CN106639293A - 一种大直径深井悬吊系统的八绳调平及同步运行控制方法 - Google Patents
一种大直径深井悬吊系统的八绳调平及同步运行控制方法 Download PDFInfo
- Publication number
- CN106639293A CN106639293A CN201510708137.7A CN201510708137A CN106639293A CN 106639293 A CN106639293 A CN 106639293A CN 201510708137 A CN201510708137 A CN 201510708137A CN 106639293 A CN106639293 A CN 106639293A
- Authority
- CN
- China
- Prior art keywords
- column side
- wall
- suspension system
- buried
- anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明涉及一种大直径深井悬吊系统的八绳调平同步运行控制方法,包括以下步骤:(1)、在梁板柱侧模内确定预埋锚件的位置;(2)、将预埋锚件放入梁板柱侧模内;(3)、向梁板柱侧模内浇筑混凝土;(4)、待梁板柱侧模内混凝土固化后,拆除梁板柱侧模;(5)、先在预埋锚件的伸出杆的螺纹处安装一紧固定位螺母,再将连接件组件与预埋锚件通过螺纹连接的方式紧固连接,最后再通过另一紧固定位螺母固定连接件组件的位置;(6)、通过扣件将连墙杆的一端与连墙件组件的一端固接,再通过扣件将连墙杆与至少一个脚手架固定连接。本发明公开的一种大直径深井悬吊系统的八绳调平同步运行控制方法具有以下有益效果:整套连墙件中报废的仅是预埋锚件,连墙件组件可重复使用。
Description
技术领域
本实用属于建筑技术领域,具体涉及一种大直径神经悬吊系统的八绳调平同步运行控制方法。
背景技术
外脚手架与主体结构进行可靠连接是确保外脚手架不发生失稳破坏的关键。目前建筑业常规用于扣件式钢管脚手架的连墙件做法包括:预埋钢管方法、后锚固方法、箍柱法、预埋铁板法。但是这些方法都存在一些不足之处:
预埋钢管方法的连墙件的不足之处是成本高,拆卸麻烦,并且必须对砌体的后留洞口进行后期封堵,有渗水隐患。
后锚固方法采用最少两颗膨胀锚栓,钻孔施工时极其麻烦,材料及人工成本较高。
箍柱法必须要等柱子模板拆除后,连墙件才能进行安装,严重造成工期滞后。
预埋铁板法的连墙杆件要与预埋铁板连接是进行焊接、拆除时进行切割,动明火现场存在火灾隐患。
发明内容
发明目的:本发明针对上述现有技术存在的问题做出改进,即本 发明公开了一种安装效率高、操作性好的连墙件组件的施工方法。
技术方案:连墙件组件包括圆柱形实心件,圆柱形实心件的两端各外接一空心管件,圆柱形实心件的中部设有通孔,通孔内侧设有内螺纹,圆柱形实心件与其两端的空心管件为一体成型。
进一步地,空心管件的内径为48mm。
一种大直径神经悬吊系统的八绳调平同步运行控制方法,包括以下步骤:
(1)、在梁板柱侧模内确定预埋锚件的位置;
(2)、将预埋锚件放入梁板柱侧模内,预埋锚件的埋进部分至少为总长度的70%;
(3)、向步骤(2)中的梁板柱侧模内浇筑混凝土;
(4)、待梁板柱侧模内混凝土固化后,拆除梁板柱侧模;
(5)、先在预埋锚件的伸出杆的螺纹处安装一紧固定位螺母,再将连接件组件与预埋锚件通过螺纹连接的方式紧固连接,最后再通过另一紧固定位螺母固定连接件组件的位置;
(6)、通过扣件将连墙杆的一端与连墙件组件的一端固接,再通过扣件将连墙杆与至少一个脚手架固定连接。
有益效果:本发明公开的一种大直径神经悬吊系统的八绳调平同步运行控制方法具有以下有益效果:
整套连墙件中报废的仅是预埋锚件,连墙件组件可重复使用。
附图说明
图1是连墙件组件安装后的整体示意图;
图2是预埋锚件示意图;
图3是连墙件组件与预埋锚件的固接后的示意图;
其中:
1-预埋锚件 2-圆柱形实心件
3-空心管件 4-紧固定位螺母
5-脚手架 6-连墙杆
7-扣件 11-螺纹
具体实施方式:
下面对本发明的具体实施方式详细说明。
如图1~3所示,一种大直径神经悬吊系统的八绳调平同步运行控制方法,包括以下步骤:
(1)、在梁板柱侧模内确定预埋锚件1的位置;
(2)、将预埋锚件1放入梁板柱侧模内,预埋锚件1的埋进部分至少为总长度的70%;
(3)、向步骤(2)中的梁板柱侧模内浇筑混凝土;
(4)、待梁板柱侧模内混凝土固化后,拆除梁板柱侧模;
(5)、先在预埋锚件1的伸出杆的螺纹11处安装一紧固定位螺母4,再将连接件组件与预埋锚件1通过螺纹连接的方式紧固连接,最后再通过另一紧固定位螺母4固定连接件组件的位置;
(6)、通过扣件7将连墙杆6的一端与连墙件组件的一端固接, 再通过扣件7将连墙杆6与至少一个脚手架5固定连接。
连墙件组件包括圆柱形实心件2,圆柱形实心件2的两端各外接一空心管件3,圆柱形实心件2的中部设有通孔,通孔内侧设有内螺纹,圆柱形实心件2与其两端的空心管件3为一体成型。圆柱形实心件2中部通孔的内径与预埋锚件1伸出杆一端的外径相配合。
进一步地,空心管件3的内径为48mm。
上面对本发明的实施方式做了详细说明。但是本发明并不限于上述实施方式,在所属技术领域普通技术人员所具备的知识范围内,还可以在不脱离本发明宗旨的前提下做出各种变化。
Claims (3)
1.一种大直径神经悬吊系统的八绳调平同步运行控制方法,其特征在于,包括以下步骤:
(1)、在梁板柱侧模内确定预埋锚件的位置;
(2)、将预埋锚件放入梁板柱侧模内,预埋锚件的埋进部分至少为总长度的70%;
(3)、向步骤(2)中的梁板柱侧模内浇筑混凝土;
(4)、待梁板柱侧模内混凝土固化后,拆除梁板柱侧模;
(5)、先在预埋锚件的伸出杆的螺纹处安装一紧固定位螺母,再将连接件组件与预埋锚件通过螺纹连接的方式紧固连接,最后再通过另一紧固定位螺母固定连接件组件的位置;
(6)、通过扣件将连墙杆的一端与连墙件组件的一端固接,再通过扣件将连墙杆与至少一个脚手架固定连接。
2.根据权利要求1所述的一种大直径神经悬吊系统的八绳调平同步运行控制方法,其特征在于,连墙件组件包括圆柱形实心件,圆柱形实心件的两端各外接一空心管件,圆柱形实心件的中部设有通孔,通孔内侧设有内螺纹,圆柱形实心件与其两端的空心管件为一体成型。
3.根据权利要求2所述的一种大直径神经悬吊系统的八绳调平同步运行控制方法,其特征在于,空心管件的内径为48mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510708137.7A CN106639293A (zh) | 2015-10-28 | 2015-10-28 | 一种大直径深井悬吊系统的八绳调平及同步运行控制方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510708137.7A CN106639293A (zh) | 2015-10-28 | 2015-10-28 | 一种大直径深井悬吊系统的八绳调平及同步运行控制方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106639293A true CN106639293A (zh) | 2017-05-10 |
Family
ID=58815544
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510708137.7A Pending CN106639293A (zh) | 2015-10-28 | 2015-10-28 | 一种大直径深井悬吊系统的八绳调平及同步运行控制方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106639293A (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2260016A1 (en) * | 1974-02-04 | 1975-08-29 | Arteon Marcel | Fixing device for prefabricated panel - has locking nut immobilising threaded rod in lost shuttering |
CN202577934U (zh) * | 2012-05-03 | 2012-12-05 | 武汉常阳新力建设工程有限公司 | 一种脚手架与建筑物的丝扣连墙件 |
CN203654710U (zh) * | 2014-01-15 | 2014-06-18 | 南通四建集团有限公司 | 外墙脚手架剪力墙部位工具式连墙件 |
CN106337556A (zh) * | 2015-07-10 | 2017-01-18 | 华北冶建工程建设有限公司 | 一种连墙件组件的施工方法 |
-
2015
- 2015-10-28 CN CN201510708137.7A patent/CN106639293A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2260016A1 (en) * | 1974-02-04 | 1975-08-29 | Arteon Marcel | Fixing device for prefabricated panel - has locking nut immobilising threaded rod in lost shuttering |
CN202577934U (zh) * | 2012-05-03 | 2012-12-05 | 武汉常阳新力建设工程有限公司 | 一种脚手架与建筑物的丝扣连墙件 |
CN203654710U (zh) * | 2014-01-15 | 2014-06-18 | 南通四建集团有限公司 | 外墙脚手架剪力墙部位工具式连墙件 |
CN106337556A (zh) * | 2015-07-10 | 2017-01-18 | 华北冶建工程建设有限公司 | 一种连墙件组件的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201722929U (zh) | 一种建筑模板的埋件锚固装置 | |
CN204983662U (zh) | 一种对拉螺杆与钢管排架组合单侧支模装置 | |
CN203096942U (zh) | 用于装配式结构的预埋螺母 | |
CN207633740U (zh) | 悬挑脚手架新型锚固装置 | |
CN107762135B (zh) | 建筑物外墙脚手架连墙件的施工方法 | |
CN104695708A (zh) | 用于高层建筑外墙狭窄空间内伸缩缝支模的施工方法 | |
CN206157913U (zh) | 一种装配式方钢管混凝土柱与钢梁连接节点 | |
CN104675101A (zh) | 脚手架连墙件及其施工方法 | |
CN107740497B (zh) | 一种水工建筑物过流面预埋地脚螺栓的施工方法 | |
CN102979183A (zh) | 预埋筒式螺母锚座及其使用方法 | |
CN103362304A (zh) | 一种用于模板安装的自锚固定位螺栓装置和方法 | |
CN205036077U (zh) | 一种适用于狭小空间使用的剪力墙支模架 | |
CN106639293A (zh) | 一种大直径深井悬吊系统的八绳调平及同步运行控制方法 | |
CN204001665U (zh) | 一种脚手架装配式连墙件 | |
CN106337556A (zh) | 一种连墙件组件的施工方法 | |
CN214658822U (zh) | 可周转使用的建筑模板夹具 | |
CN219451461U (zh) | 新型带止水环的脚手架连墙装置 | |
CN209179465U (zh) | 对拉型螺杆连墙件 | |
CN112609963B (zh) | 复合保温模板的安装锚固装置及其使用方法 | |
CN204435835U (zh) | 脚手架连墙件 | |
CN108086523A (zh) | 轻钢混凝土砌块组合墙及其施工方法 | |
CN203603490U (zh) | 一种预制梁上用于架设支模桁架的支撑结构 | |
CN208219724U (zh) | 一种防止地下连续墙沉降的加固装置 | |
CN112796505A (zh) | 一种脚手架预埋滑槽式连墙件及其施工方法 | |
CN206903185U (zh) | 预埋板式支座螺栓结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170510 |