CN106514863A - Integral pretension equipment - Google Patents

Integral pretension equipment Download PDF

Info

Publication number
CN106514863A
CN106514863A CN201611249206.3A CN201611249206A CN106514863A CN 106514863 A CN106514863 A CN 106514863A CN 201611249206 A CN201611249206 A CN 201611249206A CN 106514863 A CN106514863 A CN 106514863A
Authority
CN
China
Prior art keywords
tensioning
jacking
lifting
entirety
rolling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611249206.3A
Other languages
Chinese (zh)
Inventor
左德发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mingsheng Drawin Technology Investment Co Ltd
Original Assignee
China Mingsheng Drawin Technology Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mingsheng Drawin Technology Investment Co Ltd filed Critical China Mingsheng Drawin Technology Investment Co Ltd
Priority to CN201611249206.3A priority Critical patent/CN106514863A/en
Publication of CN106514863A publication Critical patent/CN106514863A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/04Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed
    • B28B23/043Wire anchoring or tensioning means for the reinforcements

Abstract

The invention relates to integral pretension equipment. The integral pretension equipment comprises a rack, a jacking mechanism and tension ropes, wherein the jacking mechanism is arranged on the rack and comprises a liftable jacking rolling element; the plurality of tension ropes wind the jacking rolling element; and a balancing weight and a clamping mechanism are arranged at two ends of each tension rope correspondingly. According to the integral pretension equipment, the jacking rolling element can ascend to driv the tension ropes to upwards move, thereby driving the balancing weights to upwards move to gradually leave from a supporting surface; and the other ends of the tension ropes are tensioned and arranged on prestressed reinforcements of the clamping mechanisms under the action of the balancing weights. Therefore, according to the integral pretension equipment disclosed by the invention, the plurality of balancing weights can be simultaneously tensioned by arranging the plurality of tension ropes; and the integral pretension equipment has relatively-high tension efficiency.

Description

Overall pre- tensioning equipment
Technical field
The present invention relates to assembled architecture field, the pre- tensioning equipment of more particularly to a kind of entirety.
Background technology
As country widelys popularize city standard construction, assembled architecture growth momentum is swift and violent.Assembled architecture is by pre- Component processed is formed in assemble in site, as main building operation is completed in factory, therefore is had the energy that economizes on resources, is reduced construction The advantages of pollution, lifting labor productivity and quality safety level, also progressively received at home and promoted, it is various prefabricated The Production requirement of component also increases therewith.
In the production process of prestressing force superimposed sheet, it is that to ensure that deformed bar is obtained in tensioning same or like pre- Stress, needs first to carry out pre- tension operation to deformed bar, is so conducive to improving the quality of prefabricated components.At present, employing Method is the single pre- tensioning that single steel bar realizes deformed bar by tensioning oil cylinder, therefore the time expended is longer, seriously Have impact on production efficiency.
The content of the invention
Based on this, it is necessary to a kind of less efficient problem of tensioning for deformed bar, there is provided deformed bar The pre- tensioning equipment of entirety for drawing efficiency higher.
A kind of pre- tensioning equipment of entirety, including:
Frame;
Lifting body, in the frame, including liftable jacking rolling member;And
Tensioning rope, many tensioning ropes bypass the jacking rolling member, per being respectively arranged at two ends with for tensioning rope described in root Balancing weight and clamp system.
The pre- tensioning equipment of above-mentioned entirety, jacking rolling member can rise and drive tensioning rope to move up, so as to drive counterweight Block is moved up and gradually leaves supporting surface, and the tensioning in the presence of balancing weight of the other end of tensioning rope is installed on clamp system Deformed bar.Thus, the overall pre- tensioning equipment can have by arranging many tensioning ropes and many balancing weights of simultaneous tension Higher tensioning efficiency.
Wherein in one embodiment, the lifting body also includes liftable lifting-up support, the jacking rolling member Located at the lifting-up support upper end, the tensioning rope is set around the jacking rolling member, and the lifting-up support can drive the top Rise rolling member lifting to drive described lifting rope.
Wherein in one embodiment, the lifting-up support includes two spaced first jacking parts, the jacking Rolling member is cylindrical in shape structure, and the first jacking part is supported in the jacking rolling member two ends.
Wherein in one embodiment, the lifting-up support includes cross bar and supports the second jacking part of the cross bar, institute Stating the second jacking part can drive the cross bar lifting, the jacking rolling member to include the multiple jackings being spaced on the cross bar Roller.
Wherein in one embodiment, the pre- tensioning equipment of the entirety also includes guide cylinder, and the balancing weight is contained in institute State in guide cylinder and can move back and forth in the inwall of guide cylinder described in the drive lower edge of the tensioning rope.
Wherein in one embodiment, the pre- tensioning equipment of the entirety also includes guiding mechanism, and the guiding mechanism is located at The lifting body side, the tensioning rope connect the clamp system after bypassing the guiding mechanism from the lifting body.
Wherein in one embodiment, the guiding mechanism includes fixed seat and is rotatably installed in the fixed seat Guide roller.
Wherein in one embodiment, the guiding mechanism also includes Height Adjustment wheel pressing shaft, the Height Adjustment pinch roller Axle is installed in the frame and is located at the guide roller away from the lifting body side, and the tensioning rope is from the guiding Roller connects the clamp system through rear between the Height Adjustment wheel pressing shaft and the frame.
Wherein in one embodiment, the clamp system includes connector and is rotationally connected with the folder of the connector Tight part, the connector are collectively forming clamp structure with the clamping element.
Wherein in one embodiment, the frame be provided with can relatively described gantry rotation road wheel, for driving The machine frame movement.
Description of the drawings
Front views of the Fig. 1 for the pre- tensioning equipment of entirety of first embodiment;
Fig. 2 is the top view of the pre- tensioning equipment of entirety shown in Fig. 1;
Schematic diagrames of the Fig. 3 for the pre- tensioning equipment of entirety of second embodiment;
Fig. 4 is the schematic diagram of the clamp system of the pre- tensioning equipment of entirety shown in Fig. 3.
Specific embodiment
For the ease of understanding the present invention, the present invention is described more fully below with reference to relevant drawings.In accompanying drawing Give the preferred embodiment of the present invention.But, the present invention can be realized in many different forms, however it is not limited to herein Described embodiment.On the contrary, the purpose for providing these embodiments is to make the understanding to the disclosure more saturating It is thorough comprehensive.
It should be noted that when element is referred to as " being fixed on " another element, it can directly on another element Or can also there is element placed in the middle.When an element is considered as " connection " another element, it can be directly connected to To another element or may be simultaneously present centering elements.Term as used herein " vertical ", " level ", " left side ", " right side " and similar statement are for illustrative purposes only.
Unless otherwise defined, all of technology used herein and scientific terminology and the technical field for belonging to the present invention The implication that technical staff is generally understood that is identical.The term for being used in the description of the invention herein is intended merely to description tool The purpose of the embodiment of body, it is not intended that of the invention in limiting.Term as used herein " and/or " including one or more phases The arbitrary and all of combination of the Listed Items of pass.
As shown in Figures 1 and 2, the pre- tensioning equipment 100 of a kind of entirety of first embodiment, including frame 11, lifting body 12 and tensioning rope 13, for coordinating with die station 300 with pre- prestressed reinforcement of tensioning.
Wherein, lifting body 12 is located in frame 11, including liftable jacking rolling member 124.Many tensioning ropes 13 around The jacking rolling member 124 of lifting body 12 is crossed, every tensioning rope 13 is respectively arranged at two ends with balancing weight 14 and clamp system 15, clamped Mechanism 15 can connect deformed bar, and balancing weight 14 can apply pulling force with pre- prestressed reinforcement of tensioning to tensioning rope 13.
The pre- tensioning equipment 100 of above-mentioned entirety, jacking rolling member 124 can rise and drive tensioning rope 13 to move up, so as to Balancing weight 14 is driven to move up and gradually leave supporting surface, the other end of the tensioning rope 13 tensioning peace in the presence of balancing weight 14 Deformed bar loaded on clamp system 15.Thus, the overall pre- tensioning equipment 100 can be same by arranging many tensioning ropes 13 Many balancing weights 14 of Shi Zhangla, with higher tensioning efficiency.
In the present embodiment, the weight of each balancing weight 14 is 200Kg, enough so as to be applied to deformed bar Pulling force.It is appreciated that the weight size not limited to this of balancing weight 14, can select according to the model of the deformed bar of institute's tensioning. Preferably, the position that balancing weight 14 is placed in frame 11 is provided with sensor (not shown), and sensor is filled with strain-pull controlling of prestress Put connected, the sensor can sense the weight that balancing weight 14 applies on the support surface, operator without the need for moment observation balancing weight is It is no to depart from supporting surface completely, so as to realize automatically controlling.
Please continue to refer to Fig. 1 and Fig. 2, lifting body 12 also includes liftable lifting-up support, and jacking rolling member 124 is located at Lifting-up support upper end, the bottom of lifting-up support are fixed in frame 11.Tensioning rope 13 is set around from the top of jacking rolling member 124 Jacking rolling member 124, lifting-up support can drive jacking rolling member 124 to lift to drive tensioning rope 13 to lift.
Thus, when lifting-up support drives tensioning rope 13 to drop to minimum point, balancing weight 14 is entirely fallen within frame 11, is matched somebody with somebody The weight of pouring weight 14 is completely by acting in frame 11.When lifting-up support drives tensioning rope 13 to rise to peak, balancing weight 14 are left frame 11 by the drawings of tensioning rope 13, and the weight of balancing weight 14 is acted on tensioning rope 13 completely, so as to tensioning It is connected to the deformed bar of 13 other end of tensioning rope connection.
Specifically in the present embodiment, lifting-up support includes two spaced first jacking parts 1222, jacking rolling member 124 are cylindrical in shape structure, and the first jacking part 1222 is supported in 124 two ends of jacking rolling member, and many tensioning ropes 13 are set around the jacking Rolling member 124 and interval setting, the first jacking part 1222 can drive jacking rolling member 124 to lift so as to while driving many tensioning Rope 13 is lifted, and finally drives the lifting of multiple balancing weights 14 to leave frame 11 up to balancing weight 14, so that deformed bar is in Tensioning state.In the present embodiment, the first jacking part 1222 is jacking cylinder, and the quantity of tensioning rope 13 is 12,12 tensioning Rope 13 is spaced along the length direction of jacking rolling member 124, so as to can 12 deformed bars of simultaneous tension.It is appreciated that 12 herein be a kind of implementation therein, in other embodiments, with can simultaneous tension deformed bar number Amount is not limited, and can also be 14,16 etc., is determined according to the type of concrete prefabricated component.
Overall pre- tensioning equipment 100 is also included for changing the guiding mechanism 16 of the extension path of tensioning rope 13.The guiding Mechanism 16 is located at 12 side of lifting body, and tensioning rope 13 bypasses connection clamp system 15 after guiding mechanism 16 from lifting body 12.
Specifically, guiding mechanism 16 includes guide roller 164 and two spaced fixed seats located at frame 11 162.Guide roller 164 is rotatably installed on two fixations in the tubular structure extended along 124 length direction of jacking rolling member On seat 162, tensioning rope 13 bypasses guide roller 164 from the bottom of guide roller 164.In the present embodiment, guide roller 164 Height is matched with deformed bar, and the tensioning rope 13 for bypassing guide roller 164 is parallel with deformed bar, so as to can be in prestressing force Apply the pulling force of level on reinforcing bar with tension reinforcing steel bar.
Clamp system 15 include connector 152 be rotationally connected with connector 152 clamping element 154, connector 152 with Clamping element 154 is collectively forming clamp structure.Specifically, 152 one end of connector is opened up by connecting hole to be connected to tensioning rope 13, folder Tight 154 one end of part is rotatably connected at the middle part of connector 152, the one end of the other end and connector 152 away from tensioning rope 13 Coordinate to clamp jointly deformed bar.Thus, the overall pre- tensioning equipment 100 can fast clamp deformed bar, so as to carry High tensioning efficiency.
Further, frame 11 is provided with the road wheel 112 that can be rotated relative to frame 11, for driving frame 11 to move. In the present embodiment, the working face of the pre- tensioning equipment of the entirety 100 is provided with guide rail 400, and road wheel 112 can be rolled along guide rail 400 It is dynamic to be moved to precalculated position to be connected with the deformed bar in die station 300 to drive frame 11 to move along guide rail 400.
Further, rail clamping device (not shown) is additionally provided with frame 11 with clamp rail 400, so that frame 11 is avoided pre- It is moved or tumbles in the stretching process of stress reinforcing bar.
The course of work of the pre- tensioning equipment of above-mentioned entirety 100 is as follows:
The entirety pre- tensioning equipment 100 is moved to precalculated position to be spaced with die station 300 by operator first along guide rail 400 Place, the deformed bar in die station 300 is connected by clamp system 15 then.Now, the jacking on lifting body 12 is rolled Part 124 is in extreme lower position, and balancing weight 14 is entirely fallen within frame 11.
During prestressed reinforcement of tensioning, jacking rolling member 124 rises under the drive of the first actuator 1222, matches somebody with somebody so as to drive Pouring weight 14 gradually rises up to whole balancing weights 14 and leaves 11 surface of frame, is finally reached and is applied on each deformed bar Pulling force is identical, completes the pre- tensioning of deformed bar.
The pre- tensioning equipment 100 of above-mentioned entirety, by lifting body 12 and is set around lifting body 12 and one end is provided with counterweight The tensioning rope 13 of block 14 realizes the entirety of a plurality of deformed bar while pre- tensioning, and the tensioning that a plurality of deformed bar is subject to Power is identical, with higher tensioning efficiency.Also, as a result of jacking rolling member 124 and the guiding for being provided with guide roller 164 Mechanism 16 is driven, thus make deformed bar tentioning stroke reach lifting body 12 jacking stroke twice, shorten The range of lifting body 12.Additionally, the frame 11 of the integrated prestress tensioning equipment can be moved on guide rail 17, so as to It is available for a plurality of production line to use, has saved production cost.
As shown in figure 3, the pre- tensioning equipment of a kind of entirety of second embodiment 200.The work of the overall pre- tensioning equipment 200 Principle and roughly the same with the pre- tensioning equipment 100 of structure and the entirety in first embodiment, second embodiment and first embodiment Difference it is as follows:
In the present embodiment, the lifting-up support 222 being arranged in frame 21 includes cross bar 2222 and support rail 2222 Second jacking part 2224, the second jacking part 2224 can drive cross bar 2222 to lift, and jacking rolling member includes interval located at cross bar Multiple jacking rollers 2242 on 2222.
Specifically, lifting-up support 222 includes two cross bars 2222 be arrangeding in parallel, and multiple jacking rollers 2242 are along cross bar 2222 length direction interval setting, and be equally divided into two row and be arranged separately on two cross bars 2222, balancing weight also in top Rise the row arrangement of roller 224 corresponding two.Thus, can ensure can tensioning deformed bar quantity in the case of reduce this The size of overall pre- tensioning equipment 200, saves space.Specifically in the present embodiment, 12 jacking rollers 224 are averagely set respectively Put in two cross bars 2222, and 12 balancing weights arranged in two row of correspondence.
In the present embodiment, guiding mechanism 26 includes multiple guide rollers 264, and multiple guide rollers 264 are directly rotatable Be arranged in frame 21 and correspond with jacking roller 224, and fixed seat need not be set.
In the present embodiment, the overall pre- tensioning equipment 100 also includes guide cylinder 242, and balancing weight is contained in guide cylinder 242 It is interior and can the drive lower edge guide cylinder 242 of tensioning rope 23 inwall move back and forth.Thus, guide cylinder 242 can make balancing weight exist Move on vertical direction, it is to avoid balancing weight is rocked in moving process, so as to smoothly pre- prestressed reinforcement of tensioning.In addition, leading Range sensor is provided with to the sidewall bottom or supporting surface of cylinder 242, the range sensor is connected with the control device of tensioning, Once perceiving balancing weight leaves supporting surface, that is, stop reinforcing tensioning.
Preferably, multiple balancing weights can be housed in guide cylinder 242, tensioning rope 23 is affixed with the balancing weight positioned at least significant end, The draw-in groove extended from central point to edge is offered on other balancing weights, tensioning rope 23 may pass through the draw-in groove to drive these counterweights Block is lifted.It is appreciated that the weight of multiple balancing weights is not limited, operator can select different balancing weights as needed.
Further, in the present embodiment, die station 300 is provided with spacing draw-in groove (not shown), with spacing every prestressing force Reinforcing bar is limited.And as deformed bar there may be flexural deformation in itself, therefore in its natural state, deformed bar May not be contained in spacing draw-in groove.Therefore, guiding mechanism 26 also includes Height Adjustment wheel pressing shaft 266, Height Adjustment pinch roller Axle 266 is installed in frame 21 and is located at guide roller 264 away from 22 side of lifting body, many 23 self-conductance way rollers of tensioning rope 264 connect clamp system 25 through rear between the Height Adjustment wheel pressing shaft 266 and frame 21.Thus, passing through the Height Adjustment Wheel pressing shaft 166 adjusts the height of many tensioning ropes 23 simultaneously, so as to deformed bar is pressed in spacing draw-in groove.
Further, in the present embodiment, clamp system 25 includes connector 252 and clamping element 254.Connector 252 In tubular construction and clamping slot is offered, clamping element 254 is stretched in connecting tube 252 from the clamping slot, connection is stretched into so as to clamp Deformed bar in part 252.
Specifically, connector 252 includes the first connecting tube 2522 and the second connecting tube 2524, and the second connecting tube 2524 is plugged Can move axially in the first connecting tube 2522 and along the first connecting tube 2522, clamping slot is opened in the second connecting tube 2524.Folder Tight part 254 includes the first clamping section 2542 and the second clamping section 2544 being rotatably connected, and the first clamping section 2542 is away from second One end of clamping section 2544 is rotatably arranged in the first connecting tube 2522, and the second clamping section 2544 is away from the first clamping section 2542 One end be rotatably arranged in the second connecting tube 2524, and the second connecting tube can be stretched into from clamping slot in second clamping section 2544 In 2524.Thus, the first connecting tube 2522 can be moved to axial with the second connecting tube 2524, so as to change the second clamping section 2544 stretch into depth in the second connecting tube 2524 to clamp deformed bar.
More specifically, the second clamping section 2544 is provided with dentalation, dentalation near the side of the second connecting tube 2524 Can be stretched in the second connecting tube 2524 from clamping slot with clamping deformed bar.
Thus, the first connecting tube is stretched in the one end of tensioning rope 23 from the first connecting tube 2522 away from the second connecting tube 2524 In 2522, the second connecting tube 2524 is stretched in the one end of deformed bar from the second connecting tube 2524 away from the first connecting tube 2522 In, the first connecting tube 2522 can be moved to axial with the second connecting tube 2524, so that the first clamping section of clamping element 254 2542 are rotated with the second clamping section 2544, cause the dentalation on clamping element 254 to stretch into the second connecting tube 2524 from clamping slot In and quick clamping deformed bar.Therefore, can adjust the first connecting tube 2522 and the second connecting tube 2524 relative position and Easily adjust the depth that the second clamping section 2544 is stretched in the second connecting tube 2524, so as to clamping different-diameter size it is pre- Stress reinforcing bar.
Each technical characteristic of embodiment described above arbitrarily can be combined, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope of this specification record is all considered to be.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more concrete and detailed, but and Therefore can not be construed as limiting the scope of the patent.It should be pointed out that for one of ordinary skill in the art comes Say, without departing from the inventive concept of the premise, some deformations and improvement can also be made, these belong to the protection of the present invention Scope.Therefore, the protection domain of patent of the present invention should be defined by claims.

Claims (10)

1. the pre- tensioning equipment of a kind of entirety, it is characterised in that include:
Frame;
Lifting body, in the frame, including liftable jacking rolling member;And
Tensioning rope, many tensioning ropes bypass the jacking rolling member, are respectively arranged at two ends with counterweight per tensioning rope described in root Block and clamp system.
2. the pre- tensioning equipment of entirety according to claim 1, it is characterised in that the lifting body also includes liftable Lifting-up support, the jacking rolling member are located at the lifting-up support upper end, and the tensioning rope is set around the jacking rolling member, institute State lifting-up support to drive the jacking rolling member lifting to drive described lifting rope.
3. the pre- tensioning equipment of entirety according to claim 2, it is characterised in that the lifting-up support includes that two intervals set The the first jacking part put, the jacking rolling member are cylindrical in shape structure, and the first jacking part is supported in the jacking rolling member two End.
4. the pre- tensioning equipment of entirety according to claim 2, it is characterised in that the lifting-up support includes cross bar and support Second jacking part of the cross bar, the second jacking part can drive the cross bar lifting, the jacking rolling member to include interval Multiple jacking rollers on the cross bar.
5. the pre- tensioning equipment of entirety according to claim 1, it is characterised in that the pre- tensioning equipment of the entirety also includes leading To cylinder, the balancing weight is contained in the guide cylinder and can be past in the inwall of guide cylinder described in the drive lower edge of the tensioning rope It is multiple to move.
6. the pre- tensioning equipment of entirety according to Claims 1 to 5 any one, it is characterised in that the pre- tensioning of the entirety Device also includes guiding mechanism, and the guiding mechanism is located at the lifting body side, and the tensioning rope is from the lifting body Connect the clamp system after bypassing the guiding mechanism.
7. the pre- tensioning equipment of entirety according to claim 6, it is characterised in that the guiding mechanism includes fixed seat and can The guide roller being rotatably mounted in the fixed seat.
8. the pre- tensioning equipment of entirety according to claim 7, it is characterised in that the guiding mechanism also includes Height Adjustment Wheel pressing shaft, the Height Adjustment wheel pressing shaft are installed in the frame and are located at the guide roller away from the lifting body one Side, the tensioning rope connect the folder through rear between the Height Adjustment wheel pressing shaft and the frame from the guide roller Tight mechanism.
9. the pre- tensioning equipment of entirety according to claim 1, it is characterised in that the clamp system include connector with can The clamping element of the connector is rotationally connected with, the connector is collectively forming clamp structure with the clamping element.
10. the pre- tensioning equipment of entirety according to claim 1, it is characterised in that the frame is provided with can be relatively described The road wheel of gantry rotation, for driving the machine frame movement.
CN201611249206.3A 2016-12-29 2016-12-29 Integral pretension equipment Pending CN106514863A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611249206.3A CN106514863A (en) 2016-12-29 2016-12-29 Integral pretension equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611249206.3A CN106514863A (en) 2016-12-29 2016-12-29 Integral pretension equipment

Publications (1)

Publication Number Publication Date
CN106514863A true CN106514863A (en) 2017-03-22

Family

ID=58338471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611249206.3A Pending CN106514863A (en) 2016-12-29 2016-12-29 Integral pretension equipment

Country Status (1)

Country Link
CN (1) CN106514863A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988226A (en) * 2017-05-19 2017-07-28 贵州顺康路桥咨询有限公司 A kind of bridge vertical reinforcement tensioning equipment
CN109333809A (en) * 2018-10-12 2019-02-15 鼎宸建设科技有限公司 A kind of reinforcing bar carding apparatus

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988226A (en) * 2017-05-19 2017-07-28 贵州顺康路桥咨询有限公司 A kind of bridge vertical reinforcement tensioning equipment
CN106988226B (en) * 2017-05-19 2018-10-30 贵州顺康路桥咨询有限公司 A kind of bridge vertical reinforcement tensioning equipment
CN109333809A (en) * 2018-10-12 2019-02-15 鼎宸建设科技有限公司 A kind of reinforcing bar carding apparatus
CN109333809B (en) * 2018-10-12 2020-07-03 广东博智林机器人有限公司 Reinforcing bar carding unit

Similar Documents

Publication Publication Date Title
CN104176471B (en) Stone plate cantilevered automatic loading and unloading device and method
CN106514863A (en) Integral pretension equipment
CN106807863B (en) Modern assembled architecture engineering steel reinforcement cage circular stirrups molding equipment
CN105537898B (en) A kind of rebar cylinder mould assembling frock
EP3064466A1 (en) Vehicle for a pallet handling system
CN102730421A (en) Plate loading device used for conveying brick support plate into plate warehouse
CN201253655Y (en) Draw bending straightener
CN206335701U (en) Overall pre- tensioning equipment
CN202147540U (en) Device for stretching and fixing canvas for painting on frame
CN204751625U (en) Automatic type tension adjusting device
CN203997977U (en) Stone plate cantilevered automatic loading and unloading device
CN109650262A (en) One kind transporting handling device convenient for private car
CN206327962U (en) Conveyer belt rolls up intracardiac square steel and takes out frame
CN206436433U (en) Tire shaving machine
CN104401726A (en) Automatic taking and lifting device of bar reinforcement conveying equipment
CN201040306Y (en) Steel bar rounding straightening machine
CN209480763U (en) De-stacking device for stacking machine
CN204914206U (en) Case roof beam prestressing force for pore -forming rubber withdrawing stick wear excellent device
CN208321939U (en) A kind of intellectual steel bar cold-drawing device
CN106743873B (en) Conveyer belt rolls up intracardiac square steel and takes out frame
CN106734772A (en) Support chain type compiles cage machine
CN214263299U (en) Feeding device of square and rectangular tube forming machine
WO2018028555A1 (en) Tensioning device for prefabricated track slab and synchronous relaxation device for pre-tensioned prefabricated track slab
CN211522888U (en) Bridge prestressing force whole bundle of steel strand wires wears to restraint equipment
CN213614885U (en) Support arrangement convenient to steel reinforcement cage welding

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination