CN106552813B CN201611021671.1A CN201611021671A CN106552813B CN 106552813 B CN106552813 B CN 106552813B CN 201611021671 A CN201611021671 A CN 201611021671A CN 106552813 B CN106552813 B CN 106552813B
Authority
CN
China
Prior art keywords
rubbish
loading embeading
region
garbage loading
monitoring point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611021671.1A
Other languages
Chinese (zh)
Other versions
CN106552813A (en
Inventor
郑澄锋
钟瑞
耿之周
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Original Assignee
Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources filed Critical Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Priority to CN201611021671.1A priority Critical patent/CN106552813B/en
Publication of CN106552813A publication Critical patent/CN106552813A/en
Application granted granted Critical
Publication of CN106552813B publication Critical patent/CN106552813B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE
    • B09B3/00Destroying solid waste or transforming solid waste into something useful or harmless
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D1/00Control of position, course or altitude of land, water, air, or space vehicles, e.g. automatic pilot
    • G05D1/02Control of position or course in two dimensions
    • G05D1/021Control of position or course in two dimensions specially adapted to land vehicles
    • G05D1/0212Control of position or course in two dimensions specially adapted to land vehicles with means for defining a desired trajectory
    • G05D1/0219Control of position or course in two dimensions specially adapted to land vehicles with means for defining a desired trajectory ensuring the processing of the whole working surface

Abstract

A kind of method that the present invention discloses garbage loading embeading density criterion Construction control, belongs to garbage loading embeading technical field.Include the following steps: that (1) weighs rubbish quality: the rubbish quality marched into the arena using large-scale platform scale measurement while monitoring point is set, monitors the elevation before each monitoring point is not dumped rubbish with GPS;(2) it calculates the total volume after rubbish rolls in the garbage loading embeading region for having monitoring point: repeatedly rolling rubbish with roller while using the elevation of each monitoring point of GPS positioning system real-time monitoring, the total volume that rubbish rolls rear rubbish is calculated according to altimeter;(3) soot is rolled without the rubbish in the garbage loading embeading region of monitoring point: density is calculated by quality and total volume meter, and roller operator rolls the rubbish in other regions, realizes garbage loading embeading density criterion.The present invention fills the rubbish of certain density in the region set, and rubbish is allowed timely and effectively to be handled, and not will cause the case where excessive rubbish cannot be handled.

Description

A kind of method of garbage loading embeading density criterion Construction control
Technical field
The invention belongs to garbage loading embeading technical fields, especially design a kind of side of garbage loading embeading density criterion Construction control Method.
Background technique
Waste density is one of key parameter needed for the work such as refuse landfill engineering design, operation, landfill yard heap body Sedimentation and stability Calculation, storage capacity prediction, vertical extension project, liner system, Closure cover system, Leachate site and landfill-gas collecting The designs such as system, Leachate site recharge require reliable density parameter.And the related design of landfill unit operation should be with compacted density For design parameter, science and accuracy of the landfill yard in relation to technical-economic index just can guarantee in this way.The country is to rubbish at present Fill the effective method unified not yet of implementing of density criterion, therefore garbage loading embeading density provided by this patent The method of standardization control has important practical significance.
It is 201310134532.X that State Patent Office, which discloses a number of patent application on April 18th, 2013, entitled The patent of invention of refuse landfill integrated conduct method.This patent discloses following technical solutions: this method comprises the following steps: 1, place early-stage preparations;2, place leachate collecting device is set;3, Air Exposure inside specific place;4, leachate tail water returns Filling processing;5, the vegetation of block is established after internal Air Exposure.This patent can reduce the pollution to surrounding enviroment, to a certain degree On reduce overall cost, effectively handle rubbish.But the rubbish of how much density should be filled without formulating each region, such as Rubbish in one region of fruit is excessive or very few, and rubbish cannot be handled in time, in addition can also waste land resource.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of setting garbage loading embeading density, allow rubbish obtain handling in time and The method of the garbage loading embeading density criterionization control to economize the land resource.For this purpose, existing, the following technical solutions are proposed:
A kind of method of garbage loading embeading density criterion Construction control, includes the following steps:
(1) it weighs rubbish quality: entire soot being divided into several pieces of garbage loading embeading regions, wherein one piece of garbage loading embeading Multiple monitoring points are set on region, the elevation before each monitoring point is not dumped rubbish is first measured with GPS positioning system;Using big Rubbish pine, is then layered in the garbage loading embeading region of monitoring point by the garbage truck gross mass that type platform scale measurement is marched into the arena, last rubbish Rubbish vehicle appears on the scene, and data information memory is in computer data;
(2) it calculates the total volume after rubbish rolls in the garbage loading embeading region for having monitoring point: repeatedly having been rolled with roller The rubbish of pine paving monitors the elevation of each monitoring point until each monitoring with GPS positioning system simultaneously in the garbage loading embeading region of monitoring point The elevation of point is unchanged, topples over rubbish before being toppled over by rubbish and rolls the elevation of rear each monitoring point and show that each monitoring point rubbish is ground The final height dumped rubbish after pressure can be calculated by the final height of the rubbish and the area in the garbage loading embeading region Total volume after rubbish rolls in the garbage loading embeading region, data information are stored in computer data;
(3) roll soot without the rubbish in the garbage loading embeading region of monitoring point: the rubbish quality that is obtained by step (1) and The rubbish that step (2) obtains roll after total volume, can calculate the density after rubbish rolls by computer, subsequent garbage truck after It is continuous that rubbish pine is layered on entire soot without in the garbage loading embeading region of monitoring point, it gives density synchronous to roller operator, grinds Press operation person carries out roller compaction construction to the garbage loading embeading region in soot without monitoring point according to density, when reaching design density When, next piece of region is rolled until whole region is rolled and finished;If do not reach design density, continue roller compaction construction, from And density criterion Construction control is carried out to entire soot garbage loading embeading;
It is comprised the following steps in the step (2):
Step 2.1: with two rollers, regular network unit rolls the rubbish that pine spreads one by one, and it is fixed with GPS often to roll once Position system observes the elevation of each monitoring point;
Step 2.2: toppling over the elevation after rolling with rubbish before being toppled over by rubbish and obtain one in the garbage loading embeading region The final height Δ H of four monitoring points to be dumped rubbish on a regular network unitxy, Δ H(x+1)y, Δ Hx(y+1), Δ H(x+1)(y+1), the garbage loading embeading region can be calculated by the height of area and the rubbish in the garbage loading embeading region Interior rubbish roll after total volume, data upload computer data in;Garbage loading embeading region rubbish roll after total volume Calculation formula is as follows:
Further improvement of these options comprises the following steps in the step (1):
Step 1.1: the corresponding magnetic card of each garbage truck;Be equipped with two tablelands pound in weighbridge office, #1 pound with #2 pounds, every tableland Pound configures a radio-frequency card reader and camera and is equipped with railing before and after weighbridge;
Step 1.2: entire soot being divided into several pieces of garbage loading embeading regions, by one of garbage loading embeading region division Growth number is 1~X, and the 1.5m*1.5m regular network unit that wide number is 1~Y chooses landfill using mesh point as monitoring point Stabilization place other than area is reference point, and the coordinate system in garbage loading embeading region is arranged, quiet using double-frequency GPS receiver State observation first monitors the elevation of each monitoring point when garbage truck is not dumped rubbish, and data information memory is in computer data;
Step 1.3: garbage truck is swiped the card before reaching #2 pounds, railing before lifting #2 pounds, after garbage truck reaches #2 pounds of weighings, Rubbish pine is layered on the rubbish of monitoring point by camera candid photograph license plate, railing after lifting #2 pounds, railing before closing #2 pounds, garbage truck After filling region, to being swiped the card before #1 pound again, railing before #1 list is lifted, after weighing, camera candid photograph license plate is lifted Railing after playing #1 pounds, railing before falling #1 pounds;
Step 1.4: garbage truck institute load garbage weight m will carry out automatic matching peeling, the letter of each car in the database Breath will be stored in computer data.
Further improvement of these options, in the step 1.1, #1 pounds and #2 pounds by scale body, sensor, instrument group At, and computer management system can be passed data to, wherein #2 pounds of parameters are 3*12m, 30 tons and #1 pounds parameters of load-carrying are 3* 20 tons of 12m, load-carrying.
Further improvement of these options, in the step 3, density calculation formula is as follows:
Compared with prior art, the beneficial effects of the present invention are:
(1) in the prior art, rubbish is only concentrated into landfill in a fixed place, does not limit the matter of landfill waste Amount can not allow rubbish timely and effectively to be handled if the rubbish in fixed place landfill is excessive.The present invention is in landfill rubbish It before rubbish, measures the quality of rubbish and rolls the volume of rubbish, divide the region of garbage loading embeading, finally determine in every piece of region Fill how many rubbish.Every piece of region can be enable to handle rubbish to greatest extent.
(2) elevation of each monitoring point and monitoring point after rolling rubbish before not dumped rubbish with GPS static monitoring techniques Elevation, compare manual measurement, and measurement result is more accurate, moreover it is possible to ensure human health.
It (3) is compared to the prior art only merely that rubbish pine is layered on together, the present invention is by garbage truck, to greatest extent Reduce rubbish occupied area, economizes the land resource.
Detailed description of the invention
A kind of Fig. 1 method flow diagram of garbage loading embeading density criterion Construction control of the present invention.
Specific embodiment
To be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, below with reference to Specific embodiment, the present invention is further explained.
The equipment for needing to use in Examples 1 to 3: #1 pounds and #2 pounds, #1 pounds and #2 pounds are equipped in weighbridge office by scale Body, sensor, instrument composition, and computer management system can be passed data to, wherein #2 pounds of parameters are 3*12m, 30 tons of load-carrying It is 3*12m, 20 tons of load-carrying with #1 pounds of parameters;Every tableland pound configures a radio-frequency card reader and camera and is all provided with before and after weighbridge There is railing;Every garbage truck configures a magnetic card, and card information has: card number, license number, rubbish type, traffic unit, card-like state, The information such as user field 1-4, redundant digital 1, redundant digital 2.
Embodiment 1
A kind of method of garbage loading embeading density criterion Construction control as shown in Fig. 1, includes the following steps:
(1) rubbish quality is weighed:
Each garbage truck of step 1.1 corresponds to a magnetic card;
Step 1.2: entire soot being divided into several pieces of garbage loading embeading regions, by one of garbage loading embeading region division Growth number is 1-4, the 1.5m*1.5m regular network unit that wide number is 1-8, using mesh point as monitoring point, chooses landfill area Stabilization place in addition is reference point, and the coordinate system in garbage loading embeading region is arranged, using double-frequency GPS receiver static state Observation first monitors the elevation of each monitoring point when garbage truck is not dumped rubbish, and data information memory is in computer data;
Step 1.3: garbage truck is swiped the card before reaching #2 pounds, railing before lifting #2 pounds, after garbage truck reaches #2 pounds of weighings, Rubbish pine is layered on the rubbish of monitoring point by camera candid photograph license plate, railing after lifting #2 pounds, railing before closing #2 pounds, garbage truck After filling region, to being swiped the card before #1 pound again, railing before #1 list is lifted, after weighing, camera candid photograph license plate is lifted Railing after playing #1 pounds, railing before falling #1 pounds;
Step 1.4: garbage truck institute load garbage weight will carry out automatic matching peeling in the database, obtain the matter of rubbish Amount is 12.5t, and the information of each car will be stored in computer data.
Step (2) calculates the volume after having the garbage loading embeading region rubbish of monitoring point to roll:
Step 2.1: rolling the rubbish of pine paving in the regular network unit of monitoring point with two rollers, often roll primary The elevation of each monitoring point is observed with GPS positioning system until elevation is unchanged;
Step 2.2: toppling over the elevation after rolling with rubbish before being toppled over by rubbish and obtain in the garbage loading embeading region and advise The then final height Δ H that each monitoring point is dumped rubbish in network unitxy, Δ H(x+1)y, Δ Hx(y+1), Δ H(x+1)(y+1), once 32 grid cells of pine paving altogether, roll the rubbish in 32 grid cells, by the area and each prison in the garbage loading embeading region The rubbish toppled over described in measuring point roll after final height can calculate it is total after rubbish rolls in the garbage loading embeading region Volume, by cubature formulaVolume is calculated to amount to 18.36m3According in upload computer data.
Step (3) rolls soot without the rubbish in the garbage loading embeading region of monitoring point:
The rubbish that the rubbish quality and step (2) obtained by step (1) obtains roll after total volume, by density formulaThe density after rubbish rolls, density 681kg/m can be calculated by computer3, subsequent garbage truck continues rubbish Pine is layered on entire soot without in the garbage loading embeading region of monitoring point, gives density synchronous to roller operator, roller operation Member carries out roller compaction construction to the garbage loading embeading region in soot without monitoring point according to density, when reaching design density, rolls Next piece of region is until whole region is rolled and finished;If do not reach design density, continue roller compaction construction, thus to entire Soot garbage loading embeading carries out density criterion Construction control.
Embodiment 2
A kind of method of garbage loading embeading density criterion Construction control as shown in Fig. 1, includes the following steps:
(2) rubbish quality is weighed:
Each garbage truck of step 1.1 corresponds to a magnetic card;
Step 1.2: entire soot being divided into several pieces of garbage loading embeading regions, by one of garbage loading embeading region division Growth number is 1-3, the 1.5m*1.5m regular network unit that wide number is 1-9, using mesh point as monitoring point, chooses landfill area Stabilization place in addition is reference point, and the coordinate system in garbage loading embeading region is arranged, using double-frequency GPS receiver static state Observation first monitors the elevation of each monitoring point when garbage truck is not dumped rubbish, and data information memory is in computer data;
Step 1.3: garbage truck is swiped the card before reaching #2 pounds, railing before lifting #2 pounds, after garbage truck reaches #2 pounds of weighings, Rubbish pine is layered on the rubbish of monitoring point by camera candid photograph license plate, railing after lifting #2 pounds, railing before closing #2 pounds, garbage truck After filling region, to being swiped the card before #1 pound again, railing before #1 list is lifted, after weighing, camera candid photograph license plate is lifted Railing after playing #1 pounds, railing before falling #1 pounds;
Step 1.4: garbage truck institute load garbage weight will carry out automatic matching peeling in the database, obtain the matter of rubbish Amount is 10.8t, and the information of each car will be stored in computer data.
Step (2) calculates the volume after garbage loading embeading region rubbish rolls:
Step 2.1: rolling the rubbish of pine paving in the regular network unit of monitoring point with two rollers, often roll primary The elevation of each monitoring point is observed with GPS positioning system until elevation is unchanged;
Step 2.2: toppling over the elevation after rolling with rubbish before being toppled over by rubbish and obtain in the garbage loading embeading region and advise The then final height Δ H that each monitoring point is dumped rubbish in network unitxy, Δ H(x+1)y, Δ Hx(y+1), Δ H(x+1)(y+1), once 27 grid cells of pine paving altogether, roll the rubbish in 27 grid cells, by the area and each prison in the garbage loading embeading region The rubbish toppled over described in measuring point roll after final height can calculate it is total after rubbish rolls in the garbage loading embeading region Volume, by cubature formulaCalculating volume is 17.01m3According to It uploads in computer data.
Step (3) rolls soot without the rubbish in the garbage loading embeading region of monitoring point:
The rubbish that the rubbish quality and step (2) obtained by step (1) obtains roll after total volume, by density formulaThe density after rubbish rolls, density 635kg/m can be calculated by computer3, subsequent garbage truck continues rubbish Pine is layered on entire soot without in the garbage loading embeading region of monitoring point, gives density synchronous to roller operator, roller operation Member carries out roller compaction construction to the garbage loading embeading region in soot without monitoring point according to density, when reaching design density, rolls Next piece of region is until whole region is rolled and finished;If do not reach design density, continue roller compaction construction, thus to entire Soot garbage loading embeading carries out density criterion Construction control.
Embodiment 3
A kind of method of garbage loading embeading density criterion Construction control as shown in Fig. 1, includes the following steps:
(3) rubbish quality is weighed:
Each garbage truck of step 1.1 corresponds to a magnetic card;
Step 1.2: entire soot being divided into several pieces of garbage loading embeading regions, by one of garbage loading embeading region division Growth number be 1, it is wide number be 1-41 1.5m*1.5m regular network unit, using mesh point as monitoring point, choose landfill area with Outer stabilization place is reference point, and the coordinate system in garbage loading embeading region is arranged, and is seen using double-frequency GPS receiver static state It surveys, first monitors the elevation of each monitoring point when garbage truck is not dumped rubbish, data information memory is in computer data;
Step 1.3: garbage truck is swiped the card before reaching #2 pounds, railing before lifting #2 pounds, after garbage truck reaches #2 pounds of weighings, Rubbish pine is layered on the rubbish of monitoring point by camera candid photograph license plate, railing after lifting #2 pounds, railing before closing #2 pounds, garbage truck After filling region, to being swiped the card before #1 pound again, railing before #1 list is lifted, after weighing, camera candid photograph license plate is lifted Railing after playing #1 pounds, railing before falling #1 pounds;
Step 1.4: garbage truck institute load garbage weight will carry out automatic matching peeling in the database, obtain the matter of rubbish Amount is 15.6t, and the information of each car will be stored in computer data.
Step (2) calculates the volume after having the garbage loading embeading region rubbish of monitoring point to roll:
Step 2.1: rolling the rubbish of pine paving in the regular network unit of monitoring point with two rollers, often roll primary The elevation of each monitoring point is observed with GPS positioning system until elevation is unchanged;
Step 2.2: toppling over the elevation after rolling with rubbish before being toppled over by rubbish and obtain in the garbage loading embeading region and advise The then final height Δ H that each monitoring point is dumped rubbish in network unitxy, Δ H(x+1)y, Δ Hx(y+1), Δ H(x+1)(y+1), once 41 grid cells of pine paving altogether, roll the rubbish in 41 grid cells, by area in the garbage loading embeading region and described Final height after the rubbish toppled over rolls can calculate the total volume after rubbish rolls in the garbage loading embeading region, by body Product formulaCalculating volume is 23.81m3According to upload computer number According in library.
Step (3) rolls soot without the rubbish in the garbage loading embeading region of monitoring point:
The rubbish that the rubbish quality and step (2) obtained by step (1) obtains roll after total volume, by density formulaThe density after rubbish rolls, density 655kg/m can be calculated by computer3, subsequent garbage truck continues rubbish is loose Entire soot is layered on without in the garbage loading embeading region of monitoring point, gives density synchronous to roller operator, roller operator Roller compaction construction is carried out to the garbage loading embeading region in soot without monitoring point according to density, when reaching design density, is rolled down One piece of region is until whole region is rolled and finished;If do not reach design density, continue roller compaction construction, thus to entire rubbish Rubbish field garbage loading embeading carries out density criterion Construction control.
One aspect of the present invention using GPS static monitoring techniques do not dump rubbish before each monitoring point elevation and roll rubbish mistake The elevation of monitoring point afterwards, compare manual measurement, and measurement result is more accurate, moreover it is possible to ensure human health.On the other hand it will fill out It buries field and is divided into several 1.5m*1.5m regular network units, monitor to obtain using GPS and roll #1 pounds of garbage bulk and platform scale and #2 Pound measures the quality of rubbish, calculate that each rules unit should fill number rubbish, allow rubbish timely and effectively to be located Reason because of very few rubbish is filled will not rubbish cannot be handled.Only simply rubbish pine is layered in addition, comparing Together, the present invention maximally reduces rubbish occupied area, economizes the land resource.
Those of ordinary skill in the art it should be appreciated that more than embodiment be intended merely to illustrate the present invention, And be not used as limitation of the invention, as long as the change in spirit of the invention, to embodiment described above Change, modification will all be fallen in scope of the presently claimed invention.

Claims (4)

1. a kind of method of garbage loading embeading density criterion Construction control, which comprises the steps of:
(1) it weighs rubbish quality: entire soot being divided into several pieces of garbage loading embeading regions, wherein one piece of garbage loading embeading region The upper multiple monitoring points of setting, first measure the elevation before each monitoring point is not dumped rubbish with GPS positioning system;Utilize large-scale platform scale The garbage truck gross mass marched into the arena is measured, then rubbish pine is layered in the garbage loading embeading region of monitoring point, last garbage truck goes out , data information memory is in computer data;
(2) it calculates the total volume after rubbish rolls in the garbage loading embeading region for having monitoring point: repeatedly having rolled monitoring with roller The rubbish of pine paving monitors the elevation of each monitoring point up to each monitoring point with GPS positioning system simultaneously in the garbage loading embeading region of point Elevation is unchanged, by rubbish topple over before and rubbish topple over roll rear each monitoring point elevation show that each monitoring point rubbish rolls after The final height dumped rubbish can be calculated described by the final height of the rubbish and the area in the garbage loading embeading region Total volume after rubbish rolls in garbage loading embeading region, data information are stored in computer data;
(3) soot is rolled without the rubbish in the garbage loading embeading region of monitoring point: the rubbish quality and step obtained by step (1) (2) rubbish obtained roll after total volume, can calculate the density after rubbish rolls by computer, subsequent garbage truck continue by Rubbish pine is layered on entire soot without in the garbage loading embeading region of monitoring point, gives density synchronous to roller operator, roller Operator carries out roller compaction construction to the garbage loading embeading region in soot without monitoring point according to density, when reaching design density, Next piece of region is rolled until whole region is rolled and finished;If do not reach design density, continue roller compaction construction, thus right Entire soot garbage loading embeading carries out density criterion Construction control;
It is comprised the following steps in the step (2):
Step 2.1: with two rollers, regular network unit rolls the rubbish that pine spreads one by one, often rolls once with GPS positioning system Overall view examines the elevation of each monitoring point until the elevation of each monitoring point is unchanged;
Step 2.2: toppling over the elevation after rolling with rubbish before being toppled over by rubbish and obtain a rule in the garbage loading embeading region Then the rubbish of four monitoring points rolls the final height dumped rubbish afterwards in network unit,,,, by the garbage loading embeading region area and the final height calculate rubbish in the garbage loading embeading region Total volume after rolling, data upload in computer data, and the total volume after garbage loading embeading region rubbish rolls calculates public affairs Formula is as follows:
2. a kind of method of garbage loading embeading density criterion Construction control according to claim 1, which is characterized in that described Step comprises the following steps in (1):
Step 1.1: the corresponding magnetic card of each garbage truck;Two tablelands pound is equipped in weighbridge office, #1 pounds and #2 pounds, every tableland pound is matched It sets a radio-frequency card reader and camera and is equipped with railing before and after weighbridge;
Step 1.2: entire soot being divided into several pieces of garbage loading embeading regions, one of garbage loading embeading region division is grown up Number is 1 ~ X, the 1.5m*1.5m regular network unit that wide number is 1 ~ Y, using mesh point as monitoring point, is chosen other than landfill area Stabilization place be reference point, be arranged garbage loading embeading region coordinate system, using double-frequency GPS receiver static observation Each monitoring point first monitors the elevation of each monitoring point when garbage truck is not dumped rubbish, and data information memory is in computer data;
Step 1.3: garbage truck is swiped the card before reaching #2 pounds, railing before lifting #2 pounds, after garbage truck reaches #2 pounds of weighings, camera shooting Rubbish pine is layered on the garbage loading embeading of monitoring point by head candid photograph license plate, railing after lifting #2 pounds, railing before closing #2 pounds, garbage truck Behind region, to being swiped the card before #1 pounds again, railing before #1 list is lifted, after weighing, camera candid photograph license plate lifts #1 pounds Railing afterwards, railing before falling #1 pounds;
Step 1.4: garbage truck institute's load garbage quality (m) will carry out automatic matching peeling, the information of each car in the database It will be stored in computer data.
3. a kind of method of garbage loading embeading density criterion Construction control according to claim 2, it is characterised in that: described In step 1.1, #1 pounds and #2 pounds are made of scale body, sensor, instrument, and pass data to computer management system, wherein # 2 pounds of parameters are 3*12m, 30 tons of load-carrying, and #1 pounds of parameters are 3*12m, 20 tons of load-carrying.
4. the method for garbage loading embeading density criterion Construction control according to claim 1, it is characterised in that: the step (3) in, density calculation formula is as follows:
CN201611021671.1A 2016-11-16 2016-11-16 A kind of method of garbage loading embeading density criterion Construction control Active CN106552813B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611021671.1A CN106552813B (en) 2016-11-16 2016-11-16 A kind of method of garbage loading embeading density criterion Construction control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611021671.1A CN106552813B (en) 2016-11-16 2016-11-16 A kind of method of garbage loading embeading density criterion Construction control

Publications (2)

Publication Number Publication Date
CN106552813A CN106552813A (en) 2017-04-05
CN106552813B true CN106552813B (en) 2019-08-23

Family

ID=58443358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611021671.1A Active CN106552813B (en) 2016-11-16 2016-11-16 A kind of method of garbage loading embeading density criterion Construction control

Country Status (1)

Country Link
CN (1) CN106552813B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1631560A (en) * 2005-01-14 2005-06-29 北京市四清环卫工程集团有限责任公司 Refuse landfilling process in rainy season
CN101872428A (en) * 2010-06-08 2010-10-27 黄庭梁 Management method for collecting and calculating garbage
CN101879516A (en) * 2009-05-06 2010-11-10 中国环境科学研究院 Improved urban domestic garbage landfilling structure and landfilling treatment method
CN104933468A (en) * 2014-03-18 2015-09-23 苏州市伏泰信息科技有限公司 Real-time online monitoring and predicating method for three-dimensional settlement of domestic garbage dump

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1631560A (en) * 2005-01-14 2005-06-29 北京市四清环卫工程集团有限责任公司 Refuse landfilling process in rainy season
CN101879516A (en) * 2009-05-06 2010-11-10 中国环境科学研究院 Improved urban domestic garbage landfilling structure and landfilling treatment method
CN101872428A (en) * 2010-06-08 2010-10-27 黄庭梁 Management method for collecting and calculating garbage
CN104933468A (en) * 2014-03-18 2015-09-23 苏州市伏泰信息科技有限公司 Real-time online monitoring and predicating method for three-dimensional settlement of domestic garbage dump

Also Published As

Publication number Publication date
CN106552813A (en) 2017-04-05

Similar Documents

Publication Publication Date Title
US10982995B2 (en) Vehicle collection bins and scale systems
US8370067B2 (en) Monitoring compression of successive layers of landfill material and measurement of layer density
CN108288059A (en) A kind of building waste monitoring method based on high-definition remote sensing technology
CN110068573B (en) Blasting bulk measurement method based on photogrammetry and particle contact theory
Kenarsari et al. Creating 3D models of tractor tire footprints using close-range digital photogrammetry
CN102799949A (en) Risk assessment method and system for refuse landfill polluted groundwater
Cândido et al. High-resolution monitoring of diffuse (sheet or interrill) erosion using structure-from-motion
WO2019006215A1 (en) System implementing solid-waste carbon exchange
CN106552813B (en) A kind of method of garbage loading embeading density criterion Construction control
CN204855311U (en) Grain grading detecting system of cubic metre of earth and stone material
CN105926570B (en) The method for determining strong rammer effective reinforcement depth
CN109919481A (en) A kind of grinding coagulation soil compaction multi-parameter joint real-time estimating method
CN105021263B (en) A kind of ship unloaders quantitative model control method
CN204142342U (en) The broken fuel metering hopper weighing apparatus of living beings
CN111521151B (en) Centrifugal model test-based filling valley foundation settlement inversion method
CN1749710A (en) Electronic weighing system for loading machine and method for metering loading capacity
CN110702171A (en) Method, device and system for monitoring building waste accepting field
CN111524228A (en) Unmanned aerial vehicle remote sensing four-dimensional modeling analysis method based on landfill operation management
JP2020194240A (en) Quality management system
CN206709943U (en) A kind of compression garbage truck weighing device with angle modification
CN110363857B (en) Method and device for constructing and observing soil erosion surface morphology DEM in rainfall process
CN104374455A (en) Biomass crushed fuel metering hopper balance
CN206580143U (en) A kind of refuse collection system
CN112710374B (en) Automatic conversion method for intelligent wagon balance collected data
Rathi et al. Smart Garbage Collection System

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant