CN106567404A CN201610985805.5A CN201610985805A CN106567404A CN 106567404 A CN106567404 A CN 106567404A CN 201610985805 A CN201610985805 A CN 201610985805A CN 106567404 A CN106567404 A CN 106567404A
Authority
CN
China
Prior art keywords
retaining wall
rigid
flexible
semi
expansive soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610985805.5A
Other languages
English (en)
Inventor
田世宽
张强
冯燕平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Fourth Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
Fourth Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd, Fourth Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN201610985805.5A priority Critical patent/CN106567404A/zh
Publication of CN106567404A publication Critical patent/CN106567404A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明的目的是提供一种新型的膨胀土路堑半刚性上挡墙设计及施工方法,利用刚性挡墙+柔性碎石垫层组合形成半刚性上挡墙,用于膨胀土路基边坡防护,柔性碎石垫层结构布设在刚性挡墙结构内侧,泄水孔设置在刚性挡墙结构上。膨胀土路堑上挡墙结构可采用浆砌片块石、片石混凝土或素混凝土,局部特殊地带也可以设计为钢筋混凝土结构,在挡墙后增加一层柔性的碎石垫层,用于吸收消化膨胀土路堑边坡遇水发生的一定膨胀变形,并且保证路堑边坡的稳定性。

Description

膨胀土路堑半刚性上挡墙设计及施工方法
技术领域
本发明涉及一种膨胀土路堑半刚性上挡墙设计及施工方法。
背景技术
膨胀土对公路路基及边坡的危害一直被工程界称为癌症,可在自然界及自然状态下我们对膨胀土的病害一般没有发现,其实在自然界里自然状态下,膨胀土病害一直存在,只是通过长时间的作用,已经形成了一个相对平衡的关系,一旦在膨胀土地带修筑公路、架设桥梁,势必会开挖边坡、填筑路堤、开挖基坑等,就会改变原有的水系、陆系,破坏原有的自然平衡。因此,工程界应该对此予以足够的重视,必须通过工程措施和自然和谐原则帮助其再建立一种新的平衡状态,施工过程也就是一个建立新平衡的过程。工程技术人员就是根据现场实际地质情况,再建立一个新的路基、地形、地貌的自然平衡体,就需要设置适当、合理、经济的排水和支挡措施。
通过对膨胀土路基病害的研究发现,直接施工在路堑边坡上挡墙防护结构基本上在几年后和几次大的强降雨后都被挤压变形破坏掉。根据膨胀土吸水膨胀、失水收缩和多次重复作用的特点,采用刚性结构的强支护已经不能满足膨胀土路基边坡支护的功能。而柔性上挡墙是目前采用的一种比较普遍的方法,但由于该结构设计断面尺寸较大,开挖工程量也较大,对环境破坏较大,已经不满足当前低碳环保和节约型社会的需求。
因此,急需研究一种新型的膨胀土路堑半刚性上挡墙设计及施工方法。
发明内容
本发明的目的是提供一种新型的膨胀土路堑半刚性上挡墙设计及施工方法,利用刚性挡墙+柔性碎石垫层组合形成半刚性上挡墙,用于膨胀土路基边坡防护,膨胀土路堑上挡墙结构可采用浆砌片块石、片石混凝土或素混凝土,局部特殊地带也可以设计为钢筋混凝土结构,在挡墙后增加一层柔性的碎石垫层,用于吸收消化膨胀土路堑边坡遇水发生的一定膨胀变形,并且保证路堑边坡的稳定性。
本发明釆取的技术方案:
一种新型的膨胀土路堑半刚性上挡墙设计及施工方法,其特征是:采用刚性挡墙+柔性碎石垫层组合形成半刚性上挡墙,实现膨胀土路堑边坡的防护。
所述膨胀土路堑半刚性上挡墙防护就是采用传统的刚性挡墙结构+柔性碎石垫层结构的组合结构,柔性碎石垫层在刚性挡墙的内侧,柔性碎石垫层与路基边坡直接接触,刚性的挡墙结构起到防护支撑作用,柔性的碎石垫层起到吸收和消化膨胀土路基遇水产生的变形。
柔性碎石垫层结构布设在刚性挡墙结构内侧,泄水孔设置在刚性挡墙结构上。
柔性碎石垫层结构采用透水性好的碎石、砂砾石材料,分层填筑,分层压实。
泄水孔尺寸为15×15cm,泄水孔3间距按2~3m布设。
具体施工方法步骤如下:
(1)先施工刚性挡墙结构,待刚性挡墙结构强度达到设计强度85%以上时,在施工柔性碎石结构。
(2)在涵背刚性挡墙结构后1m范围内填筑柔性碎石垫层,然后紧邻填筑透水性涵背回填材料。
(3)先填筑柔性碎石垫层材料,紧接着填筑透水性涵背回填材料,柔性碎石垫层结构与涵背回填材料一起从底部向上分层填筑,每层松铺厚度20cm,采用静压的方式进行压实,并保证压实度达到96%以上。
(4)柔性碎石垫层结构与涵背回填材料一起分层填筑,分层压实,直至刚性挡墙结构顶面位置。
(5)这样就形成刚性挡墙+柔性碎石垫层组合形成用于膨胀土路基边坡防护的半刚性上挡墙防护结构。
(6)在刚性挡墙结构中在岩土分界线以上部分分层设置15×15cm泄水孔,泄水孔间距2~3m,渗水处适当加密,上下交错布置。最下面一排泄水孔出口应保证排水顺畅,高出地面30cm。
本发明的优点:
(1)较传统挡墙结构相比,半刚性上挡墙可以允许路基边坡有一定的变形,柔性碎石结构可以消耗和吸收掉胀缩变形。
(2)较传统挡墙结构相比,在路基发生吸水膨胀时刚性的挡墙结构不会发生开裂破坏,不会影响到整体防护结构的稳定性。
(3)较传统挡墙结构相比,半刚性上挡墙不是完全靠刚性防护去抵挡膨胀土的膨胀变形,而是采用刚柔相济,相辅相成的方式,既容许路基发生一定的变形,又能够有效限制路基发生过大或进一步的变形,经济性和实用型更加合理,经济效益显著。
附图说明
图1本发明组成结构整体立面示意图。
图2柔性碎石垫层结构示意图
图中标号说明:1.刚性挡墙结构 2.柔性碎石垫层 3.泄水孔 。
具体实施方式
本发明半刚性上挡墙结构主要由刚性挡墙结构1、柔性碎石垫层2、泄水孔3组成。
一种新型的膨胀土路堑半刚性上挡墙设计及施工方法,主要是靠刚性挡墙结构1起主要支撑加固作用,柔性碎石垫层2位于刚性挡墙结构1后面,与路基边坡相接,主要起吸收和消化路基的胀缩变形,泄水孔3位于刚性挡墙结构1上,横向间距2~3m,纵向分层布置,主要起排水作用。
具体施工方法步骤如下:
(1)先施工刚性挡墙结构1,待刚性挡墙结构1强度达到设计强度85%以上时,在施工柔性碎石结构2。
(2)在刚性挡墙结构1后1m范围内填筑柔性碎石垫层2,然后紧邻填筑透水性涵背回填材料。
(3)先填筑柔性碎石垫层结构2,紧接着填筑透水性涵背回填材料。
(4)柔性碎石垫层结构2与涵背回填材料一起分层填筑,每层松铺厚度20cm,采用静压的方式进行压实,并保证压实度达到96%以上。分层填筑分层压实,直至刚性挡墙结构顶面位置。
(5)这样就形成刚性挡墙1+柔性碎石垫层2组合形成用于膨胀土路基边坡防护的半刚性上挡墙防护结构。
(6)在刚性挡墙结构1中在岩土分界线以上部分分层设置15×15cm泄水孔3,泄水孔3间距2~3m,渗水处适当加密,上下交错布置。最下面一排泄水孔3出口应保证排水顺畅,高出地面30cm。
膨胀土路堑上挡墙结构可采用浆砌片块石、片石混凝土或素混凝土,局部特殊地带也可以设计为钢筋混凝土结构,在挡墙后增加一层柔性的碎石垫层,用于吸收消化膨胀土路堑边坡遇水发生的一定膨胀变形,并且保证路堑边坡的稳定性。

Claims (4)

1.一种膨胀土路堑半刚性上挡墙结构,其特征在于:柔性碎石垫层结构(2)布设在刚性挡墙结构(1)内侧,泄水孔(3)设置在刚性挡墙结构(1)上。
2.根据权利要求1所述的膨胀土路堑半刚性上挡墙结构,其特征在于:柔性碎石垫层结构(2)采用透水性好的碎石、砂砾石材料,分层填筑,分层压实。
3.根据权利要求1所述的膨胀土路堑半刚性上挡墙结构,其特征在于:泄水孔(3)尺寸为15×15cm,泄水孔(3)间距按2~3m布设。
4.一种膨胀土路堑半刚性上挡墙施工方法,其特征在于具体施工方法步骤如下:
(1)先施工刚性挡墙结构,待刚性挡墙结构强度达到设计强度85%以上时,在施工柔性碎石结构;
(2)在涵背刚性挡墙结构后1m范围内填筑柔性碎石垫层,然后紧邻填筑透水性涵背回填材料;
(3)先填筑柔性碎石垫层材料,紧接着填筑透水性涵背回填材料,柔性碎石垫层结构与涵背回填材料一起从底部向上分层填筑,每层松铺厚度20cm,采用静压的方式进行压实,并保证压实度达到96%以上;
(4)柔性碎石垫层结构与涵背回填材料一起分层填筑,分层压实,直至刚性挡墙结构顶面位置;
(5)这样就形成刚性挡墙+柔性碎石垫层组合形成用于膨胀土路基边坡防护的半刚性上挡墙防护结构;
(6)在刚性挡墙结构中在岩土分界线以上部分分层设置15×15cm泄水孔,泄水孔间距2~3m,渗水处适当加密,上下交错布置,最下面一排泄水孔出口应保证排水顺畅,高出地面30cm。
CN201610985805.5A 2016-11-09 2016-11-09 膨胀土路堑半刚性上挡墙设计及施工方法 Pending CN106567404A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610985805.5A CN106567404A (zh) 2016-11-09 2016-11-09 膨胀土路堑半刚性上挡墙设计及施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610985805.5A CN106567404A (zh) 2016-11-09 2016-11-09 膨胀土路堑半刚性上挡墙设计及施工方法

Publications (1)

Publication Number Publication Date
CN106567404A true CN106567404A (zh) 2017-04-19

Family

ID=58540788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610985805.5A Pending CN106567404A (zh) 2016-11-09 2016-11-09 膨胀土路堑半刚性上挡墙设计及施工方法

Country Status (1)

Country Link
CN (1) CN106567404A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165190A (zh) * 2017-07-04 2017-09-15 西安科技大学 中冻区路基防渗防冻保温墙施工方法
CN107237230A (zh) * 2017-08-01 2017-10-10 四川睿铁科技有限责任公司 一种膨胀土(岩)路基支挡减胀结构及其施工方法
CN109183818A (zh) * 2018-11-07 2019-01-11 中交铁道设计研究总院有限公司 一种膨胀土岩路堑边坡支挡减胀结构
CN109972654A (zh) * 2019-05-08 2019-07-05 贵州智华建设工程有限责任公司 一种j型锚杆高挡墙及其施工方法
CN112195965A (zh) * 2020-11-12 2021-01-08 云南建投第一勘察设计有限公司 膨胀土路堑挡土墙

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07216916A (ja) * 1994-01-27 1995-08-15 Kajima Corp 山岳、丘陵地における道路の建設工法
CN1281083A (zh) * 1999-07-19 2001-01-24 扬州市勘测设计研究院土工新技术研究所 一种加筋挡土墙
CN1752354A (zh) * 2005-10-31 2006-03-29 程卫国 一种建造挡土墙的方法及该方法所用挡土块
CN102852160A (zh) * 2012-10-06 2013-01-02 朱维伟 用于艺术墙绘的复合结构挡墙及其施工方法
CN103410159A (zh) * 2013-08-13 2013-11-27 南昌工程学院 膨胀土路堑边坡支护结构及其施工方法
CN103452130A (zh) * 2013-08-20 2013-12-18 中铁第四勘察设计院集团有限公司 预应力钢筋网加筋土柱板式挡墙
CN105002927A (zh) * 2015-06-15 2015-10-28 湖北工业大学 一种挖方边坡挡墙反滤层的施工方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07216916A (ja) * 1994-01-27 1995-08-15 Kajima Corp 山岳、丘陵地における道路の建設工法
CN1281083A (zh) * 1999-07-19 2001-01-24 扬州市勘测设计研究院土工新技术研究所 一种加筋挡土墙
CN1752354A (zh) * 2005-10-31 2006-03-29 程卫国 一种建造挡土墙的方法及该方法所用挡土块
CN102852160A (zh) * 2012-10-06 2013-01-02 朱维伟 用于艺术墙绘的复合结构挡墙及其施工方法
CN103410159A (zh) * 2013-08-13 2013-11-27 南昌工程学院 膨胀土路堑边坡支护结构及其施工方法
CN103452130A (zh) * 2013-08-20 2013-12-18 中铁第四勘察设计院集团有限公司 预应力钢筋网加筋土柱板式挡墙
CN105002927A (zh) * 2015-06-15 2015-10-28 湖北工业大学 一种挖方边坡挡墙反滤层的施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘宝兴: "《路基工程新技术实用全书 公路·铁路·机场场道》", 31 May 2001 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165190A (zh) * 2017-07-04 2017-09-15 西安科技大学 中冻区路基防渗防冻保温墙施工方法
CN107237230A (zh) * 2017-08-01 2017-10-10 四川睿铁科技有限责任公司 一种膨胀土(岩)路基支挡减胀结构及其施工方法
CN109183818A (zh) * 2018-11-07 2019-01-11 中交铁道设计研究总院有限公司 一种膨胀土岩路堑边坡支挡减胀结构
CN109183818B (zh) * 2018-11-07 2023-11-03 中交铁道设计研究总院有限公司 一种膨胀土岩路堑边坡支挡减胀结构
CN109972654A (zh) * 2019-05-08 2019-07-05 贵州智华建设工程有限责任公司 一种j型锚杆高挡墙及其施工方法
CN112195965A (zh) * 2020-11-12 2021-01-08 云南建投第一勘察设计有限公司 膨胀土路堑挡土墙

Similar Documents

Publication Publication Date Title
CN111851505B (zh) 一种灌注式防渗心墙土石坝的构筑方法及其结构
CN203188065U (zh) 无砟轨道铁路膨胀土路堑基床及边坡防护结构
CN113445396B (zh) 一种高液限土路段的高填土路基填筑施工方法
CN103510441A (zh) 防止寒区公路水损破坏的立体排水路基结构及施工方法
CN103981876B (zh) 用于深厚软基河道与傍河路堤共建的组合构件及施工方法
CN106193066B (zh) 一种基于生态修复的黄土崩塌治理方法
CN106567404A (zh) 膨胀土路堑半刚性上挡墙设计及施工方法
CN203498721U (zh) 一种防止寒区公路水损破坏的立体排水路基结构
CN206529652U (zh) 一种富盐软弱盐渍土地区无砟轨道路堤结构
CN103643689B (zh) 一种管式地下水排渗盲沟及其施工工艺和应用
CN107288120A (zh) 一种新老路基在浸水路段稳固拼接的排水加固结构
CN111535105B (zh) 沿海平原地区市政道路路基防水隔离保护结构及施工方法
CN112195965A (zh) 膨胀土路堑挡土墙
CN111794030A (zh) 在穿堤建筑物处加宽堤基的方法
CN106836034B (zh) 一种高填方盖板涵柔性减载体系及施工方法
CN103276717A (zh) 复合土工合成材料加筋垫层处理软土地基的方法
CN107761668A (zh) 一种滨海滨库造地型护岸结构及其建筑方法
CN112281912A (zh) 一种陡峭山区河滩弃土场防护体系及其施工方法
CN206245341U (zh) 一种膨胀土路堑半刚性上挡墙结构
CN102425179A (zh) 一种微型钢管灌注桩支撑加筋土渗沟结构
CN218090730U (zh) 一种环保型防渗挡水坝
CN106049508B (zh) 一种坑塘型洼地土石方填筑结构及施工方法
CN108914959A (zh) 一种适用于山区房建的基础结构及其施工方法
CN214657200U (zh) 一种陡峭山区河滩弃土场防护体系
CN204385575U (zh) 土工格栅加筋粘土包边尾矿砂路基

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170419