CN106532568A - 一种电力线路施工拉线装置 - Google Patents

一种电力线路施工拉线装置 Download PDF

Info

Publication number
CN106532568A
CN106532568A CN201610979517.9A CN201610979517A CN106532568A CN 106532568 A CN106532568 A CN 106532568A CN 201610979517 A CN201610979517 A CN 201610979517A CN 106532568 A CN106532568 A CN 106532568A
Authority
CN
China
Prior art keywords
transmission
roller
box
power line
line construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610979517.9A
Other languages
English (en)
Other versions
CN106532568B (zh
Inventor
王伟年
张兵
宗绍伟
纪振军
赵光
王宗炜
史殿江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suqian Zhongjiang Construction Engineering Co ltd
Original Assignee
Longkou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longkou Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Longkou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN201610979517.9A priority Critical patent/CN106532568B/zh
Publication of CN106532568A publication Critical patent/CN106532568A/zh
Application granted granted Critical
Publication of CN106532568B publication Critical patent/CN106532568B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • H02G1/04Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables for mounting or stretching

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本发明公开了一种电力线路施工拉线装置,包括推车、把手、手持控制盒、主传动箱、气动导轨、上传动轮、下传动轮、传动电机、气动箱、限位支架、传动箱、第一滚轮、控制器、蓄电池、太阳能板、第二滚轮、第三滚轮、固定支架、第四滚轮、滚柱、支撑架以及电缆滚筒。本发明拉线装置采用传动箱和多级滚轮共同工作来实现电力线的稳定拉线过程,并且传动箱设有主副两个,副传动箱可在需要的拉送动力较大时启动,能够有效的保证输送稳定性;传动装置可通过推车移送至指定的拉送区域,减少工人的劳动强度;配置有手持端控制器,工作人员可通过手持控制盒对拉线装置进行远程控制,从而便于工人可根据现场环境需要调节相对应的模式。

Description

一种电力线路施工拉线装置
技术领域
本发明涉及一种拉线装置,具体为一种电力线路施工拉线装置,属于电力设备应用技术领域。
背景技术
随着电网建设的快速发展,电力线的建设过程正在日益增进,由于电力线较为笨重,在送电线路施工中经常会遇到电力线输送比较困难的问题,施工过程中电力线的拉线效率对于施工周期有着很大影响。
传统的拉线装置传动机构较为单一,运输较为麻烦,不能很好的满足于户外作业需求,传动装置与电缆线配合不够紧密,传动效率不足。因此,针对上述问题提出一种电力线路施工拉线装置。
发明内容
本发明的目的就在于为了解决上述问题而提供一种电力线路施工拉线装置。
本发明通过以下技术方案来实现上述目的,一种电力线路施工拉线装置,包括推车、主传动箱、支撑架以及电缆滚筒;所述推车顶部设有把手,且把手侧面设有手持控制盒;所述推车顶部设有主传动箱,且主传动箱内部设有气动导轨;所述气动导轨连接上传动轮和下传动轮;所述主传动箱内部设有传动电机和气动箱;所述主传动箱连接限位支架,且主传动箱一侧设置副传动箱;所述主传动箱连接控制器,且控制器连接蓄电池;所述蓄电池连接太阳能板;所述推车顶部设有第一滚轮,且第一滚轮连接第二滚轮。
优选的,所述第二滚轮连接第三滚轮和第四滚轮,且第三滚轮固定在固定支架内部。
优选的,所述第三滚轮连接滚柱,且滚柱连接电缆滚筒。
优选的,所述电缆滚筒固定在支撑架顶部。
优选的,所述手持控制盒通过导线连接至所述控制器。
优选的,所述传动电机连接所述上传动轮和所述下传动轮。
优选的,所述太阳能板是种可转动的所述太阳能板。
优选的,所述上传动轮和所述下传动轮与所述气动导轨之间滑动连接。
本发明的有益效果是:该种拉线装置采用传动箱和多级滚轮共同工作来实现电力线的稳定拉线过程,并且传动箱设有主副两个,副传动箱可在需要的拉送动力较大时启动,能够有效的保证输送稳定性,提高输送效率;传动装置可通过推车移送至指定的拉送区域,减少工人的劳动强度;配置有手持端控制器,工作人员可通过手持控制盒对拉线装置进行远程控制,从而便于工人可根据现场环境需要调节相对应的模式;可在户外作业时转出太阳能板将太阳能转化为电能,在不使用时转回,使得占用空间更小,满足工人的户外作业需求;设有气动箱和气动导轨,可使得传动轮之间的间隙能够根据不同电缆尺寸进行相应的调整,使得传动轮与电缆的之间配合更为紧密,从而增大输送速度和传动效率。
附图说明
图1为本发明整体结构示意图;
图2为本发明传动箱连接结构示意图;
图3为本发明电缆滚筒结构示意图。
图中:1、推车,101把手,2、手持控制盒,3、主传动箱,301、气动导轨,302、上传动轮,303、下传动轮,304、传动电机,305、气动箱,4、限位支架,5、副传动箱,6、第一滚轮,7、控制器,8、蓄电池,9、太阳能板,10、第二滚轮,11、第三滚轮,12、固定支架,13、第四滚轮,14、滚柱,15、支撑架,16、电缆滚筒。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
请参阅图1-3所示,一种电力线路施工拉线装置,包括推车1、主传动箱3、支撑架15以及电缆滚筒16;所述推车1顶部设有把手101,便于工作人员移送作业设备;所述把手101侧面设有手持控制盒2,工作人员可通过手持控制盒2对拉线装置进行远程控制,从而可根据现场环境需要调节相对应的模式;所述推车1顶部设有主传动箱3,电缆可在主传动箱3在传动下进行推送;所述主传动箱3内部设有气动导轨301;所述气动导轨301连接上传动轮302和下传动轮303,电缆固定在上传动轮302和下传动轮303之间,在传动轮的带动下进行移动;所述主传动箱3内部设有传动电机304和气动箱305,气动箱305可对气动导轨301进行控制;所述主传动箱3连接限位支架4;所述主传动箱3一侧设置副传动箱5,副传动箱5可在需要的拉送动力较大时启动,能够有效的保证输送稳定性,提高输送效率;所述主传动箱3连接控制器7;所述控制器7连接蓄电池8;所述蓄电池8连接太阳能板9,太阳能板9可为蓄电池8提供电能;所述推车1顶部设有第一滚轮6;所述第一滚轮6连接第二滚轮10。
作为本发明的一种技术优化方案,所述第二滚轮10连接第三滚轮11和第四滚轮13,且所述第三滚轮11固定在固定支架12内部,提高了整体传动的稳定性。
作为本发明的一种技术优化方案,所述第三滚轮11连接滚柱14,且所述滚柱14连接电缆滚筒16,结构简单、紧凑。
作为本发明的一种技术优化方案,所述电缆滚筒16固定在支撑架15顶部,稳定性好,传送效率高。
作为本发明的一种技术优化方案,所述手持控制盒2通过导线连接至所述控制器7,便于工作人员对设备进行操控。
作为本发明的一种技术优化方案,所述传动电机304连接所述上传动轮302和所述下传动轮303,实现电缆的输送过程。
作为本发明的一种技术优化方案,所述太阳能板9是种可转动的所述太阳能板9,可在户外作业时转出太阳能板9将太阳能转化为电能,在不使用时转回,使得占用空间更小,满足工人的户外作业需求。
作为本发明的一种技术优化方案,所述上传动轮302和所述下传动轮303与所述气动导轨301之间滑动连接,使得传动轮之间的间隙可根据不同电缆尺寸进行相应的调整,使得传动轮与电缆的之间配合更为紧密,从而增大输送速度和传动效率。
实施例一:
本发明在使用时,将推车1推至指定的拉送区域并外接电源,然后将电缆滚筒16上的电缆穿过滚柱14,、第三滚轮11、第二滚轮10、第四滚轮13最后从第一滚轮6拉出,再穿过副传动箱5、主传动箱3便可完成电缆的安装固定,此时主传动箱3工作,副传动箱5不工作,使得上传动轮302和下传动轮303与电缆之间能够紧密配合,且配合间隙不变,随后启动传动电机304,使得上传动轮302和下传动轮303转动继而推送电缆前进。
适用于拉送动力较大并且电缆直径不变的情况下,副传动箱可在需要的拉送动力较大时启动,能够有效的保证输送稳定性,提高输送效率。
实施例二:
本发明在使用时,将推车1推至指定的拉送区域,然后将电缆滚筒16上的电缆穿过滚柱14,、第三滚轮11、第二滚轮10、第四滚轮13最后从第一滚轮6拉出,再穿过主传动箱3便可完成电缆的安装固定,通过控制器7控制气动箱305和气动导轨301,使得上传动轮302和下传动轮303与电缆之间能够紧密配合,随后启动传动电机304,使得上传动轮302和下传动轮303转动继而推送电缆前进。
适用于拉送动力较小并且电缆直径变化的情况下,极大的提高了该装置使用的灵活性,同时又避免了能源的浪费;使得拉线装置内部紧密配合电缆,传送效率高。
实施例三:在户外作业时,可转出太阳能板9将光能储存至蓄电池8,并且蓄电池8电性连接至手持控制盒2、主传动箱3、传动箱5、控制器7、蓄电池8各部件,为该装置整体工作提供电源。
适用于光照强度较大的地方,并且一些偏远山区在拉线时,是没有外接电源来提供电力的,因此带有的太阳能板极大的提高了该装置的使用范围。
对于本领域技术人员而言,显然本发明不限于上述示范性实施例的细节,而且在不背离本发明的精神或基本特征的情况下,能够以其他的具体形式实现本发明。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本发明的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本发明内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。
此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。

Claims (8)

1.一种电力线路施工拉线装置,包括推车(1)、主传动箱(3)、支撑架(15)以及电缆滚筒(16);其特征在于:所述推车(1)顶部设有把手(101),且把手(101)侧面设有手持控制盒(2);所述推车(1)顶部设有主传动箱(3),且主传动箱(3)内部设有气动导轨(301);所述气动导轨(301)连接上传动轮(302)和下传动轮(303);所述主传动箱(3)内部设有传动电机(304)和气动箱(305);所述主传动箱(3)连接限位支架(4),且主传动箱(3)一侧设置副传动箱(5);所述主传动箱(3)连接控制器(7),且控制器(7)连接蓄电池(8);所述蓄电池(8)连接太阳能板(9);所述推车(1)顶部设有第一滚轮(6),且第一滚轮(6)连接第二滚轮(10)。
2.根据权利要求1所述的一种电力线路施工拉线装置,其特征在于:所述第二滚轮(10)连接第三滚轮(11)和第四滚轮(13),且第三滚轮(11)固定在固定支架(12)内部。
3.根据权利要求2所述的一种电力线路施工拉线装置,其特征在于:所述第三滚轮(11)连接滚柱(14),且滚柱(14)连接电缆滚筒(16)。
4.根据权利要求3所述的一种电力线路施工拉线装置,其特征在于:所述电缆滚筒(16)固定在支撑架(15)顶部。
5.根据权利要求1或2所述的一种电力线路施工拉线装置,其特征在于:所述手持控制盒(2)通过导线连接至所述控制器(7)。
6.根据权利要求1所述的一种电力线路施工拉线装置,其特征在于:所述传动电机(304)连接所述上传动轮(302)和所述下传动轮(303)。
7.根据权利要求1所述的一种电力线路施工拉线装置,其特征在于:所述太阳能板(9)是种可转动的所述太阳能板(9)。
8.根据权利要求1所述的一种电力线路施工拉线装置,其特征在于:所述上传动轮(302)和所述下传动轮(303)与所述气动导轨(301)之间滑动连接。
CN201610979517.9A 2016-11-08 2016-11-08 一种电力线路施工拉线装置 Expired - Fee Related CN106532568B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610979517.9A CN106532568B (zh) 2016-11-08 2016-11-08 一种电力线路施工拉线装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610979517.9A CN106532568B (zh) 2016-11-08 2016-11-08 一种电力线路施工拉线装置

Publications (2)

Publication Number Publication Date
CN106532568A true CN106532568A (zh) 2017-03-22
CN106532568B CN106532568B (zh) 2018-07-03

Family

ID=58350483

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610979517.9A Expired - Fee Related CN106532568B (zh) 2016-11-08 2016-11-08 一种电力线路施工拉线装置

Country Status (1)

Country Link
CN (1) CN106532568B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109592502A (zh) * 2018-11-01 2019-04-09 上海市基础工程集团有限公司 海缆敷埋设张力自动控制装置
CN112061884A (zh) * 2020-09-14 2020-12-11 国网河南省电力公司温县供电公司 一种电力施工用电力线缆放线的滑轮机构

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL8502222A (nl) * 1985-08-10 1987-03-02 Willem Jan Van Oudbroekhuizen Inrichting voor het verplaatsen van leidingen en/of buizen.
JP2001309519A (ja) * 2000-04-25 2001-11-02 Furukawa Electric Co Ltd:The 管路内へのケーブル送込み装置
CN101183774A (zh) * 2006-11-14 2008-05-21 株式会社Kt 从管道拉出线缆的机器
CN201498921U (zh) * 2009-09-17 2010-06-02 刘鹏 一种缆线牵引机
CN204858397U (zh) * 2015-05-22 2015-12-09 嘉兴市恒欣电力建设有限公司 一种无障碍架空线牵引器
CN205442212U (zh) * 2015-12-25 2016-08-10 天津奥林奥克通信科技有限公司 一种用于线缆加工的收线牵引装置
CN105858362A (zh) * 2016-06-08 2016-08-17 常州市禾昌机械有限公司 一种线缆放线装置及其工作方法
CN206211409U (zh) * 2016-11-08 2017-05-31 国网山东省电力公司龙口市供电公司 一种电力线路施工拉线装置

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL8502222A (nl) * 1985-08-10 1987-03-02 Willem Jan Van Oudbroekhuizen Inrichting voor het verplaatsen van leidingen en/of buizen.
JP2001309519A (ja) * 2000-04-25 2001-11-02 Furukawa Electric Co Ltd:The 管路内へのケーブル送込み装置
CN101183774A (zh) * 2006-11-14 2008-05-21 株式会社Kt 从管道拉出线缆的机器
CN201498921U (zh) * 2009-09-17 2010-06-02 刘鹏 一种缆线牵引机
CN204858397U (zh) * 2015-05-22 2015-12-09 嘉兴市恒欣电力建设有限公司 一种无障碍架空线牵引器
CN205442212U (zh) * 2015-12-25 2016-08-10 天津奥林奥克通信科技有限公司 一种用于线缆加工的收线牵引装置
CN105858362A (zh) * 2016-06-08 2016-08-17 常州市禾昌机械有限公司 一种线缆放线装置及其工作方法
CN206211409U (zh) * 2016-11-08 2017-05-31 国网山东省电力公司龙口市供电公司 一种电力线路施工拉线装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109592502A (zh) * 2018-11-01 2019-04-09 上海市基础工程集团有限公司 海缆敷埋设张力自动控制装置
CN112061884A (zh) * 2020-09-14 2020-12-11 国网河南省电力公司温县供电公司 一种电力施工用电力线缆放线的滑轮机构

Also Published As

Publication number Publication date
CN106532568B (zh) 2018-07-03

Similar Documents

Publication Publication Date Title
CN109177790B (zh) 一种新能源充电桩用充电枪放置架
CN202944942U (zh) 一种接地线绕制辅助装置
CN205555753U (zh) 绕线小车
CN100413161C (zh) 一种用于移动系统市电供应的收放电缆卷筒装置
CN106532568B (zh) 一种电力线路施工拉线装置
CN203212111U (zh) 一种新型电缆盘底座
CN206211409U (zh) 一种电力线路施工拉线装置
CN203889772U (zh) 移动式放线车
CN204424690U (zh) 一种适于野外作业的移动供电车
CN204363696U (zh) 一体化太阳能电动开合帘
CN204896985U (zh) 一种车载太阳能收线装置
CN102437543A (zh) 电动液压线缆放线器
CN211077965U (zh) 一种市政施工用的线缆放线装置
CN211266271U (zh) 一种电缆布线装置
CN109230811B (zh) 一种便携式可调节的电力线缆放线装置
CN207483092U (zh) 一种电缆放线装置
CN108190655A (zh) 一种电缆收放装置
CN206615882U (zh) 一种使用方便的电力电缆收放架
CN206585266U (zh) 一种便携型电缆弯角生成器
CN213326062U (zh) 一种电力工程用绕线车
CN206023073U (zh) 通信专用电动放线机
CN212366652U (zh) 一种应用于电缆敷设的牵引装置
CN210795626U (zh) 一种玻璃门窗安装辅助装置
CN203889774U (zh) 一种双线放线装置
CN203722181U (zh) 一种孔内电视专用全自动电缆绞车

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200325

Address after: Room 6a207, Bawang mall, Sucheng District, Suqian City, Jiangsu Province

Patentee after: Jiangsu Shenghong Construction Co.,Ltd.

Address before: 265700 No. 28 Tonghai Road, Yantai, Shandong, Longkou City

Patentee before: Longkou Power Supply Company of State Grid Shandong Electric Power Company

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200701

Address after: 441000 Whole Floor of Building A2, 6, Hongxing International Office Building, Dengcheng Avenue, Xiangyang High-tech Zone, Hubei Province

Patentee after: Hubei Hongchanghong Architectural Decoration Co.,Ltd.

Address before: Room 6a207, Bawang mall, Sucheng District, Suqian City, Jiangsu Province

Patentee before: Jiangsu Shenghong Construction Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201105

Address after: No.06, building C2, Athens City, Zhonggang, Suqian, Jiangsu Province 223800

Patentee after: Jiangsu senhang Construction Co.,Ltd.

Address before: 441000 Whole Floor of Building A2, 6, Hongxing International Office Building, Dengcheng Avenue, Xiangyang High-tech Zone, Hubei Province

Patentee before: Hubei Hongchanghong Architectural Decoration Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201216

Address after: Shop 07, building B06, Zhongda Shanghai City, Suyu District, Suqian City, Jiangsu Province 223800

Patentee after: Suqian Zhongjiang Construction Engineering Co.,Ltd.

Address before: No.06, building C2, Athens City, Zhonggang, Suqian, Jiangsu Province 223800

Patentee before: Jiangsu senhang Construction Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210127

Address after: 223600 doors 03-04, 25B building, Shucheng City Sunshine Community, Shuyang County, Suqian City, Jiangsu Province

Patentee after: Jiangsu Zhengyang Construction Project Management Co.,Ltd.

Address before: Shop 07, building B06, Zhongda Shanghai City, Suyu District, Suqian City, Jiangsu Province 223800

Patentee before: Suqian Zhongjiang Construction Engineering Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20210427

Address after: 223001 No.11 Yan'an west road, qingjiangpu District, Huai'an City, Jiangsu Province

Patentee after: JIANGSU CHUYANG CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: 223600 doors 03-04, 25B building, Shucheng City Sunshine Community, Shuyang County, Suqian City, Jiangsu Province

Patentee before: Jiangsu Zhengyang Construction Project Management Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210804

Address after: 213299 Chang Tang Xin Cun, Jincheng Town, Jintan District, Changzhou City, Jiangsu Province 107

Patentee after: Jiangsu Zeyu Construction Engineering Co.,Ltd.

Address before: 223001 No. 11, Yan'an west road, qingjiangpu District, Huai'an City, Jiangsu Province

Patentee before: JIANGSU CHUYANG CONSTRUCTION ENGINEERING Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220118

Address after: Shop 07, building B06, Zhongda Shanghai City, Suyu District, Suqian City, Jiangsu Province 223800

Patentee after: Suqian Zhongjiang Construction Engineering Co.,Ltd.

Address before: 213299 Chang Tang Xin Cun, Jincheng Town, Jintan District, Changzhou City, Jiangsu Province 107

Patentee before: Jiangsu Zeyu Construction Engineering Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180703