CN106541166A - A smart watch strap efficient drilling equipment - Google Patents

A smart watch strap efficient drilling equipment Download PDF

Info

Publication number
CN106541166A
CN106541166A CN201611115412.5A CN201611115412A CN106541166A CN 106541166 A CN106541166 A CN 106541166A CN 201611115412 A CN201611115412 A CN 201611115412A CN 106541166 A CN106541166 A CN 106541166A
Authority
CN
China
Prior art keywords
bevel gear
rotating shaft
drilling
gear
bearing seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611115412.5A
Other languages
Chinese (zh)
Other versions
CN106541166B (en
Inventor
李贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yinglishi Watch Industry Dongguan Co ltd
Original Assignee
Wuhu Kechuang Productivity Promotion Center Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhu Kechuang Productivity Promotion Center Co ltd filed Critical Wuhu Kechuang Productivity Promotion Center Co ltd
Priority to CN201611115412.5A priority Critical patent/CN106541166B/en
Publication of CN106541166A publication Critical patent/CN106541166A/en
Application granted granted Critical
Publication of CN106541166B publication Critical patent/CN106541166B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B41/00Boring or drilling machines or devices specially adapted for particular work; Accessories specially adapted therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B47/00Constructional features of components specially designed for boring or drilling machines; Accessories therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q3/00Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine
    • B23Q3/02Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine for mounting on a work-table, tool-slide, or analogous part
    • B23Q3/06Work-clamping means
    • B23Q3/062Work-clamping means adapted for holding workpieces having a special form or being made from a special material

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)

Abstract

The invention relates to drilling equipment, in particular to high-efficiency drilling equipment for a watchband of an intelligent watch. The invention aims to provide high-efficiency drilling equipment for a watchband of an intelligent watch, which is high in drilling efficiency. In order to solve the technical problem, the invention provides high-efficiency drilling equipment for a watchband of an intelligent watch, which comprises a servo motor, a first bevel gear, a flat belt, a first bearing seat, a first rotating shaft, a large belt pulley, a second drilling tool, a fixing device, a second operating platform and the like; branch and fourth bearing frame, the top is connected with servo motor and first bearing frame through bolted connection's mode in the drilling frame to servo motor locates the left of first bearing frame, and the servo motor below is equipped with the third pivot. The intelligent watch drilling device has the advantages of simple structure, simplicity and convenience in operation and high drilling efficiency, and a plurality of factors are considered, so that the intelligent watch is well protected, and the reliability of the intelligent watch drilling device is improved.

Description

一种智能手表表带高效钻孔设备A smart watch strap efficient drilling equipment

技术领域technical field

本发明涉及一种钻孔设备,尤其涉及一种智能手表表带高效钻孔设备。The invention relates to a drilling device, in particular to a high-efficiency drilling device for a smart watch strap.

背景技术Background technique

智能手表是具有信息处理能力,符合手表基本技术要求的手表。除指示时间之外,还应具有提醒、导航、校准、监测、交互等其中一种或者多种功能;显示方式包括指针、数字、图像等。2013年3月媒体报道,苹果、三星、谷歌等科技巨头都将在2013年晚些时候发布智能手表。美国市场研究公司分析师艾维·格林加特认为2013年可能会成为智能手表元年。A smart watch is a watch that has information processing capabilities and meets the basic technical requirements of a watch. In addition to indicating time, it should also have one or more functions such as reminder, navigation, calibration, monitoring, and interaction; the display methods include pointers, numbers, images, etc. According to media reports in March 2013, technology giants such as Apple, Samsung, and Google will release smart watches later in 2013. Ivy Greengart, an analyst at the US market research company, believes that 2013 may be the first year of the smart watch.

钻孔是指用钻头在实体材料上加工出孔的操作。这里讲述了勘探工作里的钻孔工作,以及钻孔需要的辅助工具以及部分应急措施方法。Drilling refers to the operation of machining a hole in a solid material with a drill. Here is a description of the drilling work in the exploration work, as well as the auxiliary tools needed for drilling and some emergency measures.

现有的钻孔设备存在钻孔效率低的缺点,因此亟需研发一种钻孔效率高的智能手表表带高效钻孔设备。Existing drilling equipment has the disadvantage of low drilling efficiency, so it is urgent to develop an efficient drilling equipment for smart watch straps with high drilling efficiency.

发明内容Contents of the invention

(1)要解决的技术问题(1) Technical problems to be solved

本发明为了克服现有的钻孔设备钻孔效率低的缺点,本发明要解决的技术问题是提供一种钻孔效率高的智能手表表带高效钻孔设备。In order to overcome the shortcoming of low drilling efficiency of the existing drilling equipment, the technical problem to be solved by the invention is to provide a high-efficiency drilling equipment for smart watch straps with high drilling efficiency.

(2)技术方案(2) Technical solution

为了解决上述技术问题,本发明提供了这样一种智能手表表带高效钻孔设备,包括有伺服电机、第一锥齿轮、平皮带、第一轴承座、第一转轴、大皮带轮、第二钻孔具、固定装置、第二操作台、第二齿轮、第二齿条、第二滑轨、第二滑块、第一齿轮、第一齿条、第一滑块、第一滑轨、钻孔架、第二轴承座、第二转轴、第二锥齿轮、第三锥齿轮、第一操作台、第一钻孔具、第三转轴、小皮带轮、第四锥齿轮、第四转轴、第五锥齿轮、第三轴承座、第六锥齿轮、第五转轴,支杆和第四轴承座,钻孔架内顶部通过螺栓连接的方式连接有伺服电机和第一轴承座,并且伺服电机设于第一轴承座的左方,伺服电机下方设有第三转轴,伺服电机的输出轴通过联轴器与第三转轴相连接,第三转轴上通过平键连接的方式连接有第一锥齿轮和小皮带轮,并且第一锥齿轮设于小皮带轮的上方,第三转轴底端焊接连接有第一钻孔具,第一轴承座上安装有第一转轴,第一转轴上通过平键连接的方式连接有大皮带轮,大皮带轮与小皮带轮之间绕有平皮带,第一转轴底端焊接连接有第二钻孔具,钻孔架左内壁上方通过螺栓连接的方式连接有第三轴承座,第三轴承座上安装有第四转轴,第四转轴上通过平键连接的方式连接有第四锥齿轮和第五锥齿轮,并且第四锥齿轮设于第五锥齿轮的右方,第四锥齿轮与第一锥齿轮啮合,钻孔架内底部通过螺栓连接的方式连接有第二轴承座、支杆、第一滑轨和第二滑轨,第二轴承座上安装有第五转轴,第五转轴上通过平键连接的方式连接有第三锥齿轮和第六锥齿轮,并且第三锥齿轮设于第六锥齿轮的下方,第六锥齿轮和第五锥齿轮啮合,支杆顶端通过螺栓连接的方式连接有第四轴承座,第四轴承座上安装有第二转轴,第二转轴上通过平键连接的方式从左至右依次连接有第二锥齿轮、第一齿轮和第二齿轮,第一滑轨前侧滑动式设置有第一滑块,第一滑块前侧焊接连接有第一齿条,第一齿条设于第一齿轮的后方,第一齿条与第一齿轮啮合,第二滑轨前侧滑动式设置有第二滑块,第二滑块前侧焊接连接有第二齿条,第二齿条设于第二齿轮的后方,第二齿条与第二齿轮啮合,第一齿条顶端焊接连接有第一操作台,第二齿条顶端焊接连接有第二操作台,第一操作台和第二操作台顶部左右两侧对称式设有固定装置,固定装置包括有上磁铁、上卡板、下磁铁、弹性件和下卡板,第一操作台和第二操作台顶部左右两侧对称式焊接连接有下卡板,下卡板顶部前后两侧对称式焊接连接有弹性件,弹性件顶部焊接连接有上卡板,上卡板内底部前后两侧对称式嵌有上磁铁,下卡板内顶部前后两侧对称式嵌有下磁铁,并且下磁铁位于上磁铁的正下方。In order to solve the above technical problems, the present invention provides such an efficient drilling equipment for smart watch straps, which includes a servo motor, a first bevel gear, a flat belt, a first bearing seat, a first rotating shaft, a large pulley, a second drill Hole tool, fixture, second console, second gear, second rack, second slide rail, second slider, first gear, first rack, first slider, first slide rail, drill Hole frame, second bearing seat, second rotating shaft, second bevel gear, third bevel gear, first operating platform, first drilling tool, third rotating shaft, small pulley, fourth bevel gear, fourth rotating shaft, the first The five-bevel gear, the third bearing seat, the sixth bevel gear, the fifth rotating shaft, the strut and the fourth bearing seat, the servo motor and the first bearing seat are connected to the top of the drilling frame by bolts, and the servo motor is set On the left side of the first bearing seat, there is a third rotating shaft under the servo motor. The output shaft of the servo motor is connected to the third rotating shaft through a coupling, and the first bevel gear is connected to the third rotating shaft through a flat key connection. and the small pulley, and the first bevel gear is arranged above the small pulley, the bottom end of the third rotating shaft is welded and connected with the first drilling tool, the first bearing seat is equipped with the first rotating shaft, and the first rotating shaft is connected by a flat key There is a large pulley connected by way, a flat belt is wound between the large pulley and the small pulley, the second drilling tool is welded and connected to the bottom of the first rotating shaft, and the third bearing seat is connected to the top of the left inner wall of the drilling frame by means of bolt connection. The fourth shaft is installed on the third bearing seat, and the fourth shaft is connected with the fourth bevel gear and the fifth bevel gear through a flat key connection mode, and the fourth bevel gear is arranged on the right side of the fifth bevel gear, and the fourth bevel gear is arranged on the right side of the fifth bevel gear. The bevel gear meshes with the first bevel gear, and the inner bottom of the drilling frame is connected with the second bearing seat, the support rod, the first slide rail and the second slide rail through bolt connection, and the fifth rotating shaft is installed on the second bearing seat. The fifth shaft is connected with the third bevel gear and the sixth bevel gear by means of a flat key connection, and the third bevel gear is arranged below the sixth bevel gear, the sixth bevel gear and the fifth bevel gear mesh, and the top of the pole The fourth bearing seat is connected by bolt connection, and the second rotating shaft is installed on the fourth bearing seat, and the second rotating shaft is connected with the second bevel gear, the first gear and the second rotating shaft in sequence from left to right through a flat key connection. Two gears, the front side of the first slide rail is slidably provided with a first slider, the front side of the first slider is welded and connected with a first rack, the first rack is arranged behind the first gear, the first rack is connected to the first rack A gear is meshed, the second slide rail is slidingly provided with a second slider, the front side of the second slider is welded and connected with a second rack, and the second rack is arranged behind the second gear, and the second rack is connected to the second gear. The second gear meshes, the top of the first rack is welded to the first console, the top of the second rack is welded to the second console, and the left and right sides of the top of the first console and the second console are symmetrically equipped with fixing devices , the fixing device includes an upper magnet, an upper clamping plate, a lower magnet, an elastic member and a lower clamping plate, the top of the first operating table and the top of the second operating table are symmetrically welded and connected with a lower clamping plate on the left and right sides. The side symmetrical welding connection has elastic parts, the top of the elastic parts is welded and connected with the upper clamping plate, and the inner bottom of the upper clamping plate is symmetrical on both sides. The upper magnet is embedded in the formula, and the lower magnet is embedded symmetrically in the front and rear sides of the top of the lower card plate, and the lower magnet is located directly below the upper magnet.

优选地,还包括有拉手,上卡板顶部通过榫接连接的方式连接有拉手,拉手的形状为弧形,拉手的材质为塑料。Preferably, a handle is also included, the handle is connected to the top of the upper clamping plate by a mortise joint, the shape of the handle is arc-shaped, and the material of the handle is plastic.

优选地,还包括有橡胶垫,上卡板内底部和下卡板内顶部均嵌有橡胶垫,并且橡胶垫设于上卡板和下卡板的中部,橡胶垫的材质为天然橡胶。Preferably, rubber pads are also included, rubber pads are embedded in the inner bottom of the upper cardboard and the inner top of the lower cardboard, and the rubber pads are arranged in the middle of the upper cardboard and the lower cardboard, and the material of the rubber pads is natural rubber.

优选地,弹性件为弹簧。Preferably, the elastic member is a spring.

优选地,钻孔架的材质为不锈钢。Preferably, the drilling frame is made of stainless steel.

工作原理:当需要对智能手表的表带进行钻孔操作时,首先将智能手表放置在第一操作台和第二操作台上,并使表带待钻孔处置于第一钻孔具和第二钻孔具的正下方,然后工作人员手动向下按压上卡板,当上卡板与下卡板接近时,上磁铁和下磁铁相吸,从而将表带非钻孔处固定住,便于后续的钻孔处理。然后启动伺服电机交替正反转动,带动第一钻孔具和第二钻孔具转动,带动第一齿条和第二齿条上下运动,从而带动智能手表上下移动,使第一钻孔具和第二钻孔具充分地对智能手表钻孔操作。当智能手表钻孔完毕时,关闭伺服电机,工作人员手动向上拉开上卡板,便可以将钻孔完毕的智能手表取下。Working principle: When it is necessary to drill the strap of the smart watch, the smart watch is first placed on the first operating table and the second operating table, and the watch strap is placed on the first drilling tool and the second operating table to be drilled. Directly below the second drilling tool, and then the staff manually press down the upper clamping plate, when the upper clamping plate and the lower clamping plate are close, the upper magnet and the lower magnet will attract each other, so as to fix the non-drilled part of the strap, which is convenient Subsequent drilling process. Then start the servo motor to rotate forward and reverse alternately, drive the first drilling tool and the second drilling tool to rotate, and drive the first rack and the second rack to move up and down, thereby driving the smart watch to move up and down, so that the first drilling tool and the second drilling tool move up and down. The second drilling tool is fully operational for drilling the smart watch. When the drilling of the smart watch is completed, the servo motor is turned off, and the staff manually pulls the upper clamping plate upwards, so that the smart watch that has been drilled can be taken off.

因为还包括有拉手,上卡板顶部通过榫接连接的方式连接有拉手,拉手的形状为弧形,拉手的材质为塑料,所以可以便于工作人员手动向上拉开上卡板,省时省力。Because it also includes a handle, the top of the upper pallet is connected with a handle through a mortise joint. The shape of the handle is arc-shaped, and the material of the handle is plastic, so it is convenient for the staff to manually pull the upper pallet upward, saving time and effort.

因为还包括有橡胶垫,上卡板内底部和下卡板内顶部均嵌有橡胶垫,并且橡胶垫设于上卡板和下卡板的中部,橡胶垫的材质为天然橡胶,所以可以避免智能手表被压坏。Because it also includes a rubber pad, the inner bottom of the upper card board and the inner top of the lower card board are embedded with rubber pads, and the rubber pad is located in the middle of the upper card board and the lower card board. The material of the rubber pad is natural rubber, so it can avoid The smart watch is crushed.

(3)有益效果(3) Beneficial effect

本发明达到了结构简单、操作简便和钻孔效率高的效果,并且考虑诸多因素,很好地保护了智能手表,提高了装置的可靠性。The invention achieves the effects of simple structure, convenient operation and high drilling efficiency, and considers many factors, well protects the smart watch and improves the reliability of the device.

附图说明Description of drawings

图1为本发明的主视结构示意图。Fig. 1 is a schematic diagram of the front view structure of the present invention.

图2为本发明固定装置的第一种左视结构示意图。Fig. 2 is a schematic diagram of the structure of the first type of the fixing device according to the present invention in left view.

图3为本发明固定装置的第二种左视结构示意图。Fig. 3 is a schematic view of the structure of the second type of left view of the fixing device of the present invention.

图4为本发明固定装置的第三种左视结构示意图。Fig. 4 is a schematic diagram of the structure of the third left view of the fixing device of the present invention.

附图中的标记为:1-伺服电机,2-第一锥齿轮,3-平皮带,4-第一轴承座,5-第一转轴,6-大皮带轮,7-第二钻孔具,8-固定装置,801-上磁铁,802-上卡板,803-下磁铁,804-弹性件,805-下卡板,806-拉手,807-橡胶垫,9-第二操作台,10-第二齿轮,11-第二齿条,12-第二滑轨,13-第二滑块,14-第一齿轮,15-第一齿条,16-第一滑块,17-第一滑轨,18-钻孔架,19-第二轴承座,20-第二转轴,21-第二锥齿轮,22-第三锥齿轮,23-第一操作台,24-第一钻孔具,25-第三转轴,26-小皮带轮,27-第四锥齿轮,28-第四转轴,29-第五锥齿轮,30-第三轴承座,31-第六锥齿轮,32-第五转轴,33-支杆,34-第四轴承座。The marks in the accompanying drawings are: 1-servo motor, 2-the first bevel gear, 3-flat belt, 4-the first bearing seat, 5-the first rotating shaft, 6-large belt pulley, 7-the second drilling tool, 8-fixing device, 801-upper magnet, 802-upper plate, 803-lower magnet, 804-elastic piece, 805-lower plate, 806-handle, 807-rubber pad, 9-second console, 10- The second gear, 11-the second rack, 12-the second slide rail, 13-the second slider, 14-the first gear, 15-the first rack, 16-the first slider, 17-the first slider Rail, 18-drilling frame, 19-second bearing seat, 20-second rotating shaft, 21-second bevel gear, 22-third bevel gear, 23-first operating table, 24-first drilling tool, 25-the third rotating shaft, 26-small pulley, 27-the fourth bevel gear, 28-the fourth rotating shaft, 29-the fifth bevel gear, 30-the third bearing seat, 31-the sixth bevel gear, 32-the fifth rotating shaft , 33-pillar, 34-the fourth bearing seat.

具体实施方式detailed description

下面结合附图和实施例对本发明作进一步的说明。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

实施例1Example 1

一种智能手表表带高效钻孔设备,如图1-4所示,包括有伺服电机1、第一锥齿轮2、平皮带3、第一轴承座4、第一转轴5、大皮带轮6、第二钻孔具7、固定装置8、第二操作台9、第二齿轮10、第二齿条11、第二滑轨12、第二滑块13、第一齿轮14、第一齿条15、第一滑块16、第一滑轨17、钻孔架18、第二轴承座19、第二转轴20、第二锥齿轮21、第三锥齿轮22、第一操作台23、第一钻孔具24、第三转轴25、小皮带轮26、第四锥齿轮27、第四转轴28、第五锥齿轮29、第三轴承座30、第六锥齿轮31、第五转轴32,支杆33和第四轴承座34,钻孔架18内顶部通过螺栓连接的方式连接有伺服电机1和第一轴承座4,并且伺服电机1设于第一轴承座4的左方,伺服电机1下方设有第三转轴25,伺服电机1的输出轴通过联轴器与第三转轴25相连接,第三转轴25上通过平键连接的方式连接有第一锥齿轮2和小皮带轮26,并且第一锥齿轮2设于小皮带轮26的上方,第三转轴25底端焊接连接有第一钻孔具24,第一轴承座4上安装有第一转轴5,第一转轴5上通过平键连接的方式连接有大皮带轮6,大皮带轮6与小皮带轮26之间绕有平皮带3,第一转轴5底端焊接连接有第二钻孔具7,钻孔架18左内壁上方通过螺栓连接的方式连接有第三轴承座30,第三轴承座30上安装有第四转轴28,第四转轴28上通过平键连接的方式连接有第四锥齿轮27和第五锥齿轮29,并且第四锥齿轮27设于第五锥齿轮29的右方,第四锥齿轮27与第一锥齿轮2啮合,钻孔架18内底部通过螺栓连接的方式连接有第二轴承座19、支杆33、第一滑轨17和第二滑轨12,第二轴承座19上安装有第五转轴32,第五转轴32上通过平键连接的方式连接有第三锥齿轮22和第六锥齿轮31,并且第三锥齿轮22设于第六锥齿轮31的下方,第六锥齿轮31和第五锥齿轮29啮合,支杆33顶端通过螺栓连接的方式连接有第四轴承座34,第四轴承座34上安装有第二转轴20,第二转轴20上通过平键连接的方式从左至右依次连接有第二锥齿轮21、第一齿轮14和第二齿轮10,第一滑轨17前侧滑动式设置有第一滑块16,第一滑块16前侧焊接连接有第一齿条15,第一齿条15设于第一齿轮14的后方,第一齿条15与第一齿轮14啮合,第二滑轨12前侧滑动式设置有第二滑块13,第二滑块13前侧焊接连接有第二齿条11,第二齿条11设于第二齿轮10的后方,第二齿条11与第二齿轮10啮合,第一齿条15顶端焊接连接有第一操作台23,第二齿条11顶端焊接连接有第二操作台9,第一操作台23和第二操作台9顶部左右两侧对称式设有固定装置8,固定装置8包括有上磁铁801、上卡板802、下磁铁803、弹性件804和下卡板805,第一操作台23和第二操作台9顶部左右两侧对称式焊接连接有下卡板805,下卡板805顶部前后两侧对称式焊接连接有弹性件804,弹性件804顶部焊接连接有上卡板802,上卡板802内底部前后两侧对称式嵌有上磁铁801,下卡板805内顶部前后两侧对称式嵌有下磁铁803,并且下磁铁803位于上磁铁801的正下方。A high-efficiency drilling equipment for smart watch straps, as shown in Figure 1-4, includes a servo motor 1, a first bevel gear 2, a flat belt 3, a first bearing seat 4, a first rotating shaft 5, a large pulley 6, The second drilling tool 7, the fixing device 8, the second console 9, the second gear 10, the second rack 11, the second slide rail 12, the second slider 13, the first gear 14, the first rack 15 , the first slider 16, the first slide rail 17, the drilling frame 18, the second bearing seat 19, the second rotating shaft 20, the second bevel gear 21, the third bevel gear 22, the first console 23, the first drill Hole 24, third rotating shaft 25, small pulley 26, fourth bevel gear 27, fourth rotating shaft 28, fifth bevel gear 29, third bearing seat 30, sixth bevel gear 31, fifth rotating shaft 32, pole 33 With the fourth bearing seat 34, the top of the drilling frame 18 is connected with the servo motor 1 and the first bearing seat 4 by means of bolt connection, and the servo motor 1 is arranged on the left side of the first bearing seat 4, and the servo motor 1 is arranged below There is a third rotating shaft 25, the output shaft of the servo motor 1 is connected with the third rotating shaft 25 through a coupling, the third rotating shaft 25 is connected with the first bevel gear 2 and the small pulley 26 by means of a flat key connection, and the first The bevel gear 2 is located above the small pulley 26, the third rotating shaft 25 bottom end is welded with the first drilling tool 24, the first bearing seat 4 is equipped with the first rotating shaft 5, and the first rotating shaft 5 is connected by a flat key. There is a large belt pulley 6 connected in the same way, a flat belt 3 is wound between the large belt pulley 6 and the small belt pulley 26, the second drilling tool 7 is welded to the bottom of the first rotating shaft 5, and the top of the left inner wall of the drilling frame 18 is connected by bolts A third bearing seat 30 is connected, and a fourth rotating shaft 28 is installed on the third bearing seat 30. The fourth rotating shaft 28 is connected with the fourth bevel gear 27 and the fifth bevel gear 29 through a flat key connection, and the fourth bevel gear Gear 27 is arranged on the right side of the fifth bevel gear 29, the fourth bevel gear 27 meshes with the first bevel gear 2, and the inner bottom of the drilling frame 18 is connected with the second bearing seat 19, the pole 33, the second bevel gear by means of bolt connection. One slide rail 17 and the second slide rail 12, the fifth rotating shaft 32 is installed on the second bearing seat 19, the third bevel gear 22 and the sixth bevel gear 31 are connected on the fifth rotating shaft 32 by means of a flat key connection, and The third bevel gear 22 is arranged under the sixth bevel gear 31, the sixth bevel gear 31 meshes with the fifth bevel gear 29, and the top of the pole 33 is connected with the fourth bearing seat 34 by means of bolt connection, and the fourth bearing seat 34 The second rotating shaft 20 is installed on the top, and the second rotating shaft 20 is connected with the second bevel gear 21, the first gear 14 and the second gear 10 in sequence from left to right through a flat key connection, and the front side of the first slide rail 17 slides The first slider 16 is arranged in the formula, and the first rack 15 is welded on the front side of the first slider 16. The first rack 15 is arranged behind the first gear 14, and the first rack 15 meshes with the first gear 14. The front side of the second slide rail 12 is slidably provided with a second slider 13, the front side of the second slider 13 is welded and connected with a second rack 11, and the second rack 11 is arranged behind the second gear 10. Two racks 11 mesh with the second gear 10, the top of the first rack 15 is welded with the first console 23, the top of the second rack 11 is welded with the second console 9, the first console 23 and the second console The left and right sides of the top of the table 9 are symmetrically equipped with a fixing device 8. The fixing device 8 includes an upper magnet 801, an upper clamping plate 802, a lower magnet 803, an elastic member 804 and a lower clamping plate 805, the first operating platform 23 and the second operating There is a lower clamping plate 805 connected by symmetrical welding on the left and right sides of the top of platform 9, and an elastic member 804 is connected by symmetrical welding on the front and rear sides of the top of the lower clamping plate 805. The upper magnet 801 is symmetrically embedded on the front and rear sides of the bottom, and the lower magnet 803 is embedded symmetrically on the front and rear sides of the top of the lower clamping plate 805, and the lower magnet 803 is located directly below the upper magnet 801.

还包括有拉手806,上卡板802顶部通过榫接连接的方式连接有拉手806,拉手806的形状为弧形,拉手806的材质为塑料。It also includes a handle 806, the top of the upper clamping plate 802 is connected with the handle 806 by tenon joint, the shape of the handle 806 is arc, and the material of the handle 806 is plastic.

还包括有橡胶垫807,上卡板802内底部和下卡板805内顶部均嵌有橡胶垫807,并且橡胶垫807设于上卡板802和下卡板805的中部,橡胶垫807的材质为天然橡胶。Also include rubber pad 807, rubber pad 807 is embedded in the bottom of upper clamp 802 and the inner top of lower clamp 805, and rubber pad 807 is located at the middle part of upper clamp 802 and lower clamp 805, the material of rubber pad 807 For natural rubber.

弹性件804为弹簧。The elastic member 804 is a spring.

钻孔架18的材质为不锈钢。The material of drilling frame 18 is stainless steel.

工作原理:当需要对智能手表的表带进行钻孔操作时,首先将智能手表放置在第一操作台23和第二操作台9上,并使表带待钻孔处置于第一钻孔具24和第二钻孔具7的正下方,然后工作人员手动向下按压上卡板802,当上卡板802与下卡板805接近时,上磁铁801和下磁铁803相吸,从而将表带非钻孔处固定住,便于后续的钻孔处理。然后启动伺服电机1交替正反转动,带动第一钻孔具24和第二钻孔具7转动,带动第一齿条15和第二齿条11上下运动,从而带动智能手表上下移动,使第一钻孔具24和第二钻孔具7充分地对智能手表钻孔操作。当智能手表钻孔完毕时,关闭伺服电机1,工作人员手动向上拉开上卡板802,便可以将钻孔完毕的智能手表取下。Working principle: When drilling the strap of the smart watch, first place the smart watch on the first console 23 and the second console 9, and place the strap to be drilled on the first drilling tool. 24 and the second drilling tool 7, then the staff manually presses down the upper clamping plate 802, when the upper clamping plate 802 and the lower clamping plate 805 are close, the upper magnet 801 and the lower magnet 803 will attract each other, thereby the table It is fixed at the non-drilled part, which is convenient for subsequent drilling. Then start the servo motor 1 to rotate forward and reverse alternately, drive the first drilling tool 24 and the second drilling tool 7 to rotate, drive the first rack 15 and the second rack 11 to move up and down, thereby driving the smart watch to move up and down, so that the first rack 15 and the second rack 11 move up and down. A drilling tool 24 and a second drilling tool 7 are sufficient for the smart watch drilling operation. When the drilling of the smart watch is completed, the servo motor 1 is turned off, and the staff manually pulls the upper clamping plate 802 upwards, so that the smart watch that has been drilled can be taken off.

因为还包括有拉手806,上卡板802顶部通过榫接连接的方式连接有拉手806,拉手806的形状为弧形,拉手806的材质为塑料,所以可以便于工作人员手动向上拉开上卡板802,省时省力。Because it also includes a handle 806, the top of the upper clamping plate 802 is connected with a handle 806 through tenon joint connection, the shape of the handle 806 is arc-shaped, and the material of the handle 806 is plastic, so it is convenient for the staff to manually pull the upper clamping plate upwards 802, saving time and effort.

因为还包括有橡胶垫807,上卡板802内底部和下卡板805内顶部均嵌有橡胶垫807,并且橡胶垫807设于上卡板802和下卡板805的中部,橡胶垫807的材质为天然橡胶,所以可以避免智能手表被压坏。Because rubber pad 807 is also included, rubber pad 807 is embedded in the bottom of upper clamp 802 and the inner top of lower clamp 805, and rubber pad 807 is located at the middle part of upper clamp 802 and lower clamp 805, the rubber pad 807 The material is natural rubber, so it can prevent the smart watch from being crushed.

以上所述实施例仅表达了本发明的优选实施方式,其描述较为具体和详细,但并不能因此而理解为对本发明专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形、改进及替代,这些都属于本发明的保护范围。因此,本发明专利的保护范围应以所附权利要求为准。The above-mentioned embodiments only express the preferred implementation of the present invention, and the description thereof is relatively specific and detailed, but should not be construed as limiting the patent scope of the present invention. It should be noted that those skilled in the art can make several modifications, improvements and substitutions without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent for the present invention should be based on the appended claims.

Claims (5)

1.一种智能手表表带高效钻孔设备,其特征在于,包括有伺服电机(1)、第一锥齿轮(2)、平皮带(3)、第一轴承座(4)、第一转轴(5)、大皮带轮(6)、第二钻孔具(7)、固定装置(8)、第二操作台(9)、第二齿轮(10)、第二齿条(11)、第二滑轨(12)、第二滑块(13)、第一齿轮(14)、第一齿条(15)、第一滑块(16)、第一滑轨(17)、钻孔架(18)、第二轴承座(19)、第二转轴(20)、第二锥齿轮(21)、第三锥齿轮(22)、第一操作台(23)、第一钻孔具(24)、第三转轴(25)、小皮带轮(26)、第四锥齿轮(27)、第四转轴(28)、第五锥齿轮(29)、第三轴承座(30)、第六锥齿轮(31)、第五转轴(32),支杆(33)和第四轴承座(34),钻孔架(18)内顶部通过螺栓连接的方式连接有伺服电机(1)和第一轴承座(4),并且伺服电机(1)设于第一轴承座(4)的左方,伺服电机(1)下方设有第三转轴(25),伺服电机(1)的输出轴通过联轴器与第三转轴(25)相连接,第三转轴(25)上通过平键连接的方式连接有第一锥齿轮(2)和小皮带轮(26),并且第一锥齿轮(2)设于小皮带轮(26)的上方,第三转轴(25)底端焊接连接有第一钻孔具(24),第一轴承座(4)上安装有第一转轴(5),第一转轴(5)上通过平键连接的方式连接有大皮带轮(6),大皮带轮(6)与小皮带轮(26)之间绕有平皮带(3),第一转轴(5)底端焊接连接有第二钻孔具(7),钻孔架(18)左内壁上方通过螺栓连接的方式连接有第三轴承座(30),第三轴承座(30)上安装有第四转轴(28),第四转轴(28)上通过平键连接的方式连接有第四锥齿轮(27)和第五锥齿轮(29),并且第四锥齿轮(27)设于第五锥齿轮(29)的右方,第四锥齿轮(27)与第一锥齿轮(2)啮合,钻孔架(18)内底部通过螺栓连接的方式连接有第二轴承座(19)、支杆(33)、第一滑轨(17)和第二滑轨(12),第二轴承座(19)上安装有第五转轴(32),第五转轴(32)上通过平键连接的方式连接有第三锥齿轮(22)和第六锥齿轮(31),并且第三锥齿轮(22)设于第六锥齿轮(31)的下方,第六锥齿轮(31)和第五锥齿轮(29)啮合,支杆(33)顶端通过螺栓连接的方式连接有第四轴承座(34),第四轴承座(34)上安装有第二转轴(20),第二转轴(20)上通过平键连接的方式从左至右依次连接有第二锥齿轮(21)、第一齿轮(14)和第二齿轮(10),第一滑轨(17)前侧滑动式设置有第一滑块(16),第一滑块(16)前侧焊接连接有第一齿条(15),第一齿条(15)设于第一齿轮(14)的后方,第一齿条(15)与第一齿轮(14)啮合,第二滑轨(12)前侧滑动式设置有第二滑块(13),第二滑块(13)前侧焊接连接有第二齿条(11),第二齿条(11)设于第二齿轮(10)的后方,第二齿条(11)与第二齿轮(10)啮合,第一齿条(15)顶端焊接连接有第一操作台(23),第二齿条(11)顶端焊接连接有第二操作台(9),第一操作台(23)和第二操作台(9)顶部左右两侧对称式设有固定装置(8),固定装置(8)包括有上磁铁(801)、上卡板(802)、下磁铁(803)、弹性件(804)和下卡板(805),第一操作台(23)和第二操作台(9)顶部左右两侧对称式焊接连接有下卡板(805),下卡板(805)顶部前后两侧对称式焊接连接有弹性件(804),弹性件(804)顶部焊接连接有上卡板(802),上卡板(802)内底部前后两侧对称式嵌有上磁铁(801),下卡板(805)内顶部前后两侧对称式嵌有下磁铁(803),并且下磁铁(803)位于上磁铁(801)的正下方。1. A high-efficiency drilling device for smart watch straps, characterized in that it includes a servo motor (1), a first bevel gear (2), a flat belt (3), a first bearing seat (4), and a first rotating shaft (5), large pulley (6), second drilling tool (7), fixture (8), second console (9), second gear (10), second rack (11), second Slide rail (12), second slide block (13), first gear (14), first rack (15), first slide block (16), first slide rail (17), drilling frame (18 ), the second bearing seat (19), the second rotating shaft (20), the second bevel gear (21), the third bevel gear (22), the first console (23), the first drilling tool (24), The 3rd rotating shaft (25), small pulley (26), the 4th bevel gear (27), the 4th rotating shaft (28), the 5th bevel gear (29), the 3rd bearing block (30), the 6th bevel gear (31 ), the fifth rotating shaft (32), the pole (33) and the fourth bearing seat (34), the top of the drilling frame (18) is connected with the servo motor (1) and the first bearing seat (4) by means of bolt connection ), and the servo motor (1) is arranged on the left side of the first bearing housing (4), the third rotating shaft (25) is arranged under the servo motor (1), and the output shaft of the servo motor (1) is connected with the first The three rotating shafts (25) are connected, and the third rotating shaft (25) is connected with the first bevel gear (2) and the small pulley (26) by means of a flat key connection, and the first bevel gear (2) is located on the small pulley ( 26), the bottom end of the third rotating shaft (25) is welded with the first drilling tool (24), the first bearing seat (4) is equipped with the first rotating shaft (5), and the first rotating shaft (5) passes through The mode of flat key connection is connected with big pulley (6), is wound with flat belt (3) between big pulley (6) and little pulley (26), and the first rotating shaft (5) bottom welding is connected with the second drilling tool. (7), the top of the left inner wall of the drilling frame (18) is connected with the third bearing seat (30) by means of bolt connection, and the fourth rotating shaft (28) is installed on the third bearing seat (30), and the fourth rotating shaft (28 ) is connected with the fourth bevel gear (27) and the fifth bevel gear (29) by means of a flat key connection, and the fourth bevel gear (27) is located on the right side of the fifth bevel gear (29), and the fourth bevel gear The gear (27) meshes with the first bevel gear (2), and the inner bottom of the drilling frame (18) is connected with the second bearing seat (19), the pole (33), and the first slide rail (17) by means of bolt connection. With the second slide rail (12), the fifth rotating shaft (32) is installed on the second bearing seat (19), and the third bevel gear (22) and the second Six bevel gears (31), and the third bevel gear (22) is arranged under the sixth bevel gear (31), the sixth bevel gear (31) and the fifth bevel gear (29) mesh, and the top of the pole (33) The fourth bearing seat (34) is connected by the mode of bolt connection, and the second rotating shaft (20) is installed on the fourth bearing seat (34), and the second rotating shaft (2 0) is connected with the second bevel gear (21), the first gear (14) and the second gear (10) in sequence from left to right through a flat key connection, and the first slide rail (17) is set in a sliding manner on the front side The first slide block (16) is arranged, and the front side of the first slide block (16) is welded to be connected with the first tooth bar (15), and the first tooth bar (15) is located at the rear of the first gear (14). The bar (15) meshes with the first gear (14), the second slide rail (12) is provided with a second slide block (13) in a sliding manner on the front side, and the second slide block (13) is welded and connected with a second rack on the front side (11), the second rack (11) is located at the rear of the second gear (10), the second rack (11) meshes with the second gear (10), and the top of the first rack (15) is welded with the second One console (23), the top of the second rack (11) is welded and connected with the second console (9), the left and right sides of the top of the first console (23) and the second console (9) are symmetrically equipped with fixed Device (8), fixing device (8) includes upper magnet (801), upper clamping plate (802), lower magnet (803), elastic member (804) and lower clamping plate (805), the first operating table (23 ) and the left and right sides of the top of the second operating table (9) are connected with a lower clamping plate (805) by symmetrical welding, and the top of the lower clamping plate (805) is connected with an elastic member (804) by symmetrical welding on both sides of the front and rear sides, and the elastic member (804 ) top is welded and connected with an upper clamping plate (802), the inner bottom of the upper clamping plate (802) is symmetrically embedded with upper magnets (801) on the front and rear sides, and the inner top of the lower clamping plate (805) is symmetrically embedded with lower magnets on the front and rear sides (803), and the lower magnet (803) is located directly below the upper magnet (801). 2.根据权利要求1所述的一种智能手表表带高效钻孔设备,其特征在于,还包括有拉手(806),上卡板(802)顶部通过榫接连接的方式连接有拉手(806),拉手(806)的形状为弧形,拉手(806)的材质为塑料。2. A kind of high-efficiency drilling equipment for smart watch straps according to claim 1, characterized in that it also includes a handle (806), and the top of the upper clamp (802) is connected with a handle (806) through a mortise joint connection. ), the shape of the handle (806) is arc-shaped, and the material of the handle (806) is plastic. 3.根据权利要求1所述的一种智能手表表带高效钻孔设备,其特征在于,还包括有橡胶垫(807),上卡板(802)内底部和下卡板(805)内顶部均嵌有橡胶垫(807),并且橡胶垫(807)设于上卡板(802)和下卡板(805)的中部,橡胶垫(807)的材质为天然橡胶。3. A smart watch strap efficient drilling device according to claim 1, characterized in that it also includes a rubber pad (807), the inner bottom of the upper clamp (802) and the inner top of the lower clamp (805) Both are embedded with rubber pads (807), and the rubber pads (807) are arranged in the middle of the upper clamping plate (802) and the lower clamping plate (805), and the material of the rubber pads (807) is natural rubber. 4.根据权利要求1所述的一种智能手表表带高效钻孔设备,其特征在于,弹性件(804)为弹簧。4. A smart watch strap efficient drilling device according to claim 1, characterized in that the elastic member (804) is a spring. 5.根据权利要求1所述的一种智能手表表带高效钻孔设备,其特征在于,钻孔架(18)的材质为不锈钢。5. A kind of high-efficiency drilling equipment for smart watch straps according to claim 1, characterized in that the drilling frame (18) is made of stainless steel.
CN201611115412.5A 2016-12-07 2016-12-07 High-efficient drilling equipment of intelligence wrist-watch watchband Active CN106541166B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611115412.5A CN106541166B (en) 2016-12-07 2016-12-07 High-efficient drilling equipment of intelligence wrist-watch watchband

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611115412.5A CN106541166B (en) 2016-12-07 2016-12-07 High-efficient drilling equipment of intelligence wrist-watch watchband

Publications (2)

Publication Number Publication Date
CN106541166A true CN106541166A (en) 2017-03-29
CN106541166B CN106541166B (en) 2018-05-29

Family

ID=58396238

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611115412.5A Active CN106541166B (en) 2016-12-07 2016-12-07 High-efficient drilling equipment of intelligence wrist-watch watchband

Country Status (1)

Country Link
CN (1) CN106541166B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107186511A (en) * 2017-07-10 2017-09-22 佛山市正略信息科技有限公司 A kind of hinge production and processing perforating device
CN108360317A (en) * 2018-03-20 2018-08-03 陈柯 A kind of railway equipment
CN108500324A (en) * 2018-03-28 2018-09-07 宁波高新区新柯保汽车科技有限公司 Automobile installs plate drilling device
CN108515204A (en) * 2018-03-29 2018-09-11 林鑫 A kind of disk-like accessory automatic position-changing formula drilling device
CN108608029A (en) * 2018-04-28 2018-10-02 重庆市乐珐机电有限责任公司 Drilling tool for gear-shifting rocker arm
CN108746728A (en) * 2018-05-02 2018-11-06 芜湖杰诺科技有限公司 A kind of drilling machine adapting to the processing of multi-angle valve port
CN111036942A (en) * 2020-01-16 2020-04-21 浦江亿岩机械设备有限公司 Machine tool center equipment capable of being freely converted
CN112676938A (en) * 2020-12-10 2021-04-20 机械科学研究总院青岛分院有限公司 Device for punching gear and removing burrs in hole

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5542787A (en) * 1978-09-25 1980-03-26 Citizen Watch Co Ltd Watch case spring rod fitting part hole-boring device
CN2654262Y (en) * 2003-10-14 2004-11-10 闳晖实业股份有限公司 Multi-hole synchronous drilling device
CN2829968Y (en) * 2005-11-04 2006-10-25 陈其宗 Full-automatic drilling stock cutter
CN201098798Y (en) * 2007-11-15 2008-08-13 李康 Full-automatic drilling stock-cutter
CN203471333U (en) * 2013-10-21 2014-03-12 惠州市精一机械设备有限公司 Full-automatic double-end drilling and cutting integrated machine
CN204449383U (en) * 2015-01-14 2015-07-08 张丽琴 A kind of boring end effector
CN105922026A (en) * 2016-07-13 2016-09-07 惠州市精机械设备有限公司 Double-pipe-position mechanism for improving drilling precision and drilling device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5542787A (en) * 1978-09-25 1980-03-26 Citizen Watch Co Ltd Watch case spring rod fitting part hole-boring device
CN2654262Y (en) * 2003-10-14 2004-11-10 闳晖实业股份有限公司 Multi-hole synchronous drilling device
CN2829968Y (en) * 2005-11-04 2006-10-25 陈其宗 Full-automatic drilling stock cutter
CN201098798Y (en) * 2007-11-15 2008-08-13 李康 Full-automatic drilling stock-cutter
CN203471333U (en) * 2013-10-21 2014-03-12 惠州市精一机械设备有限公司 Full-automatic double-end drilling and cutting integrated machine
CN204449383U (en) * 2015-01-14 2015-07-08 张丽琴 A kind of boring end effector
CN105922026A (en) * 2016-07-13 2016-09-07 惠州市精机械设备有限公司 Double-pipe-position mechanism for improving drilling precision and drilling device

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107186511A (en) * 2017-07-10 2017-09-22 佛山市正略信息科技有限公司 A kind of hinge production and processing perforating device
CN107186511B (en) * 2017-07-10 2019-04-26 广东顺事德智能科技有限公司 Perforating device is used in a kind of production and processing of hinge
CN108360317A (en) * 2018-03-20 2018-08-03 陈柯 A kind of railway equipment
CN108500324A (en) * 2018-03-28 2018-09-07 宁波高新区新柯保汽车科技有限公司 Automobile installs plate drilling device
CN108515204A (en) * 2018-03-29 2018-09-11 林鑫 A kind of disk-like accessory automatic position-changing formula drilling device
CN108515204B (en) * 2018-03-29 2019-11-19 浙江亿钛数控机械有限公司 A kind of disk-like accessory automatic position-changing formula drilling device
CN108608029A (en) * 2018-04-28 2018-10-02 重庆市乐珐机电有限责任公司 Drilling tool for gear-shifting rocker arm
CN108746728A (en) * 2018-05-02 2018-11-06 芜湖杰诺科技有限公司 A kind of drilling machine adapting to the processing of multi-angle valve port
CN111036942A (en) * 2020-01-16 2020-04-21 浦江亿岩机械设备有限公司 Machine tool center equipment capable of being freely converted
CN111036942B (en) * 2020-01-16 2021-02-05 杭州盈动达精密机械有限公司 Machine tool center equipment capable of being freely converted
CN112676938A (en) * 2020-12-10 2021-04-20 机械科学研究总院青岛分院有限公司 Device for punching gear and removing burrs in hole

Also Published As

Publication number Publication date
CN106541166B (en) 2018-05-29

Similar Documents

Publication Publication Date Title
CN106541166B (en) High-efficient drilling equipment of intelligence wrist-watch watchband
CN106735421B (en) A kind of accurate drilling device
CN203920070U (en) A kind of Full-automatic stamping device
CN202412379U (en) Milling groove workpiece locating device
CN106493406B (en) A kind of watchband drilling device
CN110567716A (en) A robot reducer test bench
CN106735422B (en) A kind of accurate drilling device of intelligent watch watchstrap
CN206527763U (en) A kind of foamed plastics cutting equipment
SG146686A1 (en) Securely using a display to exchange information
CN205076465U (en) Soft board test fixture
CN221363201U (en) Double-station laser welding equipment for circuit board
CN203269381U (en) Displacement detection device on crane
CN202889793U (en) Soft circuit board clamp tool
CN106423376A (en) Breaking device for workpieces of 3D printer
CN208391631U (en) A kind of Novel inclined-lathe precise numerical control machine
CN213255754U (en) Annular transformer production detection workbench
CN210011094U (en) Double-end plate milling device
CN204449902U (en) Numerical Control Punch all-in-one
CN207997075U (en) A kind of horizontal drive mechanism of laser cutting machine
CN209910948U (en) A high-efficiency COFCG visual inspection equipment
CN209973177U (en) A processing device for easy-to-pull stickers for disposable sterile items
CN208166057U (en) A kind of liquid crystal display grabbing device
CN202421215U (en) Multimeter fixing band
CN206992070U (en) An IC packaging frame feeding and grabbing mechanism
CN2936227Y (en) Positioning fastener for operation table head plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200417

Address after: 523797 xinmalian village, Dalang Town, Dongguan City, Guangdong Province

Patentee after: YINGLISHI WATCH INDUSTRY (DONGGUAN) Co.,Ltd.

Address before: Beijing road 241000 Anhui city of Wuhu province Jiujiang District of Wuhu advertising industry park hotel apartment building 11 room 1102

Patentee before: WUHU KECHUANG PRODUCTIVITY PROMOTION CENTER Co.,Ltd.

TR01 Transfer of patent right