CN106549375A - Power distribution network frequently power failure management-control method and device - Google Patents

Power distribution network frequently power failure management-control method and device Download PDF

Info

Publication number
CN106549375A
CN106549375A CN201611110579.2A CN201611110579A CN106549375A CN 106549375 A CN106549375 A CN 106549375A CN 201611110579 A CN201611110579 A CN 201611110579A CN 106549375 A CN106549375 A CN 106549375A
Authority
CN
China
Prior art keywords
power
power failure
distribution network
distribution line
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611110579.2A
Other languages
Chinese (zh)
Inventor
林科
罗立华
茅奎
应芳义
高栋寅
李明
任雪辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Cixi Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Cixi Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Cixi Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611110579.2A priority Critical patent/CN106549375A/en
Publication of CN106549375A publication Critical patent/CN106549375A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

This application discloses power distribution network frequently power failure management-control method and device, to reduce the probability that power distribution network frequently has a power failure to greatest extent.The method includes:The distribution line for obtaining grass-roots unit's submission stops the numbering of distribution line involved during labour is applied;According to the numbering, power cut record of the distribution line in the preset duration with current time as finish time is inquired about;According to the power cut record, power failure frequency of the distribution line in the preset duration is calculated;Judge whether the power failure frequency reaches preset value, if the power failure frequency reaches the preset value, information warning is sent to the grass-roots unit.

Description

Power distribution network frequently power failure management-control method and device
Technical field
The present invention relates to supply distribution technique field, more particularly, it relates to power distribution network frequently power failure management-control method and device.
Background technology
With the fast development of national economy, the public is more and more stronger to the dependency of supply of electric power, the confession to power supply enterprise The requirement also more and more higher of electric energy power, service level, but electrical network constantly build and upgrading during, inevitably go out Now frequently have a power failure phenomenon, affects the normal production of electricity consumption enterprise and the daily life of residential customers.
Therefore, how to control power distribution network frequently to have a power failure phenomenon, it has also become power supply enterprise is providing high-quality power supply service process In critical problem urgently to be resolved hurrily.
The content of the invention
In view of this, the present invention provides power distribution network frequently power failure management-control method and device, to reduce power distribution network to greatest extent The probability frequently having a power failure.
A kind of power distribution network frequently has a power failure management-control method, including:
The distribution line for obtaining grass-roots unit's submission stops the numbering of distribution line involved during labour is applied;
According to the numbering, power failure of the distribution line in the preset duration with current time as finish time is inquired about Record;
According to the power cut record, power failure frequency of the distribution line in the preset duration is calculated;
Judge whether the power failure frequency reaches preset value, if the power failure frequency reaches the preset value, to the base Layer unit sends information warning.
Wherein, the distribution line includes:Substation feeder, power distribution network basic routing line, power distribution network branched line.
Wherein, the power cut record includes fault power cut record and non-faulting power cut record.
A kind of power distribution network frequently has a power failure control device, including:
Acquiring unit, the distribution line for obtaining grass-roots unit's submission stop the volume of the distribution line for using as a servant involved in application Number;
Query unit, for according to the numbering, inquiring about the distribution line pre- with current time as finish time If the power cut record in duration;
Computing unit, for according to the power cut record, being calculated the distribution line in the preset duration Power failure frequency;
Control unit, for judging whether the power failure frequency reaches preset value, if the power failure frequency reach it is described pre- If value, sends information warning to the grass-roots unit.
Wherein, the distribution line includes:Substation feeder, power distribution network basic routing line, power distribution network branched line.
Wherein, the power cut record includes fault power cut record and non-faulting power cut record.
It can be seen from above-mentioned technical scheme that, the present invention strengthens power distribution network is completely stopped to use as a servant the examination & approval management and control of application, such as Really power failure frequency of certain circuit in the preset duration with current time as finish time has reached power failure frequency early warning value, then lead to That knows the corresponding grass-roots unit's reasonable arrangement of this circuit this circuit stops labour plan, it is to avoid during the later stage stops labour, because of this circuit Stop labour plan to arrange unreasonable and cause this line outage frequency to list frequent power failure category in.
Description of the drawings
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing Accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is a kind of frequently power failure management-control method flow chart of power distribution network disclosed in the embodiment of the present invention;
Fig. 2 is a kind of frequently power failure control device structural representation of power distribution network disclosed in the embodiment of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than the embodiment of whole.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Referring to Fig. 1, the management-control method the embodiment of the invention discloses a kind of power distribution network frequently has a power failure, to reduce to greatest extent matching somebody with somebody The probability that electrical network frequently has a power failure, including:
Step S01:The distribution line for obtaining grass-roots unit's submission stops the numbering of distribution line involved during labour is applied;
Step S02:According to the numbering, the distribution line is inquired about in the preset duration with current time as finish time Interior power cut record;
Step S03:According to the power cut record, power failure frequency of the distribution line in the preset duration is calculated Rate;
Step S04:Judge whether the power failure frequency reaches preset value;If the power failure frequency is not up to preset value, return Return step S01;If the power failure frequency reaches the preset value, into step S05;
Step S05:Information warning is sent to the grass-roots unit.
Below, explanation is analyzed to scheme described in the present embodiment.
Frequently power failure phenomenon mainly has two big class to power distribution network, is described in detail below.
(1) fault frequent power failure.Mainly there are three kinds of situations:One is outer by external force destruction, natural disaster, vile weather etc. The distribution network failure power failure phenomenon that portion's factor causes;Two is because the protectiveness tripping operation that the failures such as short circuit, overload, ground connection cause stops Electricity;Three are controller switching equipment itself fail and the power failure that causes.
(2) non-faulting frequently has a power failure.Mainly power supply enterprise electrical network is built or upgrading during, because Distribution line stops frequently having a power failure caused by labour plan arranges unreasonable institute.
Wherein, it is the main cause for causing the frequent power failure phenomenon of power distribution network that non-faulting frequently has a power failure, and the present embodiment is solved The point of penetration of the frequent power cut problem of power distribution network.
The present embodiment strengthens power distribution network is completely stopped to use as a servant the examination & approval management and control of application, if certain circuit (can be transformer station's feedback Line, power distribution network basic routing line, power distribution network branched line etc.) (such as front two in the preset duration with current time as finish time Individual month) power failure frequency reached power failure frequency early warning value, then notify the corresponding grass-roots unit's reasonable arrangement of this circuit this circuit Stop labour plan, it is to avoid the later stage stop labour during, because this circuit stop labour plan arrange it is unreasonable cause this line outage frequency Rate lists frequent power failure category in.
Wherein, the power cut record inquired about in step S02, including fault power cut record and non-faulting power cut record. That is, the power failure frequency is to consider that all fault power failure occurred in the preset duration and non-faulting have a power failure to calculate Obtain.
Additionally, referring to Fig. 2, the control device the embodiment of the invention discloses a kind of power distribution network frequently has a power failure, with to greatest extent The probability that power distribution network frequently has a power failure is reduced, including:
Acquiring unit 100, the distribution line for obtaining grass-roots unit's submission stop using as a servant distribution line involved in application Numbering;
Query unit 200, for according to the numbering, inquiring about the distribution line with current time as finish time Power cut record in preset duration;
Computing unit 300, for according to the power cut record, being calculated the distribution line in the preset duration Power failure frequency;
Control unit 400, for judging whether the power failure frequency reaches preset value, if the power failure frequency reach it is described Preset value, sends information warning to the grass-roots unit.
Wherein, the distribution line includes:Substation feeder, power distribution network basic routing line, power distribution network branched line.
Wherein, the power cut record includes fault power cut record and non-faulting power cut record.
In sum, the present invention strengthens power distribution network is completely stopped to use as a servant the examination & approval management and control of application, if certain circuit is with current Moment has reached power failure frequency early warning value for the power failure frequency in the preset duration of finish time, then notify the corresponding base of this circuit Layer unit reasonable arrangement this circuit stops labour plan, it is to avoid during the later stage stops labour, do not conform to because this circuit stops labour plan arrangement Manage and cause this line outage frequency to list frequent power failure category in.
In this specification, each embodiment is described by the way of progressive, and what each embodiment was stressed is and other The difference of embodiment, between each embodiment identical similar portion mutually referring to.For device disclosed in embodiment For, as which corresponds to the method disclosed in Example, so description is fairly simple, related part is said referring to method part It is bright.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or using the present invention. Various modifications to these embodiments will be apparent for those skilled in the art, as defined herein General Principle can be realized in the case of the spirit or scope without departing from the embodiment of the present invention in other embodiments.Therefore, The embodiment of the present invention is not intended to be limited to the embodiments shown herein, and be to fit to principles disclosed herein and The consistent most wide scope of features of novelty.

Claims (6)

1. a kind of power distribution network frequently has a power failure management-control method, it is characterised in that include:
The distribution line for obtaining grass-roots unit's submission stops the numbering of distribution line involved during labour is applied;
According to the numbering, power failure note of the distribution line in the preset duration with current time as finish time is inquired about Record;
According to the power cut record, power failure frequency of the distribution line in the preset duration is calculated;
Judge whether the power failure frequency reaches preset value, if the power failure frequency reaches the preset value, to basic unit's list Position sends information warning.
2. power distribution network according to claim 1 frequently has a power failure management-control method, it is characterised in that the distribution line includes: Substation feeder, power distribution network basic routing line, power distribution network branched line.
3. power distribution network according to claim 1 frequently has a power failure management-control method, it is characterised in that the power cut record include therefore Barrier property power cut record and non-faulting power cut record.
4. a kind of power distribution network frequently has a power failure control device, it is characterised in that include:
Acquiring unit, the distribution line for obtaining grass-roots unit's submission stop the numbering of the distribution line for using as a servant involved in application;
Query unit, for according to the numbering, inquiring about the distribution line in default with current time as finish time Power cut record in length;
Computing unit, for according to the power cut record, being calculated power failure of the distribution line in the preset duration Frequency;
Control unit, for judging whether the power failure frequency reaches preset value, if the power failure frequency reaches the preset value, Information warning is sent to the grass-roots unit.
5. power distribution network according to claim 4 frequently has a power failure management-control method, it is characterised in that the distribution line includes: Substation feeder, power distribution network basic routing line, power distribution network branched line.
6. power distribution network according to claim 4 frequently has a power failure management-control method, it is characterised in that the power cut record include therefore Barrier property power cut record and non-faulting power cut record.
CN201611110579.2A 2016-12-06 2016-12-06 Power distribution network frequently power failure management-control method and device Pending CN106549375A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611110579.2A CN106549375A (en) 2016-12-06 2016-12-06 Power distribution network frequently power failure management-control method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611110579.2A CN106549375A (en) 2016-12-06 2016-12-06 Power distribution network frequently power failure management-control method and device

Publications (1)

Publication Number Publication Date
CN106549375A true CN106549375A (en) 2017-03-29

Family

ID=58396900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611110579.2A Pending CN106549375A (en) 2016-12-06 2016-12-06 Power distribution network frequently power failure management-control method and device

Country Status (1)

Country Link
CN (1) CN106549375A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109272125A (en) * 2018-10-30 2019-01-25 深圳供电局有限公司 Frequent power failure recognition analysis processing method and system
CN112036682A (en) * 2020-07-10 2020-12-04 广西电网有限责任公司 Early warning method and device for frequent power failure

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105809322A (en) * 2016-02-22 2016-07-27 国网冀北电力有限公司 Urban power grid reliability evaluation method taking power generation, power transmission and power distribution systems into integrated consideration

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105809322A (en) * 2016-02-22 2016-07-27 国网冀北电力有限公司 Urban power grid reliability evaluation method taking power generation, power transmission and power distribution systems into integrated consideration

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109272125A (en) * 2018-10-30 2019-01-25 深圳供电局有限公司 Frequent power failure recognition analysis processing method and system
CN112036682A (en) * 2020-07-10 2020-12-04 广西电网有限责任公司 Early warning method and device for frequent power failure

Similar Documents

Publication Publication Date Title
CN106990328B (en) Distribution network emergency repair abnormal data analysis and fault positioning system and method
CN105576660B (en) Local distribution network in-circuit emulation analytical equipment and system
CN105184442A (en) Power distribution network dispatching management statistical analysis system
CN104318374A (en) Method for assessing reliability of medium voltage distribution network for calculating upstream power restoration operation time
CN106651643A (en) Power security management and control method for whole process based on distribution and adjustment
BRPI1105058A2 (en) distribution control center
JP2013102676A (en) Power outage management apparatus and method in ems
CN107991580A (en) Electrical power distribution network fault location method based on associated weights discreteness multi-source information
Xiangning et al. Study on distribution reliability considering voltage sags and acceptable indices
CN104331777A (en) Error-preventing management system for county level power grid dispatching operation
CN106549375A (en) Power distribution network frequently power failure management-control method and device
CN104463488A (en) Power failure message notifying method and device
CN103530743A (en) Method for establishing information management system for distribution network line
CN105139712A (en) On-line dispatcher training simulator based on real-time simulation and method thereof.
EP2907221A2 (en) Use of a demand response to enable improved power supply restoration planning
CN103854230A (en) Electric power security risk management and control system and method
CN105208106A (en) Network security system of intelligent power distribution network system
Olechiw et al. Power quality monitoring systems more information than just waveforms and events
Lamberti et al. FLISR with field devices and distribution management system
Goel A comparison of distribution system reliability indices for different operating configurations
Okhaifoh et al. Reliability Assessment of the Etete and GRA 33kV Feeders in Benin Transmission Station, Benin City, Nigeria
CN207558582U (en) A kind of transformer and a kind of Switching Power Supply
CN107067337A (en) A kind of power distribution network high reliability powering mode determines method
Sastry Integrated Outage Management System: an effective solution for power utilities to address customer grievances
Vilayphonh et al. Reliability Centered Maintenance for electrical distribution system of Phontong substation in Vientiane Capital

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170329

RJ01 Rejection of invention patent application after publication