CN106525123A - Electrical fire-fighting safety detection method - Google Patents

Electrical fire-fighting safety detection method Download PDF

Info

Publication number
CN106525123A
CN106525123A CN201610952583.7A CN201610952583A CN106525123A CN 106525123 A CN106525123 A CN 106525123A CN 201610952583 A CN201610952583 A CN 201610952583A CN 106525123 A CN106525123 A CN 106525123A
Authority
CN
China
Prior art keywords
check
cable
investigation
equipment
checks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610952583.7A
Other languages
Chinese (zh)
Inventor
鲁涛
马健
邵光华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN HONGYUAN ELECTRIC Co Ltd
Original Assignee
TIANJIN HONGYUAN ELECTRIC Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN HONGYUAN ELECTRIC Co Ltd filed Critical TIANJIN HONGYUAN ELECTRIC Co Ltd
Priority to CN201610952583.7A priority Critical patent/CN106525123A/en
Publication of CN106525123A publication Critical patent/CN106525123A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • G01D21/02Measuring two or more variables by means not covered by a single other subclass
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses an electrical fire-fighting safety detection method, including the following steps: 1. performing safety detection on a building power distribution unit; and using professional equipment to complete hidden danger identification on power distribution equipment and power distribution lines; 2. according to the order of severity of the hidden dangers, sequentially processing the hidden dangers, and at the same time, referring to national and industrial standards, performing standardization transformation on potential safety hazards that do not meet electrical construction requirements; 3. performing cable equipment load analysis, performing load analysis on an existing power distribution system, solving the problem of overload caused by three-phase imbalance and large zero line current, and calculating and matching lines and equipment capacity again; 4. performing harmonic hidden danger handling; and 5. normalizing a power utilization safety service. By performing power utilization safety check according to the abovementioned method and steps, hidden dangers can be effectively eliminated, power utilization safety can be improved, using requirements of users are satisfied, and popularization and application in industry are facilitated.

Description

A kind of electric fire-control safety detection method
Technical field
The present invention relates to safety technique for using electricity field, more particularly to a kind of electric fire-control safety detection method.
Background technology
The electrified mark as social progress, various electric utilities step into national economy and people's lives more and more Every field.But if electrical equipment use, managing, operating, keeping in repair improper, cause electric energy it is uncontrolled it is unexpected discharge, Disaster can then be brought.Simultaneously it is also because a variety of causes induces substantial amounts of disaster hidden-trouble, its casualties for causing and Economic loss is startling!Counted according to the Fire-Fighting Bureau under the Ministry of Public Security, annual generation fire 33.8 ten thousand altogether in 2015(The whole nation), make altogether Into 2854 people's injures and deaths, wherein 1742 people are dead, and 1112 people are injured, directly contribute 39.5 hundred million yuan of economic loss.Whole year in 2015 has 10.2 ten thousand fire are electrically to install and use regulation initiation due to violation, are due to electric reason compared with having 56.7% in conflagration Cause.
Electric disaster hidden-trouble has certain " disguise " incubation period, and macroscopy is often difficult to find that this just compels to be essential Set up a set of science, accurate, exercisable electric fire-control safety detection method.Electrical safety detects the need as social development Will, show its irreplaceable effect in modern fire work.
The content of the invention
It is an object of the invention to provide a kind of electric fire-control safety detection method, to meet social development to electric fire-control safety The demand of detection.
For realizing the purpose of the present invention, the invention provides a kind of electric fire-control safety detection method, comprises the steps:
Step one:Safety detection is carried out to building power supply unit;Using professional equipment, controller switching equipment and distribution wire is completed The hidden troubles removing on road, specifically includes:
(1)Anti- toy measure investigation, checks whether anti-toy measure implements.
(2)Managing security tools and instruments is investigated, and checks whether scene is in kind complete;Check whether ground connection wire management meets regulation and want Ask, earth point implements positioning;
(3)Field apparatus situation investigate, check primary equipment name, indicate it is correct, complete, clear;It is all to operate Whether secondary device has the name of specification and obvious switching position state;
(4)Equipment deficiency situation is investigated, and checks whether equipment is qualitative correct;Elimination of equipment defect whether superperiod, if closed loop; Whether equipment deficiency carries out periodic analysises;
(5)Chopper ruuning situation is investigated, and checks whether chopper external insulation creep distance meets infield filth standard and want Ask;Check that switch anti-error function is intact;Check that switch control circuit, auxiliary contact are intact, backstage dispaly state is correct;Inspection is opened Each joining seam, position are closed without heating, if periodically carry out infrared thermometry, at important connecting portion, whether post sheetlike temperature indicator;Switch Whether whether room has exhaust apparatus, divulge information good, if dress/oxygen automatic detection alarm device, and normal operation;Check open circuit Device capacity of short circuit, if meet the capacity of short circuit of infield;Hydraulic mechanism chopper, checks whether hydraulic system is normal, is The negative phase is exhausted, and whether hydraulic mechanism energy storage cylinder anchor ear is intact;Vacuum circuit breaker answers emphasis to check whether insulated tension pole is complete It is good;Inspection body connecting shaft, connecting lever part whether corrosion, abrasion condition are answered to the capacitor switch of frequent operation;Check open circuit The mechanism case good seal of device, heater switching are normal;
(6)Disconnecting switch ruuning situation is investigated, and checks that disconnecting switch anti-error function is intact, mechanical latching reliability;Check electricity Dynamic operation plug-in strip, electric blocking are perfect;Check disconnecting switch joining seam, position without heating, if periodically to enter infrared thermometry, check Whether indoor isolator connecting portion posts sheetlike temperature indicator;Isolator operating mechanism case good seal is checked, without water inlet phenomenon;
(7)Capacitor ruuning situation is investigated, and checks whether condenser capacity periodically measures;Check outside capacitor absolutely Edge leakage is than away from meeting the requirements;Check whether capacitor has leakage of oil failure;Check the outer fuse operation 3-5 of outdoor capacitors group Whether exchanged afterwards;Check that capacitor bank protection setting valve is correct, normal operation;Check capacitor bank without heating, if fixed Phase carries out infrared thermometry;
(8)Reactor ruuning situation is investigated, and checks that reactor rated voltage meets actual motion voltage request;Check dry type Whether reactor creep distance meets the insulating requirements of actual filth condition, and not damaged crackle;Check dry-type air-core reactor appearance No cracking phenomenon, creepage phenomenon, the epoxy powdered phenomenon in top layer;Check whether dry reactor interval chopper type selecting is correct, is No employing cut-offs dam little chopper or on-load switch;Oil-immersed electric reactor is checked, whether oiling test is qualified, and appearance whether There is leakage of oil;
(9)Electricity system situation is investigated, and checks whether low-voltage alternating-current cable type selecting meets related regulatory requirements, low-voltage-powered Whether cable selects flame retardant cable, and from single armored cable, armoring material whether nonmagnetic substance exchanges single armouring electric power Whether armature of cable layer takes single-point to be directly grounded;Check whether change low pressure used arranges low tension switch, and be furnished with electronics and take off Buckle device;Check whether the low-voltage-powered cable laying of change used meets countermeasure;The fire prevention of inspection cable duct, isolation, waterproof In place whether, whether fire wall is intact for safety measure;
(10)Straight-flow system situation is investigated, and checks whether configuration, wiring and the method for operation of straight-flow system meet technical bid It is accurate;Check whether DC power system air-break, fuse arrangement and Graded coordination meet requirement;Check outside accumulator See, housing has ne-leakage and deformation exception, whether accumulator capacity meets requirement;Check whether accumulator operation skin temperature is different Often, whether single battery cell voltage and terminal voltage are abnormal;Check that whether high-frequency model working condition is normal in direct current cabinet, fills Whether electric installation and accumulator parameter performance match;Check whether insulation monitoring and warning device working condition is good, direct current branch insulation Whether situation is normal;Check whether direct current cabinet charging voltage, battery charging current and load current are normal;Check DC charging Whether the work of machine alternating current power supply switching device is normal;Check whether straight-flow system lightning protection device is perfect;
(11)Spark gap ruuning situation is investigated, and checks that the selection of the spark gap nominal discharge current installed should meet the requirements; Spark gap on-line computing model normal operation is checked, whether leakage current is exceeded, check the insulation of spark gap equalizing capacitance device assembly Whether enough nargin is had;
(12)Circuit ruuning situation is investigated, and is checked line facility ruuning situation, is carried out Insulation test, leakage testses, electric arc Test, ensures circuit reliability service;
(13)Machine operation is investigated, and checks switchgear ruuning situation, if there is abnormal sound, disrepair phenomenon, and and Shi Jinhang is changed, and ensures that power supply is normal;
(14)Circuit infrared measurement of temperature situation is investigated, and the infrared diagnostics for completing important transmission facility before Peak power use comprehensively is surveyed Temperature work;For old circuit emphasis detection more than heavy-haul line and 20 years of operation;Detection position includes wire connection gold utensil; For heavy-haul line, accurate detection should be carried out to wire connection gold utensil, insulator;Accurate detection should be using the infrared thermal imagery of pixel Instrument or infrared induction temperature measuring device, and meet the detection environmental condition requirement of charging equipment infrared diagnostics;
(15)Cable passage situation is investigated, foundation《Cable passage management regulation》, investigate cable run and subside along circuit surface, Work well, raceway groove, tunnel hydrops, cave in, external force destruction operation hidden danger, eliminate in time conduit line structure safety, percolating water, anti- Fire, ventilation, support and fixture corrosion potential safety hazard.
(16)Cable thermometric, detection case investigation, carry out the infrared survey of heavily loaded cable, critical cables medial head and terminals Temperature, Partial Discharge Detection, to the operation monitoring of should strengthening for noting abnormalities, shorten detection cycle, and organizes expert is carried out further deep Enter analysis, and implement emergency plan and standby redundancy in advance;
(17)Distribution line operation investigation, check circuit periodical inspection whether perform on request, safe distance, intersect across More, whether grounding resistance measurement record is complete, defect management whether closed loop;Check whether operating analysis record is complete, if having Specific aim;The circuit joining seam of inspection heavy-haul line, end, the thermometric record of cable intermediate joint;Whether cable is made regular check on Passage, work well, the hydrops situation of raceway groove;
(18)Switchgear house equipment operation investigation, checks whether waterproof, protection against the tide, fire prevention, anti-toy measure are complete, check day Often make an inspection tour and whether be carried out in accordance with regulations, standing, whether interior primary connection figure is correct, and whether the safety notice in gas apparatus and place In place;
(19)Distribution mark investigation, checks whether equipment name, caution sign are complete;
(20)Thermal imaging detection investigation, because of unlike material, the difference of different conductor length factor, can cause under same current Conductor overheating situation is different, and under different torsion, termination contact resistance is also differed, by checking terminal temperature, Ke Yijian Terminal connection is found whether reliable;
Step 2:According to the hidden danger order of severity, hidden danger is processed successively, meanwhile, with reference to country and industry standard, to not meeting The potential safety hazard that electrical construction is required is standardized transformation;
Step 3:Cable machinery load Analysis, carry out load Analysis to existing distribution system, solve three-phase imbalance, zero The overload phenomenon that line current causes greatly, recalculates and terminated line and place capacity;
Step 4:The process of harmonic wave hidden danger;
Step 5:Normalization Electrical Safety is serviced, and specifically includes following steps:
(21)The power distribution system equipment account set up in units of building, while transform to hidden danger;
(22)Content according to Daily Round Check list, conventional sense project and performance detection project is examined to equipment and circuit Look into;
(23)Judge whether to break down?If so, carry out Safe Transformation;If it is not, determining whether polling period?If so, Reenter(21).
Compared with prior art, beneficial effects of the present invention are, carry out Electrical Safety inspection with step according to the method described above, Hidden danger can be effectively discharged, Electrical Safety is improved, is met the use demand of user, be easy to industrially promotion and application.
Description of the drawings
Fig. 1 show the schematic flow sheet of the application.
Specific embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.It should be appreciated that described herein Specific embodiment only to explain the present invention, be not intended to limit the present invention.
It should be noted that " connection " described herein and the word for expressing " connection ", such as " being connected ", " being connected ", both it was directly connected to another part including a certain part, also passed through miscellaneous part and another part including a certain part It is connected.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative Be also intended to include plural form, additionally, it should be understood that, when in this manual using belong to "comprising" and/or " bag Include " when, which indicates existing characteristics, step, operation, part or module, component and/or combinations thereof.
It should be noted that the description and claims of this application and the term " first " in above-mentioned accompanying drawing, " Two " it is for distinguishing similar object, without being used for describing specific order or precedence.It should be appreciated that so use Data can be exchanged in the appropriate case, so that presently filed embodiment described herein for example can be with except scheming here Order beyond those shown or describe is implemented.Additionally, term " comprising " and " having " and their any deformation, it is intended that In cover it is non-exclusive include, for example, process, method, system, product or the equipment for containing series of steps or unit need not Be limited to those steps or the unit clearly listed, but may include clearly not list or for these processes, method, Other intrinsic steps of product or equipment or unit.
For the ease of description, space relative terms can be used here, such as " ... on ", " ... top ", " in ... upper surface ", " above ", for describing such as a part shown in the figure or module or feature and other portions The spatial relation of part or module or feature.It should be appreciated that space relative terms be intended to comprising except part or Different azimuth in use or operation outside orientation of the module described in figure.For example, if the part in accompanying drawing or Person's module is squeezed, then be described as " above miscellaneous part or module or construction " or " in miscellaneous part or module or structure On making " part or module after will be positioned as " below miscellaneous part or module or construction " or " in other portions Under part or module or construction ".Thus, exemplary term " ... top " can include " ... top " and " in ... lower section " two kinds of orientation.The part or module can also other different modes positioning(It is rotated by 90 ° or in other Orientation), and respective explanations are made to the relative description in space used herein above.
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase Mutually combine.
As shown in figure 1, the invention provides a kind of electric fire-control safety detection method, comprises the steps:
Step one:Safety detection is carried out to building power supply unit;Using professional equipment, controller switching equipment and distribution wire is completed The hidden troubles removing on road, specifically includes:
(1)Anti- toy measure investigation, checks whether anti-toy measure implements.
(2)Managing security tools and instruments is investigated, and checks whether scene is in kind complete;Check whether ground connection wire management meets regulation and want Ask, earth point implements positioning;
(3)Field apparatus situation investigate, check primary equipment name, indicate it is correct, complete, clear;It is all to operate Whether secondary device has the name of specification and obvious switching position state;
(4)Equipment deficiency situation is investigated, and checks whether equipment is qualitative correct;Elimination of equipment defect whether superperiod, if closed loop; Whether equipment deficiency carries out periodic analysises;
(5)Chopper ruuning situation is investigated, and checks whether chopper external insulation creep distance meets infield filth standard and want Ask;Check that switch anti-error function is intact;Check that switch control circuit, auxiliary contact are intact, backstage dispaly state is correct;Inspection is opened Each joining seam, position are closed without heating, if periodically carry out infrared thermometry, at important connecting portion, whether post sheetlike temperature indicator;Switch Whether whether room has exhaust apparatus, divulge information good, if dress/oxygen automatic detection alarm device, and normal operation;Check open circuit Device capacity of short circuit, if meet the capacity of short circuit of infield;Hydraulic mechanism chopper, checks whether hydraulic system is normal, is The negative phase is exhausted, and whether hydraulic mechanism energy storage cylinder anchor ear is intact;Vacuum circuit breaker answers emphasis to check whether insulated tension pole is complete It is good;Inspection body connecting shaft, connecting lever part whether corrosion, abrasion condition are answered to the capacitor switch of frequent operation;Check open circuit The mechanism case good seal of device, heater switching are normal;
(6)Disconnecting switch ruuning situation is investigated, and checks that disconnecting switch anti-error function is intact, mechanical latching reliability;Check electricity Dynamic operation plug-in strip, electric blocking are perfect;Check disconnecting switch joining seam, position without heating, if periodically to enter infrared thermometry, check Whether indoor isolator connecting portion posts sheetlike temperature indicator;Isolator operating mechanism case good seal is checked, without water inlet phenomenon;
(7)Capacitor ruuning situation is investigated, and checks whether condenser capacity periodically measures;Check outside capacitor absolutely Edge leakage is than away from meeting the requirements;Check whether capacitor has leakage of oil failure;Check the outer fuse operation 3-5 of outdoor capacitors group Whether exchanged afterwards;Check that capacitor bank protection setting valve is correct, normal operation;Check capacitor bank without heating, if fixed Phase carries out infrared thermometry;
(8)Reactor ruuning situation is investigated, and checks that reactor rated voltage meets actual motion voltage request;Check dry type Whether reactor creep distance meets the insulating requirements of actual filth condition, and not damaged crackle;Check dry-type air-core reactor appearance No cracking phenomenon, creepage phenomenon, the epoxy powdered phenomenon in top layer;Check whether dry reactor interval chopper type selecting is correct, is No employing cut-offs dam little chopper or on-load switch;Oil-immersed electric reactor is checked, whether oiling test is qualified, and appearance whether There is leakage of oil;
(9)Electricity system situation is investigated, and checks whether low-voltage alternating-current cable type selecting meets related regulatory requirements, low-voltage-powered Whether cable selects flame retardant cable, and from single armored cable, armoring material whether nonmagnetic substance exchanges single armouring electric power Whether armature of cable layer takes single-point to be directly grounded;Check whether change low pressure used arranges low tension switch, and be furnished with electronics and take off Buckle device;Check whether the low-voltage-powered cable laying of change used meets countermeasure;The fire prevention of inspection cable duct, isolation, waterproof In place whether, whether fire wall is intact for safety measure;
(10)Straight-flow system situation is investigated, and checks whether configuration, wiring and the method for operation of straight-flow system meet technical bid It is accurate;Check whether DC power system air-break, fuse arrangement and Graded coordination meet requirement;Check outside accumulator See, housing has ne-leakage and deformation exception, whether accumulator capacity meets requirement;Check whether accumulator operation skin temperature is different Often, whether single battery cell voltage and terminal voltage are abnormal;Check that whether high-frequency model working condition is normal in direct current cabinet, fills Whether electric installation and accumulator parameter performance match;Check whether insulation monitoring and warning device working condition is good, direct current branch insulation Whether situation is normal;Check whether direct current cabinet charging voltage, battery charging current and load current are normal;Check DC charging Whether the work of machine alternating current power supply switching device is normal;Check whether straight-flow system lightning protection device is perfect;
(11)Spark gap ruuning situation is investigated, and checks that the selection of the spark gap nominal discharge current installed should meet the requirements; Spark gap on-line computing model normal operation is checked, whether leakage current is exceeded, check the insulation of spark gap equalizing capacitance device assembly Whether enough nargin is had;
(12)Circuit ruuning situation is investigated, and is checked line facility ruuning situation, is carried out Insulation test, leakage testses, electric arc Test, ensures circuit reliability service;
(13)Machine operation is investigated, and checks switchgear ruuning situation, if there is abnormal sound, disrepair phenomenon, and and Shi Jinhang is changed, and ensures that power supply is normal;
(14)Circuit infrared measurement of temperature situation is investigated, and the infrared diagnostics for completing important transmission facility before Peak power use comprehensively is surveyed Temperature work;For old circuit emphasis detection more than heavy-haul line and 20 years of operation;Detection position includes wire connection gold utensil; For heavy-haul line, accurate detection should be carried out to wire connection gold utensil, insulator;Accurate detection should be using the infrared thermal imagery of pixel Instrument or infrared induction temperature measuring device, and meet the detection environmental condition requirement of charging equipment infrared diagnostics;
(15)Cable passage situation is investigated, foundation《Cable passage management regulation》, investigate cable run and subside along circuit surface, Work well, raceway groove, tunnel hydrops, cave in, external force destruction operation hidden danger, eliminate in time conduit line structure safety, percolating water, anti- Fire, ventilation, support and fixture corrosion potential safety hazard.
(16)Cable thermometric, detection case investigation, carry out the infrared survey of heavily loaded cable, critical cables medial head and terminals Temperature, Partial Discharge Detection, to the operation monitoring of should strengthening for noting abnormalities, shorten detection cycle, and organizes expert is carried out further deep Enter analysis, and implement emergency plan and standby redundancy in advance;
(17)Distribution line operation investigation, check circuit periodical inspection whether perform on request, safe distance, intersect across More, whether grounding resistance measurement record is complete, defect management whether closed loop;Check whether operating analysis record is complete, if having Specific aim;The circuit joining seam of inspection heavy-haul line, end, the thermometric record of cable intermediate joint;Whether cable is made regular check on Passage, work well, the hydrops situation of raceway groove;
(18)Switchgear house equipment operation investigation, checks whether waterproof, protection against the tide, fire prevention, anti-toy measure are complete, check day Often make an inspection tour and whether be carried out in accordance with regulations, standing, whether interior primary connection figure is correct, and whether the safety notice in gas apparatus and place In place;
(19)Distribution mark investigation, checks whether equipment name, caution sign are complete;
(20)Thermal imaging detection investigation, because of unlike material, the difference of different conductor length factor, can cause under same current Conductor overheating situation is different, and under different torsion, termination contact resistance is also differed, by checking terminal temperature, Ke Yijian Terminal connection is found whether reliable;
Step 2:According to the hidden danger order of severity, hidden danger is processed successively, meanwhile, with reference to country and industry standard, to not meeting The potential safety hazard that electrical construction is required is standardized transformation;
Step 3:Cable machinery load Analysis, carry out load Analysis to existing distribution system, solve three-phase imbalance, zero The overload phenomenon that line current causes greatly, recalculates and terminated line and place capacity;
Step 4:The process of harmonic wave hidden danger;
Step 5:Normalization Electrical Safety is serviced, and specifically includes following steps:
(21)The power distribution system equipment account set up in units of building, while transform to hidden danger;
(22)Content according to Daily Round Check list, conventional sense project and performance detection project is examined to equipment and circuit Look into;
(23)Judge whether to break down?If so, carry out Safe Transformation;If it is not, determining whether polling period?If so, Reenter(21).
In a preferred embodiment, the socket and chopper used in above-mentioned circuit includes, anti-electric-linkage socket, antioverloading Socket, anti-virtual connection RCCB, electric arc prevention socket, electric circumstance precaution device.
In a preferred embodiment, also include by smart machine Real-time Collection electricity consumption data, and arrange professional couple Data are analyzed, and use and security situation so as to grasp electricity consumption unit of electrical energy.
In a preferred embodiment, also include relying on the Internet, Internet of Things and big data using efficiency metering management system, On-Line Dynamic Monitoring is implemented during electricity consumption to enterprise and institution using the pattern of the Internet+safety, energy efficiency management, complete Surface analysis enterprise with can data, with can feature and with can on the basis of environment, with it is scientific and rational with can management means as propping up Support, formulates a set of for enterprise and institution's electrical safety, the piece electrical solution of energy efficiency management, with reach Electrical Safety, Reduces cost, raising business administration.Can also the use of electric circumstance early warning platform be to rely on electric circumstance precaution device, be a kind of Customize service platform.According to precaution device actual installation situation, the dynamic safety monitored control network in actually used region can be designed, More intuitively whether safe the ruuning situation of observation electric circumstance precaution device, understand distribution environment.
The above is only the preferred embodiment of the present invention, it is noted that for the common skill of the art For art personnel, under the premise without departing from the principles of the invention, some improvements and modifications, these improvements and modifications can also be made Also should be regarded as protection scope of the present invention.

Claims (1)

1. a kind of electric fire-control safety detection method, it is characterised in that comprise the steps:
Step one:Safety detection is carried out to building power supply unit;Using professional equipment, controller switching equipment and distribution line is completed Hidden troubles removing, specifically includes:
(1) anti-toy measure investigation, checks whether anti-toy measure implements.
(2) managing security tools and instruments investigation, checks whether scene is in kind complete;Check whether ground connection wire management meets regulation requirement, connect Implement positioning in place;
(3) field apparatus situation investigation, check primary equipment name, indicate it is correct, complete, clear;It is all need to operate it is secondary Whether equipment has the name of specification and obvious switching position state;
(4) equipment deficiency situation investigation, checks whether equipment is qualitative correct;Elimination of equipment defect whether superperiod, if closed loop;Equipment Whether defect carries out periodic analysises;
(5) chopper ruuning situation investigation, checks whether chopper external insulation creep distance meets infield filth standard and require;Inspection Look into switch anti-error function intact;Check that switch control circuit, auxiliary contact are intact, backstage dispaly state is correct;Check that switch is each Joining seam, position are without heating, if periodically carry out infrared thermometry, whether post sheetlike temperature indicator at important connecting portion;Switch gear room is It is no to have exhaust apparatus, whether good divulge information, if dress/oxygen automatic detection alarm device, and normal operation;Check that chopper is short Appearance of a street amount, if meet the capacity of short circuit of infield;Hydraulic mechanism chopper, checks whether hydraulic system is normal, if fixed Phase is exhausted, and whether hydraulic mechanism energy storage cylinder anchor ear is intact;Vacuum circuit breaker answers emphasis to check whether insulated tension pole is intact;It is right The capacitor switch of frequent operation answers inspection body connecting shaft, connecting lever part whether corrosion, abrasion condition;Check the machine of chopper Structure case good seal, heater switching are normal;
(6) disconnecting switch ruuning situation investigation, checks that disconnecting switch anti-error function is intact, mechanical latching reliability;Check electronic behaviour Make plug-in strip, electric blocking is perfect;Check disconnecting switch joining seam, position without heating, if periodically to enter infrared thermometry, check indoor Whether disconnecting switch connecting portion posts sheetlike temperature indicator;Isolator operating mechanism case good seal is checked, without water inlet phenomenon;
(7) capacitor ruuning situation investigation, checks whether condenser capacity periodically measures;Check that capacitor external insulation is let out Leakage is than away from meeting the requirements;Check whether capacitor has leakage of oil failure;After checking the outer fuse operation 3-5 of outdoor capacitors group it is It is no to be exchanged;Check that capacitor bank protection setting valve is correct, normal operation;Check capacitor bank without heating, if periodically to enter Row infrared thermometry;
(8) reactor ruuning situation investigation, checks that reactor rated voltage meets actual motion voltage request;Check dry type reactance Whether device creep distance meets the insulating requirements of actual filth condition, and not damaged crackle;Check dry-type air-core reactor appearance without Testudiniss Split phenomenon, creepage phenomenon, the epoxy powdered phenomenon in top layer;Check whether dry reactor interval chopper type selecting is correct, if adopt With cut-offfing dam little chopper or on-load switch;Oil-immersed electric reactor is checked, whether oiling test is qualified, and whether appearance has oozes Oil leak;
(9) electricity system situation investigation, checks whether low-voltage alternating-current cable type selecting meets related regulatory requirements, low-voltage-powered cable Flame retardant cable is selected whether, from single armored cable, armoring material whether nonmagnetic substance exchanges single armoured power cable Armor whether take single-point to be directly grounded;Check whether change low pressure used arranges low tension switch, and be furnished with electronics dropout dress Put;Check whether the low-voltage-powered cable laying of change used meets countermeasure;The fire prevention of inspection cable duct, isolation, waterproof safety In place whether, whether fire wall is intact for measure;
(10) straight-flow system situation investigation, checks whether configuration, wiring and the method for operation of straight-flow system meet technical standard;Inspection Look into whether DC power system air-break, fuse arrangement and Graded coordination meet requirement;Check storage battery appearance, housing There are ne-leakage and deformation exception, whether accumulator capacity meets requirement;Check whether accumulator operation skin temperature is abnormal, electric power storage Whether pond monomer battery voltage and terminal voltage are abnormal;Check whether high-frequency model working condition is normal in direct current cabinet, charging device Whether match with accumulator parameter performance;Check whether insulation monitoring and warning device working condition is good, direct current branch insulation situation is It is no normal;Check whether direct current cabinet charging voltage, battery charging current and load current are normal;Check DC charging motor exchange Whether power transfer device work is normal;Check whether straight-flow system lightning protection device is perfect;
(11) spark gap ruuning situation investigation, checks that the selection of the spark gap nominal discharge current installed should meet the requirements;Check Whether spark gap on-line computing model normal operation, leakage current are exceeded, and whether the insulation of inspection spark gap equalizing capacitance device assembly There is enough nargin;
(12) circuit ruuning situation investigation, checks line facility ruuning situation, carries out Insulation test, leakage testses, electric arc test, Ensure circuit reliability service;
(13) machine operation investigation, checks switchgear ruuning situation, if there is abnormal sound, disrepair phenomenon, and enter in time Row is changed, and ensures that power supply is normal;
(14) circuit infrared measurement of temperature situation investigation, completes the infrared diagnostics temperature measurer of important transmission facility before Peak power use comprehensively Make;For old circuit emphasis detection more than heavy-haul line and 20 years of operation;Detection position includes wire connection gold utensil;For Heavy-haul line, should carry out accurate detection to wire connection gold utensil, insulator;Accurate detection should using pixel thermal infrared imager or Infrared induction temperature measuring device, and meet the detection environmental condition requirement of charging equipment infrared diagnostics;
(15) cable passage situation investigation, foundation《Cable passage management regulation》, investigate cable run and subside along circuit surface, work Well, raceway groove, tunnel hydrops, cave in, external force destruction operation hidden danger, eliminate in time conduit line structure safety, percolating water, fire prevention, Ventilation, support and fixture corrosion potential safety hazard.
(16) cable thermometric, detection case investigation, the infrared measurement of temperature of the heavily loaded cable of development, critical cables medial head and terminals, Partial Discharge Detection, to the operation monitoring of should strengthening for noting abnormalities, shortens detection cycle, and organizes expert development further deeply divides Analysis, and emergency plan and standby redundancy is implemented in advance;
(17) distribution line operation investigation, checks whether circuit periodical inspection performs on request, safe distance, scissors crossing, connects Whether ground resistance measurement record is complete, defect management whether closed loop;Check whether operating analysis record is complete, if be directed to Property;The circuit joining seam of inspection heavy-haul line, end, the thermometric record of cable intermediate joint;Whether cable logical is made regular check on Road, work well, the hydrops situation of raceway groove;
(18) switchgear house equipment operation investigation, checks whether waterproof, protection against the tide, fire prevention, anti-toy measure are complete, checks daily patrolling Whether depending on being carried out in accordance with regulations, standing, whether interior primary connection figure is correct, and in place whether the safety notice in gas apparatus and place;
(19) distribution mark investigation, checks whether equipment name, caution sign are complete;
(20) thermal imaging detection investigation, because of unlike material, the difference of different conductor length factor, can cause same current lower wire Heat condition is different, and under different torsion, termination contact resistance is also differed, and by checking terminal temperature, can be checked Whether terminal connection is reliable;
Step 2:According to the hidden danger order of severity, hidden danger is processed successively, meanwhile, with reference to country and industry standard, to not meeting electrically The potential safety hazard of construction requirement is standardized transformation;
Step 3:Cable machinery load Analysis, carry out load Analysis to existing distribution system, solve three-phase imbalance, zero line electricity The overload phenomenon that stream causes greatly, recalculates and terminated line and place capacity;
Step 4:The process of harmonic wave hidden danger;
Step 5:Normalization Electrical Safety is serviced, and specifically includes following steps:
(21) the power distribution system equipment account set up in units of building, while transform to hidden danger;
(22) equipment and circuit are checked according to the content of Daily Round Check list, conventional sense project and performance detection project;
(23) judge whether to break down?If so, carry out Safe Transformation;If it is not, determining whether polling period?If so, again Into (21).
CN201610952583.7A 2016-11-02 2016-11-02 Electrical fire-fighting safety detection method Pending CN106525123A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610952583.7A CN106525123A (en) 2016-11-02 2016-11-02 Electrical fire-fighting safety detection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610952583.7A CN106525123A (en) 2016-11-02 2016-11-02 Electrical fire-fighting safety detection method

Publications (1)

Publication Number Publication Date
CN106525123A true CN106525123A (en) 2017-03-22

Family

ID=58325299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610952583.7A Pending CN106525123A (en) 2016-11-02 2016-11-02 Electrical fire-fighting safety detection method

Country Status (1)

Country Link
CN (1) CN106525123A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107370056A (en) * 2017-08-25 2017-11-21 国网山东省电力公司日照供电公司 Electrical equipment sheetlike temperature indicator secure attachment device
CN109058769A (en) * 2018-06-22 2018-12-21 国网浙江省电力有限公司检修分公司 A kind of transformer oil leakage on-line monitoring, emergent treatment system and method
CN109799437A (en) * 2019-03-27 2019-05-24 江苏海事职业技术学院 A kind of electric fire control method based on three proofings means
CN111006770A (en) * 2019-12-20 2020-04-14 广东海外建设咨询有限公司 Supervision method for construction between sample plates

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107370056A (en) * 2017-08-25 2017-11-21 国网山东省电力公司日照供电公司 Electrical equipment sheetlike temperature indicator secure attachment device
CN107370056B (en) * 2017-08-25 2023-07-18 国网山东省电力公司日照供电公司 Fixing and adhering device for temperature display sheet of electrical equipment
CN109058769A (en) * 2018-06-22 2018-12-21 国网浙江省电力有限公司检修分公司 A kind of transformer oil leakage on-line monitoring, emergent treatment system and method
CN109058769B (en) * 2018-06-22 2023-12-12 国网浙江省电力有限公司检修分公司 A transformer oil leakage online monitoring and emergency treatment system and method
CN109799437A (en) * 2019-03-27 2019-05-24 江苏海事职业技术学院 A kind of electric fire control method based on three proofings means
CN111006770A (en) * 2019-12-20 2020-04-14 广东海外建设咨询有限公司 Supervision method for construction between sample plates
CN111006770B (en) * 2019-12-20 2021-03-23 广东海外建设咨询有限公司 Supervision method for construction between sample plates

Similar Documents

Publication Publication Date Title
CN103605015B (en) High-precision electric parameter measurement dry-type reactor on-Line Monitor Device and method
CN106530182A (en) Protective method for electrical fire hazards based on three-proofing means
CN109633384A (en) A kind of Intelligent insulating line thunder protection on-Line Monitor Device and method
CN103852694A (en) Power cable intelligent grounding box
CN103426620B (en) Open-close type electronic current transformer
CN106525123A (en) Electrical fire-fighting safety detection method
CN110579693A (en) High-altitude GIS localization online monitoring device and online monitoring method based on wireless transmission
CN207096346U (en) A kind of online phase checking device of high-tension switch cabinet
CN105445567B (en) The nuclear-phase method of totally enclosed type generalized information system
CN104348106A (en) Combined intelligent low-voltage distribution JP cabinet
CN108459230A (en) Electric high-voltage equipment fault detection method
CN203786250U (en) Power cable intelligent grounding box
KR100676225B1 (en) How to detect and repair short circuit of live low voltage distribution line
CN110323836A (en) Electrical Safety hidden danger supervisory systems and its working method based on safe cloud platform
CN106483487A (en) A kind of on-line monitoring Intelligent current transformer
CN109342856A (en) A kind of Repair of Transformer method
CN120300611A (en) A modular grounding box for centralized grounding of multiple high-voltage cables
CN102565614B (en) Alternating voltage loop test method
CN209086369U (en) A kind of distribution low-voltage cable junction box state monitoring apparatus
CN210863933U (en) A high-altitude GIS local online monitoring device based on wireless transmission
CN108008236A (en) A kind of method for detecting electrical equipment fault
CN204190345U (en) 110kV and the cross interconnected protective earthing case of above band detection of electrical leakage type
CN216718577U (en) 10kV overhead line direct current trial delivery and troubleshooting tester
CN118130867A (en) A zinc oxide arrester resistive current online detection method and system
CN110488068A (en) A sampling unit on a capacitive voltage transformer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170322

WD01 Invention patent application deemed withdrawn after publication