CN106545115B - The construction method of assembled steel concrete composite slab - Google Patents

The construction method of assembled steel concrete composite slab Download PDF

Info

Publication number
CN106545115B
CN106545115B CN201611054428.XA CN201611054428A CN106545115B CN 106545115 B CN106545115 B CN 106545115B CN 201611054428 A CN201611054428 A CN 201611054428A CN 106545115 B CN106545115 B CN 106545115B
Authority
CN
China
Prior art keywords
steel
plate
superstructure
precast floor
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611054428.XA
Other languages
Chinese (zh)
Other versions
CN106545115A (en
Inventor
乔文涛
张海影
史占宽
王园园
解雅倩
杨洋
吴立朋
李文平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Xiong'an Ruimi Technology Co ltd
Original Assignee
Shijiazhuang Tiedao University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shijiazhuang Tiedao University filed Critical Shijiazhuang Tiedao University
Priority to CN201611054428.XA priority Critical patent/CN106545115B/en
Publication of CN106545115A publication Critical patent/CN106545115A/en
Application granted granted Critical
Publication of CN106545115B publication Critical patent/CN106545115B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
    • E04B5/14—Load-carrying floor structures formed substantially of prefabricated units with beams or girders laid in two directions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种装配式钢‑混凝土组合楼盖,涉及土木建筑技术领域,包括若干个楼盖单元,楼盖单元包括四块呈田字形布置的预制楼板,四个预制楼板交界处通过方钢板相连,每排楼盖单元下方的方钢板中间隔设有支撑杆,支撑杆下端通过钢拉索将若干个楼盖单元串联为单榀楼盖,钢拉索两端与设置在单榀楼盖端部两个预制楼板交界处的连接座相连;逐榀楼盖组装、且相邻间隙浇注混凝土,形成装配式钢‑混凝土组合楼盖;预制楼板为四周带肋梁的钢筋桁架楼承板,钢筋桁架顶部钢筋裸露、钢筋桁架下部及四周肋梁由混凝土浇注为一体,在单榀楼盖组装后顶部现浇混凝土形成混凝土保护层。本发明预制楼板适合标准化生产,自重小,整体安全性好,跨度大,施工便捷。

The invention discloses a prefabricated steel-concrete composite floor, which relates to the technical field of civil engineering. The steel plates are connected, and there are supporting rods between the square steel plates under each row of floor units. The lower ends of the supporting rods connect several floor units in series to form a single floor through steel cables. The connecting seat at the junction of the two prefabricated floor slabs at the end of the cover is connected; the floors are assembled one by one, and concrete is poured in the adjacent gaps to form a prefabricated steel-concrete composite floor; the prefabricated floor slab is a reinforced truss floor deck with ribbed beams around it , the top of the reinforced truss is exposed, the lower part of the reinforced truss and the surrounding rib beams are poured with concrete as a whole, and the top is cast-in-place concrete after the single floor is assembled to form a concrete protective layer. The prefabricated floor slab of the invention is suitable for standardized production, has small dead weight, good overall safety, large span and convenient construction.

Description

The construction method of assembled steel concrete composite slab
Technical field
The present invention relates to technical field of civil, more particularly to a kind of assembled steel concrete composite slab and its apply Work method.
Background technique
Currently, traditional roof boarding or floor mostly uses greatly the armored concrete knot such as rib beam type floor and cross beam formula floor Structure, general beam slab are supported by the pillar or load bearing wall of its underpart, are considered from structural mechanical property and economic angle, this floor Form should not be used in the biggish building of span, be usually used in residential construction.When building functional requirement its have it is biggish across When spending, such as stadiums, conference and exhibition center and workshop building, then it must change the structure type of roof boarding, can be used pre- Stress reinforced concrete girder slab system, Elements of Space Grid Truss or reinforced concrete combination rack system directly adopt steel structure system, but These methods or still there is significant limitation in span, or fails concrete (preferably compression characteristic) and steel The material advantage of (preferable tension characteristic) gives full play of.
Common floor structural form has armored concrete rib-beam floor frame and prestressed reinforced concrete superstructure etc. in engineering, But when the planar dimension of building and column are away from 5~8 times of increase, and interior is without column, if using the building armored concrete Lei Xing again Lid and prestressed reinforced concrete superstructure are infeasible.Currently, for this large span (80m≤L≤150m) Large Column Spacing The roof system of (32m≤a≤60m) generally uses plate steel latticed structures, and is designed as three layers more, and steel using amount is larger, reaches lOOkg/m2More than, project cost is higher.
A kind of Suspendome concrete integrated floor is disclosed in patent (CN101285329A), armoured concrete slab is using pre- Making sheet, its underpart component are welded to connect by built-in fitting therewith again after being connected with each other, after the installation in place of each component, tensioning steel Then rope pours post-cast strip between plate, form removal and scaffold, ultimately form Suspendome concrete integrated floor structure system, can Big across range, construction and installation are convenient.But the armoured concrete slab of the superstructure is thicker floor, floor is from great, floor Between connecting structure it is unreliable, connection type between strut and floor is complicated and is easy to appear deadlock phenomenon, influences to construct.
Summary of the invention
Technical problem to be solved by the invention is to provide the fast assembled steels-of a kind of reliable construction quality, speed of application Combined concrete superstructure and its construction method, the present invention can make full use of the material property of concrete and steel, mitigate structure certainly Weight increases structure and is applicable in span, is particularly suitable for the flooring or roofing system of the long span buildings such as stadiums.
In order to solve the above technical problems, the technical solution used in the present invention is:
Assembled steel concrete composite slab, including several superstructure units, it is in field word that the superstructure unit, which includes four pieces, The built-in fitting of the precast floor slab of shape arrangement, four precast floor slab intersection lower surfaces is connected by square steel plate, four precast floor slabs It is connected two-by-two by the built-in fitting in precast floor slab between adjacent surface and adjacent superstructure unit and perfusion mixes in the gap of adjacent surface It is solidifying native, support rod is equipped at intervals in the square steel plate below every row's superstructure unit, the support rod lower end will be several by steel cable A superstructure unit series connection is list Pin superstructure, and the steel cable both ends are connected with attachment base, and the attachment base is fixed at single Pin The lower surface of the two precast floor slab intersections in superstructure end;Several list Pin superstructures, which are sequentially connected, constitutes assembled steel-concrete Composite floor system;The precast floor slab is steel bar truss floor support plate of the surrounding with girt strip, reinforcing bar and top rebars in the girt strip Reinforcing bar in truss, which is connected, constitutes steel reinforcement cage, the steel bar girder top rebars of the precast floor slab are exposed, steel bar girder lower part and Surrounding girt strip is integrated by concrete casting;A Pin superstructure assembling after precast floor slab top and contiguous prefabricated floor gap again It is poured concrete, forms the concrete cover of integral type at the top of single Pin superstructure.
Preferably, the support rod includes upper strut and lower supporting rod, and the upper strut upper end is fixedly linked with square steel plate, institute It states strut lower end and lower supporting rod upper end to be pivotally connected by shaft, the lower supporting rod lower end is connected with steel cable.
Preferably, the lower supporting rod lower end is connected by connecting cover plate with steel cable, and the connecting cover plate includes center band The upper dome plate and lower dome plate of groove, the upper dome plate are fixedly connected with lower supporting rod lower end, the upper dome Plate and lower dome plate docking rear center's groove form a through-hole, and the steel cable is arranged through through-hole, the upper dome Plate and lower dome plate are fixed by high-strength bolt.
Preferably, it is connected between contiguous prefabricated floor by frame-type connector, the frame-type connector and precast floor slab In built-in fitting be connected.
Preferably, the built-in fitting in the precast floor slab is pre-embedded bolt, and the frame-type connector includes the first I-shaped Steel and junction steel plate, the junction steel plate vertical welding are fixed on the upper lower flange and web two sides of the first I-steel, the company It connects on steel plate and is symmetrically arranged with connecting hole in opposite webs, connecting hole and pre-embedded bolt cooperate on the junction steel plate.
Preferably, floor is equipped between the upper strut and square steel plate, between upper dome plate and lower supporting rod.
Preferably, the precast floor slab outer end face with attachment base is equipped with the connection structure connecting with pre embedded bolt on wall, The connection structure includes connecting plate and the second I-steel, and the connecting plate and the built-in fitting of precast floor slab side are fixed, described Connecting plate is fixed with the upper lower flange of the second I-steel and web vertical welding;Second I-steel lower part edge of a wing be equipped with The gap of pre embedded bolt cooperation, welding baffle on the outside of the gap.
Preferably, the concrete being perfused between the concrete cover and precast floor slab selects lightweight concrete.
The present invention also provides the construction methods of above-mentioned assembled steel concrete composite slab, include the following steps,
(1), it sets up scaffold and does temporary support;
(2), assemble superstructure unit: junction steel plate is welded on the first I-steel web two by prefabricated frame posture connector It side will be on the pre-embedded bolt and junction steel plate on contiguous prefabricated floor side two-by-two by four blocks of precast floor slabs in matrix pattern arrangement Connecting hole cooperate and fix, the pre-embedded bolts of four precast floor slab intersection lower surfaces passes through square steel plate and is secured with nuts, by four Block precast floor slab is assembled into superstructure unit;
(3), it assembles list Pin superstructure: superstructure unit being sequentially connected in series, the pre-embedded bolt on contiguous prefabricated floor side With the connecting hole cooperation on junction steel plate and end fastened with nut after fixed, the square steel plate interval welding below superstructure unit Upper strut and lower supporting rod are pivotally connected by upper strut by shaft, and upper dome plate with groove is welded in lower supporting rod lower end, in both ends building The pre-embedded bolt of two precast floor slab intersections of cap unit matches to merge with attachment base to be secured with nuts;Steel cable is sequentially passed through The groove of upper dome plate lower end below square steel plate, lower dome plate with groove are connect by high-strength bolt with upper dome plate It is fixed, so that the steel cable passed through securely fixes;The both ends of steel cable are connect with attachment base;It is very heavy by tensioning at one end Top applies prestressing force to steel cable, to make a Pin precast floor slab arch camber to calculated value, in the gap of contiguous prefabricated floor And upper pouring concrete, complete the assembling of a Pin superstructure;
(4), by the sequence of construction of step (3) next Pin superstructure is made and between two Pin superstructure of concreting Gap is finally assembled into one, and forms assembled steel concrete composite slab;
(5), after constructing, scaffold is dismantled, the disassembly mode of hand cradle can be used tears open by Pin from one end to the other end It unloads.
The beneficial effects of adopting the technical scheme are that the present invention uses reinforcing bar purlin of the lower part surrounding with girt strip Frame floor support plate is precast floor slab, 4 precast floor slabs is formed a superstructure unit first, then in a row connected superstructure unit is used Steel cable connects into single Pin superstructure, to steel cable stretch-draw prestressing force, is then poured top concrete protective layer again;Assembled by Pin, It is poured concrete between Pin and Pin, ultimately forms assembled steel concrete composite slab.The present invention and original building without girt strip Lid is compared, and self weight is greatly reduced, and the globality of structure is more preferable, and safety is more preferable, and span is bigger;It is suitble to standardization extensive simultaneously Production, precast floor slab quality are stablized, and interchangeability is good, versatile, economical rationality;It is convenient to construct, and construction workload is small, reduces behaviour Make personnel labor intensity;It is particularly suitable for the roofing system of the long span buildings such as stadiums.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of assembled steel concrete composite slab provided in an embodiment of the present invention;
Fig. 2 is the structural schematic diagram of frame-type connector;
Fig. 3 is the partial enlarged view in Fig. 1 at B;
Fig. 4 is the partial enlarged view in Fig. 1 at C;
Fig. 5 is the connection schematic diagram of four precast floor slabs in superstructure unit;
Fig. 6 be in Fig. 1 A to not being poured concrete state diagram at the top of precast floor slab;
In figure: 1- precast floor slab, 2- square steel plate, 3- support rod, 4- steel cable, 5- attachment base, 6- girt strip, 7- reinforcing bar purlin Frame, the upper strut of 8-, 9- lower supporting rod, 10- connecting cover plate, 11- upper dome plate, 12- lower dome plate, 13- high-strength bolt, 14- Pre-embedded bolt, the first I-steel of 15-, 16- junction steel plate, 17- connecting hole, 18- floor, the second I-steel of 19-, 20- gap, 22- shaft, 23- link block.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with attached drawing and specific implementation Example, the present invention is described in further detail.It should be appreciated that specific embodiment described herein is only used to explain this hair It is bright, it is not intended to limit the present invention.
As shown in Figure 1,5, assembled steel concrete composite slab provided by the invention, including several superstructure units, institute Stating superstructure unit includes four blocks of precast floor slabs 1 in matrix pattern arrangement, and the built-in fitting of four 1 intersection lower surfaces of precast floor slab is logical It crosses square steel plate 2 to be connected, four precast floor slabs 1 are two-by-two by pre-buried in precast floor slab 1 between adjacent surface and adjacent superstructure unit Part is connected and concrete perfusion in the gap of adjacent surface, is equipped at intervals with support rod 3 in the square steel plate 2 below every row's superstructure unit, The series connection of several superstructure units is list Pin superstructure, 4 both ends of steel cable and company by steel cable 4 by 3 lower end of support rod Joint chair 5 is connected, and the attachment base 5 is fixed at the lower surface of two 1 intersections of precast floor slab in single Pin superstructure end;Several Single Pin superstructure, which is sequentially connected, constitutes assembled steel concrete composite slab;The precast floor slab 1 is reinforcing bar of the surrounding with girt strip 6 Truss floor support plate, the reinforcing bar in the girt strip 6 is connected with the reinforcing bar in top rebars truss 7 constitutes steel reinforcement cage, the prefabricated building 7 top rebars of steel bar girder of plate 1 are exposed, 7 lower part of steel bar girder and surrounding girt strip 6 are integrated by concrete casting, in a Pin The top and contiguous prefabricated floor gap of precast floor slab 1 are poured concrete again after superstructure assembling, form one at the top of single Pin superstructure The concrete cover of body formula.
Use steel bar truss floor support plate of the lower part surrounding with girt strip for precast floor slab, self weight substantially reduces, every 4 prefabricated buildings Board group connects into single Pin superstructure with steel cable at a superstructure unit, then by a row connected superstructure unit, is then poured top again Portion's concrete cover;It finally is poured concrete by between Pin assembling, Pin and Pin, forms assembled steel concrete composite slab. This assembled steel-Combined concrete building cover structure globality is more preferable, and safety is more preferable, and span is bigger;It makes full use of simultaneously The material property of concrete and steel, economical rationality;And it is high using the prefabricated degree of precast floor slab, it is extensive to be more suitable for standardization Production, more convenient and quicker of constructing.
As shown in figure 3, the support rod 3 includes upper strut 8 and lower supporting rod 9, upper 8 upper end of strut and square steel plate 2 are solid Fixed to be connected, upper 8 lower end of strut and 9 upper end of lower supporting rod are pivotally connected, and 9 lower end of lower supporting rod is connected with steel cable 4.Split type The more convenient production of support rod and installing and dismounting, can also reduce its in operation force in radial it is excessive and cause strut with Square steel plate junction is broken, while being also convenient for the installation of steel cable or being applied prestressing force.
Further, 9 lower end of lower supporting rod is connected by connecting cover plate 10 with steel cable 4, and the connecting cover plate 10 is wrapped Include center upper dome plate 11 with groove and lower dome plate 12, the upper dome plate 11 and the fixed company in 9 lower end of lower supporting rod It connects, the upper dome plate 11 and lower dome plate 12 dock rear center's groove and form a through-hole, and the steel cable 4 is through logical Hole setting, the upper dome plate 11 and lower dome plate 12 are fixed by high-strength bolt 13, so that steel cable 4 tightly be blocked Extremely.Connecting cover plate selects split type structure design, while facilitating production and installing and dismounting, also reduces production and operation is difficult Spend coefficient.
In one particular embodiment of the present invention, the upper strut 8, lower supporting rod 9 are round steel pipe, upper 8 lower end of strut Soldering and sealing circular end plate, end plate lower section two pieces of otic placodes of vertical position welding, 9 upper end of lower supporting rod is flattened and aperture, the otic placode and lower supporting rod of upper strut It is pivotally connected by shaft 22.In order to reinforce upper strut 8 and lower supporting rod 9, between the upper strut 8 and square steel plate 2, upper dome plate 11 Floor 18 is equipped between lower supporting rod 9.
In a preferred embodiment of the invention, it is connected between contiguous prefabricated floor 1 by frame-type connector, the frame Posture connector is connected with the built-in fitting in precast floor slab 1.
Wherein, the built-in fitting in the precast floor slab 1 is pre-embedded bolt 14;As shown in Fig. 2, the frame-type connector packet The first I-steel 15 and junction steel plate 16 are included, 16 vertical welding of junction steel plate is fixed on the upper lower flange of the first I-steel 15 And web two sides, it is symmetrically arranged with connecting hole 17 on the junction steel plate 16 and in opposite webs, is connected on the junction steel plate 16 Hole 17 and pre-embedded bolt 14 cooperate.Such structure is more convenient the connection between precast floor slab.
As shown in fig. 6, with attachment base 51 outer end face of precast floor slab be equipped with pre embedded bolt is connect on wall, on column or beam Connection structure, the connection structure includes connecting plate and the second I-steel 19, and the connecting plate is pre- with 1 side of precast floor slab Embedded part is fixed, and the connecting plate is fixed with the upper lower flange of the second I-steel 19 and web vertical welding;Second I-steel The 19 lower parts edge of a wing are equipped with the gap 20 cooperated with pre embedded bolt, the 20 outside welding baffle of gap.Steel can be selected in connecting plate Second I-steel of welding steel is mounted on precast floor slab side first by plate, will when precast floor slab gap is poured concrete Second I-steel and steel plate are also cast in concrete, only lower part reserving hole, by the second I-steel lower part edge of a wing and its under Side exposes, and reserves installation gap;At the edge of a wing of precast floor slab side the second I-steel lower part on gap and wall, column or beam After upper pre embedded bolt is secured with nuts with merging, then in lower flange gap outer ledge welding baffle, there is pre embedded bolt along steel The sliding space in drag-line direction simultaneously prevents it from skidding off.After pre embedded bolt is inserted into gap, backing plate is set at the top of pre embedded bolt, so Chain intermittent weld baffle, the baffle level are welded on the second I-steel lower part edge of a wing face with gap again on the outside of backing plate afterwards, Finally by the reserving hole Concrete Filled of assembled steel concrete composite slab side.
In order to mitigate overall weight, the concrete being perfused between the concrete cover and precast floor slab 1 selects lightweight Concrete.Wherein, haydite concrete, light aggregate concrete or air entrained concrete can be selected in the lightweight concrete.
The present invention also provides the construction methods of above-mentioned assembled steel concrete composite slab, include the following steps,
(1), it sets up scaffold and does temporary support;
(2), assemble superstructure unit: junction steel plate 16 is welded on 15 web of the first I-steel by prefabricated frame posture connector Two sides, by four blocks of precast floor slabs 1 in matrix pattern arrange, by contiguous prefabricated 1 side of floor two-by-two pre-embedded bolt 14 with connect Connecting hole 17 on steel plate 16, which cooperates, to be fixed, and the pre-embedded bolt 14 of four 1 intersection lower surfaces of precast floor slab is used across square steel plate 2 Nut is fixed, and is assembled into superstructure unit by four blocks of precast floor slabs 1;
(3), it assembles list Pin superstructure: superstructure unit being sequentially connected in series, the pre-buried spiral shell on contiguous prefabricated 1 side of floor Connecting hole cooperation and end on bolt 14 and junction steel plate 16 are fixed after being fastened with nut, between the square steel plate 2 below superstructure unit Every welding upper strut 8, upper strut 8 is pivotally connected with lower supporting rod 9 by shaft 22, top circle with groove is welded in 9 lower end of lower supporting rod Cover board 11, lower dome plate 12 with groove are connected and fixed by high-strength bolt 13 with upper dome plate 11, upper dome plate 11 Rear center's groove, which is docked, with lower dome plate 12 forms a through-hole;Two 1 intersections of precast floor slab of both ends superstructure unit Pre-embedded bolt 14 matches to merge with attachment base 5 to be secured with nuts.
As shown in figure 4, the attachment base 5 includes junction steel plate 16 and link block 23, junction steel plate is prefabricated with two first The pre-embedded bolt of floor intersection is secured with nuts with merging, and the link block end of vertical welding can be with steel in the middle part of junction steel plate Drag-line is bolted.
Steel cable 4 is sequentially passed through into the through-hole that 2 lower section upper dome plate 11 of square steel plate and lower dome plate 12 form, steel is drawn 4 both ends of rope are connect with attachment base 5;Prestressing force is applied to steel cable 4 by stretch-draw jack, makes a Pin superstructure arch camber to theory Calculated value forms concrete cover in the gap of contiguous prefabricated floor 1 and upper pouring concrete, completes the group of a Pin superstructure Dress;
(4), by the sequence of construction of step (3) next Pin superstructure is made and between two Pin superstructure of concreting Gap is finally assembled into one, and forms assembled steel concrete composite slab;
(5), after constructing, scaffold is dismantled, disassembly mode can be used to be dismantled by Pin from one end to the other end.
Used herein a specific example illustrates the principle and implementation of the invention, and above embodiments are said It is bright to be merely used to help understand method and its core concept of the invention.It should be pointed out that for the ordinary skill of the art , without departing from the principle of the present invention, can be with several improvements and modifications are made to the present invention for personnel, these improvement It is also fallen within the protection scope of the claims of the present invention with modification.

Claims (4)

1. a kind of construction method of assembled steel concrete composite slab, it is characterised in that: include the following steps,
(1), it sets up scaffold and does temporary support;
(2), assemble superstructure unit: superstructure unit includes four blocks of precast floor slabs (1) in matrix pattern arrangement, four precast floor slabs (1) built-in fitting of intersection lower surface is connected by square steel plate (2), four precast floor slabs (1) adjacent surface and adjacent superstructure two-by-two It is connected by the built-in fitting in precast floor slab (1) between unit and concrete perfusion in the gap of adjacent surface, every row's superstructure unit Support rod (3) are equipped at intervals in the square steel plate (2) of lower section;
Several list Pin superstructures, which are sequentially connected, constitutes assembled steel concrete composite slab;The precast floor slab (1) is surrounding band The steel bar truss floor support plate of girt strip (6), the reinforcing bar in the girt strip (6) are connected composition with the reinforcing bar in top rebars truss (7) Steel reinforcement cage, steel bar girder (7) top rebars of the precast floor slab (1) are exposed, steel bar girder (7) lower part and surrounding girt strip (6) It is integrated by concrete casting;The top and contiguous prefabricated floor (1) gap of precast floor slab (1) are poured again after Pin superstructure assembling Concrete is infused, forms the concrete cover of integral type at the top of single Pin superstructure;Connected between contiguous prefabricated floor (1) by frame-type Fitting is connected, and the frame-type connector is connected with the built-in fitting in precast floor slab (1), and the built-in fitting in precast floor slab (1) is Pre-embedded bolt (14);
Prefabricated frame posture connector, the frame-type connector include the first I-steel (15) and junction steel plate (16), will be connected Steel plate (16) vertical welding is fixed on the upper lower flange and web two sides of the first I-steel (15), on the junction steel plate (16), And connecting hole (17) are symmetrically arranged in opposite webs;Four pieces of precast floor slabs (1) are arranged in matrix pattern, it will contiguous prefabricated building two-by-two The connecting hole (17) on pre-embedded bolt (14) and junction steel plate (16) on plate (1) side, which cooperates, to be fixed, four precast floor slabs (1) The pre-embedded bolt (14) of intersection lower surface passes through square steel plate (2) and is secured with nuts, and is assembled into superstructure by four pieces of precast floor slabs (1) Unit;
(3), it assembles list Pin superstructure: support rod (3) lower end of superstructure unit is passed through into steel cable (4) for several superstructure units It is sequentially connected in series as single Pin superstructure, steel cable (4) both ends are connected with attachment base (5), and the attachment base (5) is fixed at list The lower surface of two precast floor slab (1) intersections in Pin superstructure end;
Connecting hole cooperation and end on pre-embedded bolt (14) and junction steel plate (16) on contiguous prefabricated floor (1) side are used Fixed after nut fastening, upper strut (8) are welded at square steel plate (2) interval below superstructure unit, by upper strut (8) and lower supporting rod (9) it is pivotally connected by shaft (22), upper dome plate (11) with groove, the superstructure unit at both ends are welded in lower supporting rod (9) lower end The pre-embedded bolt (14) of two precast floor slab (1) intersections matches to merge with attachment base (5) to be secured with nuts;Upper dome plate (11) With the center band groove of lower dome plate (12), shape in the middle part of the connecting cover plate that forms after upper dome plate and the docking of lower dome plate At a through-hole, steel cable (4) is sequentially passed through into through-hole, lower dome plate (12) passes through high-strength bolt (13) and upper dome plate (11) it is connected and fixed, so that the steel cable passed through is fixed;The both ends of steel cable (4) are connect with attachment base (5);By one Stretch-draw jack is held to apply prestressing force to steel cable (4), to make Pin precast floor slab (1) arch camber to calculated value, in phase The gap of adjacent precast floor slab (1) and upper pouring concrete complete the assembling of a Pin superstructure;
(4), by the sequence of construction of step (3) next Pin superstructure is made and with the gap between two Pin superstructure of concreting, It is finally assembled into one, forms assembled steel concrete composite slab;
(5), after constructing, scaffold is dismantled, the disassembly mode of scaffold is using from one end to the other end by Pin disassembly.
2. the construction method of assembled steel concrete composite slab according to claim 1, it is characterised in that: on described Floor (18) are equipped between strut (8) and square steel plate (2), between upper dome plate (11) and lower supporting rod (9).
3. the construction method of assembled steel concrete composite slab according to claim 1, it is characterised in that: with company Precast floor slab (1) outer end face of joint chair (5) is equipped with the connection structure connecting with pre embedded bolt on wall, and the connection structure includes Connecting plate and the second I-steel (19), the connecting plate and the built-in fitting of precast floor slab (1) side are fixed, the connecting plate and The upper lower flange of two I-steel (19) and web vertical welding are fixed;Second I-steel (19) the lower part edge of a wing be equipped with it is pre- Bury the gap (20) of screw rod cooperation, welding baffle on the outside of the gap (20).
4. the construction method of assembled steel concrete composite slab according to claim 1, it is characterised in that: described mixed The concrete being perfused between solidifying protective soil layer and precast floor slab (1) selects lightweight concrete.
CN201611054428.XA 2016-11-25 2016-11-25 The construction method of assembled steel concrete composite slab Active CN106545115B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611054428.XA CN106545115B (en) 2016-11-25 2016-11-25 The construction method of assembled steel concrete composite slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611054428.XA CN106545115B (en) 2016-11-25 2016-11-25 The construction method of assembled steel concrete composite slab

Publications (2)

Publication Number Publication Date
CN106545115A CN106545115A (en) 2017-03-29
CN106545115B true CN106545115B (en) 2019-01-18

Family

ID=58395148

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611054428.XA Active CN106545115B (en) 2016-11-25 2016-11-25 The construction method of assembled steel concrete composite slab

Country Status (1)

Country Link
CN (1) CN106545115B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988479A (en) * 2017-04-06 2017-07-28 清华大学 The pre-buried system and its application process of FRP battenboards
CN110748063B (en) * 2019-10-31 2021-06-29 中国一冶集团有限公司 Assembled steel bar truss floor support plate with support
CN111236517A (en) * 2020-03-10 2020-06-05 朱辉祖 Detachable prestressed reinforcement truss superimposed sheet
CN115467408B (en) * 2022-09-23 2024-10-18 扬州大学 An assembled self-balancing cable steel-wood structure system
CN118273462B (en) * 2024-05-06 2025-08-15 广东海龙建筑科技有限公司 Concrete module integrated with prefabricated shear wall and assembly method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07207794A (en) * 1994-01-12 1995-08-08 Nippon Kokan Raito Steel Kk Precast synthetic slabs
CN101285329B (en) * 2008-06-05 2010-10-27 天津大学 Suspension Concrete Integrated Floor Structure and Its Construction Method
CN103741812A (en) * 2013-11-29 2014-04-23 湖北弘毅建设有限公司 Connection joint of steel reinforced concrete superposed beams and middle column
CN103883054B (en) * 2014-03-04 2015-12-30 石家庄铁道大学 A kind of rope bar girt strip composite floor system and construction method thereof
CN204225277U (en) * 2014-11-21 2015-03-25 大元建业集团股份有限公司 The prefabricated floor connector of steel building

Also Published As

Publication number Publication date
CN106545115A (en) 2017-03-29

Similar Documents

Publication Publication Date Title
CN113152283B (en) Construction method of large-crotch-diameter supporting system of small box girder type hidden cover beam prefabricated on road and bridge
CN113882238B (en) Large-span top-supported cable-assisted beam-arch composite rigid frame bridge and its construction method
US4646495A (en) Composite load-bearing system for modular buildings
US20150167289A1 (en) Open web composite shear connector construction
JP2004137686A (en) Composite panel structure, panel bridge structure and construction method of continuous composite girder bridge
CN114352035B (en) Large-span assembled combined arched heavy roof structure and construction method thereof
CN103883054B (en) A kind of rope bar girt strip composite floor system and construction method thereof
CN113062197A (en) Assembly type stiffening large cantilever corrugated steel web PC combined box girder and construction method thereof
CN105064195B (en) The fish belly Wavelike steel webplate prestressing with bond steel reinforced concrete combination simply supported girder bridge and its construction method of precast assembly
CN107268889B (en) Prestressed aluminum-concrete combined truss girder and construction method thereof
CN112647591A (en) Prefabricated reinforced concrete beam column steel node
CN105064200A (en) Prestressed ferroconcrete combined simply-supported beam bridge with preprocessed assembled fish-bellied truss frame and construction method of prestressed ferroconcrete combined simply-supported beam bridge
CN112854438A (en) Assembly type concrete frame system with exposed flat net rack floor and exposed truss girder
CN106545115A (en) Assembled steel Combined concrete superstructure and its construction method
KR100949828B1 (en) Steel beam and hybrid beam of steel concrete for slim floor
CN106906756A (en) Can Fast Installation remove maintenance operation platform and its construction method
CN207062787U (en) Can Fast Installation remove maintenance construction platform
CN112323985A (en) Prefabricated reinforced concrete column and composite slab joint and construction technology
CN205188792U (en) Prefabricated internal prestressing force steel and concrete composite simply supported girder bridge of assembling of fish belly wave form steel web
CN110512784A (en) A kind of assembled light floor and its construction method
CN110117931A (en) Prefabricated PC combined box beam
KR200383490Y1 (en) System for constructing composite reinforced concrete girders and beams using FRP
CN108411763A (en) Pre-splicing bridge and its construction method
RU2197578C2 (en) Structural system of multistory building and process of its erection ( variants )
CN217537332U (en) Connecting structure of assembled type steel reinforced concrete beam and steel-concrete composite board

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230302

Address after: 071000 Dabiantuo Village, Damafang Township, High-tech Zone, Baoding City, Hebei Province

Patentee after: Baoding Jimmy Network Technology Co.,Ltd.

Address before: 050043 No. 17, North Second Ring Road, Hebei, Shijiazhuang

Patentee before: SHIJIAZHUANG TIEDAO University

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20260313

Address after: 071799 Hebei Province, China (Hebei) Free Trade Pilot Zone Xiongan Area, Xiongan High-tech Industrial Development Zone Service Center 619-086 (Self-declared)

Patentee after: Hebei xiong'an RUIMI Technology Co.,Ltd.

Country or region after: China

Address before: 071000 Dabiantuo Village, Damafang Township, High-tech Zone, Baoding City, Hebei Province

Patentee before: Baoding Jimmy Network Technology Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right