CN106643139B - 加热炉框架结构模块化安装施工方法 - Google Patents
加热炉框架结构模块化安装施工方法 Download PDFInfo
- Publication number
- CN106643139B CN106643139B CN201611235996.XA CN201611235996A CN106643139B CN 106643139 B CN106643139 B CN 106643139B CN 201611235996 A CN201611235996 A CN 201611235996A CN 106643139 B CN106643139 B CN 106643139B
- Authority
- CN
- China
- Prior art keywords
- frame
- bolt
- installation
- group
- spelling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B9/00—Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity
- F27B9/30—Details, accessories, or equipment peculiar to furnaces of these types
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Tunnel Furnaces (AREA)
Abstract
本发明公开了一种加热炉框架结构模块化安装施工方法,在加热炉跨搭设简易拼装平台,在平台上架设两根H型钢,合理设置框架拼装单元,选取2‑3组滚轮为一组拼装单元或者框架纵向钢梁连接板拼接部位;将待组对框架左右纵梁部件就位摆放在H型钢上,顺序将组拼单元内横梁、连系梁就位并穿上安装螺栓;一组框架模块全部组对完毕后,各组拼单元模块再拼装,可将步进机械提升、平移框架整体组装完毕。本发明方法实现设备框架模块化组拼安装,提高工作效率,通过搭设简易工装平台,保证框架拼装精度;施工工序有效衔接,施工同步进行,解决了现场施工面狭小,无法同步施工的问题。应用本方法,可在2‑3天内完成框架整体组对安装工作。
Description
技术领域
本发明涉及一种加热炉机械设备安装方法,具体涉及一种加热炉框架结构模块化安装施工方法。
背景技术
加热炉升降、平移框架是步进梁式加热炉设备安装工程量最大,结构形式最为复杂的安装单元。如何实现该部分设备的快速安装,决定着整体步进机械设备安装的速度,同时也直接决定能否为下步工序提供施工工作面。现有施工技术主要考虑在炉体外进行构件组对、形成组件后吊装就位,到工作面再调整。这样一系列工序下来,至少需要一周时间,已不适合现今设备快速安装、模块化施工的要求,所以如何合理设置安装单元,实现加热炉提升框架、平移框架模块化、快速安装就尤为重要。
发明内容
为了解决现有技术中存在的问题,本发明提供一种加热炉框架结构模块化安装施工方法,克服现有技术中步进梁式加热炉提升、平移框架组成部件零散,施工现场狭窄、工作面组对困难的问题。
本发明采用的技术方案是:一种加热炉框架结构模块化安装施工方法,包括如下步骤:
(1)在加热炉跨搭设简易拼装平台,在平台上架设两根H型钢,型钢底部架设斜垫铁,用来调整H型钢上表面标高,保证两根型钢相对标高差控制在1mm范围内;
(2)合理设置框架拼装单元,选取2-3组滚轮为一组拼装单元或者框架纵向钢梁连接板拼接部位。将待组对框架左右纵梁部件就位摆放在H型钢上,顺序将组拼单元内横梁、连系梁就位并穿上安装螺栓;一组框架模块组件就位完毕,进行组件内连接面螺栓安装工作,首先穿入定位铰孔螺栓,铰孔螺栓安装必须保证位置准确,接触面轻微偏差利用跨顶、螺旋千斤顶调整,严禁铰孔螺栓重锤强行敲击穿过;铰孔螺栓安装完毕,采取对角紧固方式将铰孔螺栓拧紧;纵横梁初次连接完毕,利用水准仪、钢卷尺检测组拼模块相对标高、对角线,控制标点选取在滚轮支座加工面上,控制重点是对角线差值,须控制在2mm以内,保证单组模块纵梁位置准确,避免出现平行错位;检查偏差范围在规范允许范围内后,再依次紧固安装螺栓,直至将整块连接板螺栓拧紧,紧固时仍需遵循对角紧固的方式;全部螺栓紧固完毕,继续复测组拼模块相对标高、位置度、对角线偏差等控制值,复核无误,可将纵横梁连接板四角点焊牢固,同时将加劲梁或连系梁螺栓拧紧,连接面点焊焊接;最后利用行车将框架滚轮就位,利用水准仪、钢卷尺检测滚轮标高、位置度,检查合格后,拧紧滚轮连接螺栓;这样一组框架模块全部组对完毕;
(3)通过步骤(2),依次可将提升框架、平移框架组拼单元在炉坑外组对完毕,待斜轨座全部安装完毕,验收合格后,即可按顺序起吊安装提升、平移框架;
(4)各组拼单元模块再拼装时,重点需控制两相邻纵梁接头标高差及位置度,既保证纵梁节点板不出现翘头及扭曲现象;铰孔螺栓及安装螺栓穿入和紧固方法同步骤(2);
(5)通过上述方法可将步进机械提升、平移框架整体组装完毕;再通过调整框架中心线与炉子中心线的重合度,框架大对角线偏差,平移框架下滚轮顶标高等控制指标可将框架精确定位,快速完成该部分设备安装工作。
所述平台选用δ=15-20mm钢板。
本发明的有益效果是:
(1)设备框架模块化组拼安装,提高工作效率,通过搭设简易工装平台,保证框架拼装精度;
(2)施工工序有效衔接,施工同步进行,解决了现场施工面狭小,无法同步施工的问题。应用本方法,可在2-3天内完成框架整体组对安装工作。
附图说明
图1为加热炉框架结构模块化安装示意图;
其中:1、滚轮支座;2、标高量测点位;3、框架纵梁;4、支撑H型钢(规格500-700);5、框架横梁;6、连系梁;7、单元模块对角线检测位;8、单元模块框架中心标点;9、纵梁连接板。
具体实施方式
以下结合附图对本发明作进一步详细说明。
如图1所示,本发明加热炉框架结构模块化安装施工方法,包括如下步骤:
(1)在加热炉跨搭设简易拼装平台,平台选用δ=15-20mm钢板,在平台上架设两根H型钢4,型钢底部架设斜垫铁,用来调整H型钢上表面标高,保证两根型钢相对标高差控制在1mm范围内;
(2)合理设置框架拼装单元,选取2-3组滚轮为一组拼装单元或者框架纵向钢梁3连接板拼接部位;将待组对框架左右纵梁部件就位摆放在H型钢4上,顺序将组拼单元内横梁5、连系梁6就位并穿上安装螺栓;一组框架模块组件就位完毕,进行组件内连接面螺栓安装工作,首先穿入定位铰孔螺栓,铰孔螺栓安装必须保证位置准确,接触面轻微偏差利用跨顶、螺旋千斤顶调整,严禁铰孔螺栓重锤强行敲击穿过;铰孔螺栓安装完毕,采取对角紧固方式将铰孔螺栓拧紧;纵横梁初次连接完毕,利用水准仪、钢卷尺检测组拼模块相对标高、对角线,控制标点选取在滚轮支座1加工面上,控制重点是对角线差值,须控制在2mm以内,保证单组模块纵梁位置准确,避免出现平行错位;检查偏差范围在可控内后,再依次紧固安装螺栓,直至将整块连接板螺栓拧紧,紧固时仍需遵循对角紧固的方式;全部螺栓紧固完毕,继续复测组拼模块相对标高、位置度、对角线偏差等控制值,复核无误,可将纵横梁连接板9四角点焊牢固,同时将加劲梁或连系梁6螺栓拧紧,连接面点焊焊接;最后利用行车将框架滚轮吊装就位,利用水准仪、钢卷尺检测滚轮标高、位置度,检查合格后,拧紧滚轮连接螺栓;这样一组框架模块部件全部组对完毕;
(3)通过步骤(2),依次可将提升框架、平移框架组拼单元在炉坑外组对完毕,待斜轨座全部安装完毕,验收合格后,即可按顺序起吊安装提升、平移框架;
(4)各组拼单元模块再拼装时,重点需控制两相邻纵梁接头标高差及位置度,既保证纵梁节点板不出现翘头及扭曲现象;铰孔螺栓及安装螺栓穿入和紧固方法同步骤(2);
(5)通过上述方法可将步进机械提升、平移框架整体组装完毕;再通过调整框架中心线与炉子中心线的重合度,框架大对角线偏差,平移框架下滚轮顶标高等控制指标可将框架精确定位,快速完成该部分设备安装工作。
尽管上面结合图对本发明进行了描述,但是本发明并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,而不是限制性的,本领域的普通技术人员在本发明的启示下,在不脱离本发明宗旨的情况下,还可以作出很多变形,这些均属于本发明的保护之内。
Claims (2)
1.一种加热炉框架结构模块化安装施工方法,其特征在于,包括如下步骤:
(1)在加热炉跨搭设简易拼装平台,在平台上架设两根H型钢,型钢底部架设斜垫铁,用来调整H型钢上表面标高,保证两根型钢相对标高差控制在1mm范围内;
(2)合理设置框架拼装单元,选取2-3组滚轮为一组拼装单元或者框架纵向钢梁连接板拼接部位,将待组对框架左右纵梁部件就位摆放在H型钢上,顺序将组拼单元内横梁、连系梁就位并穿上安装螺栓;一组框架模块组件就位完毕,进行组件内连接面螺栓安装工作,首先穿入定位铰孔螺栓,铰孔螺栓安装必须保证位置准确,接触面轻微偏差利用跨顶、螺旋千斤顶调整,严禁铰孔螺栓重锤强行敲击穿过;铰孔螺栓安装完毕,采取对角紧固方式将铰孔螺栓拧紧;纵横梁初次连接完毕,利用水准仪、钢卷尺检测组拼模块相对标高、对角线,控制标点选取在滚轮支座加工面上,控制重点是对角线差值,须控制在2mm以内,保证单组模块纵梁位置准确,避免出现平行错位;检查偏差范围在规范允许范围内后,再依次紧固安装螺栓,直至将整块连接板螺栓拧紧,紧固时仍需遵循对角紧固的方式;全部螺栓紧固完毕,继续复测组拼模块相对标高、位置度、对角线偏差控制值,复核无误,可将纵横梁连接板四角点焊牢固,同时将加劲梁或连系梁螺栓拧紧,连接面点焊焊接;最后利用行车将框架滚轮就位,利用水准仪、钢卷尺检测滚轮标高、位置度,检查合格后,拧紧滚轮连接螺栓;这样一组框架模块全部组对完毕;
(3)通过步骤(2),依次可将提升框架、平移框架组拼单元在炉坑外组对完毕,待斜轨座全部安装完毕,验收合格后,即可按顺序起吊安装提升、平移框架;
(4)各组拼单元模块再拼装时,重点需控制两相邻纵梁接头标高差及位置度,既保证纵梁节点板不出现翘头及扭曲现象;铰孔螺栓及安装螺栓穿入和紧固方法同步骤(2);
(5)通过上述方法可将步进机械提升、平移框架整体组装完毕;再通过调整框架中心线与炉子中心线的重合度,框架大对角线偏差,平移框架下滚轮顶标高控制指标可将框架精确定位,快速完成该部分设备安装工作。
2.根据权利要求1所述加热炉框架结构模块化安装施工方法,其特征在于,所述平台选用δ=15-20mm钢板。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611235996.XA CN106643139B (zh) | 2016-12-28 | 2016-12-28 | 加热炉框架结构模块化安装施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611235996.XA CN106643139B (zh) | 2016-12-28 | 2016-12-28 | 加热炉框架结构模块化安装施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106643139A CN106643139A (zh) | 2017-05-10 |
CN106643139B true CN106643139B (zh) | 2018-11-06 |
Family
ID=58831981
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611235996.XA Active CN106643139B (zh) | 2016-12-28 | 2016-12-28 | 加热炉框架结构模块化安装施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106643139B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109227110A (zh) * | 2018-09-12 | 2019-01-18 | 中国二十冶集团有限公司 | 带钢生产线活套钢结构平台的模块化组装方法 |
CN116352410B (zh) * | 2023-05-31 | 2023-09-15 | 浙江祥晋汽车零部件股份有限公司 | 一种用于拼装铝合金电池托盘框架的拼装装置和拼装方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4669939A (en) * | 1984-08-03 | 1987-06-02 | Chugai Ro Co., Ltd. | Workpiece charger for heating furnace |
CN101487232A (zh) * | 2009-01-05 | 2009-07-22 | 广州市市政集团有限公司 | 一种钢箱梁拼装施工方法 |
CN101705693A (zh) * | 2009-11-06 | 2010-05-12 | 天津二十冶建设有限公司 | 大直径地脚螺栓整体固定安装方法 |
CN103334002A (zh) * | 2013-07-17 | 2013-10-02 | 上海诚达工业炉有限公司 | 连续加热炉进钢口的横梁机构 |
CN105018115A (zh) * | 2014-04-23 | 2015-11-04 | 五冶集团上海有限公司 | 干熄焦一次除尘器分片吊装方法 |
CN105543467A (zh) * | 2012-12-26 | 2016-05-04 | 中冶天工集团有限公司 | 基于三角形条形凹槽的环形加热炉炉底工作层施工方法 |
CN105863042A (zh) * | 2015-01-19 | 2016-08-17 | 江苏沪宁钢机股份有限公司 | 一种全钢结构建筑及其施工方法 |
-
2016
- 2016-12-28 CN CN201611235996.XA patent/CN106643139B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4669939A (en) * | 1984-08-03 | 1987-06-02 | Chugai Ro Co., Ltd. | Workpiece charger for heating furnace |
CN101487232A (zh) * | 2009-01-05 | 2009-07-22 | 广州市市政集团有限公司 | 一种钢箱梁拼装施工方法 |
CN101705693A (zh) * | 2009-11-06 | 2010-05-12 | 天津二十冶建设有限公司 | 大直径地脚螺栓整体固定安装方法 |
CN105543467A (zh) * | 2012-12-26 | 2016-05-04 | 中冶天工集团有限公司 | 基于三角形条形凹槽的环形加热炉炉底工作层施工方法 |
CN103334002A (zh) * | 2013-07-17 | 2013-10-02 | 上海诚达工业炉有限公司 | 连续加热炉进钢口的横梁机构 |
CN105018115A (zh) * | 2014-04-23 | 2015-11-04 | 五冶集团上海有限公司 | 干熄焦一次除尘器分片吊装方法 |
CN105863042A (zh) * | 2015-01-19 | 2016-08-17 | 江苏沪宁钢机股份有限公司 | 一种全钢结构建筑及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106643139A (zh) | 2017-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103381986B (zh) | 一种预组装电梯 | |
CN106643139B (zh) | 加热炉框架结构模块化安装施工方法 | |
CN106401198A (zh) | 一种大跨度钢连廊提升设备及施工方法 | |
CN101759079B (zh) | 钢结构电梯井架地面整体拼接安装方法 | |
CN107663951A (zh) | 叠合板与墙板一体浇筑的支撑体系及施工工艺 | |
CN105421792A (zh) | 一种模块式钢结构构件的吊装施工工艺 | |
CN112252472A (zh) | 一种不规则多边形钢结构桁架地面拼装方法 | |
CN104033878B (zh) | 烧结机环冷机锅炉钢架组合以及安装的工艺 | |
CN108343163A (zh) | 钢柱对接调整固定装置及方法 | |
CN205558306U (zh) | 一种大型钢结构连廊吊装提升架 | |
CN109736440A (zh) | 一种大跨度钢结构错层合拢安装方法 | |
CN109629449B (zh) | 一种钢箱拱桥拱脚钢混结合段安装定位支架及对位方法 | |
Kiriyama et al. | Structure and construction examples of tunnel reinforcement method using thin steel panels | |
CN117027425A (zh) | 一种大跨度钢桁架悬挑异型结构的安装方法 | |
CN211034860U (zh) | 钢结构网架液压提升施工作业装置 | |
CN101492147A (zh) | 行车梁标高调整方法 | |
CN107419907A (zh) | 一种炼钢塔楼钢结构平台的交错安装焊接方法 | |
CN206034459U (zh) | 一种用于地铁基坑的支撑体系的可调支座组件 | |
CN116335149A (zh) | 一种应用前置式钢支撑系统的小型超深基坑的施工方法 | |
CN105817883B (zh) | 利用胎具进行液压机机架组对方法 | |
CN102019511A (zh) | 加热炉升降框架的组焊工艺 | |
CN113235433B (zh) | 一种矮塔斜拉桥分丝管索鞍精确快速定位方法及装置 | |
CN210713861U (zh) | 上下叠梁连接时挠度校正装置 | |
CN212224677U (zh) | 型钢梁落位临固调整体系 | |
CN103754791A (zh) | 利用预应力钢绞线提升水塔1000m3水箱的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |