2, motor seat Ⅱ-18-3, gear AⅡ-18-4, lock nut Ⅱ-18- 5. Shaft sleeve Ⅱ-18-6, driving wheel Ⅱ-18-7, driving wheel nut Ⅱ-18-8, tapered roller bearing Ⅱ-18-9, gear BⅡ-18-10, driving shaft Ⅱ-18- 11. A drive wheel is installed at each end of the drive shaft, and the drive motor drives the drive wheel to rotate through gear transmission. The two traveling mechanisms are respectively installed at the end of the 6-DOF mechanical arm, and the drive wheel rolls and walks above the cable.

图8为除冰装置Ⅲ的结构设计,此设计的实施例中的除冰装置Ⅲ通过旋转敲打的方式清除输电线上的履冰,其由电机后支架Ⅲ-1、除冰机构电机Ⅲ-2、电机前支架Ⅲ-3、锥销锁紧挡圈Ⅲ-4、除冰主动齿轮Ⅲ-5、安装板Ⅲ-6、除冰机构轴承座Ⅲ-7、圆锥滚子轴承Ⅲ-8、除冰机构转轴Ⅲ-9、除冰从动齿轮Ⅲ-10、除冰机构轴承座Ⅲ-11、敲击架aⅢ-12、敲击杆轴Ⅲ-13、敲击杆Ⅲ-14、圆锥滚子轴承Ⅲ-15、套筒Ⅲ-16、敲击架bⅢ-17、敲击架连接件Ⅲ-18等组成。旋转盘上均匀安装4个敲击杆,电机固定在驱动机构中的电机座上,经过直齿轮传递运动给除冰机构转轴,带动敲击架转动,敲击杆在高速状态下击碎冰块。所述的敲击架有两个,敲击杆和敲击杆轴分别为四个,电机支架安装在驱动箱上面,电机安装在电机支架上,电机输出轴安装齿轮a,并通过锁紧挡圈轴向限位,除冰机构转轴安装在除冰机构轴承座上,齿轮b安装在除冰机构转轴上并通过轴套对其轴向限位,两个敲击架通过敲击架连接件连接起来,四对敲击杆和敲击杆轴安装在两个敲击架之间。通过电机带动敲击杆快速旋转即可达到单相四分裂输电线的除冰任务。Figure 8 shows the structural design of the deicing device III. The deicing device III in the embodiment of this design clears the ice shoes on the transmission line by rotating and beating. It consists of the motor rear bracket III-1, the deicing mechanism motor III- 2. Motor front bracket Ⅲ-3, tapered pin locking retaining ring Ⅲ-4, deicing driving gear Ⅲ-5, mounting plate Ⅲ-6, deicing mechanism bearing seat Ⅲ-7, tapered roller bearing Ⅲ-8, Deicing mechanism shaft III-9, deicing driven gear III-10, deicing mechanism bearing seat III-11, knocking frame aIII-12, knocking rod shaft III-13, knocking rod III-14, tapered roller Sub-bearing Ⅲ-15, sleeve Ⅲ-16, percussion frame bⅢ-17, percussion frame connector Ⅲ-18, etc. Four percussion rods are evenly installed on the rotating disk, and the motor is fixed on the motor seat in the driving mechanism, and the motion is transmitted to the rotating shaft of the deicing mechanism through the spur gear, which drives the percussion frame to rotate, and the percussion rod crushes the ice at high speed . There are two knocking frames, four knocking rods and four knocking rod shafts respectively, the motor bracket is installed on the drive box, the motor is installed on the motor bracket, the motor output shaft is equipped with gear a, and the locking gear The shaft of the deicing mechanism is installed on the bearing seat of the deicing mechanism, the gear b is installed on the rotating shaft of the deicing mechanism and its axial limit is limited by the bushing, and the two percussion frames are connected through the percussion frame connector Connected, four pairs of knocking rods and knocking rod shafts are mounted between two knocking frames. The deicing task of the single-phase four-split transmission line can be achieved by driving the knock rod to rotate rapidly through the motor.

图9为中间支撑臂Ⅳ的结构设计,此装置由底部固定架Ⅳ-1、支撑杆Ⅳ-2、顶部连接件Ⅳ-3、齿轮箱托架Ⅳ-4、回转轴支撑板Ⅳ-5、轴承套筒Ⅳ-6、圆锥滚子轴承Ⅳ-7、从动轴Ⅳ-8、从动轮Ⅳ-9、深沟球轴承Ⅳ-10、轴支架Ⅳ-11、锁死螺母Ⅳ-12、中间回转轴Ⅳ-13、齿轮箱Ⅳ-14等组成。所述齿轮箱Ⅳ-14和6自由度手臂中的腕部回转结构相同,底部固定架安装在机器人支撑平台Ⅰ上,中间支撑杆安装在底部固定架上,顶部连接件安装在中间支撑杆上端,齿轮箱托架安装在顶部连接件上,齿轮箱安装在托架中,轴承套筒安装在齿轮箱托架上板,回转轴安装在轴承套筒中并与齿轮箱输出轴连接,轴支架将回转轴和从动轴连接起来,从动轴两端分别连接一个从动轮。中间支撑臂的作用是:当跨越障碍时,两边机械手臂伸长,中间支撑臂的回转轴正向转动90°,两边机械手臂缩短使从动轮运动到线缆上方,中间支撑臂的回转轴反向转动90°,两边机械手臂伸长至三排轮同时接触线缆上表面,一边的6自由度机械手臂松开,除冰机器人仍然平衡,松开的手臂跨越障碍,后续中间支撑臂和另外一个机械手臂依次翻越障碍。中间支撑臂配合两边的6自由度手臂,起到张紧作用,防止冰机器人在大风或者振动的影响从输电线缆上掉下。一般行走过程中,支撑臂上的从动轮在电缆下方与电缆张紧,当跨越障碍时,支撑臂上的从动轮运动到电缆上方,相应的机器人支撑平台Ⅰ下方的控制箱移动,使重心向一侧偏移,然后另外一边的6自由度手臂脱离电缆,这样机器人重心依然处于合适的位置不会倾倒,脱离电缆的6自由度手臂开始跨越障碍物。Fig. 9 is the structural design of the middle support arm IV. This device consists of a bottom fixed frame IV-1, a support rod IV-2, a top connector IV-3, a gear box bracket IV-4, a rotary shaft support plate IV-5, Bearing sleeve Ⅳ-6, tapered roller bearing Ⅳ-7, driven shaft Ⅳ-8, driven wheel Ⅳ-9, deep groove ball bearing Ⅳ-10, shaft bracket Ⅳ-11, lock nut Ⅳ-12, middle Rotary shaft Ⅳ-13, gear box Ⅳ-14 and so on. The gear box IV-14 is the same as the wrist rotation structure in the 6-DOF arm. The bottom fixed frame is installed on the robot support platform I, the middle support rod is installed on the bottom fixed frame, and the top connector is installed on the upper end of the middle support rod. , the gearbox bracket is installed on the top connector, the gearbox is installed in the bracket, the bearing sleeve is installed on the upper plate of the gearbox bracket, the rotary shaft is installed in the bearing sleeve and connected with the output shaft of the gearbox, and the shaft bracket The rotary shaft and the driven shaft are connected, and a driven wheel is respectively connected to two ends of the driven shaft. The function of the middle support arm is: when crossing obstacles, the mechanical arms on both sides are extended, the rotation axis of the middle support arm is rotated 90° forward, the mechanical arms on both sides are shortened to make the driven wheel move above the cable, and the rotation axis of the middle support arm is reversed. Rotate 90°, the arms on both sides extend until the three rows of wheels touch the upper surface of the cable at the same time, the 6-DOF arm on one side is released, the de-icing robot is still balanced, the released arm crosses obstacles, and the middle support arm and other A robotic arm climbs over obstacles one by one. The middle support arm cooperates with the 6-DOF arms on both sides to play a tensioning role to prevent the ice robot from falling off the power transmission cable under the influence of strong wind or vibration. Generally, during walking, the driven wheel on the support arm is under the cable and tensioned with the cable. When crossing an obstacle, the driven wheel on the support arm moves to the top of the cable, and the corresponding control box below the robot support platform Ⅰ moves to make the center of gravity toward One side is offset, and then the 6-DOF arm on the other side is detached from the cable, so that the center of gravity of the robot is still in a proper position and will not fall over, and the 6-DOF arm detached from the cable begins to cross obstacles.

本发明的主要动作有:6自由度手臂伸长、手臂行走机构放置到四分裂输电线的下部两根线上部、6自由度手臂缩短、两个除冰装置同时工作除冰、除冰机器人越障动作,具体如下:The main actions of the present invention are as follows: 6 degrees of freedom arm extension, arm walking mechanism placed on the lower two lines of the four-split transmission line, 6 degrees of freedom arm shortening, two deicing devices working simultaneously to deicing, deicing robot more Actions are as follows:

1、控制机器人支撑平台上的控制箱运动到中间位置,确保重心处在除冰机器人中心,两边的6自由度手臂同步伸长,使之末端垂直于机器人支撑平台并且高于中间支撑臂150mm。1. Control the control box on the robot support platform to move to the middle position, ensure that the center of gravity is at the center of the deicing robot, and the 6-DOF arms on both sides are extended synchronously, so that the ends are perpendicular to the robot support platform and 150mm higher than the middle support arm.

2、手臂末端腕部回转使行走机构转过90°,将两个行走机构的驱动轮分别放到下排线缆之上,腕部回转再转90°使行走机构恢复到原来位置。驱动轮的沟槽与高压输电线配合进行限位,保证除冰机器人顺着电缆行走。2. Rotate the wrist at the end of the arm to make the traveling mechanism turn 90°, put the driving wheels of the two traveling mechanisms on the lower cables respectively, turn the wrist and turn 90° to restore the traveling mechanism to its original position. The groove of the driving wheel cooperates with the high-voltage transmission line to limit the position, so as to ensure that the deicing robot walks along the cable.

3、两边的6自由度手臂同步缩短,缩短至其驱动轮中心和从动轮中心的垂直高度为100mm,此时中间支撑臂上的从动轮在电缆下方压紧线缆,这样做可以防止驱动轮脱离轨道,可以使除冰机器人抵御较大的风速,当遇到挠度较大的电缆时,增大张紧力可以确保驱动轮和电缆之间有足够的摩擦力,防止除冰机器人在电缆上打滑。3. The 6-DOF arms on both sides are shortened synchronously until the vertical height between the center of the driving wheel and the center of the driven wheel is 100mm. At this time, the driven wheel on the middle support arm presses the cable under the cable, which can prevent the driving wheel from Off the track, the de-icing robot can withstand high wind speed. When encountering a cable with large deflection, increasing the tension can ensure that there is enough friction between the driving wheel and the cable to prevent the de-icing robot from being on the cable. skidding.

4、除冰装置的电机带动回转架高速回转,回转架四周均布有4个敲击杆,敲击杆在高速运动下敲碎四分裂高压输电线上的积冰。4. The motor of the de-icing device drives the slewing frame to rotate at a high speed. There are 4 knocking rods evenly distributed around the slewing frame.

5、当遇到四分裂阻尼间隔棒或者杆塔时,首先,两边手臂同步伸长,使中间支撑臂脱离线缆,中间支撑臂上的回转轴转动90°,两边手臂同步缩短使三排轮子处于同一水平面,然后,中间支撑臂上的回转轴再次转动90°恢复原来的位置,这时三排轮均在电缆上方,且电缆均在轮子的沟槽内。再然后,控制机器人支撑平台Ⅰ上的控制箱向后运动,目的是使机器人重心向后移动,前进方向的第一个手臂脱离电缆并向前运动跨越障碍物,跨越障碍物后,第一个手臂再次回到电缆上方,并且使电缆与驱动轮的沟槽配合。再接着,使支撑平台Ⅰ上的控制箱移向中间,中间支撑臂运动到电缆下方,机器人接着前行,使中间支撑臂跨越障碍,中间支撑臂跨越障碍后,从动轮运动到电缆上方并且沟槽与电缆配合好,支撑平台Ⅰ上的控制箱移向前进方向端,这时机器人重心在前端。最后,除冰机器人前进方向的第二个手臂脱离电缆,并运动到电缆下方,除冰机器人接着向前运动并使第二个手臂跨越障碍,跨越障碍后,第二个手臂的主动轮回到电缆上方,中间支撑臂最后运动到线缆下方张紧,至此完成了除冰机器人的越障动作,除冰机器人继续向前运动除冰。总之,此越障结构在实际应用中非常灵活,手臂自由度多达6个,结合躲避障碍动作和越障动作可以跨越杆塔,从而轻松实现越障、跨越杆塔连续除冰作业。5. When encountering four-split damping spacers or pole towers, firstly, the arms on both sides are extended synchronously, so that the middle support arm is separated from the cable, the rotary shaft on the middle support arm is rotated 90°, and the arms on both sides are shortened synchronously so that the three rows of wheels are in the Same horizontal plane, then, the rotary shaft on the middle support arm rotates 90 ° again and recovers original position, at this moment the three rows of wheels are all above the cables, and the cables are all in the grooves of the wheels. Then, control the control box on the robot support platform Ⅰ to move backwards, the purpose is to move the center of gravity of the robot backwards, the first arm in the forward direction is detached from the cable and moves forward to cross the obstacle. After crossing the obstacle, the first arm The arm is brought back over the cable again and the cable fits into the groove of the drive wheel. Then, move the control box on the support platform I to the middle, the middle support arm moves below the cable, and the robot moves forward to make the middle support arm cross the obstacle. After the middle support arm crosses the obstacle, the driven wheel moves to the top of the cable and The groove is well matched with the cable, and the control box on the support platform I moves to the end of the forward direction, at this moment, the center of gravity of the robot is at the front end. Finally, the second arm in the forward direction of the deicing robot breaks away from the cable and moves under the cable. The deicing robot then moves forward and makes the second arm cross the obstacle. After crossing the obstacle, the active rotation of the second arm returns to the cable Above, the middle support arm finally moves to the lower part of the cable to be tensioned. So far, the de-icing robot's obstacle-crossing action is completed, and the de-icing robot continues to move forward for de-icing. In short, this obstacle-crossing structure is very flexible in practical applications, with up to 6 degrees of freedom of the arm, combined with obstacle avoidance and obstacle-crossing actions, it can cross the tower, so as to easily realize obstacle-crossing and continuous deicing operations across the tower.

Claims (5)

1.四分裂高压输电线路除冰机器人,其特征在于:包括机器人支撑平台、对称设置在支撑平台上的两个结构相同的六自由度手臂、设置在每个六自由度手臂上端部的除冰装置,所述机器人支撑平台包括支撑板、对称设置在支撑板两侧的两根直线导轨、安装在每根导轨上的滑块、与滑块固连的控制箱连接件、设置在两个控制箱连接件之间的控制箱、安装在支撑板一端的丝杠电机、与丝杠电机输出端连接的齿轮b、与直线导轨平行设置在支撑板上的丝杠、安装在丝杠端部的齿轮a,所述齿轮b与齿轮a啮合,所述控制箱位于支撑板的下方;1. The four-split high-voltage transmission line deicing robot is characterized in that: it includes a robot support platform, two arms with the same structure and the same six degrees of freedom arranged symmetrically on the support platform, and a deicing arm arranged at the upper end of each six degrees of freedom arm. device, the robot support platform includes a support plate, two linear guide rails symmetrically arranged on both sides of the support plate, a slider installed on each guide rail, a control box connector fixedly connected to the slider, and two control boxes The control box between the box connectors, the lead screw motor installed at one end of the support plate, the gear b connected to the output end of the lead screw motor, the lead screw arranged on the support plate parallel to the linear guide rail, and the screw motor installed at the end of the lead screw gear a, the gear b meshes with the gear a, and the control box is located under the support plate; 每个六自由度手臂包括设置在支撑板下端的肩部回转托架、安装在肩部回转托架内的肩部回转、与肩部回转的输出轴连接的肩部回转轴、与肩部回转轴上端连接的关节连接架、与关节连接架铰接的肩部俯仰、与肩部俯仰上端固连的连杆a、安装在连杆a端部的肘部俯仰、与肘部俯仰铰接连接的连杆b和连杆c、设置在连杆b和连杆c端部间的腕部俯仰、与腕部俯仰铰接的腕部连接件、与腕部连接件固连的腕部回转拖箱、设置在腕部回转拖箱内的腕部回转、与腕部回转输出轴连接的腕部回转轴、与腕部回转轴上端连接的行走机构,所述行走机构包括与腕部回转轴上端固连的驱动箱、安装在驱动箱内的驱动电机、安装在电机输出轴上的齿轮A、通过轴承安装在驱动箱内的驱动轴、安装在驱动轴的齿轮B,齿轮A与齿轮B啮合,所述驱动轴的两端伸出至驱动箱外且驱动轴的两端分别设置有在电缆上行走的驱动轮;Each six-degree-of-freedom arm includes a shoulder rotary bracket arranged at the lower end of the support plate, a shoulder rotary shaft installed in the shoulder rotary bracket, a shoulder rotary shaft connected with the output shaft of the shoulder rotary, and a shoulder rotary shaft connected to the shoulder rotary The joint connecting frame connected to the upper end of the rotating shaft, the shoulder pitch hinged with the joint connecting frame, the connecting rod a fixedly connected with the upper end of the shoulder pitch, the elbow pitch installed at the end of the connecting rod a, the connecting rod hingedly connected with the elbow pitch Rod b and connecting rod c, wrist pitch arranged between the ends of connecting rod b and connecting rod c, wrist connecting piece articulated with wrist pitching, wrist swivel drag box fixedly connected with wrist connecting piece, setting The wrist rotation in the wrist rotation drag box, the wrist rotation shaft connected with the wrist rotation output shaft, and the running mechanism connected with the upper end of the wrist rotation shaft, the walking mechanism includes a fixed connection with the upper end of the wrist rotation shaft The drive box, the drive motor installed in the drive box, the gear A installed on the output shaft of the motor, the drive shaft installed in the drive box through the bearing, the gear B installed on the drive shaft, the gear A and the gear B mesh, the The two ends of the drive shaft protrude out of the drive box and the two ends of the drive shaft are respectively provided with drive wheels running on the cable; 所述除冰装置包括安装在驱动箱上端的安装板、通过电机支架设置在安装板上的除冰机构电机、安装在除冰电机输出轴上的除冰主动齿轮、通过轴承座设置在安装板上的除冰机构转轴、安装在除冰机构转轴上的除冰从动齿轮、设置在除冰机构转轴端部上的敲击架连接件、设置在敲击架连接件两端的敲击架a和敲击架b,除冰主动齿轮与除冰从动齿轮啮合,敲击架a和敲击架b均是十字型结构,且在敲击架a与敲击架b之间对称设置有四根敲击杆轴,每个敲击杆轴上安装有敲击杆。The deicing device includes a mounting plate mounted on the upper end of the drive box, a deicing mechanism motor mounted on the mounting plate through a motor bracket, a deicing driving gear mounted on the output shaft of the deicing motor, and a deicing drive gear mounted on the mounting plate through a bearing seat. The shaft of the deicing mechanism on the top, the deicing driven gear installed on the shaft of the deicing mechanism, the knocking frame connecting piece arranged on the end of the rotating shaft of the deicing mechanism, the knocking frame a arranged at both ends of the knocking frame connecting piece and the knocking frame b, the deicing driving gear meshes with the deicing driven gear, the knocking frame a and the knocking frame b are both cross-shaped structures, and there are four symmetrically arranged between the knocking frame a and the knocking frame b. There are root knocking bar shafts, and a knocking bar is installed on each knocking bar shaft. 2.根据权利要求1所述的四分裂高压输电线路除冰机器人,其特征在于:在机器人支撑平台中间位置还设置有中间支撑臂,中间支撑臂包括安装在支撑板中间位置的底部固定架、与底部固定架两端连接的支撑杆、同时与两个支撑杆连接的顶部连接件、安装在顶部连接件上的齿轮箱托架、安装在齿轮箱托架内的齿轮箱、与齿轮箱输出轴连接的中间回转轴、与中间回转轴上端部固连的轴支架、安装在轴支架上的从动轴、安装在从动轴两端的两个与电缆配合的从动轮。2. The four-split high-voltage transmission line deicing robot according to claim 1, characterized in that: an intermediate support arm is also provided at the middle position of the robot support platform, and the intermediate support arm includes a bottom fixing frame installed at the middle position of the support plate, The support bar connected to both ends of the bottom fixed frame, the top link connected to both support bars at the same time, the gearbox bracket installed on the top link, the gearbox installed in the gearbox bracket, and the gearbox output The intermediate rotary shaft connected with the shaft, the shaft bracket fixedly connected with the upper end of the intermediate rotary shaft, the driven shaft installed on the shaft bracket, and the two driven wheels matched with the cables installed at both ends of the driven shaft. 3.根据权利要求1或2所述的四分裂高压输电线路除冰机器人,其特征在于:所述肩部回转、腕部回转和齿轮箱的结构相同,均包括一号方形箱体、外置在方形箱体侧面上的一号电机、与一号电机输出轴连接的且水平设置在一号方形箱体内的一号蜗杆、竖直安装在一号方形箱体内的一号蜗轮轴、安装在一号蜗轮轴的上的一号蜗轮,一号蜗杆与一号蜗轮啮合,且一号蜗轮轴的上端部伸出至一号方形箱体外作为输出轴。3. The four-split high-voltage transmission line deicing robot according to claim 1 or 2, characterized in that: the shoulder rotation, the wrist rotation and the gear box have the same structure, and all include a No. 1 square box, an external The No. 1 motor on the side of the square box, the No. 1 worm screw that is connected with the output shaft of the No. 1 motor and is horizontally arranged in the No. 1 square box, the No. 1 worm gear shaft that is vertically installed in the No. 1 square box, and is installed in the No. 1 square box. The No. 1 worm gear on the No. 1 worm gear shaft, the No. 1 worm screw meshes with the No. 1 worm gear, and the upper end of the No. 1 worm gear shaft stretches out to the No. 1 square box body as an output shaft. 4.根据权利要求1或2所述的四分裂高压输电线路除冰机器人,其特征在于:所述肩部俯仰、肘部俯仰和腕部俯仰的结构相同,均包括二号方形箱体、外置在二号方形箱体侧面的二号电机、与二号电机输出轴连接的且水平设置在二号方形箱体内的二号蜗杆、水平设置在二号方形箱体内的二号蜗轮轴、安装在二号蜗轮轴上的二号蜗轮,二号蜗轮与二号蜗杆啮合,且二号蜗轮轴的一端部伸出至二号方形箱体外部作为输出轴。4. The four-split high-voltage transmission line deicing robot according to claim 1 or 2, characterized in that: the structures of the shoulder pitch, elbow pitch and wrist pitch are the same, and all include a No. 2 square box, an outer The No. 2 motor placed on the side of the No. 2 square box, the No. 2 worm connected to the output shaft of the No. 2 motor and horizontally arranged in the No. 2 square box, the No. 2 worm gear shaft horizontally arranged in the No. 2 square box, and On the No. 2 worm gear on the No. 2 worm gear shaft, the No. 2 worm gear meshes with the No. 2 worm screw, and one end of the No. 2 worm gear shaft stretches out to the outside of the No. 2 square casing as an output shaft. 5.根据权利要求3所述的四分裂高压输电线路除冰机器人,其特征在于:所述肩部俯仰、肘部俯仰和腕部俯仰的结构相同,均包括二号方形箱体、外置在二号方形箱体侧面的二号电机、与二号电机输出轴连接的且水平设置在二号方形箱体内的二号蜗杆、水平设置在二号方形箱体内的二号蜗轮轴、安装在二号蜗轮轴上的二号蜗轮,二号蜗轮与二号蜗杆啮合,且二号蜗轮轴的一端部伸出至二号方形箱体外部作为输出轴。5. The four-split high-voltage transmission line deicing robot according to claim 3, characterized in that: said shoulder pitch, elbow pitch and wrist pitch have the same structure, and all include a No. The No. 2 motor on the side of the No. 2 square box, the No. 2 worm connected to the output shaft of the No. 2 motor and horizontally arranged in the No. 2 square box, the No. 2 worm gear shaft horizontally arranged in the No. The No. 2 worm gear on the No. worm gear shaft, the No. 2 worm gear meshes with the No. 2 worm screw, and one end of the No. 2 worm gear shaft stretches out to the outside of the No. 2 square casing as an output shaft.
CN201710122215.4A 2017-03-02 2017-03-02 Quadripartion deicing high-voltage power transmission line robot Expired - Fee Related CN106655060B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710122215.4A CN106655060B (en) 2017-03-02 2017-03-02 Quadripartion deicing high-voltage power transmission line robot

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710122215.4A CN106655060B (en) 2017-03-02 2017-03-02 Quadripartion deicing high-voltage power transmission line robot

Publications (2)

Publication Number Publication Date
CN106655060A CN106655060A (en) 2017-05-10
CN106655060B true CN106655060B (en) 2018-04-24

Family

ID=58847082

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710122215.4A Expired - Fee Related CN106655060B (en) 2017-03-02 2017-03-02 Quadripartion deicing high-voltage power transmission line robot

Country Status (1)

Country Link
CN (1) CN106655060B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107425497B (en) * 2017-05-18 2023-03-14 桂林电子科技大学 Obstacle-surpassing anti-icing and de-icing robot for high-voltage transmission lines
CN108493885B (en) * 2018-04-17 2019-11-08 台州瑜瑞科技有限公司 A kind of de-icing device for electric wire based on crank rocker driving
CN108879553B (en) * 2018-07-11 2020-05-15 哈尔滨工程大学 Deicing robot for four-split high-voltage line
CN109599815B (en) * 2018-11-29 2020-11-10 山西大学 Intelligent power distribution network protection device and system
CN109861133B (en) * 2019-01-25 2020-06-09 武汉大学 A mobile robot for multi-split overhead high-voltage transmission lines and its reconfigurable method
CN111509647B (en) * 2020-04-27 2021-04-27 东北电力大学 A kind of automatic short-circuit connection control device for DC ice melting of transmission wire
CN112003187B (en) * 2020-08-24 2022-01-28 南京云上自动化科技有限公司 Joint type double-foot high-voltage line inspection robot
CN111987679B (en) * 2020-09-03 2021-05-14 广东电网有限责任公司东莞供电局 Detection processing device for icing of power transmission line
CN113725797B (en) * 2021-08-26 2022-05-13 武汉理工大学 Continuous cable snow removal device
CN115102124B (en) * 2022-07-14 2022-12-27 杭州申昊科技股份有限公司 Walking deicing robot suitable for flexible power transmission line
CN116995603B (en) * 2023-09-28 2023-12-19 南通市东风特种电线有限公司 Intelligent manufacturing deicing equipment for cables

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100391771C (en) * 2006-01-13 2008-06-04 中国科学院沈阳自动化研究所 A wheel-claw compound inspection robot autonomous obstacle-surpassing mechanism
CN201504053U (en) * 2009-10-13 2010-06-09 中国科学院沈阳自动化研究所 Variable distance wheel-arm composite inspection robot mechanism
CN102227075B (en) * 2011-03-29 2013-03-20 重庆市电力公司检修分公司 Rapid deicing apparatus of four bundled conductors
CN103490365B (en) * 2013-10-11 2016-05-25 洛阳理工学院 High-voltage line deicer deicing mechanism
CN105870832B (en) * 2015-01-19 2017-12-15 国家电网公司 A kind of three arm combined type inspection robot mechanisms

Also Published As

Publication number Publication date
CN106655060A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN106655060B (en) Quadripartion deicing high-voltage power transmission line robot
CN102074915B (en) Split line moving platform
CN109301753B (en) It is a kind of along overhead transmission line walk climbing robot
CN107097866B (en) Power line operation walking robot and obstacle crossing method thereof
CN204578033U (en) climbing deicing robot
CN107859950A (en) A kind of illumination capability is strong and has the solar street light of automatic cleaning function
CN103736685A (en) Mobile Solar Module Cleaning Equipment
CN104161486B (en) Washing device
CN201766309U (en) Double wheel arm locking type inspection robot mechanism
CN105846352A (en) Line patrol robot mechanical structure suitable for single conducting wire and obstacle surmounting method therefor
CN102170097B (en) Two-arm-regulating gravity type inspection robot for high-voltage transmission lines
CN107716501A (en) A kind of sweeping robot for being applied to dislocation photovoltaic panel
CN204905752U (en) Deicing that can stride across high -voltage line cat head tower mechanical device that removes obstacles
CN201877728U (en) Mobile platform for split lines
CN102962834B (en) A kind of inspection robot for high-voltage transmission lines mechanism
CN115258139A (en) Airborne semiconductor laser obstacle clearing device of multi-rotor unmanned aerial vehicle
CN204117553U (en) Unpowered turnover panel is from folding advertisement banister
CN103594967A (en) Overturning obstacle crossing type overhead line work robot
CN104612580B (en) A kind of car ladder for electrification railway contact net maintenance
CN204552590U (en) A kind of car ladder for electrification railway contact net maintenance
CN203006367U (en) Insulating aerial ladder conveying device suitable for extra-high voltage live environment
CN207988463U (en) One kind can transverse shifting stable type building hanging basket
CN108282853A (en) A kind of energy-saving communication base station with antenna protection function
CN108543789A (en) A kind of intelligence cleans mobile conveying device across row's solar panel
CN108183405A (en) A kind of outdoor electricity distribution cabinet with cooling and bird dispelling function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180424