CN106654807A - Cable core neatening device - Google Patents
Cable core neatening device Download PDFInfo
- Publication number
- CN106654807A CN106654807A CN201611261364.0A CN201611261364A CN106654807A CN 106654807 A CN106654807 A CN 106654807A CN 201611261364 A CN201611261364 A CN 201611261364A CN 106654807 A CN106654807 A CN 106654807A
- Authority
- CN
- China
- Prior art keywords
- portable plate
- cable core
- wire
- plate
- management device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01R—ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H01R43/00—Apparatus or processes specially adapted for manufacturing, assembling, maintaining, or repairing of line connectors or current collectors or for joining electric conductors
- H01R43/28—Apparatus or processes specially adapted for manufacturing, assembling, maintaining, or repairing of line connectors or current collectors or for joining electric conductors for wire processing before connecting to contact members, not provided for in groups H01R43/02 - H01R43/26
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Installation Of Indoor Wiring (AREA)
Abstract
本发明提供了电缆线芯理线装置,包括底板和若干理线板,所述理线板包括第一活动板和第二活动板,所述第一活动板与第二活动板铰接,所述第一活动板和第二活动板端部设有卡槽,所述卡槽内设置有固定杆,所述固定杆下端设有螺杆,所述固定杆上端设有第二螺纹孔和扳手槽,所述底板上设有若干第一螺纹孔,所述第一活动板与第二活动板之间设有连接销,所述第一活动板和第二活动板上设有穿线槽,所述穿线槽内设有线芯固定装置。由于采用了上述技术方案,本发明将电缆线芯头部按照线号逐一穿过理线板,其利于绑扎。同时,该理线板的数量是自由组合的,穿线槽能够适应多种电缆线芯规格,可以满足不同型号的二次电缆线芯使用。
The present invention provides a wire management device for cable cores, which includes a bottom plate and several wire management boards, the wire management boards include a first movable board and a second movable board, the first movable board is hinged to the second movable board, and the The ends of the first movable plate and the second movable plate are provided with draw-in grooves, and a fixed rod is arranged in the said draw-in groove, and a screw rod is arranged at the lower end of the fixed rod, and a second threaded hole and a wrench groove are arranged at the upper end of the fixed rod, The bottom plate is provided with several first threaded holes, connecting pins are arranged between the first movable plate and the second movable plate, threading slots are provided on the first movable plate and the second movable plate, and the threading A wire core fixing device is arranged in the groove. Due to the adoption of the above technical solution, the present invention passes the cable core heads through the cable management board one by one according to the wire numbers, which is beneficial for binding. At the same time, the number of the cable management boards can be combined freely, and the threading groove can adapt to various cable core specifications, and can meet the use of different types of secondary cable cores.
Description
技术领域technical field
本发明涉及变电站电气安装工程设备领域,具体的说涉及一种电缆线芯理线装置。The invention relates to the field of substation electrical installation engineering equipment, in particular to a cable core management device.
背景技术Background technique
《二次电缆施工工艺》对二次电缆接线有严格的标准,要求绑扎后的线芯应互相紧密靠拢,外观平直整齐。为满足工艺要求,接线前要将控制电缆多股线芯按线号理顺捋直。未处理的控制电缆线芯均扭缠在一起,将其一一分拆开来,再按线号固定绑扎,耗时长,工作量大。且二次施工现场各种电缆数量巨大,如不对电缆进行理顺固定会造成工作现场杂乱,影响工作效率。"Secondary Cable Construction Technology" has strict standards for secondary cable wiring, requiring that the bundled wire cores should be close to each other, and the appearance should be straight and tidy. In order to meet the technical requirements, the multi-strand cores of the control cables should be straightened according to the wire numbers before wiring. The cores of the untreated control cables are all twisted together, separated one by one, and then fixed and tied according to the wire number, which takes a long time and a lot of work. Moreover, there are a huge number of various cables at the secondary construction site. If the cables are not straightened out and fixed, the work site will be messy and affect work efficiency.
部分保护屏柜厂家在屏柜上安装了固定二次电缆的孔板,但受限于屏柜内部空间狭小,所安装的孔板数量远不能满足实际需求,且不同屏柜所连接的二次电缆数量不同,通用性差,效率低。当前常见解决方法是将剖好的电缆线芯搭挂在屏柜门上,该做法即不能满足电缆线芯平直整齐的施工要求,又不利于现场环境卫生整洁,急需发明一种电缆线芯固定及理顺的解决方案。Some protective screen cabinet manufacturers have installed orifice plates for fixing secondary cables on the screen cabinets, but due to the small space inside the screen cabinets, the number of installed orifice plates is far from meeting the actual needs, and the secondary cables connected to different screen cabinets The quantity is different, the versatility is poor, and the efficiency is low. The current common solution is to hang the cut cable cores on the screen cabinet door. This method cannot meet the construction requirements of straight and tidy cable cores, and is not conducive to the sanitation and cleanliness of the site environment. It is urgent to invent a cable core Fixed and streamlined solutions.
发明内容Contents of the invention
本发明要解决的技术问题是克服上述缺陷,提供一种快速方便理顺及固定二次线芯的理线板。The technical problem to be solved by the present invention is to overcome the above defects and provide a quick and convenient cable management board for straightening out and fixing secondary wire cores.
为解决上述问题,本发明所采用的技术方案是:In order to solve the above problems, the technical solution adopted in the present invention is:
电缆线芯理线装置,包括底板和若干理线板,所述理线板包括第一活动板和第二活动板,所述第一活动板与第二活动板铰接,所述第一活动板和第二活动板端部设有卡槽,所述卡槽内设置有固定杆,所述固定杆下端设有螺杆,所述固定杆上端设有第二螺纹孔和扳手槽,所述底板上设有若干第一螺纹孔,所述第一活动板与第二活动板之间设有连接销,所述第一活动板和第二活动板上设有穿线槽,所述穿线槽内设有线芯固定装置。The cable core management device includes a base plate and several wire management boards, the wire management boards include a first movable board and a second movable board, the first movable board is hinged to the second movable board, and the first movable board and the end of the second movable plate is provided with a card slot, a fixed rod is arranged in the said card slot, a screw rod is provided at the lower end of the fixed rod, a second threaded hole and a wrench groove are provided at the upper end of the fixed rod, and the bottom plate Several first threaded holes are provided, connecting pins are arranged between the first movable plate and the second movable plate, threading grooves are provided on the first movable plate and the second movable plate, and wires are arranged in the threading grooves. Core fixture.
作为一种改进:所述线芯固定装置包括上卡板和下卡板,所述上卡板和下卡板弹性设置。As an improvement: the wire core fixing device includes an upper clamping plate and a lower clamping plate, and the upper clamping plate and the lower clamping plate are elastically arranged.
作为一种改进:所述连接销包括横销,所述横销连接有两个竖销,所述第一活动板和第二活动板上设有竖孔,所述竖孔连接有第一导槽和第二导槽,所述第一导槽位于上卡板上方,所述第二导槽位于下卡板下方,所述第一导槽内活动设置有第一活动杆,所述第二导槽内活动设置有第二活动杆,所述第一活动杆连接有第一弹簧,所述第二活动杆连接有第二弹簧,所述第一活动杆和第二活动杆靠近竖销的一端设有斜面,所述竖销下端设有斜面,所述第一活动杆下部设有第一凸起,所述上卡板上部设有上凸起,所述第二活动杆上部设有第二凸起,所述下卡板下部设有下凸起。As an improvement: the connecting pin includes a horizontal pin, the horizontal pin is connected with two vertical pins, the first movable plate and the second movable plate are provided with vertical holes, and the vertical holes are connected with the first guide slot and a second guide slot, the first guide slot is located above the upper clamp, the second guide slot is located below the lower clamp, a first movable rod is movably arranged in the first guide slot, and the second guide slot is located below the lower clamp. A second movable rod is movably arranged in the guide groove, the first movable rod is connected with a first spring, the second movable rod is connected with a second spring, and the first movable rod and the second movable rod are close to the vertical pin. One end is provided with an inclined surface, the lower end of the vertical pin is provided with an inclined surface, the lower part of the first movable rod is provided with a first protrusion, the upper part of the upper clamp is provided with an upper protrusion, and the upper part of the second movable rod is provided with a second protrusion. Two protrusions, the lower part of the lower clamping plate is provided with a lower protrusion.
作为一种改进:所述第一凸起或第二凸起或上凸起或下凸起为半球形。As an improvement: the first protrusion or the second protrusion or the upper protrusion or the lower protrusion is hemispherical.
作为一种改进:所述上卡板和下卡板为弧形。As an improvement: the upper clamping plate and the lower clamping plate are arc-shaped.
作为一种改进:所述第一活动板和第二活动板上设有凹坑,所述横销设置于凹坑内。As an improvement: the first movable plate and the second movable plate are provided with pits, and the horizontal pins are arranged in the pits.
作为一种改进:若干第一螺纹孔呈直线排列。As an improvement: several first threaded holes are arranged in a straight line.
作为一种改进:所述底板上设有把手和挂扣。As an improvement: the bottom plate is provided with a handle and a buckle.
作为一种改进:所述第一活动板和第二活动板为L形。As an improvement: the first movable plate and the second movable plate are L-shaped.
作为一种改进:所述第一活动板与第二活动板之间设有活页。As an improvement: a hinge is provided between the first movable board and the second movable board.
由于采用了上述技术方案,本发明将电缆线芯头部按照线号逐一穿过理线板,其利于绑扎。同时,该理线板的数量是自由组合的,穿线槽能够适应多种电缆线芯规格,可以满足不同型号的二次电缆线芯使用。可以临时固定二次电缆,便于接线,减少了施工人员不断理顺电缆的工作量,施工现场可以更加整洁。Due to the adoption of the above technical solution, the present invention passes the cable core heads through the cable management board one by one according to the wire numbers, which is beneficial for binding. At the same time, the number of the cable management boards can be combined freely, and the threading groove can adapt to various cable core specifications, and can meet the use of different types of secondary cable cores. The secondary cable can be fixed temporarily, which is convenient for wiring, reducing the workload of construction personnel to straighten out the cables, and the construction site can be more tidy.
下面结合附图和实施例对本发明作进一步说明。The present invention will be further described below in conjunction with drawings and embodiments.
附图说明Description of drawings
附图1为本发明电缆线芯理线装置的结构示意图;Accompanying drawing 1 is the structural representation of cable core line arrangement device of the present invention;
附图2为本发明电缆线芯理线装置中理线板的结构示意图;Accompanying drawing 2 is the structural representation of the wire management plate in the cable core wire management device of the present invention;
附图3为图2的俯视结构示意图;Accompanying drawing 3 is the top view structure diagram of Fig. 2;
附图4为本发明电缆线芯理线装置中固定杆的结构示意图;Accompanying drawing 4 is the structure schematic diagram of the fixing bar in the cable core line arrangement device of the present invention;
附图5为本发明电缆线芯理线装置中理线板的内部结构示意图;Accompanying drawing 5 is the internal structure diagram of the cable management board in the cable core wire management device of the present invention;
附图6为本发明电缆线芯理线装置中连接销的结构示意图;Accompanying drawing 6 is the schematic structural view of the connecting pin in the cable core wire management device of the present invention;
附图7为本发明电缆线芯理线装置中底板的结构示意图。Accompanying drawing 7 is the structural diagram of the bottom plate in the cable core management device of the present invention.
图中:1-底板;2-把手;3-挂扣;4-间隙;5-理线板;6-第一螺纹孔;7-第一活动板;8-第二活动板;9-凹坑;10-横销;11-穿线槽;12-上卡板;13-下卡板;14-活页;15-二次电缆线芯;16-卡槽;17-固定杆;18-第二螺纹孔;19-螺杆;20-扳手槽;21-竖孔;22-第一活动杆;23-第一弹簧;24-第一凸起;25-上凸起;26-第一导槽;27-第二导槽;28-下凸起;29-第二凸起;30-第二弹簧;31-第二活动杆;32-竖销。In the figure: 1-base plate; 2-handle; 3-hanging buckle; 4-gap; 5-wiring board; 6-first threaded hole; 7-first movable plate; 8-second movable plate; Pit; 10-horizontal pin; 11-threading groove; 12-upper clamp; 13-lower clamp; 14-loose leaf; 15-secondary cable core; 16-card slot; 17-fixing rod; Threaded hole; 19-screw rod; 20-wrench groove; 21-vertical hole; 22-the first movable rod; 23-the first spring; 24-the first protrusion; 25-the upper protrusion; 26-the first guide groove; 27-the second guide groove; 28-the lower protrusion; 29-the second protrusion; 30-the second spring; 31-the second movable bar; 32-vertical pin.
具体实施方式detailed description
实施例:Example:
如图1到7所示,电缆线芯理线装置,包括底板1和若干理线板5,所述理线板5包括第一活动板7和第二活动板8,所述第一活动板7与第二活动板8铰接,所述第一活动板7和第二活动板8端部设有卡槽16,所述卡槽16内设置有固定杆17,所述固定杆17下端设有螺杆19,所述固定杆17上端设有第二螺纹孔18和扳手槽20,所述底板1上设有若干第一螺纹孔6,所述第一活动板7与第二活动板8之间设有连接销,所述第一活动板7和第二活动板8上设有穿线槽11,所述穿线槽11内设有线芯固定装置。所述线芯固定装置用于固定二次电缆线芯15。所述连接销用于固定第一活动板7和第二活动板8,防止其活动。As shown in Figures 1 to 7, the cable core management device includes a bottom plate 1 and several wire management boards 5, and the wire management boards 5 include a first movable board 7 and a second movable board 8, and the first movable board 7 is hinged with the second movable plate 8, and the ends of the first movable plate 7 and the second movable plate 8 are provided with a draw-in groove 16, and a fixed rod 17 is arranged in the draw-in groove 16, and a fixed rod 17 is arranged at the lower end of the fixed rod 17 Screw 19, the upper end of the fixed rod 17 is provided with a second threaded hole 18 and a wrench groove 20, and the bottom plate 1 is provided with some first threaded holes 6, between the first movable plate 7 and the second movable plate 8 Connecting pins are provided, and the first movable plate 7 and the second movable plate 8 are provided with threading grooves 11, and wire core fixing devices are arranged in the threading grooves 11. The wire core fixing device is used for fixing the wire core 15 of the secondary cable. The connecting pin is used to fix the first movable plate 7 and the second movable plate 8 to prevent them from moving.
所述扳手槽20为正六边形槽。The wrench groove 20 is a regular hexagonal groove.
所述卡槽1截面为半圆形,当连接销取出后,第一活动板7和第二活动板8可以折叠退出,不必拆卸固定杆17,方便更换和添加理线板5。The cross section of the slot 1 is semicircular. When the connecting pin is taken out, the first movable plate 7 and the second movable plate 8 can be folded and withdrawn without dismantling the fixed rod 17, which is convenient for replacing and adding the cable management plate 5.
若干第一螺纹孔6呈直线排列。所述第一螺纹孔6的适量可以为四个、六个或八个。Several first threaded holes 6 are arranged in a straight line. An appropriate amount of the first threaded holes 6 may be four, six or eight.
所述理线板5排列成多个纵列,各纵列之间设有间隙4。每个纵列最上方的固定杆17上设有螺栓。The wire management boards 5 are arranged in multiple columns, and gaps 4 are provided between each column. The uppermost fixed rod 17 of each column is provided with bolts.
所述第一活动板7与第二活动板8之间设有活页14,第一活动板7与第二活动板8通过活页14铰接。A hinge 14 is provided between the first movable plate 7 and the second movable plate 8 , and the first movable plate 7 and the second movable plate 8 are hinged through the hinge 14 .
所述线芯固定装置包括上卡板12和下卡板13,所述上卡板12和下卡板13弹性设置。The wire core fixing device includes an upper clamping plate 12 and a lower clamping plate 13, and the upper clamping plate 12 and the lower clamping plate 13 are elastically arranged.
所述连接销包括横销10,所述横销10连接有两个竖销32,所述第一活动板7和第二活动板8上设有竖孔21,所述竖孔21连接有第一导槽26和第二导槽27,所述第一导槽26位于上卡板12上方,所述第二导槽27位于下卡板13下方,所述第一导槽26内活动设置有第一活动杆22,所述第二导槽27内活动设置有第二活动杆31,所述第一活动杆22连接有第一弹簧23,所述第二活动杆31连接有第二弹簧30,所述第一活动杆22和第二活动杆31靠近竖销32的一端设有斜面,所述竖销32下端设有斜面,所述第一活动杆22下部设有第一凸起24,所述上卡板12上部设有上凸起25,所述第二活动杆31上部设有第二凸起29,所述下卡板13下部设有下凸起28。所述竖孔21为通孔。Described connection pin comprises horizontal pin 10, and described horizontal pin 10 is connected with two vertical pins 32, and described first movable plate 7 and second movable plate 8 are provided with vertical hole 21, and described vertical hole 21 is connected with the first movable plate. A guide groove 26 and a second guide groove 27, the first guide groove 26 is located above the upper clamp 12, the second guide groove 27 is located below the lower clamp 13, and the first guide groove 26 is movably provided with The first movable rod 22, the second movable rod 31 is movably arranged in the second guide groove 27, the first movable rod 22 is connected with the first spring 23, and the second movable rod 31 is connected with the second spring 30 One end of the first movable rod 22 and the second movable rod 31 close to the vertical pin 32 is provided with a slope, the lower end of the vertical pin 32 is provided with a slope, and the lower part of the first movable rod 22 is provided with a first protrusion 24, The upper part of the upper clamping plate 12 is provided with an upper protrusion 25 , the upper part of the second movable rod 31 is provided with a second protrusion 29 , and the lower part of the lower clamping plate 13 is provided with a lower protrusion 28 . The vertical hole 21 is a through hole.
所述上卡板12和下卡板13为弧形。所述上卡板12和下卡板13一端与理线板5连接,另一端自由设置,所述上凸起25和下凸起28设置于上卡板12和下卡板13自由端。The upper clamping plate 12 and the lower clamping plate 13 are arc-shaped. One end of the upper clamping plate 12 and the lower clamping plate 13 is connected to the cable management plate 5 , and the other end is freely arranged. The upper protrusion 25 and the lower protrusion 28 are arranged on the free ends of the upper clamping plate 12 and the lower clamping plate 13 .
所述第一凸起24或第二凸起29或上凸起25或下凸起28为半球形。The first protrusion 24 or the second protrusion 29 or the upper protrusion 25 or the lower protrusion 28 is hemispherical.
所述第一活动板7和第二活动板8上设有凹坑9,所述横销10设置于凹坑9内。The first movable plate 7 and the second movable plate 8 are provided with pits 9 , and the cross pins 10 are arranged in the pits 9 .
所述底板1上设有把手2和挂扣3。The bottom plate 1 is provided with a handle 2 and a buckle 3 .
所述第一活动板7和第二活动板8为L形。所述穿线槽11设置于第一活动板7和第二活动板8长边远离对方的一端。两个卡槽16与活页14位于同一直线上。所述卡槽16设置于第一活动板7和第二活动板8短边远离对方的一端。The first movable plate 7 and the second movable plate 8 are L-shaped. The threading groove 11 is arranged at the ends of the first movable plate 7 and the second movable plate 8 whose long sides are away from each other. The two draw-in slots 16 are located on the same straight line as the loose-leaf 14 . The card slot 16 is provided at the short sides of the first movable plate 7 and the second movable plate 8 at the ends away from each other.
达到的效果:The effect achieved:
1、满足了二次控制电缆线芯接线时工艺要求,穿过理线板的所有线芯均挺直理顺,线号规律,间距均匀。1. It meets the technical requirements of the secondary control cable core wiring. All the cores passing through the cable management board are straight and smooth, with regular wire numbers and uniform spacing.
2、能够更快的理顺线芯,节省了顺线时间,减轻了二次施工工作量。2. It can straighten out the wire core faster, save the time for routing, and reduce the workload of secondary construction.
3、在进行进线工作时,起到固定电缆的作用,防止平直的电缆弯曲打折,电缆排列更加规整,作业现场更加整洁。3. During the incoming work, it plays the role of fixing the cable, preventing the straight cable from being bent and discounted, the cable arrangement is more regular, and the work site is more tidy.
满足了电缆线芯的固定及理顺的功能要求;二是相对于其它固定方式,该方案适用性更强,设计有不同直径的孔洞,能满足各种型号线芯的理顺及固定;三是单个的理线板都有公母口接口,可以随意组合排列,既满足了控制电缆线芯数量不同的要求,又能实现不同固定方式的现场施工要求。It meets the functional requirements of fixing and straightening the cable cores; second, compared with other fixing methods, this solution has stronger applicability, and is designed with holes of different diameters, which can meet the straightening and fixing of various types of wire cores; A single cable management board has male and female ports, which can be combined and arranged at will, which not only meets the requirements of different numbers of control cable cores, but also realizes the on-site construction requirements of different fixing methods.
以上对本发明的一个实施例进行了详细说明,但所述内容仅为本发明的较佳实施例,不能被认为用于限定本发明的实施范围。凡依本发明申请范围所作的均等变化与改进等,均应归属于本发明的专利涵盖范围之内。An embodiment of the present invention has been described in detail above, but the content described is only a preferred embodiment of the present invention, and cannot be considered as limiting the implementation scope of the present invention. All equivalent changes and improvements made according to the application scope of the present invention shall belong to the scope covered by the patent of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201611261364.0A CN106654807B (en) | 2016-12-30 | 2016-12-30 | Cable core wire arranging device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201611261364.0A CN106654807B (en) | 2016-12-30 | 2016-12-30 | Cable core wire arranging device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106654807A true CN106654807A (en) | 2017-05-10 |
| CN106654807B CN106654807B (en) | 2022-07-29 |
Family
ID=58839043
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201611261364.0A Active CN106654807B (en) | 2016-12-30 | 2016-12-30 | Cable core wire arranging device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106654807B (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108923224A (en) * | 2018-07-16 | 2018-11-30 | 国网山东省电力公司烟台供电公司 | A kind of dress table connects electric lineation tool |
| TWI734208B (en) * | 2019-10-05 | 2021-07-21 | 啓碁科技股份有限公司 | Mounting structure |
Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0739066A2 (en) * | 1995-04-20 | 1996-10-23 | Molex Incorporated | Apparatus for uncurling electric wires and method for using same |
| CN201402946Y (en) * | 2009-04-09 | 2010-02-10 | 刘广宇 | Cable fixing device |
| CN201766317U (en) * | 2010-07-20 | 2011-03-16 | 英业达股份有限公司 | Cable management device and electronic computing device using the cable management device |
| KR101073862B1 (en) * | 2011-05-03 | 2011-10-14 | (주)케이제이종합엔지니어링 | Fixed Cable Tray for Apartment House |
| CN202395293U (en) * | 2011-12-26 | 2012-08-22 | 东莞市三信精密机械有限公司 | Double wire rack for cable making |
| CN204068097U (en) * | 2014-09-28 | 2014-12-31 | 淮南常力达电气有限公司 | A kind of strand oscillator for arranging electric elements cable |
| CN105428960A (en) * | 2015-12-07 | 2016-03-23 | 许继集团有限公司 | Wire harness processing tool and processing method |
| CN205509383U (en) * | 2016-03-01 | 2016-08-24 | 朱津时 | Electric cabinet reason ply -yarn drill and electric cabinet |
| CN205544024U (en) * | 2016-04-28 | 2016-08-31 | 刘海涛 | Inside plant reason line is buckled |
| CN205846612U (en) * | 2016-07-28 | 2016-12-28 | 黄河科技学院 | Cable management clips for easy access to cables |
| CN206322988U (en) * | 2016-12-30 | 2017-07-11 | 国网山东省电力公司高密市供电公司 | Cable core wire-management device |
-
2016
- 2016-12-30 CN CN201611261364.0A patent/CN106654807B/en active Active
Patent Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0739066A2 (en) * | 1995-04-20 | 1996-10-23 | Molex Incorporated | Apparatus for uncurling electric wires and method for using same |
| CN201402946Y (en) * | 2009-04-09 | 2010-02-10 | 刘广宇 | Cable fixing device |
| CN201766317U (en) * | 2010-07-20 | 2011-03-16 | 英业达股份有限公司 | Cable management device and electronic computing device using the cable management device |
| KR101073862B1 (en) * | 2011-05-03 | 2011-10-14 | (주)케이제이종합엔지니어링 | Fixed Cable Tray for Apartment House |
| CN202395293U (en) * | 2011-12-26 | 2012-08-22 | 东莞市三信精密机械有限公司 | Double wire rack for cable making |
| CN204068097U (en) * | 2014-09-28 | 2014-12-31 | 淮南常力达电气有限公司 | A kind of strand oscillator for arranging electric elements cable |
| CN105428960A (en) * | 2015-12-07 | 2016-03-23 | 许继集团有限公司 | Wire harness processing tool and processing method |
| CN205509383U (en) * | 2016-03-01 | 2016-08-24 | 朱津时 | Electric cabinet reason ply -yarn drill and electric cabinet |
| CN205544024U (en) * | 2016-04-28 | 2016-08-31 | 刘海涛 | Inside plant reason line is buckled |
| CN205846612U (en) * | 2016-07-28 | 2016-12-28 | 黄河科技学院 | Cable management clips for easy access to cables |
| CN206322988U (en) * | 2016-12-30 | 2017-07-11 | 国网山东省电力公司高密市供电公司 | Cable core wire-management device |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108923224A (en) * | 2018-07-16 | 2018-11-30 | 国网山东省电力公司烟台供电公司 | A kind of dress table connects electric lineation tool |
| CN108923224B (en) * | 2018-07-16 | 2019-12-13 | 国网山东省电力公司烟台供电公司 | Dress table connects reason line instrument |
| TWI734208B (en) * | 2019-10-05 | 2021-07-21 | 啓碁科技股份有限公司 | Mounting structure |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106654807B (en) | 2022-07-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106654807A (en) | Cable core neatening device | |
| CN204668863U (en) | 2M cell cube activity reason coil holder | |
| CN206322988U (en) | Cable core wire-management device | |
| CN109300622B (en) | Wire hole number and distribution adjustable branching plate | |
| CN203948791U (en) | cross wire clamp | |
| CN209766219U (en) | Transformer high-voltage side lead and outlet wire connecting device | |
| CN205846612U (en) | Cable management clips for easy access to cables | |
| CN206640219U (en) | A kind of vertical reason wire loop in rack reason coil holder | |
| CN102340949A (en) | Server cabinet | |
| CN204793906U (en) | A reason line ware for network equipment | |
| CN106300157B (en) | A kind of cable core arrangement arrangement auxiliary tool | |
| CN208971704U (en) | Novel 2M cabinet | |
| CN206023088U (en) | A kind of cable core arranges arrangement aid | |
| CN106532591B (en) | Distributing frame | |
| CN201898307U (en) | Threading device | |
| CN219067771U (en) | Communication engineering electric wire connecting device | |
| CN202550415U (en) | Cable laying distributor | |
| CN210926742U (en) | An electrical distribution box that is convenient for wiring work | |
| CN209824248U (en) | Take away wire casing rack | |
| CN219489243U (en) | Computer wire harness finishing device | |
| CN217115441U (en) | Computer room wiring management device | |
| CN209497737U (en) | The general wire-management device of standard cabinet | |
| CN221852662U (en) | A container cable protection structure | |
| CN220628687U (en) | Wire placing tool for overhauling wiring port of electric appliance cabinet instrument | |
| CN211088993U (en) | Cable fixing device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |