CN106621630A - Industrial production waste gas treatment system - Google Patents

Industrial production waste gas treatment system Download PDF

Info

Publication number
CN106621630A
CN106621630A CN201611224506.6A CN201611224506A CN106621630A CN 106621630 A CN106621630 A CN 106621630A CN 201611224506 A CN201611224506 A CN 201611224506A CN 106621630 A CN106621630 A CN 106621630A
Authority
CN
China
Prior art keywords
cleaning case
dust cleaning
waste gas
industrial production
production waste
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611224506.6A
Other languages
Chinese (zh)
Other versions
CN106621630B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Sigma Metal Inc
Qingyuan Starter Intelligent Technology Co Ltd
Original Assignee
Qingdao Hengke New Mdt Infotech Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Hengke New Mdt Infotech Ltd filed Critical Qingdao Hengke New Mdt Infotech Ltd
Priority to CN201611224506.6A priority Critical patent/CN106621630B/en
Publication of CN106621630A publication Critical patent/CN106621630A/en
Application granted granted Critical
Publication of CN106621630B publication Critical patent/CN106621630B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D47/00Separating dispersed particles from gases, air or vapours by liquid as separating agent
    • B01D47/06Spray cleaning
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D50/00Combinations of methods or devices for separating particles from gases or vapours
    • B01D50/10Combinations of devices covered by groups B01D45/00, B01D46/00 and B01D47/00
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/005Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by heat treatment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/02Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography
    • B01D53/04Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography with stationary adsorbents
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/32Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by electrical effects other than those provided for in group B01D61/00

Abstract

The invention discloses an industrial production waste gas treatment system. The industrial production waste gas treatment system comprises a dust removing box; the left end of the dust removing box is communicated with a gas suction mechanism located at the top of the dust removing box through a gas guide pipe I; one end, far away from the gas guide pipe I, of the gas suction mechanism is communicated with a gas inlet pipe; a rotary mechanism is inserted into the middle of the top of the dust removing box; the bottom end of the rotary mechanism is communicated with a liquid collection pipe located in the dust removing box; a liquid distribution nozzle is communicated with one side, far away from the rotary mechanism, of the liquid collection pipe; a liquid guide pipe is inserted into the top of the rotary mechanism; one end, far away from the rotary mechanism, of the liquid guide pipe, is communicated with an outlet of a vacuum pump located at the top of the dust removing box; an inlet of the vacuum pump is communicated with the outlet of a liquid collection box located on the side face of the vacuum pump. According to the industrial production waste gas treatment system, a purification mechanism is arranged, and waste gas can be electrolyzed by high voltage generated under the matching of an electrolysis anode and an electrolysis cathode; meanwhile, active carbon is matched with a water tank, so that the undesirable odor and impurities dissolved into water can be removed and the practicability is high.

Description

A kind of industrial production waste gas processing system
Technical field
The present invention relates to environmental protection technical field, specially a kind of industrial production waste gas processing system.
Background technology
Industry refers to collection raw material-pretreatment, and they are processed into work and the process of product.Can produce in industrial processes production The substantial amounts of waste gas of life, if these waste gas are discharged into air can have a strong impact on the health and environmental aspect of people, and occurs now Many emission-control equipments all there are problems that processing halfway when processing, cause still to have it is a small amount of it is discarded be discharged to it is outer Boundary, so we have proposed a kind of industrial production waste gas processing system to solve the problems, such as the above.
The content of the invention
(1) technical problem for solving
For the deficiencies in the prior art, the invention provides a kind of industrial production waste gas processing system, possesses to waste gas The advantages of processing more thoroughly complete, the emission-control equipments for solving many all have that process is halfway to ask when processing Topic, causes still have a small amount of discarded problem for being discharged to the external world.
(2) technical scheme
To realize the above-mentioned process to the waste gas more thorough purpose such as complete, the present invention provides following technical scheme:It is a kind of Industrial production waste gas processing system, including dust cleaning case, the left end of the dust cleaning case is communicated with positioned at dust cleaning case by wireway one The suction mechanism at top, and suction mechanism is communicated with air inlet pipe away from one end of wireway one, in the dust cleaning case top Portion is plugged with rotating mechanism, and the bottom of rotating mechanism is communicated with the collector tube inside dust cleaning case, in collector tube away from rotation The side of mechanism is communicated with a point liquid shower nozzle, and the top of the rotating mechanism is plugged with catheter, and catheter away from whirler One end of structure connect with the vacuum pump outlet at the top of the dust cleaning case, the import of vavuum pump and the catch box positioned at vavuum pump side Outlet, is installed with the dividing plate positioned at dust cleaning case inner cavity top between collector tube and wireway one, and in liquid collecting Be movably installed with dust-collecting mechanism immediately below pipe, the right-hand member of dust-collecting mechanism with positioned at the tangent every stake of dust cleaning case intracavity bottom, and And the filter that top is connected with dedusting chamber interior wall is installed with every the top of stake, the right-hand member of the dust cleaning case passes through wireway two Connect with the high-temperature cabinet of dust cleaning case side.
The bottom of the high temperature box cavity is installed with heating wire, and high-temperature cabinet away from dust cleaning case by bracing frame Side is connected by wireway three with the water tank positioned at high-temperature cabinet top, and is installed with check valve on wireway three, The top of the water tank is connected by wireway four with the blast pipe positioned at high-temperature cabinet side, and in the bottom of exhaust tube cavity Filled with activated carbon, be installed with successively from top to bottom in square blast pipe on the activated carbon purification mechanism, unhurried current mechanism and Unhurried current plate, and fixedly mount crown cap in the exit on blast pipe top.
The suction mechanism includes being located at the gettering container on dust cleaning case top, and the inside of the gettering container is installed with air-breathing Blower fan, and it is installed with expanded rubber in the gettering container of suction fan right-hand member.
Preferably, the unhurried current plate is made up of semi-circular plate, the gentle discharge orifice of baffle plate, the edge of the baffle plate and eight semi-circular plates Edge it is equidistant be fixedly connected, and offer on baffle plate circle unhurried current hole.
Preferably, the rotating mechanism includes the sleeve pipe being plugged on dust cleaning case, and the outer cover of described sleeve pipe is equipped with circular cone Gear one, and the side of conical gear one engages with the conical gear two on the servo motor output shaft, and servo electricity Machine is located at the top of dust cleaning case.
Preferably, the dust-collecting mechanism includes being located at the gripper shoe immediately below dividing plate, and the top of the gripper shoe is hinged with Top board, top board away from one end of gripper shoe be movably installed with every the tangent movable pulley in stake side, and in slip wheel side Top board lower surface is hinged with the hydraulically extensible bar for being fixedly mounted on dedusting box cavity bottom.
Preferably, the purification mechanism includes being pasted onto the thermal insulation board of exhaust inside pipe wall, fixed between the thermal insulation board The electrolytic anode and electrolysis cathode of the arrangement that intersects are installed.
Preferably, the unhurried current mechanism includes being fixedly mounted on the support inside blast pipe, is set with the support and turns Axle, in the bottom of rotating shaft propeller blade is installed with, and on the top of rotating shaft unhurried current steel wire is installed with.
Preferably, described sleeve pipe is installed with the bearing being sleeved on outside casing shoe with the junction of dust cleaning case.
(3) beneficial effect
Compared with prior art, the invention provides a kind of industrial production waste gas processing system, possesses following beneficial effect:
1st, the industrial production waste gas processing system, by arranging suction mechanism, can make to give up in the presence of suction fan Gas is quickly imported into, while coordinating with expanded rubber and can slow down waste gas fashionable flow velocity is entered, and is further ensured that air-breathing The normal work of mechanism and into the optimum flow velocity of dust cleaning case, improves service life.
2nd, the industrial production waste gas processing system, by arranging rotating mechanism, can be under the indirect drive of servomotor Sleeve pipe is set quickly to rotate so that the rotation at a high speed while hydrojet of point liquid shower nozzle, makes the liquid of ejection more uniform, to waste gas Process it is more thoroughly complete.
3rd, the industrial production waste gas processing system, by arranging dust-collecting mechanism, can be in the dust accretions because of liquid sedimentation It is set to slide the suitable position in dedusting box cavity by the effect of hydraulically extensible bar when on top board, it is to avoid dust affects next The normal work of step.
4th, the industrial production waste gas processing system, by arranging heating wire, can produce 200 DEG C of height when waste gas is passed through Temperature carries out oxidation processes to the composition in waste gas decomposes it, to reach harmless free of contamination purpose.
5th, the industrial production waste gas processing system, by arranging purification mechanism, can be in electrolytic anode and electrolysis cathode The lower high pressure that produces is coordinated to be electrolysed waste gas, while activated carbon and water tank cooperation can remove peculiar smell and be dissolved in the impurity of water, It is practical.
6th, industrial production waste gas processing system, by arranging unhurried current mechanism, in the effect of the unhurried current steel wire of braiding Under make gas slowly be flowed, while with unhurried current plate coordinate flow velocity can be made further to reduce, it is ensured that waste gas discharge when Flow velocity, process it is thorough, security is good, do not interfere with people health and environment.
Description of the drawings
Fig. 1 is present configuration front cut-away illustration;
Fig. 2 is the close-up schematic view in present configuration A portions;
Fig. 3 is the close-up schematic view in present configuration B portions;
Fig. 4 is the close-up schematic view in present configuration C portions;
Fig. 5 is the close-up schematic view in present configuration D portions;
Fig. 6 is A-A cuttings structural representation of the present invention.
In figure:1 dust cleaning case, 2 wireways one, 3 suction mechanisms, 31 gettering containers, 32 suction fans, 33 expanded rubbers, 4 air inlets Pipe, 5 rotating mechanisms, 51 sleeve pipes, 52 conical gears one, 53 conical gears two, 54 servomotors, 6 collector tubes, 7 points of liquid shower nozzles, 8 Catheter, 9 vavuum pumps, 10 catch boxs, 11 dividing plates, 12 dust-collecting mechanisms, 121 gripper shoes, 122 top boards, 123 movable pulleies, 124 hydraulic pressure Expansion link, 13 every stake, 14 filters, 15 wireways two, 16 high-temperature cabinets, 17 bracing frames, 18 heating wires, 19 wireways three, 20 water tanks, It is 21 check valves, 22 wireways four, 23 blast pipes, 24 activated carbons, 25 purification mechanisms, 251 thermal insulation boards, 252 electrolytic anodes, 253 electric Solution negative electrode, 26 unhurried current mechanisms, 261 support, 262 rotating shafts, 263 unhurried current steel wires, 264 propeller blades, 27 unhurried current plates, 271 semi-circular plates, 272 baffle plates, 273 unhurried current holes, 28 top caps.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than the embodiment of whole.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Refer to Fig. 1, Fig. 3 and Fig. 4, a kind of industrial production waste gas processing system, including dust cleaning case 1, the left end of dust cleaning case 1 Suction mechanism 3 positioned at the top of dust cleaning case 1 is communicated with by wireway 1, waste gas can be made quickly to be imported into, while Can slow down waste gas with the cooperation of expanded rubber 33 and enter fashionable flow velocity, and suction mechanism 3 is connected away from one end of wireway 1 There is air inlet pipe 4, dust cleaning case 1 is plugged with rotating mechanism 5 in the middle part of top, by arranging rotating mechanism 5, can be in servomotor 54 Indirect drive under sleeve pipe 51 is quickly rotated so that point liquid shower nozzle rotates at a high speed while hydrojet, make the liquid of ejection more Plus it is uniform, the process to waste gas is more thoroughly complete, and rotating mechanism 5 includes the sleeve pipe 51 being plugged on dust cleaning case 1, sleeve pipe 51 with The junction of dust cleaning case 1 is installed with the bearing being sleeved on outside the bottom of sleeve pipe 51, and the outer cover of sleeve pipe 51 is equipped with circular cone tooth 1 are taken turns, and the side of conical gear 1 is engaged with the conical gear 2 53 on the output shaft of servomotor 54, and Servomotor 54 is located at the top of dust cleaning case 1, and the bottom of rotating mechanism 5 is communicated with the collector tube 6 inside dust cleaning case 1, Collector tube 6 is communicated with a point liquid shower nozzle 7 away from the side of rotating mechanism 5, and the top of rotating mechanism 5 is plugged with catheter 8, and leads The one end and the outlet of vavuum pump 9 for being located at the top of dust cleaning case 1, the import of vavuum pump 9 and position of liquid pipe 8 away from rotating mechanism 5 In the outlet of catch box 10 of the side of vavuum pump 9, it is installed between collector tube 6 and wireway 1 positioned at dust cleaning case 1 The dividing plate 11 of inner cavity top, and dust-collecting mechanism 12 is movably installed with the underface of collector tube 6, by arranging dust-collecting mechanism 12, can remove its landing by the effect of hydraulically extensible bar 124 when the dust accretions because of liquid sedimentation are on top board 122 The suitable position of the inner chamber of dirt case 1, it is to avoid under dust affects the normal work of next step, dust-collecting mechanism 12 to include being located at dividing plate 11 just The gripper shoe 121 of side, the top of gripper shoe 121 is hinged with top board 122, and top board 122 is installed away from one end activity of gripper shoe 121 Have with every the tangent movable pulley 123 in the side of stake 13, and the lower surface of top board 122 in the side of movable pulley 123 is hinged with fixed peace The hydraulically extensible bar 124 of the inner chamber bottom of dust cleaning case 1 is mounted in, can be lifted under the control of main controller, when specifically lifting Between by manually holding, the right-hand member of dust-collecting mechanism 12 with positioned at the tangent every stake 13 of the intracavity bottom of dust cleaning case 1, and every the top of stake 13 End is installed with the filter 14 that top is connected with the inwall of dust cleaning case 1, and the right-hand member of dust cleaning case 1 is by wireway 2 15 and dust cleaning case The high-temperature cabinet 16 of 1 side is connected.
Fig. 1, Fig. 5 and Fig. 6 are referred to, the bottom of the inner chamber of high-temperature cabinet 16 is installed with heating wire 18 by bracing frame 17, By arranging heating wire 18,200 DEG C of high temperature can be produced when waste gas is passed through carry out oxidation processes to the composition in waste gas makes Its decomposition, to reach harmless free of contamination purpose, and high-temperature cabinet 16 passes through wireway 3 19 and position away from the side of dust cleaning case 1 Water tank 20 in the top of high-temperature cabinet 16 is connected, and check valve 21 is installed with wireway 3 19, the top of water tank 20 Connected with the blast pipe 23 positioned at the side of high-temperature cabinet 16 by wireway 4 22, and be filled with the bottom of the inner chamber of blast pipe 23 Activated carbon 24, is installed with successively from top to bottom purification mechanism 25, unhurried current mechanism in the blast pipe 23 of the top of activated carbon 24 26 and unhurried current plate 27, by arrange purification mechanism 25, height can be produced under the cooperation of electrolytic anode 252 and electrolysis cathode 253 Pressure is electrolysed to waste gas, while activated carbon 24 and water tank 20 coordinate and can remove peculiar smell and be dissolved in the impurity of water, it is practical, By arranging unhurried current mechanism 26, gas is set slowly to be flowed in the presence of the unhurried current steel wire 263 of braiding, while with Unhurried current plate 27 coordinate flow velocity can be made further to reduce, it is ensured that waste gas discharge when flow velocity, process it is thorough, security is good, The health and environment of people are not interfered with, purification mechanism 25 includes being pasted onto the thermal insulation board 251 of the inwall of blast pipe 23, thermal insulation board The electrolytic anode 252 and electrolysis cathode 253 of the arrangement that intersects are installed between 251, unhurried current mechanism 26 includes fixing Support 261 inside blast pipe 23, is set with rotating shaft 262 in support 261, be installed with the bottom of rotating shaft 262 Propeller blade 264, can automatically rotate in the presence of air-flow, and on the top of rotating shaft 262 unhurried current steel wire 263 is installed with, Unhurried current plate 27 is made up of semi-circular plate 271, baffle plate 272 discharge orifice 273 that eases up, the edge of the edge of baffle plate 272 and eight semi-circular plates 271 It is equidistant to be fixedly connected, and circular unhurried current hole 273 is offered on baffle plate 272, and in the outlet on the top of blast pipe 23 Place's fixed installation crown cap 28, prevents debris from entering in blast pipe 23.
Fig. 1-2 is referred to, suction mechanism 3 includes being located at the gettering container 31 on the top of dust cleaning case 1, and the inside of gettering container 31 is fixed Suction fan 32 is installed, and expanded rubber 33, porous rubber are installed with the gettering container 31 of the right-hand member of suction fan 32 Glue 33 is perfluoroelastomers, by arranging suction mechanism 3, waste gas can be made to carry out quickly quilt in the presence of suction fan 32 Import, while coordinating with expanded rubber 33 and can slow down waste gas fashionable flow velocity is entered, be further ensured that the normal work of suction mechanism 3 Make and into the optimum flow velocity of dust cleaning case 1, improve service life.
The electric elements occurred in this article are electrically connected with extraneous main controller and 220V civil powers, and main controller can be meter Calculation machine etc. plays the conventionally known equipment of control.
In sum, the industrial production waste gas processing system, by arranging suction mechanism 3, can be in suction fan 32 Waste gas is quickly imported under effect, while coordinating with expanded rubber 33 and can slow down waste gas fashionable flow velocity is entered, enter One step ensures the normal work of suction mechanism 3 and into the optimum flow velocity of dust cleaning case 1, improves service life.
By arranging rotating mechanism 5, sleeve pipe 51 can be made under the indirect drive of servomotor 54 quickly to rotate so that Divide liquid shower nozzle to rotate at a high speed while hydrojet, make the liquid of ejection more uniform, the process to waste gas is more thoroughly complete.
By arranging dust-collecting mechanism 12, can be stretched by hydraulic pressure when the dust accretions because of liquid sedimentation are on top board 122 The effect of contracting bar 124 makes it slide the suitable position in the inner chamber of dust cleaning case 1, it is to avoid dust affects the normal work of next step.
By arranging heating wire 18,200 DEG C of high temperature can be produced when waste gas is passed through carries out oxygen to the composition in waste gas Change is processed decomposes it, to reach harmless free of contamination purpose.
By arranging purification mechanism 25, high pressure can be produced under the cooperation of electrolytic anode 252 and electrolysis cathode 253 to useless Gas is electrolysed, while activated carbon 24 and water tank 20 coordinate and can remove peculiar smell and be dissolved in the impurity of water, it is practical, by setting Put unhurried current mechanism 26, braiding unhurried current steel wire 263 in the presence of make gas slowly be flowed, while with unhurried current plate 27 coordinate flow velocity can be made further to reduce, it is ensured that waste gas discharge when flow velocity, process it is thorough, security is good, Bu Huiying The health and environment of people are rung, the emission-control equipment for solving many all there are problems that processing halfway when processing, and lead Cause still has a small amount of discarded problem for being discharged to the external world.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply these entities or deposit between operating In any this actual relation or order.And, term " including ", "comprising" or its any other variant are intended to Nonexcludability is included, so that a series of process, method, article or equipment including key elements not only will including those Element, but also including other key elements being not expressly set out, or also include for this process, method, article or equipment Intrinsic key element.In the absence of more restrictions, the key element for being limited by sentence "including a ...", it is not excluded that Also there is other identical element in process, method, article or equipment including the key element.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding can carry out various changes, modification, replacement to these embodiments without departing from the principles and spirit of the present invention And modification, the scope of the present invention be defined by the appended.

Claims (8)

1. a kind of industrial production waste gas processing system, including dust cleaning case (1), it is characterised in that:The left end of the dust cleaning case (1) leads to The suction mechanism (3) that wireway one (2) is communicated with the top of dust cleaning case (1) is crossed, and suction mechanism (3) is away from wireway one (2) one end is communicated with air inlet pipe (4), and in the middle part of dust cleaning case (1) top rotating mechanism (5), rotating mechanism (5) are plugged with Bottom be communicated with positioned at the internal collector tube (6) of dust cleaning case (1), connect away from the side of rotating mechanism (5) in collector tube (6) The top for having a point liquid shower nozzle (7), the rotating mechanism (5) is plugged with catheter (8), and catheter (8) away from rotating mechanism (5) one end is with vavuum pump (9) outlet being located at the top of dust cleaning case (1), the import of vavuum pump (9) and positioned at vavuum pump (9) catch box (10) outlet of side, is installed with positioned at dust cleaning case between collector tube (6) and wireway one (2) (1) dividing plate (11) of inner cavity top, and dust-collecting mechanism (12), dust-collecting mechanism are movably installed with immediately below collector tube (6) (12) right-hand member with it is tangent every stake (13) positioned at dust cleaning case (1) intracavity bottom, and be installed with every the top of stake (13) The filter (14) that top is connected with dust cleaning case (1) inwall, the right-hand member of the dust cleaning case (1) is by wireway two (15) and dust cleaning case (1) high-temperature cabinet (16) connection of side;
The bottom of high-temperature cabinet (16) inner chamber is installed with heating wire (18), and high-temperature cabinet (16) by bracing frame (17) Connected with the water tank (20) positioned at high-temperature cabinet (16) top by wireway three (19) away from the side of dust cleaning case (1), and Check valve (21) is installed with wireway three (19), the top of the water tank (20) is by wireway four (22) and positioned at height Blast pipe (23) connection of incubator (16) side, and activated carbon (24) is filled with the bottom of blast pipe (23) inner chamber, living Property charcoal (24) above blast pipe (23) in be installed with purification mechanism (25), unhurried current mechanism (26) successively from top to bottom and ease up Stream plate (27), and in exit fixed installation crown cap (28) on blast pipe (23) top;
The suction mechanism (3) includes being located at the gettering container (31) on dust cleaning case (1) top, and the inside of the gettering container (31) is fixed Suction fan (32) is installed, and expanded rubber is installed with the gettering container (31) of suction fan (32) right-hand member (33)。
2. a kind of industrial production waste gas processing system according to claim 1, it is characterised in that:It is described unhurried current plate (27) by Gentle discharge orifice (273) composition of semi-circular plate (271), baffle plate (272), the edge of the baffle plate (272) and eight semi-circular plates (271) Edge is equidistant to be fixedly connected, and the unhurried current hole (273) of circle is offered on baffle plate (272).
3. a kind of industrial production waste gas processing system according to claim 1, it is characterised in that:The rotating mechanism (5) Including the sleeve pipe (51) being plugged on dust cleaning case (1), the outer cover of described sleeve pipe (51) is equipped with conical gear one (52), and circle The side of bevel gear one (52) is engaged with the conical gear two (53) on servomotor (54) output shaft, and servomotor (54) positioned at the top of dust cleaning case (1).
4. a kind of industrial production waste gas processing system according to claim 1, it is characterised in that:The dust-collecting mechanism (12) Including the gripper shoe (121) immediately below dividing plate (11), the top of the gripper shoe (121) is hinged with top board (122), top board (122) one end away from gripper shoe (121) is movably installed with every the tangent movable pulley (123) in stake (13) side, and is being slided Top board (122) lower surface of driving wheel (123) side is hinged with the hydraulically extensible bar for being fixedly mounted on dust cleaning case (1) inner chamber bottom (124)。
5. a kind of industrial production waste gas processing system according to claim 1, it is characterised in that:The purification mechanism (25) Including the thermal insulation board (251) for being pasted onto blast pipe (23) inwall, it is installed between the thermal insulation board (251) and intersects The electrolytic anode (252) and electrolysis cathode (253) of arrangement.
6. a kind of industrial production waste gas processing system according to claim 1, it is characterised in that:Unhurried current mechanism (26) The support (261) internal including blast pipe (23) is fixedly mounted on, is set with rotating shaft (262), in rotating shaft on the support (261) (262) bottom is installed with propeller blade (264), and on the top of rotating shaft (262) unhurried current steel wire (263) is installed with.
7. a kind of industrial production waste gas processing system according to claim 1 or 3, it is characterised in that:Described sleeve pipe (51) The bearing being sleeved on outside sleeve pipe (51) bottom is installed with the junction of dust cleaning case (1).
8. a kind of industrial production waste gas processing method, it is characterised in that:The suction mechanism includes being located at the suction on dust cleaning case top Gas tank, the inside of gettering container is installed with suction fan, and is installed with the gettering container of suction fan right-hand member many Hole rubber, expanded rubber is perfluoroelastomers, by arranging suction mechanism, carries out in the presence of suction fan waste gas Quickly it is imported into, while coordinating with expanded rubber and can slow down waste gas fashionable flow velocity is entered, is further ensured that suction mechanism Normal work and into the optimum flow velocity of dust cleaning case, improves service life.
CN201611224506.6A 2016-12-27 2016-12-27 A kind of industrial production waste gas processing system Expired - Fee Related CN106621630B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611224506.6A CN106621630B (en) 2016-12-27 2016-12-27 A kind of industrial production waste gas processing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611224506.6A CN106621630B (en) 2016-12-27 2016-12-27 A kind of industrial production waste gas processing system

Publications (2)

Publication Number Publication Date
CN106621630A true CN106621630A (en) 2017-05-10
CN106621630B CN106621630B (en) 2019-04-12

Family

ID=58832527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611224506.6A Expired - Fee Related CN106621630B (en) 2016-12-27 2016-12-27 A kind of industrial production waste gas processing system

Country Status (1)

Country Link
CN (1) CN106621630B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107213751A (en) * 2017-05-26 2017-09-29 柳州源联科技有限公司 A kind of processing tapping equipment for plant gas
CN108217853A (en) * 2018-01-16 2018-06-29 南京农业大学 A kind of device for handling tube furnace high temperature cabonization tail gas
CN108246029A (en) * 2018-01-30 2018-07-06 江苏大学 A kind of Atmospheric Transportation processing equipment
CN109200780A (en) * 2018-11-16 2019-01-15 杭州富阳锦丰纸业有限公司 Off-gas cleaning equipment in a kind of garbage processing procedure
CN109589736A (en) * 2019-01-09 2019-04-09 交通运输部天津水运工程科学研究所 A kind of air inlet return water integral type Environmental-protecting dust-removing device

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6068031A (en) * 1983-09-26 1985-04-18 Hitachi Ltd Dust collecting device by washing
JPH08257336A (en) * 1995-03-27 1996-10-08 Aiwa Co Ltd Air cleaner
KR20000054562A (en) * 2000-06-12 2000-09-05 장준태 Air conditioner for removing air pollutants by the water spray system
CN1895736A (en) * 2006-06-23 2007-01-17 白金龙 Industrial waste-gas purifier
CN103349881A (en) * 2013-08-08 2013-10-16 上海台安工程实业有限公司 Multifunctional environment-friendly asphalt flue gas purification system
CN103721498A (en) * 2013-11-26 2014-04-16 南通四通林业机械制造安装有限公司 Silent industrial gas condensation, drying and purification device
CN104144750A (en) * 2012-01-24 2014-11-12 英特科特殊熔炼技术有限责任公司 Method and arrangement for waste-gas purification in vacuum steel treatment processes
CN203954960U (en) * 2014-04-28 2014-11-26 单泓 A kind of waste gas purifying environmental protecting device
KR101549201B1 (en) * 2015-03-23 2015-09-03 (주)화인테크워터 Deodorizing system equipped with bio-filter
CN205354354U (en) * 2016-01-17 2016-06-29 惠英 Fixed motor vehicle radar speed -measuring appearance
CN105833646A (en) * 2016-05-04 2016-08-10 刘操 Purification unit of self-protection industrial waste gas scrubbing tower

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6068031A (en) * 1983-09-26 1985-04-18 Hitachi Ltd Dust collecting device by washing
JPH08257336A (en) * 1995-03-27 1996-10-08 Aiwa Co Ltd Air cleaner
KR20000054562A (en) * 2000-06-12 2000-09-05 장준태 Air conditioner for removing air pollutants by the water spray system
CN1895736A (en) * 2006-06-23 2007-01-17 白金龙 Industrial waste-gas purifier
CN104144750A (en) * 2012-01-24 2014-11-12 英特科特殊熔炼技术有限责任公司 Method and arrangement for waste-gas purification in vacuum steel treatment processes
CN103349881A (en) * 2013-08-08 2013-10-16 上海台安工程实业有限公司 Multifunctional environment-friendly asphalt flue gas purification system
CN103721498A (en) * 2013-11-26 2014-04-16 南通四通林业机械制造安装有限公司 Silent industrial gas condensation, drying and purification device
CN203954960U (en) * 2014-04-28 2014-11-26 单泓 A kind of waste gas purifying environmental protecting device
KR101549201B1 (en) * 2015-03-23 2015-09-03 (주)화인테크워터 Deodorizing system equipped with bio-filter
CN205354354U (en) * 2016-01-17 2016-06-29 惠英 Fixed motor vehicle radar speed -measuring appearance
CN105833646A (en) * 2016-05-04 2016-08-10 刘操 Purification unit of self-protection industrial waste gas scrubbing tower

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107213751A (en) * 2017-05-26 2017-09-29 柳州源联科技有限公司 A kind of processing tapping equipment for plant gas
CN108217853A (en) * 2018-01-16 2018-06-29 南京农业大学 A kind of device for handling tube furnace high temperature cabonization tail gas
CN108246029A (en) * 2018-01-30 2018-07-06 江苏大学 A kind of Atmospheric Transportation processing equipment
CN109200780A (en) * 2018-11-16 2019-01-15 杭州富阳锦丰纸业有限公司 Off-gas cleaning equipment in a kind of garbage processing procedure
CN109589736A (en) * 2019-01-09 2019-04-09 交通运输部天津水运工程科学研究所 A kind of air inlet return water integral type Environmental-protecting dust-removing device

Also Published As

Publication number Publication date
CN106621630B (en) 2019-04-12

Similar Documents

Publication Publication Date Title
CN106621630A (en) Industrial production waste gas treatment system
CN107288674A (en) A kind of air cleaning ventilation equipment in ore deposit hole
CN210114937U (en) Mill is with portable filtration dust collecting equipment
CN212010143U (en) Air purification warning sign
CN213643577U (en) Interior decoration construction dust isolating device
CN220415442U (en) On-spot dust collector that ventilates of using under mine
CN108525406B (en) Dust collector for producing artificial bezoar
CN107890736B (en) Dust treatment device of numerical control machining center
CN112246058B (en) Deodorizing device is used in bio-organic fertilizer production
CN112717626B (en) High-efficient active carbon adsorption case
CN215842259U (en) A dust treatment device for production and processing workshop
CN107441890A (en) A kind of large-scale air clarifier
CN212091517U (en) Waste gas filtering device
CN111974130B (en) Chemical waste gas pretreatment device capable of accelerating treatment rate
CN210050923U (en) Air purification device for water quality modifier production workshop
CN207342401U (en) A kind of lithium battery mixing raw materials equipment dust treatment device
CN208757207U (en) A kind of filtering classification formula workshop simple environment protection dust-extraction unit
CN208049607U (en) A kind of oxidation pond air exhausting device
CN207478221U (en) A kind of washing air purification device
CN206837683U (en) Air exhauster drawing type filter screen structure
CN108080149B (en) Honeycomb type anode tube wet electric dust collector and operation method thereof
CN213254359U (en) Chemical product processing equipment
CN112893424A (en) Soil prosthetic devices is used in gardens
CN214681124U (en) Agricultural organic fertilizer stirring generates equipment
CN215975781U (en) Air interchanger capable of avoiding pollution for strain culture

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190211

Address after: 314100 No. 111 Huangpu Road, Huimin Street, Jiashan County, Jiaxing City, Zhejiang Province

Applicant after: ZHEJIANG SIGMA METAL, Inc.

Address before: 511500 Tian'an Zhigu Exhibition Service Center 159, No. 18 Chuangxing Avenue, Science and Technology Innovation Park, Qingyuan High-tech Industrial Development Zone, Guangdong Province

Applicant before: QINGYUAN CHUQU INTELLIGENT TECHNOLOGY Co.,Ltd.

Effective date of registration: 20190211

Address after: 511500 Tian'an Zhigu Exhibition Service Center 159, No. 18 Chuangxing Avenue, Science and Technology Innovation Park, Qingyuan High-tech Industrial Development Zone, Guangdong Province

Applicant after: QINGYUAN CHUQU INTELLIGENT TECHNOLOGY Co.,Ltd.

Address before: 266000 4 403-3, No. 396 Emeishan Road, Huangdao District, Qingdao City, Shandong Province

Applicant before: QINGDAO HENGKE RUIXIN INFORMATION TECHNOLOGY CO.,LTD.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190412

Termination date: 20191227

CF01 Termination of patent right due to non-payment of annual fee