CN106499212A CN201611082144.1A CN201611082144A CN106499212A CN 106499212 A CN106499212 A CN 106499212A CN 201611082144 A CN201611082144 A CN 201611082144A CN 106499212 A CN106499212 A CN 106499212A
Authority
CN
China
Prior art keywords
shear wall
steel plate
profiled sheet
plate strip
sheet shear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611082144.1A
Other languages
Chinese (zh)
Other versions
CN106499212B (en
Inventor
冯宁宁
曹平周
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Amoeba Engineering Structure Optimization Research Institute Co ltd
Original Assignee
Changzhou Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Institute of Technology filed Critical Changzhou Institute of Technology
Priority to CN201611082144.1A priority Critical patent/CN106499212B/en
Publication of CN106499212A publication Critical patent/CN106499212A/en
Application granted granted Critical
Publication of CN106499212B publication Critical patent/CN106499212B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

本发明公开了一种压型钢板剪力墙与RC框架梁的连接结构及其施工方法。该连接结构包括由框架梁和框架柱构成的RC框架梁,在RC框架梁的内侧固定设置有钢板条,钢板条上设置有螺栓孔,连接结构还包括压型钢板剪力墙,压型钢板剪力墙由相邻压型钢板经部分重叠后固定连接而成,压型钢板剪力墙靠近框架梁的端部与钢板条固定连接。本发明的压型钢板剪力墙与RC框架梁的连接结构及其施工方法,压型钢板加固部件和钢板条连接构件,经济性能佳,在操作和连接方面提出简便易行的连接方式,缩短施工周期;此连接方法解决了实际工程中压型钢板剪力墙与框架梁的连接问题,施工方法可靠。

The invention discloses a connection structure of a profiled steel plate shear wall and an RC frame beam and a construction method thereof. The connection structure includes RC frame beams composed of frame beams and frame columns. Steel slats are fixed on the inner side of the RC frame beams. Bolt holes are arranged on the steel slats. The connection structure also includes profiled steel plate shear walls, profiled steel plates The shear wall is made of adjacent profiled steel plates that are partially overlapped and then fixedly connected, and the end of the profiled steel plate shear wall near the frame beam is fixedly connected with the steel strips. The connection structure and construction method of the profiled steel plate shear wall and the RC frame beam of the present invention, the profiled steel plate reinforcement part and the steel strip connection member have good economic performance, and a simple and easy connection method is proposed in terms of operation and connection, shortening The construction period; this connection method solves the connection problem between the profiled steel plate shear wall and the frame beam in the actual project, and the construction method is reliable.

Description

压型钢板剪力墙与RC框架梁的连接结构及其施工方法Connection structure and construction method of profiled steel plate shear wall and RC frame beam

技术领域technical field

本发明涉及压型钢板剪力墙与RC框架梁的连接结构及其施工方法,属于施工技术领域。The invention relates to a connection structure of a profiled steel plate shear wall and an RC frame beam and a construction method thereof, belonging to the technical field of construction.

背景技术Background technique

《建筑工程抗震设防分类标准》GB50223-2008中,把三级医院中承担特别重要医疗任务的门诊、医技、住院用房,抗震设防类别划为特殊设防类(甲类),将二、三级医院其他部门划为重点设防类(乙类);2016年新修订的《建筑抗震设计规范》也相应提高了抗震等级。对于既有医院建筑有必要进行抗震加固,开展对医院建筑框架结构抗震加固技术的研究有重要的研究意义和实用价值。在提出了压型钢板剪力墙加固RC框架结构后,对于实际工程中压型钢板剪力墙与框架梁的连接尚有待进一步的研究。In GB50223-2008 "Standards for Seismic Fortification Classification of Construction Engineering", the anti-seismic fortification category of outpatient clinics, medical technology and inpatient rooms that undertake particularly important medical tasks in tertiary hospitals is classified as special fortification category (category A), and class II and III The other departments of the first-level hospitals are classified as key fortifications (Class B); the newly revised "Code for Seismic Design of Buildings" in 2016 also raised the earthquake resistance level accordingly. It is necessary to carry out seismic reinforcement for existing hospital buildings, and it has important research significance and practical value to carry out research on the seismic reinforcement technology of hospital building frame structures. After the RC frame structure strengthened by the profiled steel shear wall is proposed, the connection between the profiled steel shear wall and the frame beam in the actual engineering needs further research.

现有用于加固RC框架结构的压型钢板剪力墙结构如实用新型专利“用于加固RC框架结构的压型钢板剪力墙”(公开号:CN 203783172 U)所述。The existing profiled steel plate shear wall structure for strengthening RC frame structure is as described in the utility model patent "Profiled steel plate shear wall for strengthening RC frame structure" (publication number: CN 203783172 U).

已有研究中的压型钢板剪力墙与RC框架梁、柱的连接方式存在以下不足:The connection methods of profiled steel plate shear walls and RC frame beams and columns in the existing research have the following deficiencies:

1、连接构件(钢条)需要穿透梁的上、下部,以及柱的左、右侧;1. The connecting member (steel bar) needs to penetrate the upper and lower parts of the beam, as well as the left and right sides of the column;

2、连接构件(槽钢)焊接到梁、柱分布的钢板条上,再砌筑填充墙。2. The connecting member (channel steel) is welded to the steel slats distributed by beams and columns, and then the filling wall is built.

以上1、2操作适用于试验研究,对于实际工程的原始结构,填充墙已砌筑于框架内部,很难实现连接构件(钢条、槽钢)的安装。The above operations 1 and 2 are suitable for experimental research. For the original structure of the actual project, the filling wall has been built inside the frame, and it is difficult to realize the installation of connecting components (steel bars, channel steel).

本发明在上述已有研究的基础上,研究压型钢板剪力墙与RC框架梁的连接及其施工方法。On the basis of the above existing studies, the present invention studies the connection of profiled steel plate shear walls and RC frame beams and its construction method.

发明内容Contents of the invention

本发明的目的在于克服现有连接方法的不足,解决实际工程中压型钢板剪力墙与RC框架梁的连接问题,与粘钢技术相结合,提供了一种施工方便,节约钢材,实际有效的压型钢板剪力墙与RC框架梁的连接结构及其施工方法。The purpose of the present invention is to overcome the shortcomings of the existing connection methods, solve the problem of connection between profiled steel plate shear walls and RC frame beams in actual engineering, and combine with steel bonding technology to provide a convenient construction, save steel, practical and effective The connection structure of profiled steel plate shear wall and RC frame beam and its construction method.

本发明的技术方案如下:Technical scheme of the present invention is as follows:

本发明提供一种压型钢板剪力墙与RC框架梁的连接结构,包括由框架梁和框架柱构成的RC框架梁,在框架梁内侧固定设置有钢板条,所述钢板条上设置有螺栓孔,所述连接结构还包括压型钢板剪力墙,所述压型钢板剪力墙由相邻压型钢板经部分重叠后固定连接而成,压型钢板剪力墙靠近框架梁的端部与钢板条固定连接。The invention provides a connection structure between a profiled steel plate shear wall and an RC frame beam, which includes an RC frame beam composed of a frame beam and a frame column, and a steel strip is fixedly arranged on the inside of the frame beam, and bolts are arranged on the steel strip The connection structure also includes a profiled steel plate shear wall, the profiled steel plate shear wall is fixedly connected by adjacent profiled steel plates after partial overlapping, and the profiled steel plate shear wall is close to the end of the frame beam Fixed connection with steel slats.

作为本发明的进一步改进,所述钢板条的螺栓孔中植入有化学锚栓,钢板条与压型钢板剪力墙通过自攻螺钉连接。As a further improvement of the present invention, chemical anchor bolts are implanted in the bolt holes of the steel strips, and the steel strips and the profiled steel plate shear walls are connected by self-tapping screws.

作为本发明的进一步改进,相邻压型钢板通过铆钉连接形成压型钢板剪力墙。As a further improvement of the present invention, adjacent profiled steel plates are connected by rivets to form a profiled steel plate shear wall.

作为本发明的进一步改进,所述压型钢板剪力墙设置为单向对角布置的一组,或者与水平呈30度、45度或60度夹角的多组压型钢板剪力墙组合布置,或者压型钢板剪力墙的两端与框架柱连接。As a further improvement of the present invention, the profiled steel plate shear walls are arranged as a group arranged diagonally in one direction, or combined with multiple sets of profiled steel plate shear walls with a horizontal angle of 30 degrees, 45 degrees or 60 degrees Arrangement, or both ends of the profiled steel shear wall are connected with frame columns.

本发明还提供一种压型钢板剪力墙与RC框架梁的连接结构的施工方法,具体包括如下步骤:The present invention also provides a construction method of a connection structure between a profiled steel plate shear wall and an RC frame beam, which specifically includes the following steps:

步骤1:确定粘帖钢板条位置和钢板条宽度;Step 1: Determine the position and width of the steel strip to be pasted;

步骤2:基层处理;Step 2: Grassroots processing;

步骤3:钢板条预贴:加工好钢板条在粘贴前先进行预贴,钢板条预贴时按钢板条上的螺栓孔位置打出螺栓孔;Step 3: Pre-pasting of steel strips: Pre-paste the processed steel strips before pasting them. When pre-pasting the steel strips, punch the bolt holes according to the positions of the bolt holes on the steel strips;

步骤4:化学锚栓植栓:螺栓孔打好并且清孔完毕后,植化学锚栓;Step 4: Chemical anchor bolt planting: After the bolt holes are drilled and the holes are cleared, chemical anchor bolts are planted;

步骤5:涂胶:将配制的结构胶用抹刀涂抹在处理后钢材表面;Step 5: Glue application: apply the prepared structural glue on the treated steel surface with a spatula;

步骤6:粘贴:将涂好结构胶的钢板条按设计要求的位置粘贴,钢板条粘贴好后立即拧紧安装螺栓;Step 6: Paste: Paste the steel strip coated with structural glue according to the position required by the design, and tighten the mounting bolts immediately after the steel strip is pasted;

步骤7:固化养护:结构胶固化,2-5天可受力使用;Step 7: Curing and maintenance: the structural adhesive is cured and can be used under stress in 2-5 days;

步骤8:由于压型钢板板宽有限,相邻压型钢板通过铆钉连接形成压型钢板剪力墙;Step 8: Due to the limited width of the profiled steel plates, adjacent profiled steel plates are connected by rivets to form a profiled steel plate shear wall;

步骤9:通过自攻螺钉连接压型钢板剪力墙和钢板条。Step 9: Connect the profiled steel shear wall and steel slats by self-tapping screws.

进一步,步骤2包括两部分:Further, step 2 includes two parts:

第一部分,混凝土粘贴面处理:将粘帖钢板条宽度范围内的混凝土表面面层铲除,磨去混凝土表面浮浆层,并清理干净;The first part, concrete paste surface treatment: remove the concrete surface layer within the width range of the pasted steel slats, grind away the laitance layer on the concrete surface, and clean it up;

第二部分,钢板粘贴面处理:当钢板条粘贴面有轻微锈迹时,对其进行除锈处理,打磨后露出金属光泽,而后清理干净钢材表面。The second part, the treatment of the pasting surface of the steel plate: when there is a slight rust on the pasting surface of the steel strip, it is derusted, and the metallic luster is exposed after polishing, and then the surface of the steel is cleaned.

进一步,步骤5中,结构胶的厚度为3~6mm,涂抹中间厚边缘薄。Further, in step 5, the thickness of the structural adhesive is 3-6mm, and the middle is thicker and the edge is thinner.

本发明的有益效果如下:The beneficial effects of the present invention are as follows:

本发明压型钢板剪力墙与RC框架梁的连接结构及其施工方法有以下优点:The connection structure and construction method of the profiled steel plate shear wall and the RC frame beam of the present invention have the following advantages:

(1)压型钢板、膨胀螺栓可以在工厂中预定制作,运输方便;(1) Profiled steel plates and expansion bolts can be pre-made in the factory, which is convenient for transportation;

(2)压型钢板剪力墙与RC框架梁通过膨胀螺栓连接,简便易行,缩短加固时间;(2) The profiled steel plate shear wall and the RC frame beam are connected by expansion bolts, which is simple and easy, and the reinforcement time is shortened;

(3)试验研究表明,压型钢板剪力墙与RC框架梁连接可靠;(3) The experimental research shows that the connection between the profiled steel plate shear wall and the RC frame beam is reliable;

(4)解决了实际工程中压型钢板剪力墙与框架的连接问题,使得构造简单,便于施工;(4) Solved the connection problem between the profiled steel plate shear wall and the frame in the actual project, making the structure simple and convenient for construction;

(5)所用压型钢板质轻、美观、经济性好,具有广泛的应用前景。(5) The profiled steel plate used is light in weight, beautiful in appearance, good in economy, and has wide application prospects.

附图说明Description of drawings

图1是本发明压型钢板剪力墙与RC框架梁的连接结构的结构示意图。Fig. 1 is a structural schematic diagram of the connection structure of the profiled steel plate shear wall and the RC frame beam of the present invention.

图2是图1中A-A剖面图。Fig. 2 is a sectional view of A-A in Fig. 1 .

图中,1、框架梁;2、框架柱;3、压型钢板剪力墙;4、铆钉;5、自攻螺钉;6、钢板条;7、化学锚栓。In the figure, 1. frame beam; 2. frame column; 3. profiled steel plate shear wall; 4. rivet; 5. self-tapping screw; 6. steel strip; 7. chemical anchor.

具体实施方式detailed description

下面结合附图对本发明作进一步详细说明。The present invention will be described in further detail below in conjunction with the accompanying drawings.

如图1~2所示,本发明的压型钢板剪力墙与RC框架梁的连接结构包括框架梁1和框架柱2构成的RC框架梁。在RC框架梁的内侧固定设置有钢板条6,钢板条6上设置有螺栓孔。本发明的连接结构还包括压型钢板剪力墙3,压型钢板剪力墙3由相邻压型钢板经部分重叠后固定连接而成,压型钢板剪力墙3靠近框架梁1的端部与钢板条6固定连接。As shown in FIGS. 1-2 , the connection structure between the profiled steel plate shear wall and the RC frame beam of the present invention includes an RC frame beam composed of a frame beam 1 and a frame column 2 . A steel strip 6 is fixedly arranged on the inner side of the RC frame beam, and bolt holes are arranged on the steel strip 6 . The connection structure of the present invention also includes a profiled steel plate shear wall 3, which is fixedly connected by adjacent profiled steel plates after partial overlapping, and the profiled steel plate shear wall 3 is close to the end of the frame beam 1 The part is fixedly connected with the steel strip 6.

作为本发明的优选实施方式,钢板条6的螺栓孔中植入有化学锚栓7,钢板条6与压型钢板剪力墙3通过自攻螺钉5连接。As a preferred embodiment of the present invention, chemical anchor bolts 7 are implanted in the bolt holes of the steel strips 6 , and the steel strips 6 and the profiled steel plate shear walls 3 are connected by self-tapping screws 5 .

作为本发明的优选实施方式,相邻压型钢板通过铆钉4连接形成压型钢板剪力墙3。As a preferred embodiment of the present invention, adjacent profiled steel plates are connected by rivets 4 to form a profiled steel plate shear wall 3 .

作为本发明的优选实施方式,上述的压型钢板剪力墙3可以是单向对角布置(如图1所示)或与水平夹角呈30度、45度、60度的多组剪力墙布置同样适用,还可将压型钢板剪力墙3两边与RC框架柱2连接,不再进行图示举例。As a preferred embodiment of the present invention, the above-mentioned profiled steel plate shear wall 3 can be arranged diagonally in one direction (as shown in Figure 1) or multiple groups of shear forces with angles of 30 degrees, 45 degrees, and 60 degrees to the horizontal The wall layout is also applicable, and both sides of the profiled steel plate shear wall 3 can also be connected with the RC frame column 2, and the illustration will not be given for example.

所述压型钢板剪力墙与RC框架梁的连接及其施工方法,The connection between the profiled steel plate shear wall and the RC frame beam and its construction method,

本发明的压型钢板剪力墙与RC框架梁的连接结构的施工方包括如下步骤:The construction side of the connection structure of profiled steel plate shear wall and RC frame beam of the present invention comprises the following steps:

1、在框架梁1的双侧面划线定位,确定粘帖钢板条6的位置和钢板条6的宽度;1. Mark and position on both sides of the frame beam 1, and determine the position and width of the steel slat 6 to be pasted;

2、基层处理:包括两部分,(1)混凝土粘贴面处理:将粘帖钢板条6宽度范围内的混凝土表面面层铲除,用合金片或钢丝刷磨去混凝土表面浮浆层,并清理干净;(2)钢板粘贴面处理:对于钢板条6粘贴面有轻微锈迹,需对其进行除锈处理,而后用角磨机打磨,露出金属光泽,而后清理干净钢材表面。2. Base treatment: including two parts, (1) Concrete paste surface treatment: remove the surface layer of concrete surface within 6 widths of the pasted steel slats, use alloy sheet or wire brush to remove the laitance layer on the concrete surface, and clean it up (2) Steel plate pasting surface treatment: there is slight rust on the pasting surface of the steel strip 6, it needs to be derusted, then polished with an angle grinder to expose the metallic luster, and then the steel surface is cleaned up.

3、钢板条预贴:加工好钢板条6在粘贴前先进行预贴,钢板条6预贴时按钢板条6上的螺栓孔位置用电锤打出螺栓孔。3. Steel strip pre-pasting: pre-paste the processed steel strip 6 before pasting. When the steel strip 6 is pre-pasted, punch out the bolt holes according to the position of the bolt holes on the steel strip 6 with an electric hammer.

4、化学锚栓植栓:螺栓孔打好并且清孔完毕后,植化学锚栓7。4. Chemical anchor bolt planting: After the bolt holes are drilled and the holes are cleared, plant chemical anchor bolts 7.

5、涂胶:将配制的结构胶用抹刀涂抹在处理后钢材表面,厚度在3~6mm左右,涂抹应中间厚边缘薄,涂抹均匀,不应有漏涂的地方。5. Glue application: apply the prepared structural glue on the surface of the treated steel with a spatula, the thickness is about 3-6mm, the application should be thick in the middle and thin at the edge, evenly applied, and there should be no missing places.

6、粘贴:将涂好结构胶的钢板条6按设计要求的位置粘贴,钢板条6粘贴好以后应立即拧紧安装螺栓,使胶液刚从钢板条边缘挤出为宜。6. Sticking: Paste the steel strip 6 coated with structural glue according to the position required by the design. After the steel strip 6 is pasted, the mounting bolts should be tightened immediately so that the glue is just squeezed out from the edge of the steel strip.

7、固化养护:结构胶固化,2-5天可受力使用。7. Curing and maintenance: the structural adhesive is cured and can be used under stress in 2-5 days.

8、由于压型钢板板宽有限,相邻压型钢板通过铆钉4连接形成压型钢板剪力墙3。8. Due to the limited width of the profiled steel plates, adjacent profiled steel plates are connected by rivets 4 to form a profiled steel plate shear wall 3 .

9、通过自攻螺钉5连接压型钢板剪力墙3和钢板条6。9. Connect the profiled steel plate shear wall 3 and steel strips 6 through self-tapping screws 5 .

本发明的压型钢板剪力墙与RC框架梁的连接结构及其施工方法,压型钢板加固部件和钢板条连接构件,经济性能佳,在操作和连接方面提出简便易行的连接方式,缩短施工周期。此连接方法解决了实际工程中压型钢板剪力墙与框架梁的连接问题,施工方法可靠。The connection structure and construction method of the profiled steel plate shear wall and the RC frame beam of the present invention, the profiled steel plate reinforcement part and the steel strip connecting member have good economic performance, and a simple and easy connection method is proposed in terms of operation and connection, shortening Construction period. This connection method solves the connection problem between the profiled steel plate shear wall and the frame beam in the actual project, and the construction method is reliable.

以上所述仅为本发明的较佳实施例而已,并不用以限制本发明。凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.

Claims (7)

1. the attachment structure of profiled sheet shear wall and RC Vierendeel girders, including the RC frames being made up of Vierendeel girder (1) and frame column (2) Set a roof beam in place, it is characterised in that:Steel plate strip (6) is fixedly installed on the inside of RC Vierendeel girders, is provided with bolt on steel plate strip (6) Hole, the attachment structure also include that profiled sheet shear wall (3), profiled sheet shear wall (3) are passed through by adjacent profiled sheet It is formed by fixedly connecting after partly overlapping, profiled sheet shear wall (3) is fixed with steel plate strip (6) near the end of Vierendeel girder (1) to be connected Connect.
2. the attachment structure of profiled sheet shear wall according to claim 1 and RC Vierendeel girders, it is characterised in that:The steel Chemical anchor bolts (7) are implanted with the bolt hole of lath (6), and steel plate strip (6) passes through tapping screw with profiled sheet shear wall (3) (5) connect.
3. the attachment structure of profiled sheet shear wall according to claim 1 and RC Vierendeel girders, it is characterised in that:Adjacent pressure Shape steel plate forms profiled sheet shear wall (3) by rivet (4) connection.
4. the attachment structure of profiled sheet shear wall according to claim 1 and RC Vierendeel girders, it is characterised in that:The pressure The rib of slab direction of shape steel plate shear wall (3) is set to unidirectional diagonally arranged one group, or is in 30 degree, 45 degree or 60 degree with level Multigroup profiled sheet shear wall (3) combination arrangement of angle, or the two ends of profiled sheet shear wall (3) are with frame column (2) even Connect.
5. profiled sheet shear wall and the construction method of the attachment structure of RC Vierendeel girders, specifically include following steps:
Step 1:Determine paste steel plate strip position and steel plate strip width;
Step 2:Base treatment;
Step 3:Steel plate strip is pasted in advance:Processing steel plate strip first carries out pre- patch before stickup, by steel plate strip when steel plate strip is pasted in advance Get bolt hole in bolt hole position;
Step 4:Chemical anchor bolts plant bolt:After bolt hole is accomplished fluently and borehole cleaning is finished, chemical anchor bolts are planted;
Step 5:Gluing:Steel surface after treatment is smeared in the structure glue spatula of preparation;
Step 6:Paste:The steel plate strip for coating structure glue is pasted by the position of design requirement, steel plate strip is twisted after pasting immediately Tight installation bolt;
Step 7:Curing conservation:Structure adhesive curing, force-applied use in 2-5 days;
Step 8:As profiled sheet plate width is limited, adjacent profiled sheet forms profiled sheet shear wall by rivet interlacement;
Step 9:By self-drilling connection profiled sheet shear wall and steel plate strip.
6. the construction method of the attachment structure of profiled sheet shear wall according to claim 5 and RC Vierendeel girders, its feature It is:Step 2 includes two parts:
Part I, the process of concrete sticking veneer:Concrete surface surface layer in paste steel plate strip width range is rooted out, is ground off Concrete surface laitance layer, and clean out;
Part II, steel sticking face are processed:When steel plate strip sticking veneer has slight rusty stain, processing of rust removing is carried out to which, polished After expose metallic luster, then clean out steel surface.
7. the construction method of the attachment structure of profiled sheet shear wall according to claim 5 and RC Vierendeel girders, its feature It is:In step 5, the thickness of structure glue is 3~6mm, smears thick middle thin edge.
CN201611082144.1A 2016-11-30 2016-11-30 The connection structure and its construction method of profiled sheet shear wall and RC Vierendeel girder Expired - Fee Related CN106499212B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611082144.1A CN106499212B (en) 2016-11-30 2016-11-30 The connection structure and its construction method of profiled sheet shear wall and RC Vierendeel girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611082144.1A CN106499212B (en) 2016-11-30 2016-11-30 The connection structure and its construction method of profiled sheet shear wall and RC Vierendeel girder

Publications (2)

Publication Number Publication Date
CN106499212A true CN106499212A (en) 2017-03-15
CN106499212B CN106499212B (en) 2018-12-28

Family

ID=58327383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611082144.1A Expired - Fee Related CN106499212B (en) 2016-11-30 2016-11-30 The connection structure and its construction method of profiled sheet shear wall and RC Vierendeel girder

Country Status (1)

Country Link
CN (1) CN106499212B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736588A (en) * 2018-12-28 2019-05-10 上海二十冶建设有限公司 Continuous casting host area double steel plate shear wall construction method under restricted clearance
CN110173063A (en) * 2019-05-30 2019-08-27 常州工学院 Punch Square Steel Tubes Truss profiled sheet shear wall and construction method
CN115405009A (en) * 2022-09-30 2022-11-29 中铁二局集团建筑有限公司 A kind of oblique corrugated steel plate shear wall

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1082095A (en) * 1996-09-05 1998-03-31 Maeda Corp Earthquake resistant reinforced constructions of rc construction skeleton
TW200933006A (en) * 2008-01-16 2009-08-01 Univ Nat Kaohsiung Applied Sci Building brace structure
CN101851967A (en) * 2010-06-01 2010-10-06 哈尔滨工业大学 A new joint connection method for steel plate concrete composite shear walls connected with frame beams
CN102635177A (en) * 2012-04-27 2012-08-15 清华大学 A kind of unbonded hidden support reinforced concrete frame shear wall and its construction method
CN103790238A (en) * 2014-02-17 2014-05-14 沈阳建筑大学 Connector for connecting assembly type steel plate shearing wall and steel beam
CN203783172U (en) * 2014-01-28 2014-08-20 河海大学 Profiled steel plate shear wall for reinforcing RC frame structure
CN203891258U (en) * 2014-05-23 2014-10-22 浙江东南网架股份有限公司 Built-in steel-plate shear wall steel structure system of assembly type steel-pipe concrete combination column frame

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1082095A (en) * 1996-09-05 1998-03-31 Maeda Corp Earthquake resistant reinforced constructions of rc construction skeleton
TW200933006A (en) * 2008-01-16 2009-08-01 Univ Nat Kaohsiung Applied Sci Building brace structure
CN101851967A (en) * 2010-06-01 2010-10-06 哈尔滨工业大学 A new joint connection method for steel plate concrete composite shear walls connected with frame beams
CN102635177A (en) * 2012-04-27 2012-08-15 清华大学 A kind of unbonded hidden support reinforced concrete frame shear wall and its construction method
CN203783172U (en) * 2014-01-28 2014-08-20 河海大学 Profiled steel plate shear wall for reinforcing RC frame structure
CN103790238A (en) * 2014-02-17 2014-05-14 沈阳建筑大学 Connector for connecting assembly type steel plate shearing wall and steel beam
CN203891258U (en) * 2014-05-23 2014-10-22 浙江东南网架股份有限公司 Built-in steel-plate shear wall steel structure system of assembly type steel-pipe concrete combination column frame

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736588A (en) * 2018-12-28 2019-05-10 上海二十冶建设有限公司 Continuous casting host area double steel plate shear wall construction method under restricted clearance
CN110173063A (en) * 2019-05-30 2019-08-27 常州工学院 Punch Square Steel Tubes Truss profiled sheet shear wall and construction method
CN115405009A (en) * 2022-09-30 2022-11-29 中铁二局集团建筑有限公司 A kind of oblique corrugated steel plate shear wall

Also Published As

Publication number Publication date
CN106499212B (en) 2018-12-28

Similar Documents

Publication Publication Date Title
CN203834970U (en) Reinforcement and repair structure of historic building dougong
CN103603431A (en) Prefabricated wood structure beam-column joints
CN106499212A (en) Profiled sheet shear wall and the attachment structure and its construction method of RC Vierendeel girders
CN203569697U (en) Assembled timber structure beam column bar planting node
CN103993749B (en) The reinforcement and repair method of ancient building bucket arch
CN205955261U (en) Prestressed wire rope curved scissors reinforcing concrete T roof beam
CN108661220A (en) A kind of glass curtain wall system and its installation method
CN104963421B (en) Prefabricated heat-insulation plate for external and the heat-preserving wall being assembled to form by which and construction method
CN204676786U (en) The novel sets of brackets on top of the columns of a kind of gardens ancient architecture
CN207660147U (en) It is a kind of can multi-angle regulation curtain wall plate assembling structure
CN203569696U (en) Assembled wood structure bar planting node
CN104389396B (en) Pseudo-classic architecture eaves lower decoration and heat-insulation system
CN204212266U (en) Light steel house anti-pulling connector system
CN104153539B (en) A kind of Novel floor brick and manufacture method thereof
CN108457444A (en) Exterior wall PU decorating structures and its construction method
CN208844765U (en) A kind of glass curtain wall system
CN108868189A (en) A kind of bamboo clappers curved scissors reinforced concrete beam and manufacturing method
CN204456651U (en) Connecting device for reinforced wood-concrete composite beam
CN205024892U (en) Open curtain wall construction of direct screening formula aluminium veneer
CN108979197A (en) A kind of bamboo wood reinforcing wood beam flexural member and manufacturing method
CN110670762B (en) Light steel-steel cable-small diameter timber-composite board surface layer in-line combined wall and method
CN208777490U (en) A kind of archaized decoration external wall structure
JP4063831B2 (en) Exterior insulation prestressed building structure
CN213897657U (en) Energy-conserving light-duty timber structure shear force wall of antidetonation
CN205712612U (en) A kind of precast wall body external corner installs module

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201218

Address after: 210000 No.1 Amber Road, Yongning Park, Pukou Economic Development Zone, Nanjing City, Jiangsu Province

Patentee after: Nanjing amoeba Engineering Structure Optimization Research Institute Co.,Ltd.

Address before: 213032 No. 666 Liaohe Road, Xinbei District, Changzhou City, Jiangsu Province

Patentee before: CHANGZHOU INSTITUTE OF TECHNOLOGY

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181228