CN106544956A - 一种钢箱梁横向分块施工临时撑纵向布置方法 - Google Patents
一种钢箱梁横向分块施工临时撑纵向布置方法 Download PDFInfo
- Publication number
- CN106544956A CN106544956A CN201610878144.6A CN201610878144A CN106544956A CN 106544956 A CN106544956 A CN 106544956A CN 201610878144 A CN201610878144 A CN 201610878144A CN 106544956 A CN106544956 A CN 106544956A
- Authority
- CN
- China
- Prior art keywords
- shoveing
- roof
- floor
- girder
- steel box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/06—Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
Abstract
本发明公开了一种钢箱梁横向分块施工临时撑纵向布置方法,具体包括如下:钢箱梁横向分块后,端部的顶底板滑移最大,首先将两个临时剪刀撑分别布置在开口侧的两个端部,然后进行建模分析,对比顶底板滑移量;将另外两个剪刀撑布置在滑移量最大的地方,建模分析,对比顶底板滑移量;以此类推,直至变形满足工程要求。临时撑横桥向布置在梁块缺失腹板的开口侧隔一个纵向加筋肋处,临时撑的支点设置在横隔板与顶底板的交界处,本发明能以最少的临时撑设置数最大限度的降低跨中挠度。实施方法简单易行,支撑效率得到最大化。
Description
技术领域
本发明涉及钢箱梁桥横向分块,纵向分段的吊装施工方法,对分块后开口的钢箱梁桥进行临时加固,具体涉及一种钢箱梁横向分块施工临时撑纵向布置方法。
背景技术
城市高架桥的建设往往要受到场地、交通等的限制,要求施工速度快,对周边环境影响小,不能用大型吊装设备,施工期间满足通车需求。因此,城市高架钢箱梁桥通常采用沿纵向或横向分块,吊装到位拼接成整体的施工方法。但是,钢箱梁的横向分块往往会使对称封闭的钢箱梁变成不对称开口薄壁截面,腹板与顶板或底板分离的情况。开口处腹板的缺失导致箱梁顶板与底板失去纵桥向滑动约束,各分块构件不能按梁构件受力,截面的抗弯抗扭刚度大大减小且梁的长细比增大,吊装和安放过程中跨中开口处变形过大,安放到临时墩后各梁块纵向焊接处位移差过大等问题而影响施工安全。因此在横向分块吊装施工过程中,需在开口处施加临时支撑结构来限制顶底板纵桥向的剪切滑移,从而减小跨中开口处的挠曲变形。传统的加固方法选择全跨加固或者只加固跨中部分,加固效率低,变形和应力的改善效果不明显。
发明内容
本发明为有效约束顶底板纵向滑移,克服钢箱梁桥横向分块施工的缺陷,提出一种钢箱梁横向分块施工临时撑纵向布置方法,该法用最少的支撑数,达到最优的支撑效果,并且适用于任何尺寸的开口箱梁。
一种钢箱梁横向分块施工临时撑纵向布置方法,具体包括如下:钢箱梁横向分块后,端部的顶底板滑移最大。首先将两个临时剪刀撑分别布置在开口侧的两个端部,然后进行建模分析,对比顶底板滑移量;将另外两个临时剪刀撑布置在滑移量最大的地方,再次进行建模分析,对比顶底板滑移量,在滑移最大的地方设置临时剪刀撑;以此类推,直至变形满足焊接要求。临时剪刀撑横桥向布置在梁块缺失腹板的开口侧隔一个纵向加筋肋处,临时剪刀撑的支点设置在横隔板与顶底板的交界处。
所述的剪刀撑采用的材料为槽钢或者工字钢。
所述的剪刀撑交叉点处采用钢板将其焊接牢固。
有益效果:按照此方法施加临时撑,能以最少的临时撑设置数最大限度的降低跨中挠度。实施方法简单易行,支撑效率得到最大化。
附图说明
图1为临时撑结构示意图;
图2为临时撑横桥向添加位置示意图;
图3-1为临时撑沿桥纵向布置方法中将临时撑加在端部并建模分析顶底板滑移。
图3-2为临时撑沿桥纵向布置方法中:将临时撑加在滑移最大的地方。
具体实施方式:
如图1所示,临时支撑形式选择X型剪刀撑,剪刀撑的支点设置在横隔板与顶底板的交界处;如图2所示,横桥向支撑在梁块缺失腹板的开口侧隔一个纵向加筋肋处;纵桥向布置方法为:如图3-1所示,首先将两个临时剪刀撑分别布置在开口侧的两个端部,然后进行建模分析,对比顶底板滑移量;如图3-2所示,将另外两个临时剪刀撑布置在滑移量最大的地方,再次进行建模分析,对比顶底板滑移量,在滑移最大的地方设置临时剪刀撑;以此类推,直至变形满足焊接要求。临时剪刀撑横桥向布置在梁块缺失腹板的开口侧隔一个纵向加筋肋处,临时剪刀撑的支点设置在横隔板与顶底板的交界处。
Claims (3)
1.一种钢箱梁横向分块施工临时撑纵向布置方法,其特征在于,该方法具体包括以下步骤:
将两个临时剪刀撑分别布置在开口侧的两个端部,然后进行建模分析,对比顶底板滑移量;将另外两个临时剪刀撑布置在滑移量最大的地方,再次进行建模分析,对比顶底板滑移量,在滑移最大的地方设置临时剪刀撑;以此类推,直至变形满足焊接要求;临时剪刀撑横桥向布置在梁块缺失腹板的开口侧隔一个纵向加筋肋处,临时剪刀撑的支点设置在横隔板与顶底板的交界处。
2.根据权利要求1所述的一种钢箱梁横向分块施工临时撑纵向布置方法,其特征在于:所述的剪刀撑采用的材料为槽钢或者工字钢。
3.根据权利要求1所述的一种钢箱梁横向分块施工临时撑纵向布置方法,其特征在于:所述的剪刀撑交叉点处采用钢板将其焊接牢固。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610878144.6A CN106544956B (zh) | 2016-10-09 | 2016-10-09 | 一种钢箱梁横向分块施工临时撑纵向布置方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610878144.6A CN106544956B (zh) | 2016-10-09 | 2016-10-09 | 一种钢箱梁横向分块施工临时撑纵向布置方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106544956A true CN106544956A (zh) | 2017-03-29 |
CN106544956B CN106544956B (zh) | 2018-03-20 |
Family
ID=58368352
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610878144.6A Active CN106544956B (zh) | 2016-10-09 | 2016-10-09 | 一种钢箱梁横向分块施工临时撑纵向布置方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106544956B (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102182147A (zh) * | 2011-03-31 | 2011-09-14 | 中铁港航局集团第二工程有限公司 | 一种钢箱梁架设方法 |
KR101067001B1 (ko) * | 2011-02-17 | 2011-09-22 | 김찬수 | 철근을 이용한 스틸 박스 거더 교량의 슬래브 시공 공법 |
CN103174093A (zh) * | 2013-03-14 | 2013-06-26 | 中交二航局第四工程有限公司 | 一种支架区钢箱梁的安装装置及其安装方法 |
JP2013142226A (ja) * | 2012-01-10 | 2013-07-22 | Sumitomo Mitsui Construction Co Ltd | 箱桁橋の構築方法 |
CN103669227A (zh) * | 2013-12-12 | 2014-03-26 | 中铁四局集团第二工程有限公司 | 一种桥梁钢-混结合段钢箱梁滑移定位方法 |
CN105648913A (zh) * | 2015-12-17 | 2016-06-08 | 浙江大学 | 一种钢箱梁桥横向分块施工临时加固方法 |
-
2016
- 2016-10-09 CN CN201610878144.6A patent/CN106544956B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101067001B1 (ko) * | 2011-02-17 | 2011-09-22 | 김찬수 | 철근을 이용한 스틸 박스 거더 교량의 슬래브 시공 공법 |
CN102182147A (zh) * | 2011-03-31 | 2011-09-14 | 中铁港航局集团第二工程有限公司 | 一种钢箱梁架设方法 |
JP2013142226A (ja) * | 2012-01-10 | 2013-07-22 | Sumitomo Mitsui Construction Co Ltd | 箱桁橋の構築方法 |
CN103174093A (zh) * | 2013-03-14 | 2013-06-26 | 中交二航局第四工程有限公司 | 一种支架区钢箱梁的安装装置及其安装方法 |
CN103669227A (zh) * | 2013-12-12 | 2014-03-26 | 中铁四局集团第二工程有限公司 | 一种桥梁钢-混结合段钢箱梁滑移定位方法 |
CN105648913A (zh) * | 2015-12-17 | 2016-06-08 | 浙江大学 | 一种钢箱梁桥横向分块施工临时加固方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106544956B (zh) | 2018-03-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107895060B (zh) | 一种高速铁路大跨度拱桥的竖向位移控制方法 | |
Zhu et al. | Fatigue behavior of orthotropic bridge decks with two types of cutout geometry based on field monitoring and FEM analysis | |
CN105735101B (zh) | 一种可转换为永久桥梁结构的高速铁路抢修梁及其抢修方法 | |
CN110175426A (zh) | 铁路桥梁弹塑性金属限位减震耗能装置设计方法 | |
CN107587417A (zh) | 混合组合梁三跨连续悬索桥 | |
CN104153284A (zh) | 部分充填式钢箱混凝土连续组合梁桥及其施工方法 | |
CN106835926A (zh) | 一种小边主跨比预应力混凝土连续梁桥及其施工方法 | |
CN105484109A (zh) | 易装配浮置道床预制板及其应用 | |
CN103924528A (zh) | 大跨度桥箱梁结构整体长距离顶推滑移施工方法 | |
CN107988924A (zh) | 一种基于旧桥改建的钢-混组合梁桥体系转换系统及转换方法 | |
CN108060634A (zh) | 双工字形超高性能混凝土-普通混凝土组合梁桥梁结构及其施工方法 | |
CN104652257B (zh) | 无缝桥台结构 | |
CN205242238U (zh) | 一种应用于自锚式悬索桥的主梁结构 | |
CN106544956B (zh) | 一种钢箱梁横向分块施工临时撑纵向布置方法 | |
CN103422422A (zh) | 具有抑制纵向地震响应的多塔斜拉桥支承体系及工作方法 | |
CN204626243U (zh) | 无缝桥台结构 | |
CN106991254B (zh) | 一种公铁两用大桥钢桥面铺装的多尺度设计方法 | |
Jiang et al. | Key technologies of whole incremental launching construction control for inclined continuous box girder with steep longitudinal gradient | |
CN205223738U (zh) | 易装配浮置道床预制板及浮置道床 | |
Mohseni et al. | Development of improved frequency expressions for composite horizontally curved bridges with high-performance steel girders | |
CN104532743B (zh) | 塔梁固结机构和相应的斜拉桥及其建造方法 | |
CN204919348U (zh) | 一种自锚式悬索桥安装辅助用钢塔 | |
CN105648911B (zh) | 桥梁施工现浇梁、盖梁、系梁混凝土附着式预应力桁架支架 | |
CN208329274U (zh) | 一种无粘结预应力型钢混凝土墙 | |
Sasidharan et al. | Finite element analysis and parametric study of curved concrete box girder using Abaqus software |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |