CN106522875A - Well cementation joint - Google Patents

Well cementation joint Download PDF

Info

Publication number
CN106522875A
CN106522875A CN201611116476.7A CN201611116476A CN106522875A CN 106522875 A CN106522875 A CN 106522875A CN 201611116476 A CN201611116476 A CN 201611116476A CN 106522875 A CN106522875 A CN 106522875A
Authority
CN
China
Prior art keywords
pipe nipple
cementing
ball
crown body
preposition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611116476.7A
Other languages
Chinese (zh)
Inventor
康克利
高飞
王战卫
左冰心
戴勇
李天鹏
李浪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Xibu Drilling Engineering Co Ltd
Original Assignee
CNPC Xibu Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Xibu Drilling Engineering Co Ltd filed Critical CNPC Xibu Drilling Engineering Co Ltd
Priority to CN201611116476.7A priority Critical patent/CN106522875A/en
Publication of CN106522875A publication Critical patent/CN106522875A/en
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00—Sealing or packing boreholes or wells
    • E21B33/10—Sealing or packing boreholes or wells in the borehole
    • E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

The invention relates to the technical field of well cementation tools, and in particular relates to a well cementation joint. The well cementation joint comprises a central tube body, an ahead short section, a cementing short section and a replacement short section with the outer end sealed, wherein the replacement short section, cementing short section and ahead short section are sequentially fixed on the central tube body at intervals from top to bottom, the replacement short section, cementing short section and ahead short section are respectively communicated with the central tube body, and an upper connecting piece is fixedly arranged between the replacement short section and the cementing short section. The well cementation joint is reasonable and compact in structure and easy to use, in a working procedure of injecting ahead fluid, cement slurry and replacement fluid, after pipelines of the cementing short section, ahead short section and the like are connected, the pipelines do not need to be assembled and disassembled multiple times, and switching of an injection working procedure can be realized by controlling an upper switch assembly, a lower switch assembly, a preposed switch assembly and a cementing switch assembly, so that an intermediate link such as waiting is eliminated, construction time is shortened, and well cementation efficiency can be improved.

Description

Cementing joint
Technical field
The present invention relates to cementing tool technical field, is a kind of cementing joint.
Background technology
Xinjiang Oilfield viscous crude well cementation at present is using special cementing technology, by being equipped with prestressed ground in bunch tube bottom Anchor, after well cementing impact pressure, lifts bunch tube, release slips fixed sleeving string, completes well cementing operation.At present well cementation be carry out before Liquid, cement mortar and displacement fluid injection three process is put, is connect using well cementation in above prepad fluid, cement mortar and displacement fluid injection process Head coordinating operation, existing cementing joint need to repeatedly load and unload pipeline, and such as loading and unloading pipeline after cemented up slurry can just carry out lower step Operation, due to the inconvenience of wellfield layout, rig-floor tools and adnexa connecting pipeline, increases the engineering time, affects well cementation efficiency.
The content of the invention
The invention provides a kind of cementing joint, overcomes the deficiency of above-mentioned prior art, its energy effectively solving is using existing There is cementing joint to carry out present in well cementing operation process, needing the problem of being dismounted for multiple times pipeline.
The technical scheme is that by following measures to realize:A kind of cementing joint, including it is center tubes, preposition The replacement pipe nipple of pipe nipple, cementing pipe nipple and outer end closure, replaces pipe nipple, cementing pipe nipple and preposition pipe nipple from top to bottom sequentially Interval is fixed in center tubes, is replaced pipe nipple, cementing pipe nipple and preposition pipe nipple and is communicated with center tubes respectively, short replacing Upper connector is installed between section and cementing pipe nipple, is provided with upper connector and can will be replaced pipe nipple and cementing pipe nipple The upper interface channel of connection, is provided with the upper switch module of interface channel on closing or turning on, on upper connector in water filling Lower connector is installed between mud pipe nipple and preposition pipe nipple, being provided with lower connector can be short with preposition by cementing pipe nipple The lower interface channel of section connection, it is upper be provided with can close or turn under interface channel lower switch module, in center tubes and The cementing that center tubes can be made to be turned on cementing pipe nipple or be not communicated with is installed on the cementing pipe nipple between upper connector Switch module, being provided with the preposition pipe nipple between center tubes and lower connector to make center tubes turn on preposition pipe nipple Or the prefix switch component being not communicated with, plug is installed with the upper end of center tubes.
The further optimization and/or improvements to foregoing invention technical scheme are presented herein below:
Above-mentioned cementing switch module includes cementing lock ball screw rod and is built in cementing pipe nipple and can block cementing pipe nipple Ball-crown body three, be integrally fixed with transition block three at the bottom edge of ball-crown body three, at the bottom of transition block three and ball-crown body three Cementing opening is formed between face, the junction of ball-crown body three is provided with opening tapped blind hole one outwardly in transition block three, It has been radially arranged on cementing pipe nipple and one corresponding fixing screwed hole one of tapped blind hole, the fixed installation of cementing lock ball screw rod In fixing screwed hole one and tapped blind hole one, it is provided with out in the cementing lock ball screw rod outer end on the outside of cementing pipe nipple Mouth open slot one outwardly;Or/and, prefix switch component includes preposition lock ball screw rod and is built in preposition pipe nipple and before blocking The ball-crown body four of pipe nipple is put, and transition block four is integrally fixed with the bottom edge of ball-crown body four, in transition block four and ball-crown body Prepad fluid opening is formed between four bottom surface, transition block four and the junction of ball-crown body four opening screw thread outwardly is provided with blind Hole two, has been radially arranged and two corresponding fixing screwed hole two of tapped blind hole in preposition pipe nipple, preposition lock ball screw rod fixed installation In fixing screwed hole two and tapped blind hole two, the preposition lock ball screw rod outer end on the outside of preposition pipe nipple is provided with opening court Outer open slot two.
Above-mentioned upper switch module includes lock ball screw rod and is built in upper connector and can block the spherical crown of interface channel Body one, is integrally fixed with transition block one, at the bottom edge of ball-crown body one between the bottom surface of transition block one and ball-crown body one Upper shed is formed, the junction of ball-crown body one opening upper tapped blind hole outwardly is provided with transition block one, in upper connector On be radially arranged upper fixing screwed hole corresponding with upper tapped blind hole, upper lock ball screw rod be fixedly mounted on fixing screwed hole and In upper tapped blind hole, the upper lock ball screw rod outer end on the outside of upper connector is provided with opening upper shed groove outwardly.
Above-mentioned upper connector includes connecting short section one, high-pressure hose one and ball valve joint one, the upper end of connecting short section one with Replace pipe nipple to be fixedly installed togather and communicate, lower end and the cementing pipe nipple of ball valve joint one are fixedly installed togather and phase Logical, lower end and the upper end of high-pressure hose one of connecting short section one are fixedly installed togather by pressure cap, the lower end of high-pressure hose one It is fixedly installed togather by pressure cap with the upper end of ball valve joint one, ball-crown body one is built in ball valve joint one, upper fixed screw thread Hole is arranged on ball valve joint one.
Above-mentioned lower switch module includes lower lock ball screw rod and is built in lower connector and can block the spherical crown of lower interface channel Body two, is integrally fixed with transition block two at the bottom edge of ball-crown body two, at transition block two and the bottom of ball-crown body ball-crown body two Under shed is formed between face, the junction of ball-crown body two opening lower tapped blind hole outwardly is provided with transition block two, under Lower fixing screwed hole corresponding with lower tapped blind hole is radially arranged on connector, lower lock ball screw rod is fixedly mounted on lower fixed spiral shell In pit and lower tapped blind hole, the lower lock ball screw rod outer end on the outside of lower connector is provided with opening under shed outwardly Groove.
Above-mentioned lower connector includes connecting short section two, high-pressure hose two and ball valve joint two, the upper end of ball valve joint two with Cementing pipe nipple is fixedly installed togather and communicates, and the lower end of connecting short section two is fixedly installed togather with preposition pipe nipple and phase Logical, upper end and the lower end of high-pressure hose two of connecting short section two are fixedly installed togather by pressure cap, the upper end of high-pressure hose two It is fixedly installed togather by pressure cap with the lower end of ball valve joint two, ball-crown body two is built in ball valve joint two, lower fixed screw thread Hole is arranged on ball valve joint two.
Above-mentioned replacement pipe nipple, cementing pipe nipple and preposition pipe nipple are located at the same side of center tubes;Or/and, it is short replacing The outer end of section is installed with blocking cap;Or/and, blocking cap is installed with the outer end of cementing pipe nipple;Or/and, preposition short The outer end of section is installed with blocking cap.
Present configuration is reasonable and compact, easy to use, and which is carrying out the injection process of prepad fluid, cement mortar and displacement fluid During, after the pipeline connection of cementing pipe nipple and preposition pipe nipple etc., without the need for repeatedly loading and unloading pipeline, by the upper switches set of control Part, lower switch module, prefix switch component and cementing switch module are capable of achieving the switching of injection process, so as to reduce wait Etc. intermediate link, the engineering time is shortened, it is possible to increase well cementation efficiency.
Description of the drawings
Main view cross section structure diagram of the accompanying drawing 1 for preferred embodiment.
Coding in accompanying drawing is respectively:Body centered on 1,2 is preposition pipe nipple, and 3 is cementing pipe nipple, and 4 to replace pipe nipple, 5 is plug, and 6 is cementing lock ball screw rod, and 7 is ball-crown body three, and 8 is transition block three, and 9 is cementing opening, and 10 is open slot one, 11 is preposition lock ball screw rod, and 12 is ball-crown body four, and 13 is transition block four, and 14 is prepad fluid opening, and 15 is open slot two, and 16 is upper Lock ball screw rod, 17 is ball-crown body one, and 18 is transition block one, and 19 is upper shed, and 20 is upper shed groove, and 21 is connecting short section one, 22 For high-pressure hose one, 23 is ball valve joint one, and 24 is lower lock ball screw rod, and 25 is ball-crown body two, and 26 is transition block two, 27 be under open Mouthful, 28 is under shed groove, and 29 is connecting short section two, and 30 is high-pressure hose two, and 31 is ball valve joint two, and 32 is pressure cap, and 33 is stifled Cap.
Specific embodiment
The present invention is not limited by following embodiments, can technology according to the present invention scheme and practical situation determining specifically Embodiment.
In the present invention, for the ease of description, the description of the relative position relation of each part is according to Figure of description 1 Butut mode being described, such as:The position relationship of forward and backward, upper and lower, left and right etc. is the Butut according to Figure of description Direction is determining.
With reference to embodiment and accompanying drawing, the invention will be further described:
As shown in Figure 1, the cementing joint includes the replacement of center tubes 1, preposition pipe nipple 2, cementing pipe nipple 3 and outer end closure Pipe nipple 4, sequentially interval is fixed in center tubes 1 from top to bottom to replace pipe nipple 4, cementing pipe nipple 3 and preposition pipe nipple 2, is replaced Pipe nipple 4, cementing pipe nipple 3 and preposition pipe nipple 2 are communicated with center tubes 1 respectively, are being replaced between pipe nipple 4 and cementing pipe nipple 3 Upper connector is installed with, is provided with upper connector and the upper connection that replacement pipe nipple 4 is connected with cementing pipe nipple 3 can be led to Road, is provided with the upper switch module of interface channel on closing or turning on upper connector, short with preposition in cementing pipe nipple 3 Lower connector is installed between section 2, is provided with lower connector under can be connected cementing pipe nipple 3 with preposition pipe nipple 2 Interface channel, it is upper be provided with can close or turn under interface channel lower switch module, center tubes 1 and upper connector it Between cementing pipe nipple 3 on the cementing switches set that center tubes 1 can be made to turn on or be not communicated with cementing pipe nipple 3 is installed Part, be provided with the preposition pipe nipple 2 between center tubes 1 and lower connector center tubes 1 can be made to turn on preposition pipe nipple 2 or The prefix switch component being not communicated with, is installed with plug 5 in the upper end of center tubes 1.
Center tubes 1, landing joint and bunch tube are sequentially connected in well head, preposition pipe nipple 2 is connected with water pipeline, cementing Pipe nipple 3 is connected with cementing pipeline, is replacing the center tubes 1 between pipe nipple 4 and cementing pipe nipple 3 built with plug, well cementation Early stage, by controlling prefix switch component, makes center tubes 1 communicate with preposition pipe nipple 2, then by preposition pipe nipple 2 into well Note prepad fluid(Clear water), after prepad fluid injection is finished, by controlling prefix switch component, make center tubes 1 with preposition pipe nipple 2 not Communicate, then, by control upper switch module, lower switch module and cementing switch module, make interface channel obstructed, lower company Connect road also obstructed, cementing pipe nipple 3 is communicated with center tubes 1, cement mortar is injected by cementing pipe nipple 3 into well, is treated When cement mortar returns to design well depth, by controlling cementing switch module, cementing pipe nipple 3 is made to be not communicated with center tubes 1, tightly Then, displacement fluid is noted by preposition pipe nipple 2 into well(Clear water), after reaching design flow, then by the upper switch module of control, under open Component and prefix switch component are closed, interface channel is connected with lower interface channel, make preposition pipe nipple 2 and center tubes 1 not phase Logical, displacement fluid is through upper interface channel, lower interface channel and replaces after pipe nipple 4 into center tubes 1, and plug is headed in well, Plug is entered in the impacting seat of shaft bottom, lifts prestressing force and complete well cementing operation after bruising.Also well-flushing can be carried out by preposition pipe nipple 2, Circulating mud bottom-hole cleaning.Prefix switch component, upper switch module, lower switch module and cementing switch module are respectively existing The component with switching function in known technology.
By above-mentioned well cementing process, during the injection process for carrying out prepad fluid, cement mortar and displacement fluid, water filling After the pipeline connection of mud pipe nipple 3 and preposition pipe nipple 2 etc., without the need for repeatedly loading and unloading pipeline, by control upper switch module, lower switches set Part, prefix switch component and cementing switch module are capable of achieving the switching of injection process, so as to reduce the intermediate links such as wait, Shorten the engineering time, it is possible to increase well cementation efficiency.
According to actual needs above-mentioned cementing joint can be made further optimization and/or improvements:
As shown in Figure 1, cementing switch module includes cementing lock ball screw rod 6 and is built in cementing pipe nipple 3 and can block The ball-crown body 37 of cementing pipe nipple 3, is integrally fixed with transition block 38, at the bottom edge of ball-crown body 37 in transition block 38 Cementing opening 9 is formed and the bottom surface of ball-crown body 37 between, the junction of ball-crown body 37 is provided with opening in transition block 38 Tapped blind hole one outwardly, has been radially arranged on cementing pipe nipple 3 and one corresponding fixing screwed hole one of tapped blind hole, water filling Mud lock ball screw rod 6 is fixedly mounted in fixing screwed hole one and tapped blind hole one, in the cementing on the outside of cementing pipe nipple 3 6 outer end of lock ball screw rod is provided with opening open slot 1 outwardly;Or/and, prefix switch component includes preposition lock ball screw rod 11 Be built in preposition pipe nipple 2 and can block the ball-crown body 4 12 of preposition pipe nipple 2, integrally consolidate at the bottom edge of ball-crown body 4 12 Surely there is transition block 4 13, prepad fluid opening 14 is formed between the bottom surface of transition block 4 13 and ball-crown body 4 12, in transition block four 13 are provided with opening tapped blind hole two outwardly with the junction of ball-crown body 4 12, have been radially arranged and screw thread in preposition pipe nipple 2 Two corresponding fixing screwed hole two of blind hole, preposition lock ball screw rod 11 are fixedly mounted in fixing screwed hole two and tapped blind hole two, Preposition 11 outer end of lock ball screw rod on the outside of preposition pipe nipple 2 is provided with opening open slot 2 15 outwardly.
During the dead in line of the spherical crown summit of ball-crown body 37 and cementing pipe nipple 3, cementing switch module is in closing shape State(Cementing pipe nipple 3 is made to be not communicated with center tubes 1), by instrument(Screwdriver or other instruments)Open slot 1 is placed in, is revolved Change a job tool, ball-crown body 37 is rotated around the axis of cementing lock ball screw rod 6, until cementing pipe nipple 3 and center tubes 1 is turned on by cementing opening 9(Cementing switch module is in open mode);When needing to close cementing switch module, By reversely rotating instrument, rotate ball-crown body 37, until cementing pipe nipple 3 is insulated by ball-crown body 37.
During the dead in line of 4 12 spherical crown summit of ball-crown body and preposition pipe nipple 2, prefix switch component is closed(Make Preposition pipe nipple 2 is not communicated with center tubes 1), instrument is placed in into open slot 2 15, throw makes ball-crown body 4 12 around front The axis for putting lock ball screw rod 11 is rotated, until preposition pipe nipple 2 is turned on by prepad fluid opening 14 with center tubes 1(It is preposition Switch module is in open mode);When needing to close prefix switch component, by reversely rotating instrument, ball-crown body 4 12 is made Rotate, until preposition pipe nipple 2 is insulated by ball-crown body 4 12.
The setting of open slot 1 is easy to the folding of cementing switch module, the setting of open slot 2 15 to be easy to prefix switch The folding of component, which can further shorten the engineering time.
As shown in Figure 1, upper switch module includes lock ball screw rod 16 and is built in upper connector and can block connection The ball-crown body 1 of passage, is integrally fixed with transition block 1 at the bottom edge of ball-crown body 1, transition block 1 with Upper shed 19 is formed between the bottom surface of ball-crown body 1, the junction of ball-crown body 1 is provided with opening court in transition block 1 Outer upper tapped blind hole, has been radially arranged fixing screwed hole on corresponding with upper tapped blind hole, upper lock ball spiral shell on upper connector Bar 16 is fixedly mounted in fixing screwed hole and upper tapped blind hole, in upper 16 outer end of lock ball screw rod on the outside of upper connector It is provided with opening upper shed groove 20 outwardly.
During the dead in line of the spherical crown summit of ball-crown body 1 and upper connector, upper switch module is closed(Make Cementing pipe nipple 3 is not communicated with pipe nipple 4 is replaced), instrument is placed in into upper shed groove 20, throw surround ball-crown body 1 The axis of upper lock ball screw rod 16 is rotated, until cementing pipe nipple 3 is turned on by upper shed 19 with pipe nipple 4 is replaced(Upper switch Component is in open mode);When needing to close upper switch module, by reversely rotating instrument, rotate ball-crown body 1, directly Upper connector is insulated to ball-crown body 1.Upper shed groove 20 arranges the folding that can be easy to upper switch module, further shortens Engineering time.
As shown in Figure 1, upper connector includes connecting short section 1, high-pressure hose 1 and ball valve joint 1, connection The upper end of pipe nipple 1 is fixedly installed togather and is communicated with pipe nipple 4 is replaced, lower end and the cementing pipe nipple 3 of ball valve joint 1 It is fixedly installed togather and communicates, the lower end of connecting short section 1 is fixedly mounted by pressure cap 32 with the upper end of high-pressure hose 1 Together, the lower end of high-pressure hose 1 is fixedly installed togather by pressure cap 32 with the upper end of ball valve joint 1, ball-crown body One 17 are built in ball valve joint 1, and upper fixing screwed hole is arranged on ball valve joint 1.Connecting short section one 21, high-pressure hose One 22 and the combination of ball valve joint 1 the characteristics of there is easy accessibility, further shorten the engineering time.
As shown in Figure 1, lower switch module includes lower lock ball screw rod 24 and is built in lower connector and can block lower connection The ball-crown body 2 25 of passage, is integrally fixed with transition block 2 26 at the bottom edge of ball-crown body 2 25, transition block 2 26 with Under shed 27 is formed between the bottom surface of ball-crown body ball-crown body 2 25, is provided with the junction of ball-crown body 2 25 in transition block 2 26 Opening lower tapped blind hole outwardly, has been radially arranged lower fixing screwed hole corresponding with lower tapped blind hole on lower connector, under Lock ball screw rod 24 is fixedly mounted in lower fixing screwed hole and lower tapped blind hole, in the lower lock ball screw rod on the outside of lower connector 24 outer ends are provided with opening under shed groove 28 outwardly.
During the dead in line of the spherical crown summit of ball-crown body 2 25 and lower connector, lower switch module is closed(Make Cementing pipe nipple 3 is not communicated with preposition pipe nipple 2), instrument is placed in under shed groove 28, throw surround ball-crown body 2 25 The axis of lower lock ball screw rod 24 is rotated, until cementing pipe nipple 3 is turned on by upper shed 19 with preposition pipe nipple 2(Lower switch Component is in open mode);When needing to close lower switch module, by reversely rotating instrument, rotate ball-crown body 2 25, directly Lower connector is insulated to ball-crown body 2 25.Under shed groove 28 arranges the folding that can be easy to lower switch module, further shortens Engineering time.
As shown in Figure 1, lower connector includes connecting short section 2 29, high-pressure hose 2 30 and ball valve joint 2 31, ball valve The upper end of joint 2 31 is fixedly installed togather and is communicated with cementing pipe nipple 3, the lower end of connecting short section 2 29 and preposition pipe nipple 2 It is fixedly installed togather and communicates, the upper end of connecting short section 2 29 is fixedly mounted by pressure cap 32 with the lower end of high-pressure hose 2 30 Together, the upper end of high-pressure hose 2 30 is fixedly installed togather by pressure cap 32 with the lower end of ball valve joint 2 31, ball-crown body 2 25 are built in ball valve joint 2 31, and lower fixing screwed hole is arranged on ball valve joint 2 31.Connecting short section 2 29, high-pressure hose 2 30 and the combination of ball valve joint 2 31 the characteristics of there is easy accessibility, further shorten the engineering time.
As shown in Figure 1, replace the same side that pipe nipple 4, cementing pipe nipple 3 and preposition pipe nipple 2 are located at center tubes 1;Or/ With, replace pipe nipple 4 outer end be installed with blocking cap 33;Or/and, blocking cap is installed with the outer end of cementing pipe nipple 3 33;Or/and, blocking cap 33 is installed with the outer end of preposition pipe nipple 2.Replace pipe nipple 4, cementing pipe nipple 3 and preposition pipe nipple 2 When the same side of center tubes 1, the winding of pipeline can be prevented.The outer end for replacing pipe nipple 4 is sealed by blocking cap 33, is being not required to When to be sealed, blocking cap 33 can be pulled down, improve the motility of the present invention.Blocking cap 33 on cementing pipe nipple 3 and preposition pipe nipple 2, Can install or do not install according to actual needs.
Above technical characteristic constitutes highly preferred embodiment of the present invention, and which has stronger adaptability and optimal enforcement effect Really, non-essential technical characteristic can be increased and decreased according to actual needs, meets the demand of different situations.

Claims (10)

1. a kind of cementing joint, it is characterised in that including the replacement of center tubes, preposition pipe nipple, cementing pipe nipple and outer end closure Pipe nipple, sequentially interval is fixed in center tubes from top to bottom to replace pipe nipple, cementing pipe nipple and preposition pipe nipple, replacement pipe nipple, Cementing pipe nipple and preposition pipe nipple are communicated with center tubes respectively, are installed between pipe nipple and cementing pipe nipple replacing Connector, is provided with upper connector and can will replace the upper interface channel that pipe nipple is connected with cementing pipe nipple, on upper connector The upper switch module that can close or turn on upper interface channel is installed, is installed between cementing pipe nipple and preposition pipe nipple Lower connector, is provided with the lower interface channel that cementing pipe nipple can be connected with preposition pipe nipple in lower connector, is provided with upper The lower switch module of lower interface channel can be closed or be turned on, is installed on the cementing pipe nipple between center tubes and upper connector Have the cementing switch module that center tubes and cementing pipe nipple can be made to turn on or be not communicated with, center tubes and lower connector it Between preposition pipe nipple on the prefix switch component that center tubes can be made to be turned on preposition pipe nipple or be not communicated with is installed, in central canal The upper end of body is installed with plug.
2. cementing joint according to claim 1, it is characterised in that cementing switch module includes cementing lock ball screw rod Be built in cementing pipe nipple and the ball-crown body three of cementing pipe nipple can be blocked, one is fixed at the bottom edge of ball-crown body three There is transition block three, cementing opening is formed between the bottom surface of transition block three and ball-crown body three, in transition block three and ball-crown body three Junction be provided with opening tapped blind hole one outwardly, be radially arranged on cementing pipe nipple corresponding with tapped blind hole one Fixing screwed hole one, cementing lock ball screw rod are fixedly mounted in fixing screwed hole one and tapped blind hole one, positioned at cementing Cementing lock ball screw rod outer end on the outside of pipe nipple is provided with opening open slot one outwardly;Or/and, before prefix switch component includes Put lock ball screw rod and be built in preposition pipe nipple and the ball-crown body four of preposition pipe nipple can be blocked, one at the bottom edge of ball-crown body four Body is fixed with transition block four, forms prepad fluid opening, in transition block four and ball between the bottom surface of transition block four and ball-crown body four The junction of hat body four is provided with opening tapped blind hole two outwardly, has been radially arranged in preposition pipe nipple corresponding with tapped blind hole two Fixing screwed hole two, preposition lock ball screw rod is fixedly mounted in fixing screwed hole two and tapped blind hole two, positioned at preposition short The preposition lock ball screw rod outer end in section outside is provided with opening open slot two outwardly.
3. cementing joint according to claim 1 and 2, it is characterised in that upper switch module includes lock ball screw rod and built-in The ball-crown body one of interface channel can simultaneously be blocked in upper connector, transition block is integrally fixed with the bottom edge of ball-crown body one One, upper shed is formed between the bottom surface of transition block one and ball-crown body one, arrange with the junction of ball-crown body one in transition block one There is opening upper tapped blind hole outwardly, fixing screwed hole on corresponding with upper tapped blind hole be radially arranged on upper connector, Upper lock ball screw rod is fixedly mounted in fixing screwed hole and upper tapped blind hole, in the upper lock ball screw rod on the outside of upper connector Outer end is provided with opening upper shed groove outwardly.
4. cementing joint according to claim 3, it is characterised in that upper connector includes connecting short section one, high-pressure hose one With ball valve joint one, the upper end of connecting short section one is fixedly installed togather and communicated with pipe nipple is replaced, the lower end of ball valve joint one It is fixedly installed togather and communicates with cementing pipe nipple, the lower end of connecting short section one is solid by pressure cap with the upper end of high-pressure hose one Dingan County is fitted together, and lower end and the upper end of ball valve joint one of high-pressure hose one are fixedly installed togather by pressure cap, ball-crown body One is built in ball valve joint one, and upper fixing screwed hole is arranged on ball valve joint one.
5. the cementing joint according to claim 1 or 2 or 4, it is characterised in that lower switch module include lower lock ball screw rod and The ball-crown body two that lower connector can simultaneously block lower interface channel is built in, was integrally fixed with the bottom edge of ball-crown body two Block two is crossed, under shed is formed between the bottom surface of transition block two and ball-crown body ball-crown body two, in transition block two and ball-crown body two Junction is provided with opening lower tapped blind hole outwardly, has been radially arranged corresponding with lower tapped blind hole lower solid on lower connector Determine screwed hole, lower lock ball screw rod is fixedly mounted in lower fixing screwed hole and lower tapped blind hole, on the outside of lower connector Lower lock ball screw rod outer end is provided with opening under shed groove outwardly.
6. cementing joint according to claim 3, it is characterised in that lower switch module includes lower lock ball screw rod and is built in Lower connector can simultaneously block the ball-crown body two of lower interface channel, at the bottom edge of ball-crown body two integrally be fixed with transition block Two, under shed is formed between the bottom surface of transition block two and ball-crown body ball-crown body two, in the handing-over of transition block two and ball-crown body two Place is provided with opening lower tapped blind hole outwardly, and lower fixed spiral shell corresponding with lower tapped blind hole has been radially arranged on lower connector Pit, lower lock ball screw rod are fixedly mounted in lower fixing screwed hole and lower tapped blind hole, in the lower lock on the outside of lower connector Ball screw rod outer end is provided with opening under shed groove outwardly.
7. cementing joint according to claim 5, it is characterised in that lower connector includes connecting short section two, high-pressure hose two With ball valve joint two, the upper end of ball valve joint two is fixedly installed togather and is communicated with cementing pipe nipple, under connecting short section two End is fixedly installed togather and is communicated with preposition pipe nipple, and the upper end of connecting short section two is solid by pressure cap with the lower end of high-pressure hose two Dingan County is fitted together, and upper end and the lower end of ball valve joint two of high-pressure hose two are fixedly installed togather by pressure cap, ball-crown body Two are built in ball valve joint two, and lower fixing screwed hole is arranged on ball valve joint two.
8. cementing joint according to claim 6, it is characterised in that lower connector includes connecting short section two, high-pressure hose two With ball valve joint two, the upper end of ball valve joint two is fixedly installed togather and is communicated with cementing pipe nipple, under connecting short section two End is fixedly installed togather and is communicated with preposition pipe nipple, and the upper end of connecting short section two is solid by pressure cap with the lower end of high-pressure hose two Dingan County is fitted together, and upper end and the lower end of ball valve joint two of high-pressure hose two are fixedly installed togather by pressure cap, ball-crown body Two are built in ball valve joint two, and lower fixing screwed hole is arranged on ball valve joint two.
9. the cementing joint according to claim 1 or 2 or 4 or 6 or 7 or 8, it is characterised in that replace pipe nipple, cementing short Section and preposition pipe nipple are located at the same side of center tubes;Or/and, blocking cap is installed with the outer end for replacing pipe nipple;Or/and, Blocking cap is installed with the outer end of cementing pipe nipple;Or/and, blocking cap is installed with the outer end of preposition pipe nipple.
10. cementing joint according to claim 5, it is characterised in that replace pipe nipple, cementing pipe nipple and preposition pipe nipple position In the same side of center tubes;Or/and, blocking cap is installed with the outer end for replacing pipe nipple;Or/and, in cementing pipe nipple Outer end is installed with blocking cap;Or/and, blocking cap is installed with the outer end of preposition pipe nipple.
CN201611116476.7A 2016-12-07 2016-12-07 Well cementation joint Pending CN106522875A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611116476.7A CN106522875A (en) 2016-12-07 2016-12-07 Well cementation joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611116476.7A CN106522875A (en) 2016-12-07 2016-12-07 Well cementation joint

Publications (1)

Publication Number Publication Date
CN106522875A true CN106522875A (en) 2017-03-22

Family

ID=58342804

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611116476.7A Pending CN106522875A (en) 2016-12-07 2016-12-07 Well cementation joint

Country Status (1)

Country Link
CN (1) CN106522875A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112360391A (en) * 2020-12-09 2021-02-12 中国石油天然气集团有限公司 Full-automatic wireless remote control well cementation cement head and use method
CN115217441A (en) * 2022-07-27 2022-10-21 中海石油(中国)有限公司湛江分公司 Ball-throwing device for cement injection plug and cement injection plug process thereof

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5035813A (en) * 1988-05-27 1991-07-30 Union Oil Company Of California Process and composition for treating underground formations penetrated by a well borehole
CN2916116Y (en) * 2006-01-24 2007-06-27 石凤岐 Separated double-plug casing cement head
CN101038038A (en) * 2007-04-20 2007-09-19 张长宗 Hard sealing ball valve
CN202597755U (en) * 2012-04-24 2012-12-12 上海星荣建设有限公司 Medium and low pressure pipeline locking and pressing type connecting structure applied to valve
CN102953707A (en) * 2012-11-13 2013-03-06 中国石油化工股份有限公司 Top-drive drill rod well cementing head
CN202832353U (en) * 2012-08-22 2013-03-27 沈阳白云机械有限公司 Straight-buckle fast connection cement head device with large inner diameter
CN202914026U (en) * 2012-11-22 2013-05-01 中国石油集团渤海钻探工程有限公司 Well cementation cement head
CN203162203U (en) * 2013-03-15 2013-08-28 浙江万士通阀门有限公司 Three-plate type internal thread ball valve
CN203395237U (en) * 2013-07-10 2014-01-15 高工阀门股份有限公司 Internal thread ball valve
CN203431244U (en) * 2013-08-27 2014-02-12 北科阀门制造有限公司 Three-way ball valve with sealing pre-tightening amount compensation function
CN203463710U (en) * 2013-09-27 2014-03-05 温州金大阀门管件有限公司 Three-piece-type tank bottom ball valve
CN203822254U (en) * 2014-05-13 2014-09-10 常熟市石油固井工具有限公司 Single plug and double plug quick clamp type cement head for sleeve pipe
CN104214360A (en) * 2014-08-29 2014-12-17 苏州福润机械有限公司 Ball valve
CN104832126A (en) * 2015-05-15 2015-08-12 中国石油集团渤海钻探工程有限公司 Anti-pollution well cementation method suitable for two stage and drilling liner cementation
CN105019858A (en) * 2015-08-17 2015-11-04 中国海洋石油总公司 High-temperature and high-pressure well three-rubber-plug cementing head device and cementing operation method
CN204877372U (en) * 2015-08-17 2015-12-16 中国海洋石油总公司 Three plugs of high temperature high pressure well well cementation cementing -head device
CN105276221A (en) * 2015-10-16 2016-01-27 浙江埃尼斯阀门科技有限公司 Multi-seal ball valve
WO2016130124A1 (en) * 2015-02-12 2016-08-18 Halliburton Energy Services, Inc. Tracking and measurements associated with cement plugs
CN206280044U (en) * 2016-12-07 2017-06-27 中国石油集团西部钻探工程有限公司 cementing joint

Patent Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5035813A (en) * 1988-05-27 1991-07-30 Union Oil Company Of California Process and composition for treating underground formations penetrated by a well borehole
CN2916116Y (en) * 2006-01-24 2007-06-27 石凤岐 Separated double-plug casing cement head
CN101038038A (en) * 2007-04-20 2007-09-19 张长宗 Hard sealing ball valve
CN202597755U (en) * 2012-04-24 2012-12-12 上海星荣建设有限公司 Medium and low pressure pipeline locking and pressing type connecting structure applied to valve
CN202832353U (en) * 2012-08-22 2013-03-27 沈阳白云机械有限公司 Straight-buckle fast connection cement head device with large inner diameter
CN102953707A (en) * 2012-11-13 2013-03-06 中国石油化工股份有限公司 Top-drive drill rod well cementing head
CN202914026U (en) * 2012-11-22 2013-05-01 中国石油集团渤海钻探工程有限公司 Well cementation cement head
CN203162203U (en) * 2013-03-15 2013-08-28 浙江万士通阀门有限公司 Three-plate type internal thread ball valve
CN203395237U (en) * 2013-07-10 2014-01-15 高工阀门股份有限公司 Internal thread ball valve
CN203431244U (en) * 2013-08-27 2014-02-12 北科阀门制造有限公司 Three-way ball valve with sealing pre-tightening amount compensation function
CN203463710U (en) * 2013-09-27 2014-03-05 温州金大阀门管件有限公司 Three-piece-type tank bottom ball valve
CN203822254U (en) * 2014-05-13 2014-09-10 常熟市石油固井工具有限公司 Single plug and double plug quick clamp type cement head for sleeve pipe
CN104214360A (en) * 2014-08-29 2014-12-17 苏州福润机械有限公司 Ball valve
WO2016130124A1 (en) * 2015-02-12 2016-08-18 Halliburton Energy Services, Inc. Tracking and measurements associated with cement plugs
CN104832126A (en) * 2015-05-15 2015-08-12 中国石油集团渤海钻探工程有限公司 Anti-pollution well cementation method suitable for two stage and drilling liner cementation
CN105019858A (en) * 2015-08-17 2015-11-04 中国海洋石油总公司 High-temperature and high-pressure well three-rubber-plug cementing head device and cementing operation method
CN204877372U (en) * 2015-08-17 2015-12-16 中国海洋石油总公司 Three plugs of high temperature high pressure well well cementation cementing -head device
CN105276221A (en) * 2015-10-16 2016-01-27 浙江埃尼斯阀门科技有限公司 Multi-seal ball valve
CN206280044U (en) * 2016-12-07 2017-06-27 中国石油集团西部钻探工程有限公司 cementing joint

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李雷祥等: "一种新型固井碰压系统", 《石油机械》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112360391A (en) * 2020-12-09 2021-02-12 中国石油天然气集团有限公司 Full-automatic wireless remote control well cementation cement head and use method
CN115217441A (en) * 2022-07-27 2022-10-21 中海石油(中国)有限公司湛江分公司 Ball-throwing device for cement injection plug and cement injection plug process thereof

Similar Documents

Publication Publication Date Title
CN107288671B (en) Construction method of soft crushed coal rock mass drilling, sealing and injecting integrated extendable anchor rod
CN104695892B (en) A kind of independent hydraulically-controlled type compression packer
CN101929318A (en) Stage cementing device
CN202266237U (en) Stage cementing device for oil well completion
CN201439701U (en) Stage cementing distributor
CN107152258B (en) A kind of controlling lost circulation valve
CN109654303A (en) A kind of bolt inflatable seal device and its installation method for pipe gallery penetration pipe
CN206280044U (en) cementing joint
CN107939335A (en) Wear-resistant and anti-reflux double rubber plug system for well cementing and its application method
CN206111126U (en) Close inserting of independent liquid accuse sliding sleeve formula
CN104806196A (en) Casing floating system for horizontal well
CN207004505U (en) A kind of totally-enclosed water horizontal well wet joint engaging tool
CN105781020A (en) Grouting sleeve and prefabricated member
CN207193980U (en) Equipment is mixed in a kind of two-shot grouting hole
CN101392636A (en) Sand prevention water injection packer
CN202273642U (en) Well cementation rubber plug
CN206554872U (en) A kind of pitching builds the pressure device and the well shaft fixing technology tubing string with the device
CN110388478A (en) Fluid control
CN105604511B (en) Thermal production well earth anchor
CN106567697A (en) deployment device
CN205712760U (en) A kind of grout sleeve and prefabricated component
CN208024316U (en) A kind of four-way conversion check valve
CN204327022U (en) A kind of slips inserted link one lead oblique window opening tool
CN204024614U (en) Counter-flow resisting bridge type eccentric injection mandrel
CN108756815A (en) A kind of hydraulic control sliding sleeve

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20201104

Address after: 100120 Beijing Xicheng District six laying Kang

Applicant after: CHINA NATIONAL PETROLEUM Corp.

Applicant after: CNPC Xibu Drilling Engineering Co.,Ltd.

Address before: 830026 science and technology management division, West drilling and Drilling Engineering Institute, No. 326 South Central Road, Urumqi economic and Technological Development Zone, the Xinjiang Uygur Autonomous Region, China

Applicant before: CNPC Xibu Drilling Engineering Co.,Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20170322

RJ01 Rejection of invention patent application after publication