CN106514168B - A kind of processing method of belt conveyor driving drum - Google Patents
A kind of processing method of belt conveyor driving drum Download PDFInfo
- Publication number
- CN106514168B CN106514168B CN201611202790.7A CN201611202790A CN106514168B CN 106514168 B CN106514168 B CN 106514168B CN 201611202790 A CN201611202790 A CN 201611202790A CN 106514168 B CN106514168 B CN 106514168B
- Authority
- CN
- China
- Prior art keywords
- roller
- primer
- layer
- rubber
- drum
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P15/00—Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
- B23P15/14—Making specific metal objects by operations not covered by a single other subclass or a group in this subclass gear parts, e.g. gear wheels
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
Abstract
本发明公开了一种皮带输送机传动滚筒的加工方法,属于输送机领域。本发明包括以下步骤:A、筒皮的制作:将筒皮原料依次经下料、压弧、卷制、焊接、校圆工序加工为筒皮;B、中心轴的制作:将轴原料依次经下料、粗车、调质处理、精车工序加工为中心轴;C、幅板的车削加工;D、装配:将加工好的筒皮、幅板和中心轴装配为一体,形成滚筒;E、在滚筒表面包覆橡胶层;F、对滚筒表面的橡胶层进行车削处理,加工表面花纹。本发明有助于改善传动滚筒的使用性能,避免滚筒在使用中发生异常损坏,保障输送系统的高效运行。
The invention discloses a processing method for a drive roller of a belt conveyor, which belongs to the field of conveyors. The present invention comprises the following steps: A, the production of the tube skin: the tube skin raw material is sequentially processed into the tube skin through blanking, arc pressing, rolling, welding, and rounding processes; B, the production of the central shaft: the shaft raw material is sequentially processed Cutting, rough turning, quenching and tempering treatment, and finishing turning process are processed as the central axis; C, turning of the web; D, assembly: the processed tube skin, web and central shaft are assembled into one to form a drum; E 1. Cover the rubber layer on the surface of the drum; F. Turn the rubber layer on the surface of the drum to process the surface pattern. The invention helps to improve the service performance of the transmission roller, avoids the abnormal damage of the roller during use, and ensures the efficient operation of the conveying system.
Description
技术领域technical field
本发明涉及输送机技术领域,更具体地说,涉及一种皮带输送机传动滚筒的加工方法。The invention relates to the technical field of conveyors, and more specifically, relates to a processing method of a belt conveyor driving roller.
背景技术Background technique
皮带输送机是一种摩擦驱动以连续方式运输物料的机械,主要由机架、输送带、托辊、滚筒、张紧装置、传动装置等组成。它可以将物料在一定的输送线上,从最初的供料点到最终的卸料点间形成一种物料的输送流程。它既可以进行碎散物料的输送,也可以进行成件物品的输送。除进行纯粹的物料输送外,还可以与各工业企业生产流程中的工艺过程的要求相配合,形成有节奏的流水作业运输线,因此在生产实践中应用广泛。Belt conveyor is a kind of machinery that is driven by friction to transport materials in a continuous manner. It is mainly composed of frame, conveyor belt, idler roller, roller, tensioning device, transmission device, etc. It can form a material conveying process from the initial feeding point to the final unloading point on a certain conveying line. It can not only transport broken materials, but also transport finished items. In addition to pure material transportation, it can also cooperate with the requirements of the technological process in the production process of various industrial enterprises to form a rhythmic assembly line, so it is widely used in production practice.
皮带输送机的传动主要靠传动滚筒与皮带之间的挠性摩擦来实现。滚筒由筒皮、幅板、中心轴等组成,使用时动力传递由滚筒传递给辐板,辐板通过螺栓传递给轴承座,为提高传动滚筒的机械性能,通常在滚筒体外表面上包覆一层耐磨橡胶层,用以增大传动滚筒与皮带间的摩擦力,从而减少皮带打滑,减小皮带的跑偏和磨损,提高运行效率。生产使用过程中传动滚筒收到长时间的摩擦力和向心力的作用,导致传动滚筒极易发生损坏,且在运输过程中,一些硬质物品对滚筒的冲击力也会损坏滚筒,影响滚筒的使用寿命,传动滚筒一旦发生异常损坏将会导致输送机系统停机,严重影响生产进度。提高传动滚筒的使用性能,保障输送机的高效、大运量运转对于生产实践意义重大。The transmission of the belt conveyor is mainly realized by the flexible friction between the drive roller and the belt. The drum is composed of drum skin, web, central shaft, etc. When in use, the power transmission is transmitted from the drum to the web, and the web is transferred to the bearing seat through bolts. In order to improve the mechanical properties of the transmission drum, it is usually coated with a A wear-resistant rubber layer is used to increase the friction between the drive roller and the belt, thereby reducing belt slippage, reducing belt deviation and wear, and improving operating efficiency. In the process of production and use, the transmission roller is subjected to long-term friction and centripetal force, which causes the transmission roller to be easily damaged, and in the process of transportation, the impact force of some hard objects on the roller will also damage the roller and affect the service life of the roller , Once the drive roller is abnormally damaged, it will cause the conveyor system to stop, seriously affecting the production schedule. Improving the performance of the drive roller and ensuring the high-efficiency and large-capacity operation of the conveyor are of great significance to production practice.
关于对传动滚筒的技术改进,现有技术中已有大量专利文件公开,如中国专利申请号:2011101713905,申请日:2011年6月24日,发明创造名称为:输送机用滚筒,该申请案公开了一种输送机用滚筒,包括滚筒轴,卷筒借助轴承座以及轴承安装于滚筒轴上,轴承座的外壁面带有台阶结构,卷筒的端口及其内壁与台阶嵌合,轴承座的内端面与滚筒轴的轴肩相抵;轴承座的内壁面与轴承的外圈嵌合,滚筒轴装置于轴承座的内圈,轴承内圈的一端外凸于轴承的外圈。该申请案可以防止矿石等输送重物对滚筒的损伤,可有效的延长滚筒及轴承的使用寿命。Regarding the technical improvement of the transmission roller, a large number of patent documents have been published in the prior art, such as the Chinese patent application number: 2011101713905, the application date: June 24, 2011, the invention name is: roller for conveyor, the application Disclosed is a roller for a conveyor, comprising a roller shaft, the roller is mounted on the roller shaft by means of a bearing seat and bearings, the outer wall of the bearing seat has a stepped structure, the port of the roller and its inner wall are fitted with the steps, the bearing seat The inner end surface of the bearing is against the shoulder of the roller shaft; the inner wall surface of the bearing seat is fitted with the outer ring of the bearing, the roller shaft is installed on the inner ring of the bearing seat, and one end of the inner ring of the bearing protrudes outward from the outer ring of the bearing. This application can prevent the damage to the roller caused by conveying heavy objects such as ores, and can effectively prolong the service life of the roller and the bearing.
又如中国专利申请号:2015107144709,申请日:2015年10月29日,发明创造名称为:一种带式输送机滚筒,该申请案公开了一种带式输送机滚筒,包括传动滚筒,传动滚筒由筒体、滚筒轴、滚筒法兰和连接螺栓组成;筒体的材质为高强度合金钢,筒体的尾部与滚筒法兰孔配合连接;滚筒轴中部带有联接法兰,联接法兰的凸台与滚筒法兰连接凹槽配合。该申请案中滚筒轴的连接轴头既保证了连接强度,又起到了定位作用,避免了棒材内部疏松的质量缺陷,有助于延长滚筒的使用寿命。Another example is the Chinese patent application number: 2015107144709, application date: October 29, 2015, and the name of the invention is: a belt conveyor roller. The application discloses a belt conveyor roller, including a transmission roller, a transmission The drum is composed of a cylinder, a drum shaft, a drum flange and connecting bolts; the material of the drum is high-strength alloy steel, and the tail of the drum is connected with the flange hole of the drum; the middle part of the drum shaft has a connecting flange, and the connecting flange The bosses of the rollers are matched with the connecting grooves of the drum flange. In this application, the connecting shaft head of the drum shaft not only ensures the connection strength, but also plays a positioning role, avoiding the loose quality defect inside the bar, and helping to prolong the service life of the drum.
以上申请案均是从传动滚筒的自身结构出发,通过改进传动滚筒的结构设计而延长滚筒的使用寿命,并未涉及对传动滚筒加工工艺的优化,提供一种可有效改善滚筒使用性能的加工方法对于行业发展仍具有指导性意义。The above applications all start from the structure of the drive drum itself, and extend the service life of the drum by improving the structural design of the drive drum. They do not involve the optimization of the processing technology of the drive drum, and provide a processing method that can effectively improve the performance of the drum. It still has guiding significance for the development of the industry.
发明内容Contents of the invention
1.发明要解决的技术问题1. The technical problem to be solved by the invention
本发明的目的在于克服现有技术中输送机传动滚筒容易发生损坏,导致输送系统异常、影响生产效率的不足,提供了一种皮带输送机传动滚筒的加工方法,可有效改善传动滚筒的使用性能,避免滚筒在使用中发生异常损坏,保障输送系统的高效运行。The purpose of the present invention is to overcome the disadvantages in the prior art that the transmission roller of the conveyor is easy to be damaged, which leads to the abnormality of the conveying system and affects the production efficiency, and provides a processing method for the transmission roller of the belt conveyor, which can effectively improve the performance of the transmission roller , to avoid abnormal damage to the roller during use, and ensure the efficient operation of the conveying system.
2.技术方案2. Technical solution
为达到上述目的,本发明提供的技术方案为:In order to achieve the above object, the technical scheme provided by the invention is:
本发明的一种皮带输送机传动滚筒的加工方法,包括以下步骤:A kind of processing method of belt conveyor driving drum of the present invention comprises the following steps:
A、筒皮的制作:将筒皮原料依次经下料、压弧、卷制、焊接、校圆工序加工为筒皮;A. Production of tube skin: The raw material of tube skin is processed into tube skin through blanking, arc pressing, rolling, welding and rounding in sequence;
B、中心轴的制作:将轴原料依次经下料、粗车、调质处理、精车工序加工为中心轴;B. Production of the central shaft: the raw material of the shaft is sequentially processed into a central shaft through blanking, rough turning, quenching and tempering treatment, and fine turning;
C、幅板的车削加工;C. Turning of the web;
D、装配:将加工好的筒皮、幅板和中心轴装配为一体,形成滚筒;D. Assembly: Assemble the processed tube skin, web and central shaft into one to form a drum;
E、在滚筒表面包覆橡胶层;E. Cover the rubber layer on the surface of the drum;
F、对滚筒表面的橡胶层进行车削处理,加工出表面花纹。F. Turning the rubber layer on the surface of the drum to process the surface pattern.
作为本发明更进一步的改进,步骤A中筒皮焊接后需进行退火处理,具体过程如下:将筒皮投入退火炉,退火炉内升温速度不超过150℃/h,炉内温度加热至600-650℃后保温2~2.5小时,保温结束后随炉冷却至150~160℃,然后空冷至室温。As a further improvement of the present invention, an annealing treatment is required after the tube skin is welded in step A. The specific process is as follows: put the tube skin into an annealing furnace, the temperature rise rate in the annealing furnace does not exceed 150°C/h, and the temperature in the furnace is heated to 600- After holding at 650°C for 2 to 2.5 hours, cool to 150 to 160°C with the furnace after the end of holding, and then air cool to room temperature.
作为本发明更进一步的改进,步骤E的具体过程如下:As a further improvement of the present invention, the specific process of step E is as follows:
步骤一、滚筒表面预处理,去除表面污物;Step 1. Pretreatment of the surface of the drum to remove surface dirt;
步骤二、在滚筒表面均匀刷涂底胶;Step 2. Apply primer evenly on the surface of the roller;
步骤三、在滚筒表面粘结橡胶板;Step 3: Glue the rubber sheet on the surface of the roller;
底胶风干后,将厚度为X的橡胶板沿周向包覆粘结在滚筒外部并压实;After the primer is air-dried, cover and bond the rubber plate with a thickness of X to the outside of the drum along the circumferential direction and compact it;
步骤四、滚筒的硫化处理;Step 4, vulcanization treatment of the drum;
步骤五、对滚筒表面进行车削处理;Step 5, turning the surface of the drum;
对硫化后滚筒表面的橡胶板进行车削处理,橡胶板的车削厚度为(1/5~1/3)X。Carry out turning treatment to the rubber plate on the surface of the vulcanized roller, the turning thickness of the rubber plate is (1/5~1/3)X.
作为本发明更进一步的改进,步骤一具体过程如下:对滚筒表面进行机械打磨或喷砂处理,并使用清洗剂清除表面污物,滚筒风干后,在滚筒表面均匀刷涂一层金属底漆。As a further improvement of the present invention, the specific process of step 1 is as follows: perform mechanical grinding or sandblasting on the surface of the roller, and use a cleaning agent to remove surface dirt. After the roller is air-dried, evenly paint a layer of metal primer on the surface of the roller.
作为本发明更进一步的改进,步骤二具体过程如下:在滚筒表面沿同一方向均匀刷涂第一层底胶,第一层底胶风干后,沿同一方向均匀刷涂第二层底胶。As a further improvement of the present invention, the specific process of step 2 is as follows: brush evenly the first layer of primer on the surface of the roller along the same direction, and after the first layer of primer is air-dried, evenly brush the second layer of primer along the same direction.
作为本发明更进一步的改进,所述第一层底胶厚度为0.05~0.06mm,第二层底胶厚度为0.03~0.05mm。As a further improvement of the present invention, the thickness of the first layer of primer is 0.05-0.06 mm, and the thickness of the second layer of primer is 0.03-0.05 mm.
作为本发明更进一步的改进,步骤三的具体过程如下:用压实滚轮将橡胶板沿滚筒圆周方向滚动并压实,挤压出橡胶板与滚筒之间的气泡,挤压时压实滚筒由橡胶板中心向两侧位置挤压。As a further improvement of the present invention, the specific process of step three is as follows: the rubber plate is rolled and compacted along the circumferential direction of the cylinder with the compacting roller, and the air bubbles between the rubber plate and the cylinder are extruded, and the compacting cylinder is formed during extrusion. The center of the rubber sheet is squeezed to the sides.
作为本发明更进一步的改进,步骤四的具体过程如下:橡胶板压实后,在橡胶板外周包覆一层隔绝膜,并用钢丝捆扎,然后将滚筒投入硫化蒸汽炉进行硫化处理,蒸汽炉内的温度为180~200℃。As a further improvement of the present invention, the specific process of step 4 is as follows: After the rubber sheet is compacted, a layer of insulating film is coated on the outer periphery of the rubber sheet, and it is bound with steel wires, and then the roller is put into a vulcanization steam furnace for vulcanization treatment. The temperature is 180 ~ 200 ℃.
作为本发明更进一步的改进,所述隔绝膜为帆布或PET薄膜。As a further improvement of the present invention, the insulating film is canvas or PET film.
作为本发明更进一步的改进,步骤五的具体过程如下:将滚筒送入车床沿周向对表面橡胶板进行车削加工,车削厚度为(1/5~1/3)X,车削后观察剩余橡胶板表面是否存在气泡,发现气泡时将气泡刺破,对该气泡处的间隙单独注胶,并将橡胶板此处压实。As a further improvement of the present invention, the specific process of step five is as follows: send the roller into the lathe and turn the surface rubber plate along the circumferential direction. The turning thickness is (1/5~1/3)X, and the remaining rubber is observed after turning. Check whether there are air bubbles on the surface of the board. When the air bubbles are found, puncture the air bubbles, inject glue separately into the gaps at the air bubbles, and compact the rubber plate here.
3.有益效果3. Beneficial effect
采用本发明提供的技术方案,与现有技术相比,具有如下显著效果:Compared with the prior art, the technical solution provided by the invention has the following remarkable effects:
(1)本发明的一种皮带输送机传动滚筒的加工方法,筒皮焊接完成后需进行退火处理,将筒皮投入退火炉,炉内升温速度不超过150℃/h,炉内温度加热至600℃时保温2h,保温结束后随炉冷至150℃,然后空冷至室温,可以充分消除筒皮的焊接应力,保障筒皮的机械性能,从而保障滚筒的综合机械性能,避免滚筒在使用中发生异常损坏,保障输送系统的高效运行。(1) The processing method of a kind of belt conveyor driving drum of the present invention, after the tube skin is welded, annealing treatment is required, the tube skin is put into an annealing furnace, the heating rate in the furnace is not more than 150°C/h, and the temperature in the furnace is heated to Keep warm at 600°C for 2 hours. After the heat preservation is over, cool it with the furnace to 150°C, and then air cool it to room temperature, which can fully eliminate the welding stress of the shell and ensure the mechanical properties of the shell, so as to ensure the comprehensive mechanical properties of the drum and prevent the drum from being in use. Abnormal damage occurs to ensure the efficient operation of the conveying system.
(2)本发明的一种皮带输送机传动滚筒的加工方法,将滚筒表面污物去除请清洗后,将滚筒快速晾干,然后迅速在滚筒表面均匀刷涂一层金属底漆,可以有效避免滚筒表面再次污染,延长预处理后滚筒的存放期,而且有利于后续胶粘剂对滚筒表面的湿润,改善其胶接强度和耐久性能,有助于提升滚筒的使用性能,延长其使用寿命。(2) According to the processing method of a belt conveyor drive roller of the present invention, after removing the dirt on the surface of the roller, please clean it, dry the roller quickly, and then quickly apply a layer of metal primer evenly on the surface of the roller, which can effectively avoid The re-contamination of the surface of the roller prolongs the storage period of the roller after pretreatment, and is conducive to the wetting of the roller surface by the subsequent adhesive, improving its bonding strength and durability, and helping to improve the performance of the roller and prolong its service life.
(3)本发明的一种皮带输送机传动滚筒的加工方法,将滚筒表面的金属底漆风干后,在滚筒表面沿同一方向均匀刷涂第一层底胶,第一层底胶风干后,沿同一方向均匀刷涂第二层底胶,刷涂底胶时全部沿同一方向进行,从而避免底胶表面吸附空气或包裹空气而在表面产生气泡或气孔,刷涂速度均匀平稳,有助于空气排出,防止气泡残留,提高后续表层橡胶板与滚筒的粘结强度,避免滚筒出现脱胶现象,提升滚筒的使用性能。(3) the processing method of a kind of belt conveyor driving drum of the present invention, after the metal primer on the drum surface is air-dried, brush the first layer of primer evenly along the same direction on the drum surface, after the first layer of primer is air-dried, Brush the second layer of primer evenly in the same direction. When brushing the primer, do it all in the same direction, so as to avoid air bubbles or pores on the surface caused by the surface of the primer absorbing or enveloping air. The brushing speed is uniform and stable, which helps The air is discharged to prevent residual air bubbles, improve the bonding strength between the subsequent surface rubber sheet and the roller, avoid degumming of the roller, and improve the performance of the roller.
(4)本发明的一种皮带输送机传动滚筒的加工方法,采取第一层底胶稍厚、第二层底胶稍薄的刷涂方式,第一层底胶可以充分包覆在金属底漆的外层,金属底漆作为滚筒与底胶之间的过渡层,使得第一层底胶紧密粘结在滚筒表面上,第二层底胶稍薄不仅有利于快速风干,且能够对第一层底胶刷涂时产生的表面微小缺陷进行修补调整,保障底胶刷涂的整体均匀性,第二层底胶稍薄也有利于保障两层底胶之间的快速高效粘结,防止底胶内部出现针眼、气泡、气孔等缺陷。(4) The processing method of a kind of belt conveyor drive roller of the present invention adopts the brushing method that the first layer of primer is slightly thicker and the second layer of primer is slightly thinner, and the first layer of primer can be fully coated on the metal bottom The outer layer of the paint, the metal primer is used as a transition layer between the roller and the primer, so that the first layer of primer is tightly bonded to the surface of the roller, and the second layer of primer is slightly thinner. Repair and adjust the small defects on the surface generated when the first layer of primer is brushed to ensure the overall uniformity of the primer. There are defects such as pinholes, air bubbles, and pores inside the primer.
(5)本发明的一种皮带输送机传动滚筒的加工方法,采用压实滚轮将橡胶板沿滚筒圆周方向滚动并压实,挤压出橡胶板与滚筒之间的气体,且挤压时压实滚筒由橡胶板中心向两侧位置挤压,从而保障挤出空气,密实胶层,使表层橡胶板紧密粘结在滚筒外周,且防止将空气包覆在橡胶板内部形成气泡。(5) The processing method of a kind of belt conveyor drive roller of the present invention, adopts compacting roller to roll and compact the rubber sheet along the circumferential direction of the roller, extrudes the gas between the rubber sheet and the roller, and compresses the rubber sheet during extrusion. The solid roller is squeezed from the center of the rubber sheet to both sides, so as to ensure the extrusion of air and compact the rubber layer, so that the surface rubber sheet is tightly bonded to the outer periphery of the roller, and prevents the air from wrapping inside the rubber sheet to form air bubbles.
(6)本发明的一种皮带输送机传动滚筒的加工方法,在滚筒的橡胶板外周包覆一层隔绝膜,并用钢丝捆扎,使隔绝膜紧密包覆在橡胶板外周,然后将滚筒投入硫化蒸汽炉进行硫化处理,隔绝膜的设置既避免钢丝直接与橡胶板接触,也避免在滚筒运输投炉过程中与其他滚筒间的碰撞摩擦,从而保护橡胶板,防止橡胶板表层出现磨损或其他表面缺陷,且钢丝的捆扎又有助于改善滚筒表层橡胶板的膨胀变形情况,从而提高橡胶板的使用强度,减少橡胶板内部气泡的产生,避免滚筒长期使用中出现脱胶现象,保障输送系统稳定运行。(6) The processing method of a kind of belt conveyor drive roller of the present invention, coats a layer of insulating film on the outer periphery of the rubber plate of the roller, and binds with steel wire, makes the insulating film tightly wrap on the outer periphery of the rubber plate, and then puts the roller into vulcanization The steam furnace is vulcanized. The setting of the insulating film not only avoids the direct contact of the steel wire with the rubber sheet, but also avoids the collision and friction with other rollers during the roller transportation and casting process, so as to protect the rubber sheet and prevent the surface of the rubber sheet from being worn or other surfaces. Defects, and the binding of steel wires helps to improve the expansion and deformation of the rubber sheet on the surface of the roller, thereby improving the use strength of the rubber sheet, reducing the generation of air bubbles inside the rubber sheet, avoiding the degumming phenomenon of the roller during long-term use, and ensuring the stable operation of the conveying system .
(7)本发明的一种皮带输送机传动滚筒的加工方法,滚筒硫化处理后对表面橡胶板进行一次车削处理,使橡胶板内部状态一览无余,将无形化为有形,生产人员可以直接观察橡胶板内部是否存在因膨胀变形而产生的气孔或气泡,若存在明显的气泡缺陷,则可以直接将气泡刺破,并对该处进行单独注胶,保障橡胶板填充完毕后将此处橡胶板压实,有效避免成品的包胶滚筒存在气泡的问题,提高橡胶板与滚筒的紧密粘结,避免气泡在内部游离而影响滚筒使用寿命,也防止因滚筒意外脱胶而导致输送机系统停机的问题,从而提高生产稳定性,保障生产进度。(7) In the processing method of a belt conveyor drive roller of the present invention, the surface rubber sheet is turned once after the roller vulcanization treatment, so that the internal state of the rubber sheet can be seen at a glance, and the intangible becomes tangible, and the production personnel can directly observe the rubber sheet. Whether there are air holes or bubbles caused by expansion and deformation inside the board. If there are obvious bubble defects, you can directly puncture the air bubbles and inject glue separately to ensure that the rubber board is pressed here after the rubber board is filled. It can effectively avoid the problem of air bubbles in the finished rubberized roller, improve the tight bonding between the rubber sheet and the roller, avoid the free air bubbles inside and affect the service life of the roller, and also prevent the conveyor system from shutting down due to accidental degumming of the roller. Thereby improving production stability and ensuring production progress.
(8)本发明的一种皮带输送机传动滚筒的加工方法,最后需对滚筒表面的橡胶板进行二次车削处理,加工出橡胶板表面花纹,从而增大传动滚筒与皮带间的摩擦力,进一步防止滚筒打滑,提高滚筒的运行效率,保障输送机系统高效运转。(8) The processing method of a kind of belt conveyor drive roller of the present invention needs to carry out the secondary turning process to the rubber plate on the surface of the roller at last, and process the pattern on the surface of the rubber plate, thereby increasing the frictional force between the drive roller and the belt, Further prevent the roller from slipping, improve the operating efficiency of the roller, and ensure the efficient operation of the conveyor system.
附图说明Description of drawings
图1为本发明的工艺流程图;Fig. 1 is a process flow diagram of the present invention;
图2为本发明中滚筒表面橡胶层的包覆流程图。Fig. 2 is the coating flowchart of the rubber layer on the surface of the drum in the present invention.
具体实施方式detailed description
为进一步了解本发明的内容,结合附图对本发明作详细描述。In order to further understand the content of the present invention, the present invention will be described in detail in conjunction with the accompanying drawings.
下面结合实施例对本发明作进一步的描述。The present invention will be further described below in conjunction with embodiment.
实施例1Example 1
本实施例的一种皮带输送机传动滚筒的加工方法,包括以下步骤:A processing method of a belt conveyor drive pulley according to the present embodiment comprises the following steps:
A、筒皮的制作:将筒皮原料依次经下料、压弧、卷制、焊接、校圆工序加工为筒皮,具体过程如下:A. Production of tube skin: The raw material of tube skin is processed into tube skin through blanking, arc pressing, rolling, welding and rounding in sequence. The specific process is as follows:
(1)下料,采用半自动切割机下料并切割出焊接坡口,坡口切割成X型坡口,切割表面粗糙度为50μm,筒皮卷制方向和材料轧制方向一致。(1) Blanking, use a semi-automatic cutting machine to cut the material and cut out the welding groove, the groove is cut into an X-shaped groove, the cutting surface roughness is 50 μm, and the rolling direction of the tube is consistent with the rolling direction of the material.
(2)压弧,筒皮展开长度的两端在压力机上预先压出圆弧,压弧上胎半径接近筒皮内圆半径,压制圆弧的长度不小于筒皮圆周长度的1/8,并用样板检测压弧内径,样板与筒皮的间隙小于0.5mm。(2) Press the arc, the two ends of the expanded length of the tube skin are pre-pressed on the press to form a circular arc, the radius of the upper tire on the press arc is close to the radius of the inner circle of the tube skin, and the length of the pressed arc is not less than 1/8 of the circumference of the tube skin. And use the template to detect the inner diameter of the pressure arc, the gap between the template and the tube skin is less than 0.5mm.
(3)卷制,将筒皮在卷板机上卷制成圆筒,用样板检测圆筒直径,样板与筒皮的间隙小于0.5mm,样板弧长不小于筒皮圆周长度的1/4,筒皮卷至对口间隙达2-3mm时点焊,焊缝长为30-50mm,间距为300-400mm,卷制时避免将钢板辗薄或接口强力对合点固。(3) Rolling, roll the tube skin on a plate rolling machine to form a cylinder, use a sample to test the diameter of the cylinder, the gap between the sample plate and the tube skin is less than 0.5mm, and the arc length of the sample plate is not less than 1/4 of the circumference of the tube skin, Spot welding when the gap between the drum skin roll and the counterpart reaches 2-3mm, the length of the weld seam is 30-50mm, and the spacing is 300-400mm. When rolling, avoid rolling the steel plate thin or the interface is strongly aligned.
(4)筒皮的焊接,采用埋弧自动焊或CO2气体保护焊将筒皮焊接成滚筒,本实施例中采用埋弧自动焊,焊接后将焊缝磨平,且筒皮焊接完成后需进行退火处理,将筒皮投入退火炉,炉内升温速度不超过150℃/h,炉内温度加热至600℃时保温2h,保温结束后随炉冷至150℃,然后空冷至室温,由此可以充分消除筒皮的焊接应力,保障筒皮的机械性能。(4) The welding of the tube skin, adopt submerged arc automatic welding or CO2 gas shielded welding to weld the tube skin into a drum, adopt submerged arc automatic welding in this embodiment, weld the weld seam after welding, and after the tube skin welding is completed Annealing treatment is required, put the shell into the annealing furnace, the temperature rise rate in the furnace does not exceed 150°C/h, when the temperature in the furnace is heated to 600°C, it is kept for 2 hours, after the heat preservation is completed, it is cooled to 150°C with the furnace, and then air-cooled to room temperature. This can fully eliminate the welding stress of the tube skin and ensure the mechanical properties of the tube skin.
(5)校圆,在卷板机上将滚筒校圆,筒皮的圆度为1mm,至此,筒皮加工完成。(5) Calibrate the circle. Calibrate the cylinder on the plate rolling machine. The roundness of the shell is 1mm. So far, the shell processing is completed.
B、中心轴的制作:将轴原料依次经下料、粗车、调质处理、精车工序加工为中心轴,调质处理后可以使中心轴的性能、材质得到较大程度的调整,其强度、塑性和韧性都大幅度提高,具有良好的综合机械性能。B. Production of the central shaft: The raw material of the shaft is sequentially processed into a central shaft through blanking, rough turning, quenching and tempering treatment, and finishing process. After quenching and tempering treatment, the performance and material of the central shaft can be adjusted to a large extent. The strength, plasticity and toughness are greatly improved, and it has good comprehensive mechanical properties.
C、幅板的车削加工,本实施例中筒皮、中心轴和幅板的加工没有明确的先后顺序,各个单独的部件加工完成后进行统一装配。C. Turning processing of the web. In this embodiment, there is no clear sequence for the processing of the tube skin, the central shaft and the web. Each individual component is assembled uniformly after processing.
D、装配:将加工好的筒皮、幅板和中心轴装配为一体,形成滚筒。D. Assembling: Assemble the processed tube skin, web and central shaft into one to form a drum.
E、在滚筒表面包覆橡胶层,该橡胶层用以增大传动滚筒与皮带间的摩擦力,有效防止滚筒与皮带间的滑动摩擦,从而减少皮带打滑,减小皮带的跑偏和磨损,提高运行效率,保证皮带高效、大运量地运转,因此橡胶层包覆质量的好坏对于滚筒的使用性能意义重大。E. Cover the surface of the roller with a rubber layer, which is used to increase the friction between the drive roller and the belt, effectively prevent the sliding friction between the roller and the belt, thereby reducing the belt slip, reducing the deviation and wear of the belt, Improve the operating efficiency and ensure the belt runs efficiently and with a large capacity. Therefore, the quality of the rubber layer coating is of great significance to the performance of the pulley.
目前由于常规生产工艺的限制,包胶后的滚筒在实际使用中容易出现以下问题:(1)滚筒包胶时橡胶板与滚筒之间容易出现气泡,难以彻底消除,导致橡胶板无法与滚筒紧密粘结,容易出现橡胶板松动;(2)橡胶板与滚筒之间的气泡随着滚筒传动而在内部游离,在输送过程中容易导致滚筒表面凹陷,影响滚筒使用寿命;(3)在传动滚筒的使用过程中,滚筒往往受到长时间摩擦力与向心力的作用,气泡的存在容易造成滚筒脱胶现象,导致系统停机,影响生产进度等。由此可见,滚筒包胶过程中如何减少气泡的产生对于提升滚筒的使用性能意义重大。At present, due to the limitation of the conventional production process, the rubber-coated roller is prone to the following problems in actual use: (1) Bubbles are prone to appear between the rubber plate and the roller when the roller is lagging, which is difficult to completely eliminate, resulting in the rubber plate not being able to be tightly connected to the roller Bonding, the rubber sheet is prone to loosening; (2) The air bubbles between the rubber sheet and the roller are dissociated inside as the roller is driven, which will easily cause the surface of the roller to sag during the transportation process, which will affect the service life of the roller; (3) In the transmission roller During the use process, the drum is often subjected to long-term friction and centripetal force. The existence of air bubbles will easily cause the degumming of the drum, which will cause the system to stop and affect the production progress. It can be seen that how to reduce the generation of air bubbles in the drum lagging process is of great significance to improve the performance of the drum.
为减少包胶过程中气泡的产生,传统加工中通常采取如下方法:先将橡胶板粘接在滚筒上,再砸击粘好的橡胶板以使橡胶板被压实,然后对包胶滚筒进行硫化处理。此种方式通过砸击将橡胶板与滚筒间的气泡赶出避免残留,但去泡效果难以保障,且生产效率较低,难以在生产中大量推广,而关于滚筒包胶工艺的优化也有大量专利文献的公开,如中国专利申请号:2014106425433,申请日:2014年11月13日,发明创造名称为:皮带辊筒胶层在线包胶及修复工艺,该申请案公开了一种皮带辊筒胶层在线包胶及修复工艺,包胶包括如下步骤:a、将聚氨酯脲弹性体原料A组分和B组分分别从喷涂机的对应吸料泵吸入加热管道;启动压缩空气源;b、对皮带滚筒进行喷砂处理,然后涂刷粘接材料;c、启动皮带滚筒电机,并开启吸料泵、喷枪,将喷枪头对准旋转的皮带滚筒表面喷涂包胶,确保喷出的混合物料覆盖在皮带辊筒上;d、在完全固化成型的包胶层上雕刻花纹后得成品;修复工艺,即是先按照上述工艺步骤a操作,然后对皮带辊筒的缺陷进行切削、清洗和造型,最后按照上述工艺步骤c和d操作,得到修复后的成品。该申请案实现了皮带辊筒的在线喷涂包胶及修复操作,但却未涉及如何避免包胶过程中气泡的产生,不能解决因包胶产生气泡而导致的一系列问题。In order to reduce the generation of air bubbles during the lagging process, the following methods are usually adopted in traditional processing: firstly, the rubber sheet is bonded to the roller, and then the glued rubber sheet is smashed to compact the rubber sheet, and then the rubber wrapping roller is vulcanization treatment. This method drives out the air bubbles between the rubber plate and the roller by smashing them to avoid residues, but the effect of defoaming is difficult to guarantee, and the production efficiency is low, so it is difficult to popularize in production. There are also a large number of patents on the optimization of the roller lagging process. Publication of documents, such as Chinese patent application number: 2014106425433, application date: November 13, 2014, and the name of the invention is: online rubber coating and repair process of belt roller rubber layer. This application discloses a belt roller adhesive Layer online encapsulation and repair process, encapsulation includes the following steps: a. Inhale component A and component B of polyurethane urea elastomer raw materials from the corresponding suction pump of the spraying machine into the heating pipeline; start the compressed air source; b. Sand blast the belt drum, and then paint the bonding material; c. Start the belt drum motor, and turn on the suction pump and spray gun, and aim the spray gun head at the surface of the rotating belt drum to spray lagging to ensure that the sprayed mixed material covers On the belt roller; d, the finished product is obtained after engraving patterns on the fully cured and formed covering layer; the repair process is to operate according to the above process step a, and then cut, clean and shape the defects of the belt roller, Finally, operate according to the above process steps c and d to obtain the repaired finished product. This application realizes the on-line spraying and repairing of the belt roller, but it does not involve how to avoid the generation of air bubbles during the encapsulation process, and cannot solve a series of problems caused by the air bubbles generated by the encapsulation.
又如中国专利申请号:2016103811021,申请日:2016年6月1日,发明创造名称为:一种钛合金板酸洗线包胶辊的修补方法,该申请案公开了一种钛合金板酸洗线包胶辊的修补方法,该申请案以胶层表层更换维修替代整体胶层更换,增加了辊面机械强度,避免板材对辊子的磨损,避免了长时间使用胶层掉胶的问题,但该申请案是对需维修的辊体如何更换橡胶板做出优化,从而降低更换成本,缩短维修工期,对于辊体初始包胶时如何有效避免气泡产生并未涉及。由此可见,现有技术中更多地涉及对包胶滚筒出现问题后如何进行修复,却忽视了如何在滚筒包胶的初始阶段减少包胶气泡的产生,改善滚筒的使用性能,最终也有助于降低滚筒的修复机率。Another example is the Chinese patent application number: 2016103811021, application date: June 1, 2016, and the name of the invention is: a method for repairing rubber rollers of titanium alloy plate pickling lines. This application discloses a titanium alloy plate acid The method of repairing the rubber roller of the washing line, the application replaces the replacement of the overall rubber layer with the surface layer of the rubber layer, which increases the mechanical strength of the roller surface, avoids the wear of the plate on the roller, and avoids the problem of the rubber layer falling off after long-term use. However, this application is to optimize how to replace the rubber plate of the roller body that needs to be repaired, thereby reducing the replacement cost and shortening the maintenance period. It does not involve how to effectively avoid the generation of air bubbles during the initial rubber covering of the roller body. It can be seen that the existing technology is more concerned with how to repair the lagging roller after problems occur, but ignores how to reduce the generation of lagging bubbles in the initial stage of roller lagging, improve the performance of the roller, and ultimately help In order to reduce the repair probability of the drum.
本实施例中滚筒表面橡胶层的包覆按照如下过程进行:In the present embodiment, the coating of the rubber layer on the surface of the drum is carried out according to the following process:
步骤一、滚筒表面预处理,去除表面污物;Step 1. Pretreatment of the surface of the drum to remove surface dirt;
毛坯滚筒表面存在各种污染物,包括各种不利于胶接的有机或无机物,包胶前需进行表面预处理,可采用机械打磨或喷砂处理或化学处理的方法清除滚筒表面的污染物,给滚筒表面提供适当的粗糙度,从而增加有效粘接面积,改善粘附性能。本实施例中采用钢丝刷对滚筒表面进行打毛处理,然后使用清洗剂清除表面污物,清洗后将滚筒快速晾干,然后迅速在滚筒表面均匀刷涂一层金属底漆,如PR-800金属底漆,将金属底漆均匀包覆在清洗后的滚筒表面,可以有效避免滚筒表面再次污染,延长预处理后滚筒的存放期,而且有利于后续胶粘剂对滚筒表面的湿润,改善其胶接强度和耐久性能,有助于提升滚筒的使用性能,延长其使用寿命。刷涂金属底漆前一定要滚筒处于晾干状态,从而避免清洗剂残留在滚筒表面而影响金属底漆的粘结强度。There are various pollutants on the surface of the blank roller, including various organic or inorganic substances that are not conducive to bonding. Surface pretreatment is required before encapsulation. Mechanical grinding, sandblasting or chemical treatment can be used to remove pollutants on the surface of the roller , to provide appropriate roughness to the surface of the drum, thereby increasing the effective bonding area and improving the adhesion performance. In this example, a steel wire brush is used to roughen the surface of the roller, and then a cleaning agent is used to remove the surface dirt. After cleaning, the roller is dried quickly, and then a layer of metal primer, such as PR-800, is evenly brushed on the surface of the roller quickly. Metal primer, evenly coat the metal primer on the surface of the cleaned roller, which can effectively prevent the surface of the roller from being polluted again, prolong the storage period of the roller after pretreatment, and facilitate the wetting of the roller surface by the subsequent adhesive to improve its bonding Strength and durability help to improve the performance of the roller and extend its service life. Before brushing the metal primer, the roller must be in a dry state, so as to avoid the cleaning agent remaining on the surface of the roller and affecting the bonding strength of the metal primer.
步骤二、在滚筒表面均匀刷涂底胶;Step 2. Apply primer evenly on the surface of the roller;
步骤一结束后,将滚筒表面的金属底漆风干,然后在滚筒表面均匀刷涂底胶,本实施例中可采用3M:K-500底胶,能和空气中的水分子发生作用,产生高粘结力,并具有较好的抗高温性能,可以起到极好的粘结效果。底胶的刷涂是为后续粘结表层的橡胶板提供基础,为保障表层橡胶板与滚筒的紧密粘结,底胶的粘结力和粘结均匀性都极为重要,对底胶的厚度有一定要求,但长时间刷涂底胶过程中底胶表面容易吸附或包裹空气而在表面产生气泡或气孔,对后续橡胶板的包覆存在不利影响。After step 1, air-dry the metal primer on the surface of the roller, and then evenly brush the primer on the surface of the roller. In this embodiment, 3M: K-500 primer can be used, which can interact with water molecules in the air to produce high Adhesive force, and has good high temperature resistance, can play an excellent bonding effect. The brushing of the primer is to provide the basis for the subsequent bonding of the rubber sheet on the surface. In order to ensure the tight bonding between the surface rubber sheet and the roller, the adhesive force and uniformity of the primer are extremely important. Certain requirements, but during the long-term brushing process of the primer, the surface of the primer is easy to absorb or wrap air, resulting in air bubbles or pores on the surface, which has an adverse effect on the subsequent coating of the rubber sheet.
本实施例中刷涂底胶时全部沿同一方向进行,避免底胶表面吸附空气或包裹空气而在表面产生气泡或气孔,且刷涂速度均匀平稳,有助于空气排出,防止气泡残留;其次,本实施例对底胶进行两次刷涂,待第一层底胶完全风干后才开始第二层的刷涂,两次刷涂底胶不仅可以充分保障底胶刷涂的均匀性,更有利于底胶内部的快速风干,防止在持续的刷涂中吸附空气形成气孔;更重要的是,本实施例中两次底胶刷涂的厚度不同,第一层底胶刷涂厚度为0.05mm,第二层底胶刷涂的厚度为0.03mm,采用第一层底胶稍厚、第二层底胶稍薄的刷涂方式,第一层底胶可以充分包覆在金属底漆的外层,金属底漆作为滚筒与底胶之间的过渡层,使得第一层底胶紧密粘结在滚筒表面上,第二层底胶稍薄不仅有利于快速风干,且能够对第一层底胶刷涂时产生的表面微小缺陷进行修补调整,保障底胶刷涂的整体均匀性,第二层底胶稍薄也有利于保障两层底胶之间的快速高效粘结。两层底胶的刷涂能有效加固滚筒表面胶层,提高后续表层橡胶板与滚筒的粘结强度,避免滚筒出现脱胶现象,也防止底胶内部出现针眼、气泡、气孔等缺陷。In this embodiment, all the brushing of the primer is carried out in the same direction, so as to avoid air bubbles or pores on the surface caused by the surface of the primer to absorb air or wrap air, and the brushing speed is uniform and stable, which helps to discharge air and prevent air bubbles from remaining; secondly In this embodiment, the primer is brushed twice, and the second layer of brushing is started after the first layer of primer is completely dried. Brushing the primer twice can not only fully ensure the uniformity of the primer, but also It is conducive to the rapid air-drying of the inside of the primer and prevents air pores from being absorbed during continuous brushing; more importantly, the thickness of the two primer brushes in this embodiment is different, and the thickness of the first layer of primer brushing is 0.05 mm, the thickness of the second layer of primer brushing is 0.03mm, the first layer of primer is slightly thicker and the second layer of primer is slightly thinner, the first layer of primer can fully cover the surface of the metal primer In the outer layer, the metal primer is used as a transition layer between the roller and the primer, so that the first layer of primer is tightly bonded to the surface of the roller, and the second layer of primer is slightly thinner, which is not only conducive to fast air drying, but also can be used for the first layer. The small defects on the surface produced during the primer brushing are repaired and adjusted to ensure the overall uniformity of the primer brushing. The second layer of primer is slightly thinner, which is also conducive to ensuring the rapid and efficient bonding between the two layers of primer. The brushing of two layers of primer can effectively strengthen the rubber layer on the surface of the roller, improve the bonding strength between the subsequent surface rubber sheet and the roller, avoid degumming of the roller, and prevent defects such as pinholes, air bubbles, and pores inside the primer.
步骤三、在滚筒表面粘结橡胶板;Step 3: Glue the rubber sheet on the surface of the roller;
第二层底胶风干后,将厚度为X的橡胶板沿周向包覆粘结在滚筒外部,采用压实滚轮将橡胶板沿滚筒圆周方向滚动并压实,挤压出橡胶板与滚筒之间的气体,且挤压时压实滚筒由橡胶板中心向两侧位置挤压,防止将空气包覆在橡胶板内部形成气泡。包覆挤压橡胶板时需一次对准位置,不可来回错动,橡胶板粘合挤压后以挤压出微小胶圈为好,防止内部缺胶,挤压过程中发现橡胶板内部存在缝隙或缺胶时则及时补满继续压平。橡胶板粘合后可从中间向两侧部位逐渐加压滚实,从而保障挤出空气,密实胶层,使表层橡胶板紧密粘结在滚筒外周,且防止粘结过程中出现气泡气孔。After the second layer of bottom glue is air-dried, the rubber sheet with a thickness of X is coated and bonded on the outside of the drum along the circumferential direction, and the rubber sheet is rolled and compacted along the circumferential direction of the drum with a compacting roller, and the gap between the rubber sheet and the drum is extruded During extrusion, the compacting roller is squeezed from the center of the rubber sheet to the two sides to prevent the air from forming air bubbles inside the rubber sheet. When wrapping and extruding the rubber sheet, it is necessary to align the position once, and do not move back and forth. After the rubber sheet is bonded and extruded, it is better to extrude a tiny rubber ring to prevent the lack of glue inside. During the extrusion process, it is found that there is a gap inside the rubber sheet. Or when there is a lack of glue, fill it up in time and continue to flatten. After the rubber sheet is bonded, it can be gradually pressed and rolled from the middle to both sides, so as to ensure the extrusion of air, compact the rubber layer, make the surface rubber sheet tightly bonded to the outer periphery of the drum, and prevent air bubbles and pores during the bonding process.
步骤四、包胶滚筒的硫化处理;Step 4, vulcanization treatment of the rubberized drum;
步骤三结束后,需将滚筒投入硫化蒸汽炉进行硫化处理,蒸汽炉内温度为180℃。生产实践显示橡胶的硫化处理会提高滚筒包胶气泡的产生,而这种气泡的增多极大地影响了传动滚筒的使用寿命,如何有效避免滚筒在硫化处理中气泡的产生是技术人员不断研究的目标。After the third step, the drum needs to be put into the vulcanization steam furnace for vulcanization treatment, and the temperature in the steam furnace is 180°C. The production practice shows that the vulcanization treatment of rubber will increase the generation of rubber lagging bubbles, and the increase of such bubbles greatly affects the service life of the transmission roller. How to effectively avoid the generation of bubbles during the vulcanization treatment of the roller is the goal of continuous research by technicians .
本实施例中在将滚筒投入硫化处理前,先采用钢丝将隔绝膜紧紧包覆在橡胶板外周,然后再将滚筒投入硫化蒸汽炉进行硫化处理,隔绝膜的设置既避免钢丝直接与橡胶板接触,也避免在滚筒运输投炉过程中与其他滚筒间的碰撞摩擦,从而保护橡胶板,防止橡胶板表层出现磨损或其他表面缺陷,更重要的是可以有效减少气泡的产生,使滚筒中的气泡量降低到常规生产工艺下滚筒气泡量的20%以下,有效提高了滚筒的使用性能。In this embodiment, before the roller is put into vulcanization treatment, the insulating film is tightly wrapped on the outer periphery of the rubber plate with steel wire, and then the roller is put into the vulcanization steam furnace for vulcanization treatment. The setting of the insulating film can prevent the steel wire from directly contacting the rubber plate. It also avoids collision and friction with other rollers during the roller transportation and casting process, so as to protect the rubber sheet and prevent abrasion or other surface defects on the surface of the rubber sheet. More importantly, it can effectively reduce the generation of air bubbles and make the rollers The amount of air bubbles is reduced to less than 20% of that of the drum under the conventional production process, which effectively improves the performance of the drum.
发明人经过长期的生产实践和积极探索,发现硫化处理中容易产生气泡增多现象主要是由于橡胶板在硫化处理中受热容易发生膨胀,导致其内部组织出现间隙,甚至形成气孔或气泡,对滚筒的使用性能造成不利影响。本实施例通过钢丝将隔绝膜紧紧捆扎在橡胶层外周,有助于改善滚筒表层橡胶板的膨胀变形情况,增强橡胶板内部的组织致密,减少橡胶板内部气泡的产生,提高包胶滚筒的使用强度和使用性能。本实施例采用帆布为隔绝膜,具有强度高、抗折性好、耐磨性佳等优势,避免因在使用中破损而影响隔绝膜的保护效果。After long-term production practice and active exploration, the inventor found that the increase in bubbles is likely to occur during the vulcanization process, mainly because the rubber sheet is prone to expand when heated during the vulcanization process, resulting in gaps in its internal structure, and even the formation of pores or air bubbles. Detrimental effect on performance. In this embodiment, the insulating film is tightly bound on the outer periphery of the rubber layer by steel wires, which helps to improve the expansion and deformation of the rubber sheet on the surface of the roller, enhances the compactness of the internal structure of the rubber sheet, reduces the generation of air bubbles inside the rubber sheet, and improves the rubber-covered roller. Use strength and performance. In this embodiment, canvas is used as the insulating film, which has the advantages of high strength, good bending resistance, and good wear resistance, so as to avoid affecting the protective effect of the insulating film due to damage during use.
步骤五、对包胶滚筒的表面一次车削处理;Step 5, turning the surface of the rubber-covered roller once;
经过步骤四处理后,包胶滚筒内部的气泡量得到明显下降,生产实践显示传动滚筒的使用寿命得到改善,使整个输送系统的运行稳定性有所提高,有助于提高整体输送效率,但是仍无法满足目前企业大量生产的实际需求,长期使用中传动滚筒受到长时间摩擦力与向心力的作用,仍会因为其内部残存的气泡而极易损坏,而内部残留的气泡大小和分布情况均难以观察判断,如何进一步去除滚筒内的残留气泡成为技术人员难以攻克的难题。After the treatment in step 4, the amount of air bubbles inside the rubber-covered roller has been significantly reduced. Production practice shows that the service life of the drive roller has been improved, which has improved the operation stability of the entire conveying system and helped to improve the overall conveying efficiency, but still It cannot meet the actual needs of the mass production of the current enterprise. The transmission roller is subjected to long-term friction and centripetal force during long-term use, and it will still be easily damaged due to the residual air bubbles inside it, and the size and distribution of the remaining internal air bubbles are difficult to observe. Judging, how to further remove the residual air bubbles in the drum has become a difficult problem for technicians to overcome.
发明人匠心独运,在滚筒硫化处理结束后,将滚筒送入车床沿周向对表面橡胶板进行车削加工,使橡胶板内部状态一览无余,将无形气泡化为有形,生产人员可以直接观察橡胶板内部是否仍存在因膨胀变形而产生的气孔或气泡,若存在明显的气泡缺陷,则可以直接将气泡刺破,并对该处进行单独注胶,保障橡胶板填充完毕后将此处橡胶板压实即可。为保障橡胶板的高效车削,实现最大化的气泡去除效果,同时为了避免造成不必要的资源浪费,发明人经过长期分析探索和实验验证,最终发现橡胶板内部产生的气泡呈聚集型分布,且主要聚集在橡胶板外侧的1/5~1/3厚度处,因此,本实施例中橡胶板的车削厚度为1/5X,车削后的橡胶板厚度为实际使用的需求厚度。如本实施例中传动滚筒实际使用需求的包胶厚度为12mm,而步骤三中初次粘结的橡胶板厚度则为15mm,一次车削处理时将橡胶板表层3mm去除,去除部分即为橡胶板在硫化处理中最易变形、气泡较为集中的部分,且将最表层橡胶板去除后可以直接对橡胶板内部状态进行观察,若仍存在气泡则可以及时补胶,经过此工序处理后滚筒内的气泡量降低到常规生产工艺下滚筒气泡量的5%以下,,显著提高了橡胶板与滚筒的紧密粘结,避免气泡在内部游离而影响滚筒使用寿命,也防止因滚筒意外脱胶而导致输送机系统停机的问题,从而提高生产稳定性,保障生产进度。The inventor is ingenious. After the vulcanization treatment of the roller is completed, the roller is sent to the lathe to turn the surface rubber sheet along the circumferential direction, so that the internal state of the rubber sheet can be seen at a glance, and the invisible air bubbles can be changed into tangible ones. The production personnel can directly observe the rubber sheet. Whether there are still pores or air bubbles inside the board due to expansion and deformation. If there are obvious bubble defects, the air bubbles can be punctured directly, and the glue can be injected separately to ensure that the rubber plate here will be sealed after the rubber plate is filled. Just compact it. In order to ensure the efficient turning of the rubber sheet, achieve the maximum air bubble removal effect, and avoid unnecessary waste of resources, the inventor finally found that the bubbles generated inside the rubber sheet were distributed in an aggregated manner after long-term analysis, exploration and experimental verification, and They are mainly gathered at 1/5-1/3 thickness of the outer side of the rubber sheet. Therefore, the turning thickness of the rubber sheet in this embodiment is 1/5X, and the turned thickness of the rubber sheet is the required thickness for actual use. For example, in this embodiment, the thickness of the lagging required for the actual use of the drive roller is 12mm, while the thickness of the rubber sheet bonded for the first time in step 3 is 15mm. During the first turning process, 3mm of the surface layer of the rubber sheet is removed, and the removed part is the rubber sheet. The part that is most easily deformed and the bubbles are concentrated in the vulcanization process, and the internal state of the rubber plate can be directly observed after removing the outermost rubber plate. If there are still bubbles, the glue can be repaired in time. After this process, the bubbles in the drum The amount of air bubbles is reduced to less than 5% of that of the roller under the conventional production process, which significantly improves the tight adhesion between the rubber sheet and the roller, avoids the free air bubbles inside and affects the service life of the roller, and also prevents the conveyor system from being accidentally degummed due to the roller. Stop the problem of downtime, thereby improving production stability and ensuring production progress.
F、对滚筒表面的橡胶层进行车削处理,加工表面花纹。F. Carry out turning treatment on the rubber layer on the surface of the drum, and process the surface pattern.
步骤五结束后,对滚筒表面的橡胶板进行二次车削处理,加工出橡胶板表面花纹,如菱形或人字形花纹等,具体在本实施例中车削出菱形花纹,从而增大传动滚筒与皮带间的摩擦力,进一步防止滚筒打滑,提高滚筒的运行效率,保障输送机系统高效运转。After step 5, the rubber plate on the surface of the roller is turned twice to process the surface pattern of the rubber plate, such as rhombus or herringbone pattern. The friction between them can further prevent the rollers from slipping, improve the operating efficiency of the rollers, and ensure the efficient operation of the conveyor system.
实施例2Example 2
本实施例的一种皮带输送机传动滚筒的加工方法,基本同实施例1,所不同的是,本实施例步骤A中筒皮焊接后需进行退火处理,炉内温度加热至650℃后保温2.5小时,保温结束后随炉冷却至160℃,然后空冷至室温。The processing method of a belt conveyor driving drum in this embodiment is basically the same as that in Embodiment 1, the difference is that in step A of this embodiment, the drum skin needs to be annealed after welding, and the temperature in the furnace is heated to 650°C and then kept warm After 2.5 hours, cool down to 160°C with the furnace after the heat preservation is over, and then air cool to room temperature.
本实施例步骤二具体过程如下:在滚筒表面沿同一方向均匀刷涂第一层底胶,第一层底胶风干后,沿同一方向均匀刷涂第二层底胶,第一层底胶厚度为0.06mm,第二层底胶厚度为0.05mm。The specific process of step 2 of this embodiment is as follows: brush the first layer of primer evenly on the surface of the drum in the same direction, after the first layer of primer is air-dried, brush the second layer of primer evenly in the same direction, the thickness of the first layer of primer 0.06mm, the thickness of the second layer of primer is 0.05mm.
本实施例步骤四中蒸汽炉内的温度为200℃,且隔绝膜为PET薄膜,PET薄膜机械性能优良,强韧性尤为突出,其抗张强度和抗冲击强度较佳,还具有优良的耐热、耐寒性和耐油性,适宜包覆在橡胶板外周使用。The temperature in the steam oven in Step 4 of this embodiment is 200°C, and the insulating film is a PET film. The PET film has excellent mechanical properties, particularly outstanding strength and toughness. Its tensile strength and impact strength are better, and it also has excellent heat resistance. , cold resistance and oil resistance, suitable for wrapping around the rubber sheet.
本实施例步骤五中滚筒表面橡胶板的车削厚度为1/3X。In the fifth step of this embodiment, the turning thickness of the rubber plate on the surface of the drum is 1/3X.
实施例3Example 3
本实施例的一种皮带输送机传动滚筒的加工方法,基本同实施例1,所不同的是,本实施例步骤A中筒皮焊接后需进行退火处理,炉内温度加热至620℃后保温2.2小时,保温结束后随炉冷却至155℃,然后空冷至室温。The processing method of a belt conveyor driving drum in this embodiment is basically the same as that in Embodiment 1, the difference is that in step A of this embodiment, the drum skin needs to be annealed after welding, and the temperature in the furnace is heated to 620°C and then kept warm After 2.2 hours, cool down to 155°C with the furnace after the heat preservation is over, and then air cool to room temperature.
本实施例步骤二具体过程如下:在滚筒表面沿同一方向均匀刷涂第一层底胶,第一层底胶风干后,沿同一方向均匀刷涂第二层底胶,第一层底胶厚度为0.06mm,第二层底胶厚度为0.04mm。The specific process of step 2 of this embodiment is as follows: brush the first layer of primer evenly on the surface of the drum in the same direction, after the first layer of primer is air-dried, brush the second layer of primer evenly in the same direction, the thickness of the first layer of primer 0.06mm, the thickness of the second layer of primer is 0.04mm.
本实施例步骤四中蒸汽炉内的温度为190℃,步骤五中滚筒表面橡胶板的车削厚度为1/4X。The temperature in the steam oven in Step 4 of this embodiment is 190° C., and the turning thickness of the rubber plate on the surface of the drum in Step 5 is 1/4X.
以上示意性的对本发明及其实施方式进行了描述,该描述没有限制性,附图中所示的也只是本发明的实施方式之一,实际的结构并不局限于此。所以,如果本领域的普通技术人员受其启示,在不脱离本发明创造宗旨的情况下,不经创造性的设计出与该技术方案相似的结构方式及实施例,均应属于本发明的保护范围。The above schematically describes the present invention and its implementation, which is not restrictive, and what is shown in the drawings is only one of the implementations of the present invention, and the actual structure is not limited thereto. Therefore, if a person of ordinary skill in the art is inspired by it, without departing from the inventive concept of the present invention, without creatively designing a structural mode and embodiment similar to the technical solution, it shall all belong to the protection scope of the present invention .
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201611202790.7A CN106514168B (en) | 2016-12-23 | 2016-12-23 | A kind of processing method of belt conveyor driving drum |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201611202790.7A CN106514168B (en) | 2016-12-23 | 2016-12-23 | A kind of processing method of belt conveyor driving drum |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106514168A CN106514168A (en) | 2017-03-22 |
| CN106514168B true CN106514168B (en) | 2018-01-12 |
Family
ID=58337415
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201611202790.7A Active CN106514168B (en) | 2016-12-23 | 2016-12-23 | A kind of processing method of belt conveyor driving drum |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106514168B (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108582607A (en) * | 2018-04-10 | 2018-09-28 | 浙江祥邦科技股份有限公司 | Chill roll design method for solar cell packaging adhesive film |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE4320069A1 (en) * | 1993-06-17 | 1995-01-12 | Roland Man Druckmasch | Method and device for repairing cylinders of printing machines |
| CN102408595A (en) * | 2011-09-13 | 2012-04-11 | 安徽盛运橡胶有限责任公司 | Acid and alkali resistant rubber coating layer of roller and preparation method thereof |
| CN103171072A (en) * | 2013-03-14 | 2013-06-26 | 威海丰泰橡胶技术有限公司 | Teflon rubber roller and production method thereof |
| CN105312785A (en) * | 2014-07-07 | 2016-02-10 | 焦作科瑞森重装股份有限公司 | Welding technology for roller of belt conveyer |
| CN105619013A (en) * | 2014-11-19 | 2016-06-01 | 重庆江东摩托车配件有限公司 | Roller shaft processing process |
| CN105522336A (en) * | 2015-11-11 | 2016-04-27 | 陕西一品达石化有限公司 | Machining method for main drum of winch |
| CN205708600U (en) * | 2016-04-13 | 2016-11-23 | 辽宁科技大学 | A kind of welded drum of rubber conveyer |
-
2016
- 2016-12-23 CN CN201611202790.7A patent/CN106514168B/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| CN106514168A (en) | 2017-03-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103331864B (en) | Using injection moulding process manufacture high-performance, metal insert and the high cohesive force roller product of PU tyre beads | |
| CN106907530A (en) | A kind of inner lining plastic tube metal tube and its manufacture method | |
| CN110042390B (en) | A kind of flexible film laser cladding strengthening method of die-casting mold | |
| CN112108840A (en) | Manufacturing method of light truck 80L compressed natural gas normal-temperature high-pressure gas cylinder | |
| CN101381799A (en) | Surface hardening treatment method for pin shaft of plastic molding machine | |
| CN101585251A (en) | Method for preparing novel temperature-resistant and anti-corrosion lining material | |
| CN101817941A (en) | Composite material inlaying abrasion-resistant alloy in rubber and preparation method thereof | |
| CN102555182B (en) | Method for manufacturing glued steel belt for steel-belt-reinforced plastic composite pipe | |
| CN106835119A (en) | A method for repairing the plunger of a reciprocating plunger pump for oilfield water injection | |
| CN103171072A (en) | Teflon rubber roller and production method thereof | |
| CN106514168A (en) | Machining method for transmission drum of belt conveyor | |
| CN101811379B (en) | Rubber-coating roll with composite rubber-coating layer and method for preparing same | |
| CN108792499A (en) | A kind of preparation method of rubber-coated roller | |
| CN109047353B (en) | A lubricant coating device for steel wire drawing and a pretreatment method using the device | |
| CN101974742A (en) | Repairing method of body cave | |
| CN204954646U (en) | Peening machine is thrown to car -type | |
| CN216644957U (en) | Eleven-roller ceramic roller body | |
| CN100507024C (en) | Rolling method of exhaust valve face | |
| CN106112817B (en) | A kind of carbon steel material bushing inner and outer pipes process of surface treatment | |
| CN104999378A (en) | Shot blasting device for inner wall of wind power tower | |
| CN204997533U (en) | Prevent shot -blasting machine of shot embedding steel sheet | |
| CN110744451A (en) | An intelligent steel pipe inner wall treatment device | |
| CN204686675U (en) | Working roll in shot blasting machine | |
| CN201702981U (en) | Rubber covered roll provided with composite material rubber covered layer | |
| CN204019377U (en) | A kind of shot-blast cleaning machine lifting subassembly |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A processing method for a belt conveyor drive drum Granted publication date: 20180112 Pledgee: Agricultural Bank of China Limited Dangtu County sub branch Pledgor: ANHUI TAIFU HEAVY INDUSTRY Co.,Ltd. Registration number: Y2025980058774 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right |