CN106523004A - Rigid-after-flexible feet-lock bolt combined supporting device and installation method - Google Patents

Rigid-after-flexible feet-lock bolt combined supporting device and installation method Download PDF

Info

Publication number
CN106523004A
CN106523004A CN201611207470.0A CN201611207470A CN106523004A CN 106523004 A CN106523004 A CN 106523004A CN 201611207470 A CN201611207470 A CN 201611207470A CN 106523004 A CN106523004 A CN 106523004A
Authority
CN
China
Prior art keywords
anchor
rigid
soft
shaped
lock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611207470.0A
Other languages
Chinese (zh)
Other versions
CN106523004B (en
Inventor
李利平
闫章程
刘京增
柴仁旺
张乾青
肖载兴
石少帅
郑彦飞
周宗青
陈仁强
成帅
周华阳
韩孟杰
甘国军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Engineering Co Ltd Of Middle Tie Shisiju Group 5th
Shandong University
Original Assignee
Engineering Co Ltd Of Middle Tie Shisiju Group 5th
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Engineering Co Ltd Of Middle Tie Shisiju Group 5th, Shandong University filed Critical Engineering Co Ltd Of Middle Tie Shisiju Group 5th
Priority to CN201611207470.0A priority Critical patent/CN106523004B/en
Publication of CN106523004A publication Critical patent/CN106523004A/en
Application granted granted Critical
Publication of CN106523004B publication Critical patent/CN106523004B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

本发明公开了一种先柔后刚的锁脚锚杆组合支护装置及安装方法,包括两支先柔后刚的锁脚锚杆和位于杆端的U型联接锁,U型联接锁将两个先柔后刚的锁脚锚杆连接在一起形成一体化支护结构;锁脚锚杆的自由端设有可沿着锚杆轴线方向来回移动的弹性半球体和螺母,弹性半球体可吸收钢拱架形变的部分能量,并通过所述的螺母旋紧固定,提供先柔后刚的支护方式;U型联接锁包括两个安装在锚杆杆端的类似于L型的圆管,其中一个圆管的自由端设有螺母本体,另一个圆管的端部设有一个与所述的螺母本体相配合的螺栓,两个圆管相连后形成U型联接锁。

The invention discloses a combination support device and installation method of soft and then rigid locking foot anchor rods, including two flexible and then rigid locking foot anchor rods and a U-shaped joint lock located at the end of the rod. The U-shaped joint lock connects the two Two first soft and then rigid locking foot anchors are connected together to form an integrated support structure; the free end of the locking foot anchor is provided with an elastic hemisphere and nut that can move back and forth along the axis of the anchor, and the elastic hemisphere can absorb Part of the energy of the deformation of the steel arch is fixed by tightening the nuts to provide a support method that is soft first and then rigid; the U-shaped joint lock consists of two L-shaped round tubes installed on the end of the anchor rod, wherein The free end of one round tube is provided with a nut body, and the end of the other round tube is provided with a bolt matched with the nut body, and the two round tubes are connected to form a U-shaped joint lock.

Description

一种先柔后刚的锁脚锚杆组合支护装置及安装方法A combination support device and installation method of lock-foot-bolt combination support device which is soft first and then rigid

技术领域technical field

本发明属于隧道施工支护技术领域,涉及一种先柔后刚的锁脚锚杆组合支护装置及安装方法。The invention belongs to the technical field of tunnel construction support, and relates to a combination support device and an installation method of a lock-foot-bolt combination support device which is flexible first and then rigid.

背景技术Background technique

隧道穿越软弱地层时,由于软弱围岩自稳能力差,极易在施工中过程中出现大变形,造成初支开裂,钢拱架扭曲等问题,给施工及以后的安全运营带来隐患。锁脚锚杆具有能够有效控制钢拱架的沉降,提高支护结构整体性的特点,所以普遍应用于软弱围岩隧道建设当中。但在目前的施工过程中,锁脚锚杆与钢拱架直接焊接为一体,当承受一定的围岩压力时,由于焊接部位的焊接强度远小于钢拱架和锁脚锚杆的承载力极限,导致锁脚锚杆过早的失去支护作用;而且锁脚锚杆仅提供刚性支护方式,亦无法与相邻锚杆形成一体化支护结构,导致对钢拱架变形的控制效果不甚理想。When the tunnel passes through the weak ground, due to the poor self-stabilization ability of the weak surrounding rock, it is very easy to undergo large deformation during the construction process, resulting in cracking of the initial support and distortion of the steel arch frame, which will bring hidden dangers to the construction and future safe operation. The locking foot bolt has the characteristics of effectively controlling the settlement of the steel arch and improving the integrity of the supporting structure, so it is widely used in the construction of tunnels with weak surrounding rocks. However, in the current construction process, the lock-foot anchor and the steel arch are directly welded together. When subjected to a certain surrounding rock pressure, the welding strength of the welded part is far less than the bearing capacity limit of the steel arch and the lock-foot anchor. , leading to the premature loss of the supporting effect of the locking foot anchor; and the locking foot anchor only provides rigid support, and cannot form an integrated support structure with adjacent anchors, resulting in ineffective control of the deformation of the steel arch. very ideal.

发明内容Contents of the invention

本发明为克服传统锁脚锚杆的不足,提供了一种先柔后刚的锁脚锚杆组合支护装置及安装方法。In order to overcome the shortcomings of the traditional lock-foot anchor, the present invention provides a lock-foot-bolt combined support device and installation method which are flexible first and then rigid.

本发明的技术方案是:Technical scheme of the present invention is:

一种先柔后刚的锁脚锚杆组合支护装置,包括两支先柔后刚的锁脚锚杆和位于杆端的U型联接锁,所述的U型联接锁将两个先柔后刚的锁脚锚杆连接在一起形成一体化支护结构;所述的锁脚锚杆的自由端设有可沿着锚杆轴线方向来回移动的弹性半球体和螺母,所述的弹性半球体可吸收钢拱架形变的部分能量,并通过所述的螺母旋紧固定,提供先柔后刚的支护方式;A combined support device for locking feet and anchors that is flexible first and then rigid, comprising two anchor bolts that are soft first and then rigid and a U-shaped joint lock located at the end of the rods. The rigid locking foot anchor rods are connected together to form an integrated support structure; the free end of the locking foot anchor rod is provided with an elastic hemisphere and a nut that can move back and forth along the axis of the anchor rod, and the elastic hemisphere It can absorb part of the energy of the deformation of the steel arch, and fix it by tightening the nuts, providing a support method that is soft first and then rigid;

所述的U型联接锁包括两个安装在锚杆杆端的类似于L型的圆管,其中一个圆管的自由端设有螺母本体,另一个圆管的端部设有一个与所述的螺母本体相配合的螺栓,两个圆管相连后形成U型联接锁。The U-shaped joint lock includes two L-shaped round tubes installed on the end of the anchor rod, wherein the free end of one round tube is provided with a nut body, and the end of the other round tube is provided with a The nut body matches the bolt, and the two round pipes are connected to form a U-shaped joint lock.

进一步的,所述的圆管与锚杆的端部通过螺纹连接,在所述的圆管内部设有与锚杆的外螺纹配合的内螺纹;圆管通过螺旋与弹性半球体六角螺母紧密接触,为其提供支持力。Further, the end of the round pipe is threadedly connected to the anchor rod, and an internal thread that matches the outer thread of the anchor rod is provided inside the round pipe; the round pipe is in close contact with the elastic hemispherical hex nut through the screw , to provide support for it.

进一步的,所述的锁脚锚杆插装在不同的锚孔内,且相互平行。Further, the anchor bolts with locking feet are inserted into different anchor holes and are parallel to each other.

进一步的,两个所述的L型圆管上下或者左右对称设置。Further, the two L-shaped circular tubes are arranged symmetrically up and down or left and right.

进一步的,所述的螺母本体、螺栓焊接在各自对应的所述圆管上。Further, the nut bodies and bolts are welded to the corresponding round tubes.

进一步的,所述的螺母本体为一个实心的柱状结构,在其外部设有外螺纹;所述的螺栓为一个空心的柱状结构,在柱状结构的内部设有内螺纹,所述的内螺纹和外螺纹相互配合。Further, the nut body is a solid columnar structure with external threads; the bolt is a hollow columnar structure with internal threads inside the columnar structure, and the internal threads and The external threads cooperate with each other.

进一步的,所述的螺母本体、螺栓焊接在各自对应的所述圆管上。Further, the nut bodies and bolts are welded to the corresponding round tubes.

具体的安装方法如下:The specific installation method is as follows:

将同一钢拱架中的一个锁脚锚杆通过钻孔插入到充满锚固剂的锚杆孔内,另一个锁脚锚杆按照同样的方式放置在另一个锚杆孔内;沿着锚杆孔所在的方向,旋转两个锁脚锚杆自由端的可移动弹性半球体和六角螺母,直到无法转动为止;Insert one lock-foot anchor in the same steel arch into the anchor hole filled with anchoring agent through drilling, and place the other lock-foot anchor in the other anchor hole in the same way; along the anchor hole Rotate the movable elastic hemisphere and the hexagon nut at the free ends of the two lock-foot anchor rods in the same direction until they cannot be rotated;

在一个锁脚锚杆的杆端安装一个L型圆管,另一个锁脚杆的杆端安装另一个L型圆管,且旋转两个L型圆管与六角螺母紧密接触为止;Install an L-shaped round tube on the rod end of one locking foot anchor rod, install another L-shaped round tube on the rod end of the other locking foot rod, and rotate the two L-shaped round tubes until they are in close contact with the hex nut;

将一个L型圆管的自由端的螺母体旋入到另一个L型圆管的螺栓中,从而将两个L型圆管联接为一体,形成U型联接锁,最终两支锁脚锚杆与U型联接锁形成一体化支护结构。Screw the nut body of the free end of one L-shaped round tube into the bolt of another L-shaped round tube, so as to connect the two L-shaped round tubes into one, forming a U-shaped joint lock, and finally the two locking foot anchor rods are connected with The U-shaped joint lock forms an integrated support structure.

与传统锁脚锚杆相比,本装置的优点是:Compared with the traditional locking foot anchor, the advantages of this device are:

创造性的采用先柔后刚的支护方式,极大的增强了锁脚锚杆的支护作用效果;杆端U型联接锁的设置,将同一钢拱架中的两支锁脚锚杆联接成一体化支护结构,提高了支护的整体性和承载力,有效控制了钢拱架变形,保障了隧道的施工安全及运营安全。The creative use of the support method of first softness and then rigidity greatly enhances the support effect of the lock-foot anchors; the setting of the U-shaped joint lock at the rod end connects two lock-foot anchors in the same steel arch An integrated support structure improves the integrity and bearing capacity of the support, effectively controls the deformation of the steel arch, and ensures the construction and operation safety of the tunnel.

附图说明Description of drawings

为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are For some embodiments of the present invention, those skilled in the art can also obtain other drawings based on these drawings without any creative work.

图1为本组合支护装置示意图;Fig. 1 is the schematic diagram of this combined supporting device;

图2为螺栓示意图;Figure 2 is a schematic diagram of the bolt;

图3为六角螺母体示意图;Fig. 3 is a schematic diagram of a hex nut body;

图中:1锚杆头部,2锚杆,3弹性半球体和六角螺母,4圆管,5螺栓,6六角螺母体,7圆管。In the figure: 1 anchor rod head, 2 anchor rod, 3 elastic hemisphere and hexagonal nut, 4 round pipe, 5 bolt, 6 hexagonal nut body, 7 round pipe.

具体实施方式detailed description

下面结合附图1、2和实例对本发明进一步说明。Below in conjunction with accompanying drawing 1,2 and example the present invention is further described.

本发明的整体结构如图1所示,先柔后刚的锁脚锚杆组合支护装置,包括两个先柔后刚的锁脚锚杆2和位于杆端的U型联接锁,所述的U型联接锁将两个先柔后刚的锁脚锚杆连接在一起形成一体化支护结构。The overall structure of the present invention is shown in Figure 1. The combined supporting device of the lock foot anchor rod that is soft first and then rigid includes two first soft and then rigid lock foot anchor rods 2 and a U-shaped joint lock located at the rod end. The U-shaped joint lock connects two anchor rods that are soft first and then rigid to form an integrated support structure.

其中,锁脚锚杆的锚杆头部1固定在锚孔内,自由端设有可沿着锚杆轴线方向来回移动的弹性半球体和六角螺母3,所述的弹性半球体可吸收钢拱架形变的部分能量,并通过所述的六角螺母旋紧固定,提供先柔后刚的支护方式;Among them, the anchor head 1 of the lock foot anchor is fixed in the anchor hole, and the free end is provided with an elastic hemisphere and a hexagonal nut 3 that can move back and forth along the axis of the anchor, and the elastic hemisphere can absorb the steel arch. Part of the energy of the deformation of the frame is fixed by tightening the hexagonal nut, providing a support method that is soft first and then rigid;

U型联接锁包括两个安装在锚杆杆端的类似于L型的圆管4,其中一个圆管4的自由端设有六角螺母本体6,另一个圆管7的端部设有一个与所述的六角螺母本体6相配合的螺栓5,两个圆管4、7相连后形成U型联接锁。The U-shaped joint lock includes two L-shaped round tubes 4 installed on the anchor rod end, wherein the free end of one round tube 4 is provided with a hex nut body 6, and the end of the other round tube 7 is provided with a The bolt 5 matched with the hex nut body 6 described above, the two round pipes 4, 7 are connected to form a U-shaped joint lock.

具体的如图1所示,所述的螺母本体6、螺栓5焊接在各自对应的所述圆管上;其中螺母本体6、螺栓5的位置可以交换。Specifically, as shown in FIG. 1 , the nut body 6 and the bolt 5 are welded on the respective corresponding round pipes; the positions of the nut body 6 and the bolt 5 can be exchanged.

其中螺母本体6、螺栓5的具体结构如图2、3所示;螺母本体6为一个柱状结构,在其外部设有外螺纹;所述的螺栓5为一个空心的柱状结构,在柱状结构的内部设有内螺纹,所述的内螺纹和外螺纹相互配合。Wherein the concrete structure of nut body 6, bolt 5 is as shown in Figure 2, 3; Nut body 6 is a columnar structure, is provided with external screw thread on its outside; Described bolt 5 is a hollow columnar structure, in columnar structure An internal thread is arranged inside, and the internal thread and the external thread cooperate with each other.

进一步的,圆管4、7与锚杆的端部均通过螺纹连接,在所述的圆管4、7内部设有与锚杆的外螺纹配合的内螺纹;圆管4、7沿着锚杆孔所在的方向旋入后与六角螺母紧密接触,为其提供支持力。Further, the ends of the round pipes 4, 7 and the anchor rods are all connected by threads, and the inner threads of the round pipes 4, 7 are provided with the external threads of the anchor rods; the round pipes 4, 7 are threaded along the anchor After screwing in the direction of the rod hole, it will be in close contact with the hexagon nut to provide support for it.

进一步的,两个锁脚锚杆插装在不同的锚孔内,且相互平行。Further, the two locking foot anchor rods are inserted into different anchor holes and are parallel to each other.

进一步的,两个所述的L型圆管4、7上下或者左右对称设置。Further, the two L-shaped round pipes 4 and 7 are arranged symmetrically up and down or left and right.

具体的安装方法如下:The specific installation method is as follows:

将同一钢拱架中的一个锁脚锚杆通过钻孔,插入到充满锚固剂的锚杆孔内,另一个锁脚锚杆按照同样的方式安装在另一个锚孔内,沿着锚杆孔所在的方向,旋转锚杆自由端的可移动弹性半球体和六角螺母3,直到无法转动为止。Insert one anchor bolt in the same steel arch into the anchor hole filled with anchoring agent through the drill hole, and install the other anchor bolt in the other anchor hole in the same way, along the anchor hole Rotate the movable elastic hemisphere and the hexagon nut 3 at the free end of the anchor rod until it cannot be rotated.

在一个锁脚锚杆杆端安装1#L型圆管4,另一个杆端安装2#L型圆管7,旋转至L型圆管与六角螺母3紧密接触为止。Install a 1# L-shaped round pipe 4 at the end of one lock foot anchor rod, install a 2# L-shaped round pipe 7 at the other end, and rotate until the L-shaped round pipe is in close contact with the hex nut 3.

向外旋转套入1#L型圆管4自由端的六角螺母体6,便可将螺栓5套入六角螺母体6中,从而将1#L型圆管4与2#L型圆管7联接为一体,形成U型联接锁,最终两支锁脚锚杆与U型联接锁形成一体化支护结构。Rotate outward and insert the hexagonal nut body 6 at the free end of the 1#L-shaped round pipe 4, and then insert the bolt 5 into the hexagonal nut body 6, thereby connecting the 1#L-shaped round pipe 4 with the 2#L-shaped round pipe 7 As a whole, a U-shaped joint lock is formed, and finally the two locking foot anchor rods and the U-shaped joint lock form an integrated support structure.

本发明中所述的弹性半球体类似于一个密封圈类的结构,其主要作用是为了用于吸收钢拱架形变的部分能量,其紧密的套装在锚杆上。The elastic hemisphere described in the present invention is similar to a sealing ring structure, its main function is to absorb part of the energy of the deformation of the steel arch, and it is tightly fitted on the anchor rod.

本发明中的弹性半球体与六角螺母之间相互接触,不连接,是两个独立的部件,通过六角螺母进行旋转拧紧,使弹性半球体与六角螺母之间紧密接触,形成一体化的先柔后刚支护结构。In the present invention, the elastic hemisphere and the hexagon nut are in contact with each other and are not connected. They are two independent parts. The hexagon nut is rotated and tightened to make the elastic hemisphere and the hexagon nut closely contact each other to form an integrated first flexible Just after supporting the structure.

综上所述,本发明通过增设弹性半球体和六角螺母,创造性的采用先柔后刚的支护方式,极大的增强了锁脚锚杆的支护作用效果;杆端U型联接锁的设置,将同一钢拱架中的两支锁脚锚杆联接成一体化支护结构,提高了支护的整体性和承载力,有效控制了钢拱架变形,保障了隧道的施工安全及运营安全。To sum up, the present invention creatively adopts the support method of first softness and then rigidity by adding elastic hemispheres and hexagonal nuts, which greatly enhances the support effect of the locking foot bolt; the U-shaped joint lock at the rod end The two lock-foot anchors in the same steel arch frame are connected into an integrated support structure, which improves the integrity and bearing capacity of the support, effectively controls the deformation of the steel arch frame, and ensures the construction safety and operation of the tunnel. Safety.

上述虽然结合附图对本发明的具体实施方式进行了描述,但并非对本发明保护范围的限制,所属领域技术人员应该明白,在本发明的技术方案的基础上,本领域技术人员不需要付出创造性劳动即可做出的各种修改或变形仍在本发明的保护范围以内。Although the specific implementation of the present invention has been described above in conjunction with the accompanying drawings, it does not limit the protection scope of the present invention. Those skilled in the art should understand that on the basis of the technical solution of the present invention, those skilled in the art do not need to pay creative work Various modifications or variations that can be made are still within the protection scope of the present invention.

Claims (7)

1.一种先柔后刚的锁脚锚杆组合支护装置,其特征在于,包括两支先柔后刚的锁脚锚杆和位于杆端的U型联接锁,所述的U型联接锁将两个先柔后刚的锁脚锚杆连接在一起形成一体化支护结构;所述的锁脚锚杆的自由端设有可沿着锚杆轴线方向来回移动的弹性半球体和螺母,所述的弹性半球体可吸收钢拱架形变的部分能量,并通过所述的螺母旋紧固定,提供先柔后刚的支护方式;1. A combined support device for locking feet and bolts that is soft first and then rigid, is characterized in that it includes two soft and then rigid locking feet anchors and a U-shaped joint lock positioned at the rod end, and the U-shaped joint lock Connect two anchor bolts that are soft first and then rigid to form an integrated support structure; the free end of the anchor bolt is provided with an elastic hemisphere and a nut that can move back and forth along the axis of the anchor, The elastic hemispherical body can absorb part of the energy of the deformation of the steel arch, and is tightened and fixed by the nut, providing a support method that is soft first and then rigid; 所述的U型联接锁包括两个安装在锚杆杆端的类似于L型的圆管,其中一个圆管的自由端设有螺母本体,另一个圆管的端部设有一个与所述的螺母本体相配合的螺栓,两个圆管相连后形成U型联接锁。The U-shaped joint lock includes two L-shaped round tubes installed on the end of the anchor rod, wherein the free end of one round tube is provided with a nut body, and the end of the other round tube is provided with a The nut body matches the bolt, and the two round pipes are connected to form a U-shaped joint lock. 2.如权利要求1所述的先柔后刚的锁脚锚杆组合支护装置,其特征在于,两个所述的L型圆管与锚杆之间通过螺纹连接,在所述的L型圆管内部设有与锚杆的外螺纹配合的内螺纹。2. As claimed in claim 1, the combined supporting device of locking feet and anchor rods that is soft first and then rigid, is characterized in that, the two L-shaped round pipes are connected with the anchor rods by threads, and in the L The inside of the shaped round tube is provided with an internal thread matched with the external thread of the anchor rod. 3.如权利要求1所述的先柔后刚的锁脚锚杆组合支护装置,其特征在于,所述的锁脚锚杆插装在不同的锚孔内,且相互平行。3. The combined supporting device of soft first and then rigid locking foot and anchor rods according to claim 1, wherein the locking foot anchor rods are inserted into different anchor holes and are parallel to each other. 4.如权利要求1所述的先柔后刚的锁脚锚杆组合支护装置,其特征在于,两个所述的L型圆管上下或者左右对称设置。4. The combined supporting device of locking feet and anchor rods that is flexible first and then rigid as claimed in claim 1, wherein the two L-shaped round tubes are arranged symmetrically up and down or left and right. 5.如权利要求1所述的先柔后刚的锁脚锚杆组合支护装置,其特征在于,所述的螺母本体、螺栓焊接在各自对应的所述圆管上。5 . The combined supporting device of soft first and then rigid locking foot and anchor rods according to claim 1 , wherein the nut body and bolts are welded to the respective corresponding round pipes. 6 . 6.如权利要求1所述的先柔后刚的锁脚锚杆组合支护装置,其特征在于,所述的螺母本体为一个实心的柱状结构,在其外部设有外螺纹;所述的螺栓为一个空心的柱状结构,在柱状结构的内部设有内螺纹,所述的内螺纹和外螺纹相互配合。6. The combined supporting device of locking feet and anchor rods that is flexible first and then rigid as claimed in claim 1, wherein the nut body is a solid columnar structure, and an external thread is provided outside it; The bolt is a hollow columnar structure, and an internal thread is provided inside the columnar structure, and the internal thread and the external thread cooperate with each other. 7.如权利要求1-6所述的先柔后刚的锁脚锚杆组合支护装置的安装方法,其特征在于,7. The installation method of the combination support device of locking feet and anchor rods that is soft first and then rigid according to claims 1-6, characterized in that, 将同一钢拱架中的一个锁脚锚杆通过钻孔插入到充满锚固剂的锚杆孔内,另一个锁脚锚杆按照同样的方式放置在另一个锚杆孔内;沿着锚杆孔所在的方向,旋转两个锁脚锚杆自由端的可移动弹性半球体和螺母,直到无法转动为止;Insert one lock-foot anchor in the same steel arch into the anchor hole filled with anchoring agent through drilling, and place the other lock-foot anchor in the other anchor hole in the same way; along the anchor hole Rotate the movable elastic hemispheres and nuts at the free ends of the two locking foot anchor rods until they cannot be rotated in the same direction; 在一个锁脚锚杆的杆端安装一个L型圆管,另一个锁脚锚杆的杆端安装另一个L型圆管,且旋转两个L型圆管与六角螺母紧密接触为止;Install an L-shaped round tube on the rod end of one lock-foot anchor rod, install another L-shaped round tube on the rod end of the other lock-foot anchor rod, and rotate the two L-shaped round tubes until they are in close contact with the hex nut; 将一个L型圆管的自由端的螺母体旋入到另一个L型圆管的螺栓中,从而将两个L型圆管联接为一体,,形成U型联接锁,最终两支锁脚锚杆与U型联接锁形成一体化支护结构。Screw the nut body of the free end of one L-shaped round tube into the bolt of another L-shaped round tube, so as to connect the two L-shaped round tubes into one, forming a U-shaped joint lock, and finally two locking foot anchor rods It forms an integrated support structure with the U-shaped joint lock.
CN201611207470.0A 2016-12-23 2016-12-23 A kind of combined support device and installation method of locking foot anchor rod with flexibility first and then rigidity Expired - Fee Related CN106523004B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611207470.0A CN106523004B (en) 2016-12-23 2016-12-23 A kind of combined support device and installation method of locking foot anchor rod with flexibility first and then rigidity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611207470.0A CN106523004B (en) 2016-12-23 2016-12-23 A kind of combined support device and installation method of locking foot anchor rod with flexibility first and then rigidity

Publications (2)

Publication Number Publication Date
CN106523004A true CN106523004A (en) 2017-03-22
CN106523004B CN106523004B (en) 2019-04-30

Family

ID=58338617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611207470.0A Expired - Fee Related CN106523004B (en) 2016-12-23 2016-12-23 A kind of combined support device and installation method of locking foot anchor rod with flexibility first and then rigidity

Country Status (1)

Country Link
CN (1) CN106523004B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107035391A (en) * 2017-05-23 2017-08-11 中铁第四勘察设计院集团有限公司 A kind of attachment means of locking angle steel pipe and steelframe
CN107676110A (en) * 2017-08-23 2018-02-09 中铁二十二局集团有限公司 A kind of attachment structure for locking pin anchor and supporting bow member
CN111878134A (en) * 2020-08-21 2020-11-03 中铁隆昌铁路器材有限公司 Support system and support method for foot-locking anchor rod

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202866840U (en) * 2012-09-05 2013-04-10 淮南市顺辉锚固有限公司 Full-thread glass fiber composite hollow grouting anchor rod
CN103498690A (en) * 2013-09-04 2014-01-08 中国矿业大学 Double-anchor-cable combination locking device and method thereof
CN104832200A (en) * 2015-04-17 2015-08-12 山东大学 Self-adaptive feet-lock bolt integrated device and application method thereof
CN204716271U (en) * 2015-06-29 2015-10-21 云南驰宏锌锗股份有限公司 A kind of steel band suspension device that intersects
CN205714235U (en) * 2016-03-31 2016-11-23 山东科技大学 A kind of pressure-relieving achor bar pallet
CN206267860U (en) * 2016-12-23 2017-06-20 山东大学 A kind of soft rear firm lock foot anchoring stock combination supporting device of elder generation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202866840U (en) * 2012-09-05 2013-04-10 淮南市顺辉锚固有限公司 Full-thread glass fiber composite hollow grouting anchor rod
CN103498690A (en) * 2013-09-04 2014-01-08 中国矿业大学 Double-anchor-cable combination locking device and method thereof
CN104832200A (en) * 2015-04-17 2015-08-12 山东大学 Self-adaptive feet-lock bolt integrated device and application method thereof
CN204716271U (en) * 2015-06-29 2015-10-21 云南驰宏锌锗股份有限公司 A kind of steel band suspension device that intersects
CN205714235U (en) * 2016-03-31 2016-11-23 山东科技大学 A kind of pressure-relieving achor bar pallet
CN206267860U (en) * 2016-12-23 2017-06-20 山东大学 A kind of soft rear firm lock foot anchoring stock combination supporting device of elder generation

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107035391A (en) * 2017-05-23 2017-08-11 中铁第四勘察设计院集团有限公司 A kind of attachment means of locking angle steel pipe and steelframe
CN107035391B (en) * 2017-05-23 2020-05-19 中铁第四勘察设计院集团有限公司 Connecting device of lock angle steel pipe and steel frame
CN107676110A (en) * 2017-08-23 2018-02-09 中铁二十二局集团有限公司 A kind of attachment structure for locking pin anchor and supporting bow member
CN107676110B (en) * 2017-08-23 2023-09-08 北京工业大学 A connection structure between a locking foot anchoring device and a supporting arch frame
CN111878134A (en) * 2020-08-21 2020-11-03 中铁隆昌铁路器材有限公司 Support system and support method for foot-locking anchor rod

Also Published As

Publication number Publication date
CN106523004B (en) 2019-04-30

Similar Documents

Publication Publication Date Title
CN104265339B (en) A kind of extruding, friction-type energy-absorption anchor rod
CN107829767B (en) A segmented assembly type pressure-reducing hollow grouting anchor and its construction method
WO2011153810A1 (en) Constant resistance and large deformation anchor rod
CN110821539A (en) Energy-absorbing anchor rod with function of monitoring surrounding rock deformation and construction method thereof
CN105544739A (en) Single-layer reticulated shell bolt connection node and constructing and mounting method
CN106523004A (en) Rigid-after-flexible feet-lock bolt combined supporting device and installation method
CN103277122A (en) Method for drilling anchor rod hole and anchoring anchor rod in broken roof
CN107387143A (en) One kind frictionally secures formula anchor pole
CN103422873A (en) Strong-strength extendable anchor rod
CN205117379U (en) Let pressure stock from advancing formula large deformation
CN105275095A (en) Circular steel tube column in threaded connection and construction method
CN202882965U (en) Non-resin multi-anchor rock bolt capable of stopping rotation reversely
CN205089345U (en) Anchor rope is put by pressure equipment
CN205172614U (en) Resin stock suitable for soft rock roadway support
CN204082188U (en) A kind of extruding, friction-type energy-absorption anchor rod
CN206876021U (en) A kind of cooling copper tube for being easy to connection
CN211174167U (en) Water injection hollow anchor rod for preventing rock burst
CN206267860U (en) A kind of soft rear firm lock foot anchoring stock combination supporting device of elder generation
CN205100376U (en) Threaded connection's circular steel tube post
CN208416591U (en) A kind of drainage anchor rod for workings subject to dy namic pressure
CN203463126U (en) Energy-absorbing anchor rod
CN202882968U (en) Multi-anchoring-point anchor rod without resin
CN207470209U (en) A kind of support system for controlling serious deformation
CN105421867A (en) Loop ground anchor device and installation method
CN205369543U (en) Individual layer net shell bolted connection node

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant