- CN106555469A CN106555469A CN201510616059.8A CN201510616059A CN106555469A CN 106555469 A CN106555469 A CN 106555469A CN 201510616059 A CN201510616059 A CN 201510616059A CN 106555469 A CN106555469 A CN 106555469A
- Authority
- CN
- China
- Prior art keywords
- construction platform
- steel pipe
- outside
- construction
- suspension type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 101
- 239000000203 mixture Substances 0.000 title claims abstract description 24
- 239000000725 suspension Substances 0.000 title claims abstract description 23
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 59
- 239000010959 steel Substances 0.000 claims abstract description 59
- 239000002344 surface layer Substances 0.000 claims description 6
- 239000004568 cement Substances 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 2
- 210000004247 Hand Anatomy 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 11
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 238000003754 machining Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 239000004615 ingredient Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006011 modification reaction Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000010626 work up procedure Methods 0.000 description 1
Abstract
A kind of external wall construction suspension type combination construction platform, including upper ejector pin actuator, construction platform horizontal support steel pipe, pedal support bar, pedal, construction platform longitudinal bracing steel pipe, suspension type combination construction platform is arranged on the outside of exterior wall sideline, fixed by fastening bolt with the horizontal drawing bolt on the outside of the exterior wall sideline, grooved shoulder pole steel is provided with the outside of the horizontal drawing bolt, on the outside of the grooved shoulder pole steel, brace is bolted.The beneficial effects of the present invention is:1st, compare with original technical matters it is of the invention with systematic part it is few, install it is simple, easy to disassemble, improve installation effectiveness, accelerate speed of application, it is more safe and reliable in construction usage.2nd, the present invention can once produce multiple circulation Reusability in factory's batch machining production, can realize that high-altitude is mounted directly, need not do from ground using the operation construction of the mechanical engagements such as tower crane, eliminate the manually installed labour forces in a large amount of scenes during in-site installation.
Description
Technical field
The present invention relates to Architectural Equipment field, and in particular to a kind of external wall construction suspension type combination construction platform.
Background technology
Building trade, either high buildings and large mansions or one-storey house, have all used scaffold in building course as operation platform, and convenient construction person constructed, and scaffold refers to job site for operative and solves the various supports for vertically and horizontally transporting and setting up.The generic term on building circle, where referring to that be used on construction site that exterior wall, inside fitting or floor height are higher directly cannot construct.Mainly for workmen work up and down or perimeter security net go along with sb. to guard him and high-altitude installation component etc. for a long time, due to erecting tools itself and its constructing technology and using management of safe operation in more backward state, cause the incidence rate of accident higher, particularly in installation process, traditional construction frame installs trouble, whole process needs man-made assembly to fix, along with very big risk, building trade experienced the technological change of decades, various related construction technical schemes are greatly improved and development, and external wall construction scaffold is rested in console model or overhanging type always, manual physical labor's amount of this technology mode is big, and production efficiency is extremely low, safety even to constructor in installation and unloading process brings threat.
The content of the invention
In order to solve the problems, such as above-mentioned prior art, the present invention provides a kind of external wall construction suspension type combination construction platform.
The present invention is achieved through the following technical solutions above-mentioned purpose:
A kind of external wall construction suspension type combination construction platform,Including upper ejector pin actuator、Construction platform horizontal support steel pipe、Pedal support bar、Pedal、Construction platform longitudinal bracing steel pipe,Suspension type combination construction platform is arranged on the outside of exterior wall sideline,Fixed by fastening bolt with the horizontal drawing bolt on the outside of the exterior wall sideline,Grooved shoulder pole steel is provided with the outside of the horizontal drawing bolt,Brace is bolted on the outside of the grooved shoulder pole steel,The construction platform longitudinal bracing steel pipe is dispersed with the outside of the brace,The upper ejector pin actuator is dispersed with below the brace,The upper ejector pin actuator is together with the construction platform longitudinal bracing steel-pipe welding,The construction platform horizontal support steel pipe is connected in the middle of the construction platform longitudinal bracing steel pipe,Pedal support bar is dispersed with above the construction platform horizontal support steel pipe,The pedal is provided with above the pedal support bar,Construction platform longitudinal bracing steel pipe front mid portion is dispersed with front sissy bar,The construction platform longitudinal bracing steel pipe side is dispersed with side airbag pull bar,Lower push rod actuator is connected to below the construction platform longitudinal bracing steel pipe,House and floor plates are provided with the inside of the exterior wall sideline,The house doorway is provided with door,It is dispersed with outside the door below stair and balustrade building and is dispersed with ground,The ground is connected with big surface layer.
Wherein, fixed by fastening bolt with the horizontal drawing bolt on the outside of the exterior wall sideline, the grooved shoulder pole steel is bolted with the brace.
Wherein, the upper ejector pin actuator and lower push rod actuator are supported by the exterior wall sideline and adjust the suspension type combination construction platform, need the distance of construction platform and wall is adjusted by the upper ejector pin actuator and the lower push rod actuator according to construction.
Wherein, with the construction platform longitudinal bracing steel pipe by being welded together, the pedal support bar is welded on the pedal and is placed on the construction platform horizontal support steel pipe construction platform horizontal support steel pipe.
Wherein, the front sissy bar and the side airbag pull bar are by the construction platform horizontal support steel pipe and the construction platform longitudinal bracing steel pipe fastening, it is ensured that construction platform is indeformable and its stability.
Wherein, the exterior wall sideline is connected by cement steel with the house and the floor plates, and the balustrade is fixed on the stair, and the ground is directly connected to the big surface layer.
The beneficial effects of the present invention is:1st, compare with original technical matters it is of the invention with systematic part it is few, install it is simple, easy to disassemble, improve installation effectiveness, accelerate speed of application, it is more safe and reliable in construction usage.2nd, the present invention can once produce multiple circulation Reusability in factory's batch machining production, can realize that high-altitude is mounted directly, need not do from ground using the operation construction of the mechanical engagements such as tower crane, eliminate the manually installed labour forces in a large amount of scenes during in-site installation.
Description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is a kind of installation enlarged drawing of external wall construction suspension type combination construction platform of the present invention;
Fig. 2 is a kind of scheme of installation of the external wall construction suspension type combination construction platform of the present invention on building;
Fig. 3 is a kind of top view of external wall construction suspension type combination construction platform of the present invention.
Specific embodiment
As shown in Figure 1-Figure 3,A kind of external wall construction suspension type combination construction platform 8,Including upper ejector pin actuator 14、Construction platform horizontal support steel pipe 15、Pedal support bar 16、Pedal 18、Construction platform longitudinal bracing steel pipe 19,Suspension type combination construction platform 8 is arranged on the outside of exterior wall sideline 7,Fixed by fastening bolt 10 with the horizontal drawing bolt 11 on the outside of the exterior wall sideline 7,Grooved shoulder pole steel 12 is provided with the outside of the horizontal drawing bolt 11,Brace 13 is bolted on the outside of the grooved shoulder pole steel 12,The construction platform longitudinal bracing steel pipe 19 is dispersed with the outside of the brace 13,The upper ejector pin actuator 14 is dispersed with below the brace 13,The upper ejector pin actuator 14 is welded together with the construction platform longitudinal bracing steel pipe 19,The construction platform horizontal support steel pipe 15 is connected in the middle of the construction platform longitudinal bracing steel pipe 19,Pedal support bar 16 is dispersed with above the construction platform horizontal support steel pipe 15,The pedal 18 is provided with above the pedal support bar 16,The 19 front mid portion of construction platform longitudinal bracing steel pipe is dispersed with front sissy bar 17,19 side of construction platform longitudinal bracing steel pipe is dispersed with side airbag pull bar 20,Lower push rod actuator 21 is connected to below the construction platform longitudinal bracing steel pipe 19,House and floor plates 6 are provided with the inside of the exterior wall sideline 7,4 mouthfuls of the house door is provided with door 4,It is dispersed with outside the door 4 below 2 building of stair 3 and 3 handrail of stair and is dispersed with ground 1,The ground 1 is connected with big surface layer 9.
In the present embodiment, fixed by fastening bolt 10 with the horizontal drawing bolt 11 on the outside of the exterior wall sideline 7, the grooved shoulder pole steel 12 is bolted with the brace 13, the brace 13 is main connecting elements, connection construction platform is fixed on wall.
In the present embodiment, the upper ejector pin actuator 14 and lower push rod actuator 21 are supported by the exterior wall sideline 7 and adjust the suspension type combination construction platform 8, need the distance of construction platform and wall is adjusted by the upper ejector pin actuator 14 and the lower push rod actuator 21 according to construction.
In the present embodiment, the construction platform horizontal support steel pipe 15 is with the construction platform longitudinal bracing steel pipe 19 by being welded together, the pedal support bar 16 is welded on the pedal 18 and is placed on the construction platform horizontal support steel pipe 15, worker station is operated on the pedal 18, the pedal 18 is smooth stable, and worker is not in inadaptable above.
In the present embodiment, a kind of external wall construction suspension type combination construction platform 8 according to claim 1, it is characterised in that:The construction platform horizontal support steel pipe 15 is fastened by the front sissy bar 17 and the side airbag pull bar 20 with the construction platform longitudinal bracing steel pipe 19, it is ensured that construction platform is indeformable and its stability.
In the present embodiment, the exterior wall sideline 7 is connected by cement steel with the house and the floor plates 6, and 3 handrail 2 of the stair is fixed on the stair 3, and the ground 1 is directly connected to the big surface layer 9, each ingredient of the above for building.
User is when using the present invention, installing hole is got in building edge first, general framework is assembled on ground, can be using the operation construction of the mechanical engagements such as tower crane when in-site installation is on wall, realize that high-altitude is mounted directly, need not do from ground, construction platform is fixed by fastening bolt 10, after fixation is finished, the distance of construction platform and the exterior wall sideline 7 is adjusted by adjusting the upper ejector pin actuator 14 and the lower push rod actuator 21, until being transferred to suitable position, constructor stands on the pedal 18 more safety and stability.
In using process of the present invention, in order to ensure the safety of constructor, whether solid safety must be checked at building punching before installation, will check whether junction fastens after installing.
Ultimate principle, principal character and the advantages of the present invention of the present invention has been shown and described above.It should be understood by those skilled in the art that; the present invention is not restricted to the described embodiments; merely illustrating the principles of the invention described in above-described embodiment and description; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements are both fallen within scope of the claimed invention.The claimed scope of the invention is by appending claims and its equivalent thereof.
Claims (6)
1. a kind of external wall is constructed with suspension type combination construction platform, it is characterised in that:Adjust including upper ejector pin
Device, construction platform horizontal support steel pipe, pedal support bar, pedal, construction platform longitudinal bracing steel pipe, hang
Hanging combination construction platform is arranged on the outside of exterior wall sideline, with the horizontal drawing bolt by tight on the outside of the exterior wall sideline
Fixing bolt is fixed, and is provided with grooved shoulder pole steel, passes through on the outside of the grooved shoulder pole steel on the outside of the horizontal drawing bolt
Bolt connection brace, and the construction platform longitudinal bracing steel pipe is dispersed with the outside of the brace, described oblique
The upper ejector pin actuator, the upper ejector pin actuator and the construction platform longitudinal bracing are dispersed with below pull bar
Steel-pipe welding together, is connected to the construction platform horizontal support steel in the middle of the construction platform longitudinal bracing steel pipe
Pipe, is dispersed with pedal support bar above the construction platform horizontal support steel pipe, on the pedal support bar
Side is provided with the pedal, and the construction platform longitudinal bracing steel pipe front mid portion is dispersed with front safety
Pull bar, the construction platform longitudinal bracing steel pipe side are dispersed with side airbag pull bar, and the construction platform is longitudinally propped up
Lower push rod actuator is connected to below support steel pipe, house and floor plates, institute on the inside of the exterior wall sideline, is provided with
State house doorway and be provided with door, be dispersed with outside the door below stair and balustrade building and be dispersed with
Ground, the ground are connected with big surface layer.
2. a kind of external wall according to claim 1 is constructed with suspension type combination construction platform, its feature
It is:Fixed by fastening bolt with the horizontal drawing bolt on the outside of the exterior wall sideline, the grooved shoulder pole steel with
The brace is bolted.
3. a kind of external wall according to claim 1 is constructed with suspension type combination construction platform, its feature
It is:The upper ejector pin actuator and lower push rod actuator are supported by the exterior wall sideline and adjust the suspension
Formula combination construction platform.
4. a kind of external wall according to claim 1 is constructed with suspension type combination construction platform, its feature
It is:The construction platform horizontal support steel pipe is with the construction platform longitudinal bracing steel pipe by being welded to connect one
Rise, the pedal support bar is welded on the pedal and is placed in the construction platform horizontal support steel pipe
On.
5. a kind of external wall according to claim 1 is constructed with suspension type combination construction platform, its feature
It is:The front sissy bar and the side airbag pull bar are by the construction platform horizontal support steel pipe and institute
State construction platform longitudinal bracing steel pipe fastening, it is ensured which is indeformable.
6. a kind of external wall according to claim 1 is constructed with suspension type combination construction platform, its feature
It is:The exterior wall sideline is connected by cement steel with the house and the floor plates, and the stair are helped
Handss are fixed on the stair, and the ground is directly connected to the big surface layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510616059.8A CN106555469A (en) | 2015-09-24 | 2015-09-24 | A kind of external wall construction suspension type combination construction platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510616059.8A CN106555469A (en) | 2015-09-24 | 2015-09-24 | A kind of external wall construction suspension type combination construction platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106555469A true CN106555469A (en) | 2017-04-05 |
Family
ID=58415193
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510616059.8A Pending CN106555469A (en) | 2015-09-24 | 2015-09-24 | A kind of external wall construction suspension type combination construction platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106555469A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2214983Y (en) * | 1994-08-26 | 1995-12-13 | 许强 | Guideway self-lifting scaffold |
CN2255468Y (en) * | 1996-05-23 | 1997-06-04 | 余鹏 | External basket for building construction |
CN2641209Y (en) * | 2003-06-06 | 2004-09-15 | 北京城建赫然建筑新技术有限责任公司 | Composite type externally hung frame |
CN201818036U (en) * | 2010-10-25 | 2011-05-04 | 姚康华 | Light inclined-pulling scaffold |
CN202164809U (en) * | 2011-07-22 | 2012-03-14 | 中国建筑第八工程局有限公司 | Adjustable support of climbing type scaffold |
KR101288683B1 (en) * | 2011-06-28 | 2013-07-22 | 인하대학교 산학협력단 | Guide rail device for climbing gang forms |
CN103669817A (en) * | 2013-12-20 | 2014-03-26 | 浙江城建建设集团有限公司 | Building structure overhanging type scaffold external corner assembling type frame device and construction method |
CN205116683U (en) * | 2015-09-24 | 2016-03-30 | 李钻水 | Construction of building outer wall is with suspension type combination construction platform |
-
2015
- 2015-09-24 CN CN201510616059.8A patent/CN106555469A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2214983Y (en) * | 1994-08-26 | 1995-12-13 | 许强 | Guideway self-lifting scaffold |
CN2255468Y (en) * | 1996-05-23 | 1997-06-04 | 余鹏 | External basket for building construction |
CN2641209Y (en) * | 2003-06-06 | 2004-09-15 | 北京城建赫然建筑新技术有限责任公司 | Composite type externally hung frame |
CN201818036U (en) * | 2010-10-25 | 2011-05-04 | 姚康华 | Light inclined-pulling scaffold |
KR101288683B1 (en) * | 2011-06-28 | 2013-07-22 | 인하대학교 산학협력단 | Guide rail device for climbing gang forms |
CN202164809U (en) * | 2011-07-22 | 2012-03-14 | 中国建筑第八工程局有限公司 | Adjustable support of climbing type scaffold |
CN103669817A (en) * | 2013-12-20 | 2014-03-26 | 浙江城建建设集团有限公司 | Building structure overhanging type scaffold external corner assembling type frame device and construction method |
CN205116683U (en) * | 2015-09-24 | 2016-03-30 | 李钻水 | Construction of building outer wall is with suspension type combination construction platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201506699U (en) | Electric lifting bridge rack for construction | |
CN106437130A (en) | Inner roof external climbing type formwork construction platform for super high-rise building construction | |
CN106400691B (en) | Anti-collision wall mould bases integrated construction technique | |
CN204126230U (en) | Assembly scaffold unit | |
KR101312400B1 (en) | structure for safety working foothold having form fixing means | |
CN205577383U (en) | Attached lifting scaffold | |
CN104775606A (en) | Operation platform for prefabricated assembled residential building wall plate construction and construction method thereof | |
CN102979297B (en) | Hanging type stairwell operating platform mechanism and construction method thereof | |
KR20070000811U (en) | Gang form climbing guide | |
CN104389415B (en) | Scaffold | |
CN107419893A (en) | A kind of elevator steel platform and preparation method thereof | |
CN203452375U (en) | Hydraulic self-jacking oblique creeping formwork | |
KR20020047071A (en) | Rail railing (scaffolding) clamping device in the construction site. | |
CN205116683U (en) | Construction of building outer wall is with suspension type combination construction platform | |
KR200415037Y1 (en) | Gang Form Level Adjusting Apparatus for Guide Climbing System | |
CN106555469A (en) | A kind of external wall construction suspension type combination construction platform | |
KR20110094720A (en) | Composite cage for construction | |
CN204590555U (en) | Assembling elevator hoistway construction platform | |
KR20110119252A (en) | Gang form climbing guide apparatus and method using the same | |
CN202718375U (en) | Installation and operation platform of high-altitude cantilever structure | |
CN207110399U (en) | A kind of construction site scaffold | |
CN107780644B (en) | Operation platform for elevator shaft construction and use method thereof | |
JP3204708U (en) | Lifting scaffold equipment | |
CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
KR200288007Y1 (en) | Rail railing (scaffolding) clamping device in the construction site. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170405 |
|
WD01 | Invention patent application deemed withdrawn after publication |