CN106545010A - A kind of jet grouting pile construction method of close to buildings - Google Patents

A kind of jet grouting pile construction method of close to buildings Download PDF

Info

Publication number
CN106545010A
CN106545010A CN201510592266.4A CN201510592266A CN106545010A CN 106545010 A CN106545010 A CN 106545010A CN 201510592266 A CN201510592266 A CN 201510592266A CN 106545010 A CN106545010 A CN 106545010A
Authority
CN
China
Prior art keywords
pile
construction
rotary churning
jet grouting
relief hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510592266.4A
Other languages
Chinese (zh)
Inventor
施群凯
范作锋
黄华
黄辉
童鹤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201510592266.4A priority Critical patent/CN106545010A/en
Publication of CN106545010A publication Critical patent/CN106545010A/en
Pending legal-status Critical Current

Links

Abstract

The present invention relates to a kind of jet grouting pile construction method.A kind of construction method of neighbouring existing construction of structures rotary churning pile, it includes:Carry out test pile and determine relevant parameter, and reduce input rotary churning pile machine quantity on the premise of quality and duration is met as far as possible;Pile spacing >=6m that two stake machines are constructed simultaneously;Relief hole, the pressure release hole depth depth certain more than rotary churning pile are set on just to Construction of High Pressure Jet Grouting Pile path;Strengthen the monitoring of close to buildings during jet grouting pile construction;Relief hole can take mud off rig pore-forming, and in hole, provisional being put into is enclosed with steel reinforcement cage, bamboo cage of Dense mesh screen etc.;Periodically mud balance in sampling observation relief hole, generally between 1.1 ~ 1.2, is adjusted after mud balance goes beyond the scope immediately;After whole Construction of High Pressure Jet Grouting Pile terminate, the steel reinforcement cage in relief hole, bamboo cage are hung out, and using element soil or swelling earthen backfill, then cover dozen rotary churning pile closure.Impact of the effectively solving rotary churning pile mortar depositing construction of the present invention to close to buildings.

Description

A kind of jet grouting pile construction method of close to buildings
Technical field
The present invention relates to pile foundation construction, more particularly to a kind of jet grouting pile construction method.
Background technology
In order to improve land use rate to greatest extent, many newly-built or reconstruction and extension project is all built very close to existing at present(Structure)Thing is built, when building in neighbouring these(Structure)When building thing construction high-pressure rotary jet grouting pile, the grouting pressure of jet grouting pile construction is huge, original stable resistance to shear of soil can be increased, cause the displacement of these inhering architectures, sedimentation, it could even be possible to causing the engineering pile broken pile of inhering architecture, cause the normal operation of the impact building(Use).
The content of the invention
Present invention seek to address that drawbacks described above, there is provided a kind of jet grouting pile construction method of close to buildings.Impact of the effectively solving rotary churning pile mortar depositing construction of the present invention to close to buildings.
What the present invention was realized in:A kind of construction method of neighbouring existing construction of structures rotary churning pile, it includes:
Carry out test pile and determine relevant parameter, and reduce input rotary churning pile machine quantity on the premise of quality and duration is met as far as possible;
Pile spacing >=6m that two stake machines are constructed simultaneously;
Relief hole, the pressure release hole depth depth certain more than rotary churning pile are set on just to Construction of High Pressure Jet Grouting Pile path;
Strengthen the monitoring of close to buildings during jet grouting pile construction;
Relief hole can take mud off rig pore-forming, and in hole, provisional being put into is enclosed with steel reinforcement cage, bamboo cage of Dense mesh screen etc.;
Periodically mud balance in sampling observation relief hole, generally between 1.1 ~ 1.2, is adjusted after mud balance goes beyond the scope immediately;
After whole Construction of High Pressure Jet Grouting Pile terminate, the steel reinforcement cage in relief hole, bamboo cage are hung out, and using element soil or swelling earthen backfill, then cover dozen rotary churning pile closure.
The present invention by arrange in relief hole, control relief hole mud balance, control simultaneously the rotary churning pile machine spacing of construction, carry out test pile and determine the methods such as parameter realizing the purpose of the present invention;The present invention forbids a machine to bunch construction, prevents group machine construction pressure during whitewashing excessive, increases and building is disturbed;Need to first pass through test pile acquirement relevant parameter, determine the parameters such as diameter, the spaced position of the construction parameter and relief hole of rotary churning pile;Method of operating of the present invention is easy to learn;Impact of the effectively solving rotary churning pile mortar depositing construction to close to buildings.
Specific embodiment
A kind of construction method of neighbouring existing construction of structures rotary churning pile of the present invention, including:
1st, test pile is carried out first and determines relevant parameter, and reduce input rotary churning pile machine quantity on the premise of quality and duration is met as far as possible;
2nd, pile spacing >=6m that two stake machines are constructed simultaneously;
3rd, relief hole, the pressure release hole depth depth certain more than rotary churning pile are set on just to Construction of High Pressure Jet Grouting Pile path;
4th, strengthen the monitoring of close to buildings during jet grouting pile construction;
5th, relief hole can take mud off rig pore-forming, and in hole, provisional being put into is enclosed with steel reinforcement cage, bamboo cage of Dense mesh screen etc.;
6th, periodically inspect mud balance in relief hole by random samples, generally between 1.1 ~ 1.2(Suitably change depending on concrete soil property situation), it is adjusted after mud balance goes beyond the scope immediately;
After whole Construction of High Pressure Jet Grouting Pile terminate, the steel reinforcement cage in relief hole, bamboo cage are hung out, and using element soil or swelling earthen backfill, then cover dozen rotary churning pile closure.

Claims (1)

1. a kind of construction method of neighbouring existing construction of structures rotary churning pile, it is characterised in that it includes:
First, carry out test pile and determine relevant parameter, and reduce input rotary churning pile machine quantity on the premise of quality and duration is met as far as possible;
Pile spacing >=6m that two stake machines are constructed simultaneously;
Relief hole, the pressure release hole depth depth certain more than rotary churning pile are set on just to Construction of High Pressure Jet Grouting Pile path;
Strengthen the monitoring of close to buildings during jet grouting pile construction;
Relief hole can take mud off rig pore-forming, and in hole, provisional being put into is enclosed with steel reinforcement cage, bamboo cage of Dense mesh screen etc.;
Periodically mud balance in sampling observation relief hole, generally between 1.1 ~ 1.2, is adjusted after mud balance goes beyond the scope immediately;
After whole Construction of High Pressure Jet Grouting Pile terminate, the steel reinforcement cage in relief hole, bamboo cage are hung out, and using element soil or swelling earthen backfill, then cover dozen rotary churning pile closure.
CN201510592266.4A 2015-09-17 2015-09-17 A kind of jet grouting pile construction method of close to buildings Pending CN106545010A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510592266.4A CN106545010A (en) 2015-09-17 2015-09-17 A kind of jet grouting pile construction method of close to buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510592266.4A CN106545010A (en) 2015-09-17 2015-09-17 A kind of jet grouting pile construction method of close to buildings

Publications (1)

Publication Number Publication Date
CN106545010A true CN106545010A (en) 2017-03-29

Family

ID=58362838

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510592266.4A Pending CN106545010A (en) 2015-09-17 2015-09-17 A kind of jet grouting pile construction method of close to buildings

Country Status (1)

Country Link
CN (1) CN106545010A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09291532A (en) * 1996-04-24 1997-11-11 Toshihiko Fujii Process of erecting existing hollow pile
CN102102363A (en) * 2009-12-21 2011-06-22 李胜男 Foundation pile and construction method thereof
KR101162111B1 (en) * 2009-11-19 2012-07-03 한국건설기술연구원 Construction Method of Concrete Pile
CN104453942A (en) * 2014-10-17 2015-03-25 海南大学 Construction method for restraining frost heave and thaw settlement in cup-shaped horizontal freezing
CN204418194U (en) * 2014-11-25 2015-06-24 中冶天工上海十三冶建设有限公司 For high water-permeability layer of sand foundation pit dewatering device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09291532A (en) * 1996-04-24 1997-11-11 Toshihiko Fujii Process of erecting existing hollow pile
KR101162111B1 (en) * 2009-11-19 2012-07-03 한국건설기술연구원 Construction Method of Concrete Pile
CN102102363A (en) * 2009-12-21 2011-06-22 李胜男 Foundation pile and construction method thereof
CN104453942A (en) * 2014-10-17 2015-03-25 海南大学 Construction method for restraining frost heave and thaw settlement in cup-shaped horizontal freezing
CN204418194U (en) * 2014-11-25 2015-06-24 中冶天工上海十三冶建设有限公司 For high water-permeability layer of sand foundation pit dewatering device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张桂: "轨交路站配套顶管工程中穿越合流污水总管的施工保护措施", 《上海建筑科技》 *

Similar Documents

Publication Publication Date Title
Nikbakhtan et al. Effect of grout pressure and grout flow on soil physical and mechanical properties in jet grouting operations
CN102286985A (en) Method for constructing dual high-pressure jet grouting pile waterproof curtain
CN110952522A (en) Double-spraying bidirectional cement mixing pile drill bit and construction method thereof
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN102296621B (en) Construction method of ground sectional water-stop curtain
CN105220654A (en) A kind of ruggedized construction of earth and rockfill dam and construction method thereof
CN104912097A (en) Novel retaining wall reverse-filtering drainage system and construction method
CN204676488U (en) A kind of novel barricade anti-filter discharge structure
CN106545010A (en) A kind of jet grouting pile construction method of close to buildings
CN103938651B (en) The stake of Large stone porous concrete and treatment process of composite foundation thereof under water
CN106049413A (en) Hybrid power drainage consolidation system applied to deep saturated soft soil foundation and construction method
CN207419441U (en) A kind of campshed formula diaphram wall
CN206015511U (en) One implant post steel pipe column
CN203977418U (en) Prevent cast-in-place pile concrete loss device
CN205062598U (en) Foam concrete stake composite foundation permeates water
CN113235550A (en) Reinforcement construction method of miscellaneous fill foundation
CN202214725U (en) Cement-soil jet grouting pile tube device for constructing cellar isolating structure
CN106120829A (en) A kind of deep hole grout curtain overfall thickens construction method
Gladkov et al. Strength and deformation characteristics of soil-concrete as a function of jet-grouting parameters
CN205134337U (en) High slope supporting construction
Kim et al. Pilot scale field test for natural fiber drain
CN209099368U (en) Single Combined type underground supporting construction
CN204645056U (en) A kind of combined type double-row pile foundation pit support structure
CN103966997A (en) Construction method for conducting foundation treatment through grouting engineering pile foundations with steel sleeves
CN203583469U (en) High-strength prestressed combination support pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170329

RJ01 Rejection of invention patent application after publication