CN106595186A - Cooling water recycling and reusing system - Google Patents

Cooling water recycling and reusing system Download PDF

Info

Publication number
CN106595186A
CN106595186A CN201611202954.6A CN201611202954A CN106595186A CN 106595186 A CN106595186 A CN 106595186A CN 201611202954 A CN201611202954 A CN 201611202954A CN 106595186 A CN106595186 A CN 106595186A
Authority
CN
China
Prior art keywords
water
pipeline
circulating water
pump
circulating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611202954.6A
Other languages
Chinese (zh)
Inventor
袁开宏
朱成意
唐春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Liuguo Chemical Industry Co Ltd
Original Assignee
Anhui Liuguo Chemical Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Liuguo Chemical Industry Co Ltd filed Critical Anhui Liuguo Chemical Industry Co Ltd
Priority to CN201611202954.6A priority Critical patent/CN106595186A/en
Publication of CN106595186A publication Critical patent/CN106595186A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D17/00Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces
    • F25D17/02Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces for circulating liquids, e.g. brine
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D29/00Arrangement or mounting of control or safety devices
    • F25D29/005Mounting of control devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The invention relates to a cooling water recycling and reusing system comprising a recycling water tank and a recycling water main pipeline communicating with the recycling water tank. A recycling water pump is arranged on the recycling water main pipeline. The recycling water pump pumps water in the recycling water tank into a pump recycling water pipeline used for cooling a pump for chemical industry production and a fan recycling water pipeline used for cooling a fan for chemical industry production through the recycling water main pipeline. The cooling water in the pump recycling water pipeline and the fan recycling water pipeline returns into the recycling water tank again. The recycling water main pipeline further communicates with a pressure adjusting pipeline used for sending the water in the recycling water main pipeline back into the recycling water tank. A first ball valve is arranged on the pressure adjusting pipeline. The pump recycling water pipeline and the fan recycling water pipeline recycle the cooling water of the pump for chemical industry production and the fan for chemical industry production correspondingly so as to save the water source. The pressure adjusting pipeline can send the superfluous water in the recycling water main pipeline back into the recycling water tank, so that the effect of adjusting water pressure of an inlet of the pump recycling water pipeline is achieved, and normal operation of the recycling water pump is guaranteed.

Description

A kind of cooling water circulation reutilization system
Technical field
The present invention relates to cooling water circulation utilization technical field in Chemical Manufacture, is specifically related to one kind cooling water circulation again Using system.
Background technology
At present in Chemical Manufacture, pump, blower fan are requisite equipment, and these equipment are usually required for using cooling Water is cooled down to rotary part, and the usually direct outer row of the cooling water after cooling down, cause water resource waste serious, and to ring Border will also result in pollution.
The content of the invention
To solve above-mentioned technical problem, the invention provides a kind of cooling water circulation reutilization system, the system can be by Pump, the cooling water of blower fan are circulated recycling, save water source, it is to avoid discharge is to environment.
For achieving the above object, present invention employs technical scheme below:
A kind of cooling water circulation reutilization system, including circulating water chennel and the circulating water main that connects with circulating water chennel Line, the circulating water main line is provided with water circulating pump, and the water in circulating water chennel is passed through circulating water main by the water circulating pump Line is pumped to Chemical Manufacture with being cooled down in the pump circulation water pipeline that pump is cooled down and to Chemical Manufacture blower fan In blower fan circulating water pipework, cooling water is returned again to the circulating water chennel in the pump circulation water pipeline, blower fan circulating water pipework In;The pressure regulation pipeline returned in the water in circulating water main line in circulating water chennel is also communicated with the circulating water main line, The pressure regulation pipeline is provided with ball valve one.
Further, the system also includes being connected with the circulating water main line and drains in the water in the circulating water chennel The sewer line of Sewage Disposal, the sewer line is provided with ball valve two;
In addition the system also includes technique water pipeline, and the technique water pipeline includes the moisturizing connected with the circulating water chennel Pipeline and the emergent water pipeline connected with the circulating water main line, the moisturizing pipeline is provided with ball valve three and electric adjustable Section valve, the emergent water pipeline is provided with ball valve four;The electric control valve is connected with middle control DCS system, the circulating water chennel Place is provided with the microwave liquidometer for measuring liquid level in circulating water chennel, and the microwave liquidometer is connected with middle control DCS system, described Electric control valve judges whether to open according to the measured value signal of the microwave liquidometer.
Further, the system also includes the conductivity meter of water quality in measurement circulating water chennel, the conductivity meter and middle control DCS system connects, and the middle control DCS system is also associated with being under abnormal condition and the warning of startup in the conductivity Device.
Further, the back with water inlet line of the water circulating pump is provided with ball valve five, and the water circulating pump port of export is provided with pressure Power table one, the circulating water main line end is provided with pressure gauge two and pipeline blowoff valve one;The sewer line, emergent water pipe Line, pump circulation water pipeline, the blower fan circulating water pipework water (flow) direction along circulating water main line is sequentially arranged, the circulating water main The pipeline section that line is located between the sewer line and emergent water pipeline is provided with ball valve six, and the pump circulation water pipeline, blower fan are followed Blow-off pipe is equipped with ring water pipeline, pipeline blowoff valve two, pipeline blowoff valve three are respectively equipped with the blow-off pipe.
Further, the pump circulation water pipeline is provided with ball on the cooling water inlet end position of the Chemical Manufacture pump Valve seven, outlet end position are provided with ball valve eight;The blower fan circulating water pipework enters in the cooling water of the Chemical Manufacture blower fan Mouth end position is provided with ball valve nine, outlet end position and is provided with ball valve ten.
Further, the circulating water chennel inner space by be mutually perpendicular to arrange dividing plate one, dividing plate two be divided into return flume, Moisturizing groove, Rinsing Area, the return flume, moisturizing groove, the trench bottom of Rinsing Area are each equipped with flowing line, and the flowing line goes out The merging of mouth end is linked into draining outer fissure, and the flowing line connected with the return flume is provided with blowoff valve four, with the moisturizing groove The flowing line of connection is provided with blowoff valve five, and the flowing line connected with the Rinsing Area is provided with blowoff valve six, the benefit Tank is furnished with the overflow pipe accessed on the flowing line.
Further, the length of the dividing plate one is circulating water chennel length, and the width of dividing plate one is the height of circulating water chennel;It is described The length of dividing plate two be moisturizing well width, the width of dividing plate two to circulating water chennel height 1/3;The dividing plate one is provided with and the benefit The overfall that tank is communicated, the overfall length is the 1/4 of the length of dividing plate one, and the overfall width is the width of dividing plate one 1/2;The return flume accounts for the 1/3 of circulating water chennel space, and the moisturizing groove accounts for the 2/9 of circulating water chennel space.
Further, the back with water inlet line of the water circulating pump is connected to the side of the Rinsing Area and in circulating water chennel 1/10 Height and position.
The beneficial effect of above-mentioned technical proposal is mainly reflected in the following aspects:
(1) in heretofore described pump circulation water pipeline cooling water all Chemical Manufactures are carried out with the sealing structure of pump it is cold But after, all cooling waters are all overflowed in circulating water chennel by blowback water pipeline.Cooling water in the blower fan circulating water pipework After being cooled down with the bearing housing of blower fan for all Chemical Manufactures, all cooling waters are all overflowed to by blower fan return piping In circulating water chennel.The present invention is by the pump circulation water pipeline, blower fan circulating water pipework respectively by Chemical Manufacture pump and wind The cooling water of machine carries out recycling, greatlys save water resource.In addition needed for the Chemical Manufacture pump and blower fan When the cooling water inflow wanted is reduced, can be by adjusting the ball valve one on the pressure regulation pipeline by water unnecessary in circulating water main line It is back in circulating water chennel, reaches regulation pump circulation water pipeline, the effect of blower fan circulating water pipework entrance point hydraulic pressure, and ensures to follow The normal operation of ring water pump.
(2) sewer line is once the appearance pollution of circulating water chennel inner loop water, by sewage Sewage Disposal is got to The pipeline for being processed.Emergent water pipeline in the technique water pipeline be once circulating water chennel inner loop water occur pollution, As the pipeline that the cooling water of Contingency supply Chemical Manufacture pump and blower fan is used, the moisturizing pipeline in the technique water pipeline It is the pipeline to circulating water chennel moisturizing, the electric control valve is used with the linkage of microwave liquidometer during moisturizing, that is, work as circulating water chennel Moisturizing is opened and carried out to middle liquid level less than setting level value, then electric control valve, when liquid level exceedes setting liquid level in circulating water chennel Value, then electric control valve closing stops moisturizing, and control is simple, it is ensured that water level stablizes in circulating water chennel.
(3) conductivity meter is used to measure water quality in circulating water chennel, when conductivity then touches alarm less than setting value Report to the police, that is, think hydropenia in circulating water chennel, check whether electric control valve and moisturizing pipeline can normally moisturizings in time;When leading Electric rate then touches alarm equipment alarm higher than setting value, that is, the sealing for thinking Chemical Manufacture pump goes wrong, the medium of its conveying In being leaked to recirculated water, then exclude leakage problem in time, the sewage in by circulating water chennel is drained while filling into new water and is led to The emergent water pipeline crossed in technique water pipeline is that Chemical Manufacture pump and blower fan provide cooling water.
(4) by pressure gauge one, pressure gauge two, the hydraulic pressure of circulating water main line can be adjusted with reference to ball valve one, Stabilize it in design load.Periodically the blowoff valve one, blowoff valve two, blowoff valve three are opened, circulating water main line, pump are followed The impurity such as rust is discharged in ring water pipeline, blower fan circulating water pipework, to guarantee the cleaning of recirculated water.In addition also periodically by the row Blowoff valve four, blowoff valve five on water pipeline, blowoff valve six are opened, and the dirt in circulating water chennel is discharged.
(5) all it is carbon steel material because manufacturing the materials such as circulating water chennel, pipeline, may manages with the presence of welding slag in welding process In line or circulating water chennel, and after operation a period of time, there is certain rust, fresh water (FW) also likely to be present in itself certain Impurity, mechanical seal of these impurity to Chemical Manufacture pump is produced and had a strong impact on, and mechanical seal failure is even resulted in, to prevent Such case occurs, and circulating water chennel arranges two road dividing plates (dividing plate one, dividing plate two), big for precipitating, in filtration cycle tank Granule foreign.
Description of the drawings
Fig. 1 is schematic structural view of the invention.
Fig. 2 is circulating water chennel top view.
Fig. 3 is circulating water chennel dividing plate one, the structural representation of dividing plate two.
The implication of label symbol is as follows in figure:
1- circulating water chennels;11- overflow pipes;12- flowing lines;121- blowoff valves four;122- blowoff valves five;123- is arranged Dirty valve six;13- outer fissures;14- return flumes;15- moisturizing grooves;16- dividing plates one;17- dividing plates two;18- Rinsing Areas;2- is followed Ring water pump;21- inlet lines;211- ball valves five;22- circulating water main lines;221- pressure gauges one;222- ball valves six; 223- blowoff valves one;224- pressure gauges two;23- sewer lines;231- ball valves two;24- pressure regulation pipelines;241- ball valves One;3- pump circulation water pipelines;31- ball valves seven;32- Chemical Manufacture pumps;33- ball valves eight;34- blowback water pipelines;35- Blowoff valve two;36- ball valves 11;4- blower fan circulating water pipeworks;41- ball valves nine;42- Chemical Manufacture blower fans;43- balls Valve ten;44- blower fan return pipings;45- blowoff valves three;5- microwave liquidometers;51- wires one;6- conductivity meters;61- Wire two;7- technique water pipelines;71- meets an urgent need water pipeline;711- ball valves four;72- moisturizing pipelines;721- ball valves three;73- Electric control valve;731- wires three;74- blowoff valves seven;DCS system is controlled in 8-;81- alarms.
Specific embodiment
With reference to embodiment and accompanying drawing, the technical scheme in the present invention is clearly and completely described.
As shown in Figure 1, 2, 3, the present invention includes circulating water chennel 1, and the whole circulating water chennel 1 is hermetically sealed, inside dividing plate One 16, dividing plate 2 17 is divided into three spaces:It is respectively return flume 14, moisturizing groove 15 and Rinsing Area 18, the length of dividing plate 1 is to follow The length of ring tank 1, the width of dividing plate 1 is the height of circulating water chennel 1;The length of dividing plate 2 17 be the width of moisturizing groove 15, dividing plate 2 17 Width to the height of circulating water chennel 1 1/3;The dividing plate 1 is provided with the overfall communicated with the moisturizing groove 15, i.e. dividing plate One 16 are opening an overfall with the connected position of moisturizing groove 15, and overfall length is the length 1/4 of dividing plate 1, and overfall width is The 1/2 of the width of dividing plate 16.The return flume 14 accounts for the space 1/3 of circulating water chennel 1, and moisturizing groove 15 accounts for the space 2/9 of circulating water chennel 1.Often Individual bottom of gullet all configures a flowing line 12, three flowing lines 12 together parallel configuration to outer fissure 13, in moisturizing groove 15 Close top configures an overflow pipe 11, is parallel on flowing line 12.The inlet line 21 of water circulating pump 2 is welded on Rinsing Area 18 sides and positioned at 1/10 height and position of circulating water chennel 1.
In 14 side of return flume 1/2, height installs conductivity meter 6, and the conductivity meter 6 is connected to middle control by wire 2 61 DCS system 8, the middle control DCS system 8 is also associated with an alarm 81.
Under the normal operation of water circulating pump 2, ball valve 2 231, ball valve 4 711, blowoff valve 1, blowoff valve 3 45, row Dirty valve 2 35, ball valve 11, blowoff valve 4 121, blowoff valve 5 122, blowoff valve 6 123, blowoff valve 7 74 are closed, ball valve five 211st, ball valve 6 222, ball valve 3 721, ball valve 7 31, ball valve 8 33, ball valve 9 41, ball valve 10 are opened.Circulating water chennel 1 it is big It is little to meet when 9/10 height of the liquid level in circulating water chennel 1, in the case of without moisturizing, it is ensured that water circulating pump 2 runs More than 20 minutes.
The circulating water main line 22 is communicated with five by-pass lines and is respectively:Sewer line 23, emergent water pipeline 71, surge pipe Line 24, pump circulation water pipeline 3, blower fan circulating water pipework 4.
The sewer line 23 is once pollution occurs in the inner loop water of circulating water chennel 1, then be accomplished by getting in sewage Sewage Disposal is processed.The emergent water pipeline 71 is once pollution occurs in the inner loop water of circulating water chennel 1, as emergent Supplying chemical production is used with the cooling water of pump 32, Chemical Manufacture blower fan 42.
The pressure regulation pipeline 24 be in order to ensure normally using for water circulating pump 2, once extraneous cooling water demand is reduced, can So that unnecessary recirculated water is directly discharged in circulating water chennel 1, and the influent pressure of cooling water in pump circulation water pipeline 3 can be adjusted Power.
The pump circulation water pipeline 3 is the water inlet manifold line of all Chemical Manufacture pumps 32, cools down in pump circulation water pipeline 3 After water is cooled down to Chemical Manufacture with the sealing structure in pump 32, all cooling waters are all by blowback water pipeline 34 by backwater The top of groove 14 is overflowed in return flume 14.
The blower fan circulating water pipework 4 for all Chemical Manufacture blower fans 42 water inlet manifold line, blower fan circulating water pipework 4 After interior cooling water is cooled down to Chemical Manufacture with the bearing housing of blower fan 42, all cooling waters are all by blower fan return piping 44 are overflowed in return flume 14 by the top of return flume 14.
For technique water pipeline 7, bifurcated, one is directly connected to emergent water pipeline 71, and used as emergency, another is straight Connect and allocate in moisturizing groove 15, for the supplement to the water yield in circulating water chennel 1, be adjusted with electric control valve 73.
Electric control valve 73 in the connection of wire 3 731 by controlling DCS system 8.The microwave liquidometer 5 is arranged on Rinsing Area 18 crown center positions, and DCS system 8 is controlled in connecting by wire 1.The microwave liquidometer 5 and electric control valve 73 Dynamic to use, electric control valve 73 is set to automatic switch, the setting liquid level of circulating water chennel 1 it is high to groove more than 9/10 when, electric control valve 73 in closing, and when high less than the groove of circulating water chennel 1 9/10, electric control valve 73 is automatically turned on to the moisturizing of circulating water chennel 1, until It is again switched off when liquid level is to the height of circulating water chennel 1 9/10.
In order to ensure the cleaning of recirculated water, need periodically by blowoff valve 7 74, blowoff valve 1, blowoff valve 3 45, blowdown Valve 2 35 is opened, and the impurity such as the rust in pipeline are discharged, periodically by the flowing line scum valve 4 121 of circulating water chennel, row Dirty valve 5 122, blowoff valve 6 123 open the dirt in cleaning circulating water chennel 1.
By pressure gauge 1, pressure gauge 2 224, the pressure for adjusting ball valve 1 to ensure pump circulation water pipeline 3 exists Between 0.4-0.45Mpa.
Pump circulation water yield 12M in the present embodiment3/h;The quantity of circulating water 15M of Chemical Manufacture blower fan, Chemical Manufacture pump3/ H, Chemical Manufacture blower fan, Chemical Manufacture pump installs extreme higher position apart from circulating water chennel 30M, then the profile chi of circulating water chennel Very little 2.0M*2.0M*2.5M=10M3, the flow of water circulating pump 2 should select Q=25M3/ h, lift 50M, the operation of water circulating pump 2 20 More than minute, and ensure the pressure of pump circulation water pipeline 3 between 0.4-0.45Mpa.
, in 0~2000us/cm, setting electrical conductivity 6 is in 200~500us/ for the measurement range of conductivity meter 6 in the present embodiment Cm is normal, less than 200us/cm or higher than 500us/cm, by middle control DCS system 8 alarm 81 is started.If electrical conductivity exists Below 200us/cm, illustrates the hydropenia of circulating water chennel 1, checks moisturizing pipeline 72 and electric control valve 73.If electrical conductivity exists More than 500us/cm, the sealing for illustrating Chemical Manufacture pump goes wrong, and the dielectric leakage of its conveying is in recirculated water, then Ball valve 4 711, ball valve 2 231 are opened, ball valve 6 222, ball valve 1, ball valve 3 721 is closed, by the sewage in circulating water chennel 1 Sewage Disposal is reached, Chemical Manufacture blower fan, the cooling water of Chemical Manufacture pump are directly provided by emergent water.Check simultaneously Pump circulation water pipeline 22 closes ball valve 8 33 in all Chemical Manufactures pipeline at the coolant outlet end of pump 32, opens ball valve 11, check that leakage occurs in which platform Chemical Manufacture pump 32, after finding, wait sewage level in circulating water chennel 1 to only have groove high by 1/ When 10, ball valve 8 33 is opened, close ball valve 11, open ball valve 3 721, line replacement is entered to the interior circulation water of circulating water chennel 1, etc. To electrical conductivity between 200-300us/cm, ball valve 6 222, ball valve 1 are opened, close ball valve 4 711, ball valve 2 231.

Claims (8)

1. a kind of cooling water circulation reutilization system, it is characterised in that:Including circulating water chennel (1) and with circulating water chennel (1) even Logical circulating water main line (22), the circulating water main line (22) is provided with water circulating pump (2), and the water circulating pump (2) will Water in circulating water chennel (1) is pumped to the pump circulation cooled down with pump (32) to Chemical Manufacture by circulating water main line (22) With in the blower fan circulating water pipework (4) that blower fan (42) is cooled down in water pipeline (3) and to Chemical Manufacture, the pump circulation water Cooling water is returned again to into the circulating water chennel (1) in pipeline (3), blower fan circulating water pipework (4);The circulating water main line (22) the pressure regulation pipeline (24) returned in the water in circulating water main line (22) in circulating water chennel (1) is also communicated with, it is described Pressure regulation pipeline (24) is provided with ball valve one (241).
2. cooling water circulation reutilization system as claimed in claim 1, it is characterised in that:The system also includes and the circulation Supply mains's line (22) connects and the water in the circulating water chennel (1) is drained into into the sewer line (23) of Sewage Disposal, the dirt Water pipeline (23) is provided with ball valve two (231);
In addition the system also includes technique water pipeline (7), and the technique water pipeline (7) includes being connected with the circulating water chennel (1) Moisturizing pipeline (72) and the emergent water pipeline (71) that connects with the circulating water main line (22), the moisturizing pipeline (72) Ball valve three (721) and electric control valve (73) are provided with, the emergent water pipeline (71) is provided with ball valve four (711);It is described Electric control valve (73) is connected with middle control DCS system (8), and circulating water chennel (1) place is provided with for measuring liquid in circulating water chennel The microwave liquidometer (5) of position, the microwave liquidometer (5) is connected with middle control DCS system (8), electric control valve (73) root Judge whether to open according to the measured value signal of the microwave liquidometer (5).
3. cooling water circulation reutilization system as claimed in claim 1, it is characterised in that:The system also includes measurement recirculated water The conductivity meter (6) of the interior water quality of groove (1), the conductivity meter (6) is connected with middle control DCS system (8), the middle control DCS system (8) it is also associated with being under abnormal condition and the alarm (81) of startup in the conductivity.
4. cooling water circulation reutilization system as claimed in claim 2, it is characterised in that:The water inlet of the water circulating pump (2) Pipeline (21) is provided with ball valve five (211), and water circulating pump (2) port of export is provided with pressure gauge one (221), and the recirculated water is total Pipeline (21) end is provided with pressure gauge two (224) and pipeline blowoff valve one (223);The sewer line (23), emergent water pipe Line (71), pump circulation water pipeline (3), blower fan circulating water pipework (4) water (flow) direction along circulating water main line (22) is sequentially arranged, Pipeline section of the circulating water main line (22) between the sewer line (23) and emergent water pipeline (71) is provided with ball valve Six (222), blow-off pipe is equipped with the pump circulation water pipeline (3), blower fan circulating water pipework (4), on the blow-off pipe respectively It is provided with pipeline blowoff valve two (35), pipeline blowoff valve three (45).
5. cooling water circulation reutilization system as claimed in claim 2, it is characterised in that:The pump circulation water pipeline (3) exists The cooling water inlet end position of the Chemical Manufacture pump (32) is provided with ball valve seven (31), outlet end position and is provided with ball valve eight (33);The blower fan circulating water pipework (4) is provided with ball on the cooling water inlet end position of the Chemical Manufacture blower fan (42) Valve nine (41), outlet end position are provided with ball valve ten (43).
6. cooling water circulation reutilization system as claimed in claim 2, it is characterised in that:The circulating water chennel (2) is internal empty Between by be mutually perpendicular to arrange dividing plate one (16), dividing plate two (17) be divided into return flume (14), moisturizing groove (15), Rinsing Area (18), The return flume (14), moisturizing groove (15), the trench bottom of Rinsing Area (18) are each equipped with flowing line (12), the flowing line (12) port of export merging is linked into draining outer fissure (13), and the flowing line (12) connected with the return flume (14) is provided with blowdown Valve four (121), the flowing line (12) connected with the moisturizing groove (15) is provided with blowoff valve five (122), with the Rinsing Area (18) flowing line (12) of connection is provided with blowoff valve six (123), and the moisturizing groove (15) is furnished with access flowing line (12) On overflow pipe (11).
7. cooling water circulation reutilization system as claimed in claim 6, it is characterised in that:The length of the dividing plate one (16) is to follow Ring tank (1) length, the width of dividing plate one (16) is the height of circulating water chennel (1);The length of the dividing plate two (17) is moisturizing groove (15) width, the width of dividing plate two (17) to circulating water chennel (1) height 1/3;The dividing plate one (16) is provided with and the moisturizing The overfall that groove (15) is communicated, the overfall length is the 1/4 of the length of dividing plate one (16), and the overfall width is dividing plate one (16) the 1/2 of width;The return flume (14) accounts for the 1/3 of circulating water chennel (1) space, and the moisturizing groove (15) accounts for circulating water chennel (1) the 2/9 of space.
8. cooling water circulation reutilization system as claimed in claim 7, it is characterised in that:The water inlet of the water circulating pump (2) Pipeline (21) is connected to the side of the Rinsing Area (18) and in the height and position of circulating water chennel (1) 1/10.
CN201611202954.6A 2016-12-23 2016-12-23 Cooling water recycling and reusing system Pending CN106595186A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611202954.6A CN106595186A (en) 2016-12-23 2016-12-23 Cooling water recycling and reusing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611202954.6A CN106595186A (en) 2016-12-23 2016-12-23 Cooling water recycling and reusing system

Publications (1)

Publication Number Publication Date
CN106595186A true CN106595186A (en) 2017-04-26

Family

ID=58603200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611202954.6A Pending CN106595186A (en) 2016-12-23 2016-12-23 Cooling water recycling and reusing system

Country Status (1)

Country Link
CN (1) CN106595186A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114413551A (en) * 2021-12-29 2022-04-29 世源科技工程有限公司 Cooling water emergency water supply system and method

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005061680A (en) * 2003-08-08 2005-03-10 Takenaka Komuten Co Ltd Water supply/discharge control device for cooling tower
CN201981574U (en) * 2010-12-31 2011-09-21 北京京诚科林环保科技有限公司 Pressure stabilizing and water replenishing device for closed circulation water system
CN202315866U (en) * 2011-12-31 2012-07-11 迪爱生合成树脂(中山)有限公司 Cooling water recycling system
CN202432789U (en) * 2011-11-24 2012-09-12 冠茂集团有限公司 Low-temperature cooling water circulation system
CN202813950U (en) * 2012-09-13 2013-03-20 山东蓝星东大化工有限责任公司 Circulating water system
CN203476733U (en) * 2013-06-24 2014-03-12 中国石油化工集团公司 Water circulation system of water ring vacuum pump and dicumyl peroxide production system
CN203603214U (en) * 2013-11-26 2014-05-21 武钢集团昆明钢铁股份有限公司 Water supply quick response device with adjusting function
CN204370503U (en) * 2014-12-03 2015-06-03 东北大学设计研究院(有限公司) Integrated circular water self-circulating device
US20150175459A1 (en) * 2013-12-24 2015-06-25 Donald S. Hofmann Apparatus Providing Softened Makeup Water for Cooling System
CN104848634A (en) * 2014-11-27 2015-08-19 重庆摩尔水处理设备有限公司 Circulating water energy-saving system
CN206339005U (en) * 2016-12-23 2017-07-18 安徽六国化工股份有限公司 A kind of cooling water circulation reutilization system

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005061680A (en) * 2003-08-08 2005-03-10 Takenaka Komuten Co Ltd Water supply/discharge control device for cooling tower
CN201981574U (en) * 2010-12-31 2011-09-21 北京京诚科林环保科技有限公司 Pressure stabilizing and water replenishing device for closed circulation water system
CN202432789U (en) * 2011-11-24 2012-09-12 冠茂集团有限公司 Low-temperature cooling water circulation system
CN202315866U (en) * 2011-12-31 2012-07-11 迪爱生合成树脂(中山)有限公司 Cooling water recycling system
CN202813950U (en) * 2012-09-13 2013-03-20 山东蓝星东大化工有限责任公司 Circulating water system
CN203476733U (en) * 2013-06-24 2014-03-12 中国石油化工集团公司 Water circulation system of water ring vacuum pump and dicumyl peroxide production system
CN203603214U (en) * 2013-11-26 2014-05-21 武钢集团昆明钢铁股份有限公司 Water supply quick response device with adjusting function
US20150175459A1 (en) * 2013-12-24 2015-06-25 Donald S. Hofmann Apparatus Providing Softened Makeup Water for Cooling System
CN104848634A (en) * 2014-11-27 2015-08-19 重庆摩尔水处理设备有限公司 Circulating water energy-saving system
CN204370503U (en) * 2014-12-03 2015-06-03 东北大学设计研究院(有限公司) Integrated circular water self-circulating device
CN206339005U (en) * 2016-12-23 2017-07-18 安徽六国化工股份有限公司 A kind of cooling water circulation reutilization system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114413551A (en) * 2021-12-29 2022-04-29 世源科技工程有限公司 Cooling water emergency water supply system and method
CN114413551B (en) * 2021-12-29 2023-10-27 世源科技工程有限公司 Cooling water emergency water supply system and method

Similar Documents

Publication Publication Date Title
CN207608421U (en) A kind of indirect air cooling pH in Circulating Water regulating device
CN105054786A (en) Intelligent water dispenser control system
CN106640113A (en) Water delivery and cooling system used for TBM
CN206339005U (en) A kind of cooling water circulation reutilization system
CN106595186A (en) Cooling water recycling and reusing system
CN208711450U (en) A kind of microkinetic immersion ultrafiltration apparatus
CN106555218A (en) A kind of painting dressing automobiles electrophoresis circulating pump axle envelope and spray hybrid system
CN114635869A (en) Slurry pump mechanical seal water supply system
CN102230292A (en) Circulation cooling device for chute of soda recovery furnace
CN108488073B (en) Environment-friendly slurry circulating pump group
CN110031201B (en) A remove detection device for detecting shield constructs quick-witted pump
CN201833230U (en) Electric spindle cooling water flow rate detection device
CN205805990U (en) A kind of equipment of recycling machine sealing liquid
CN107858467B (en) Blast furnace cooling water leakage detection method and system
CN212717232U (en) Automatic detection and discharge device for circulation of machine seal cooling water of pump in MVR system
CN103016957B (en) Pressure-adaptive continuous drainer for gas conveying pipeline
CN208701878U (en) A kind of power station drainage control system
CN210281936U (en) A return water lifting box for grinding fluid centralized processing
CN211849762U (en) Circulating water supply system applied to large-scale water delivery and transfer system
CN215213890U (en) Machine seals water recycling system
CN222099761U (en) Emergency device for process circulating cooling water and production line
CN219772051U (en) Automatic slag discharging system of acetylene generator
CN223628261U (en) Split overflow brick processing water tank device
CN223939228U (en) Mechanical seal circulating water system with automatic alarm function
CN216160345U (en) Automatic water replenishing device for hydrostatic testing machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170426