CN106498850B - A kind of bridge pavement component and preparation method thereof - Google Patents

A kind of bridge pavement component and preparation method thereof Download PDF

Info

Publication number
CN106498850B
CN106498850B CN201610956051.0A CN201610956051A CN106498850B CN 106498850 B CN106498850 B CN 106498850B CN 201610956051 A CN201610956051 A CN 201610956051A CN 106498850 B CN106498850 B CN 106498850B
Authority
CN
China
Prior art keywords
concrete block
concrete
mould
metal tube
fixing axle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610956051.0A
Other languages
Chinese (zh)
Other versions
CN106498850A (en
Inventor
周士军
曹宁
南燕杰
许志梅
刘娟
余武
蒋学真
李俊俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cao Ning
Jiang Xuezhen
Li Junjun
Liu Juan
Nan Yanjie
Xu Zhimei
Yu Wu
Zhou Shijun
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610956051.0A priority Critical patent/CN106498850B/en
Priority to CN201711383099.8A priority patent/CN107974936B/en
Priority to CN201711383083.7A priority patent/CN107988905B/en
Publication of CN106498850A publication Critical patent/CN106498850A/en
Application granted granted Critical
Publication of CN106498850B publication Critical patent/CN106498850B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The invention discloses a kind of bridge pavement component and preparation method thereof, comprise the following steps:Preparation and cleaning, releasing agent smearing, work-yard preparation, reinforcement installation, concreting, the installation of metal tube, the installation of fixing axle, mould form removal, concrete block maintenance, the concrete block assembling of mould.The assembling that the present invention passes through the first concrete block and the second concrete block, and second the inside of concrete block be provided with reinforcing bar, the hardness and compression strength of the component can be improved, the component is enabled to keep out the shock of vehicle, again because the first concrete block is arranged in the groove of bridge pavement, and the inside fill concrete of groove so that the first concrete block can firmly be combined with bridge, so as to improve the securement strength of the component.

Description

A kind of bridge pavement component and preparation method thereof
Technical field
The present invention relates to bridge pavement component technology field, more particularly to a kind of bridge pavement component and its preparation side Method.
Background technology
Bridge facilitates the dealing of people as traffic aisle, has saved the time needed for traveling, on some bridges, Not only there is car lane, pavement is also cooked up in the both sides of bridge pavement, so facilitates the trip of people, but for bridge The aesthetic measure of beam, flower bed can be only provided between car lane and pavement, flower bed is made up of wood materials mostly, High vehicle speeds occur surprisingly to make, and easily break through flower bed, drive in pavement, easily the pedestrian in pavement are caused to endanger Evil.
The content of the invention
The invention aims to solve shortcoming present in prior art, and a kind of bridge pavement component proposed And preparation method thereof.
To achieve these goals, present invention employs following technical scheme:
A kind of bridge pavement component, including the first concrete block are designed, first concrete block, which coordinates, is arranged on bridge In the groove that beam road surface opens up, the gap of the groove and the first concrete block is filled with concrete, Concrete Filled to Bridge pavement keep level, the inside of first concrete block is plugged with fixing axle, and fixing axle is away from the first coagulation One end of soil block extends to the top of bridge pavement, and the side of the fixing axle above bridge pavement, which coordinates, is socketed with metal Pipe, and the side cooperation of metal tube is socketed with the second concrete block, the internal chiasma of the second concrete block is arranged with more reinforcing bars, First concrete block is in cross shape, and the groove of bridge pavement is stepped.
Preferably, the length of the fixing axle and the length of metal tube are identical, and the length of metal tube and the second concrete The thickness of block is identical.
A kind of preparation method of bridge pavement component, comprises the following steps:
S1, mould preparation and cleaning:First get out two groups of moulds that can produce the first concrete block and the second concrete block Two groups of moulds are cleared up and repaired by tool, and carry out grinding and buffing processing to the inner mould surface of two groups of moulds;
S2, releasing agent are smeared:After terminating to the inner mould surface sanding and polishing of two groups of moulds, to the internal model table of two groups of moulds The uniform smearing release agent in face;
S3 work-yards prepare:First the ground of work-yard is cleaned, keeps the clean level of work-yard bottom surface And planarization, and by the work-yard of handle well two groups of moulds placements after the cleaning;
S4, reinforcement installation:According to the specification requirement of the second concrete block, suitable reinforcing bar length is chosen, reinforcing bar is carried out Position is arranged, and carries out colligation to adjacent reinforcing bar, and the good reinforcing bar group of colligation is arranged on to the mould of the second concrete block of production In;
S5, concreting:The concrete casting being stirred is being produced into the first concrete block and the second concrete block In two moulds, and the concrete in two moulds is vibrated by vibrating spear, concrete surface present it is flat, do not have During notable bubble, concrete has filled up mould inside substantial;
S6, metal tube installation:After the completion of the concrete vibrating that will be produced in the second concrete block mould, metal tube After simple cleaning, in the uniform smearing release agent of the internal side wall of metal tube, then metal tube is run through as requested and is plugged in life Produce in the concrete in the second concrete block mould;And by the concrete clearing and retrieving inside metal tube;
S7, fixing axle installation:After the completion of the concrete vibrating that will be produced in the first concrete block mould, by fixing axle After simple cleaning, fixing axle is plugged on as requested in the concrete in the first concrete block mould of production;
S8, mould form removal:The concrete solidified in two moulds is separated, obtains the first concrete block and the second coagulation Soil block, and by the concrete block clearing and retrieving inside metal tube, and by transporting equipment by the first concrete block and the second coagulation Soil block is transported to the place of storage;
S9, concrete block maintenance:The first concrete block on storage space and the second concrete block are subjected to concentration watering Maintenance;
S10, concrete block assembling:When needing to install the component, the second concrete block is socketed in the first concrete block On fixing axle side, and fixing axle and the metal tube in the second concrete block are welded and fixed.
Preferably, machine oil can be used in the releasing agent.
A kind of bridge pavement component proposed by the present invention and preparation method thereof, beneficial effect is:The present invention passes through the The assembling of one concrete block and the second concrete block, and the inside of the second concrete block is provided with reinforcing bar, can improve the component Hardness and compression strength so that the component can keep out the shock of vehicle, and because the first concrete block is arranged on bridge pavement Groove in, and the inside fill concrete of groove so that the first concrete block can firmly be combined with bridge, so as to improve this The securement strength of component, and the present invention also by the way that metal tube and fixing axle are welded together so that the first concrete block and The stability of second concrete block connection improves.
Brief description of the drawings
Fig. 1 is a kind of structural representation of bridge pavement component proposed by the present invention and preparation method thereof;
Fig. 2 is that a kind of the second concrete block construction of bridge pavement component proposed by the present invention and preparation method thereof is overlooked Figure.
In figure:First concrete block 1, reinforcing bar 2, concrete 3, fixing axle 4, metal tube 5, the second concrete block 6.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.
Reference picture 1-2, a kind of bridge pavement component, including the first concrete block 1, the first concrete block 1 coordinate installation In the groove that bridge pavement opens up, the first concrete block 1 is in cross shape, and the groove of bridge pavement is stepped, recessed The gap of groove and the first concrete block 1 is filled with concrete 3, concrete 3 be filled into bridge pavement keep level, The inside of one concrete block 1 is plugged with fixing axle 4, and the one end of fixing axle 4 away from the first concrete block 1 extends to bridge pavement Top, the side of the fixing axle 4 above bridge pavement, which coordinates, is socketed with metal tube 5, and the side engagement sleeves of metal tube 5 The second concrete block 6 is connected to, the length of fixing axle 4 is identical with the length of metal tube 5, and the length of metal tube 5 and the second coagulation The thickness of soil block 6 is identical.The internal chiasma of second concrete block 6 is arranged with more reinforcing bars 2.
A kind of preparation method of bridge pavement component, comprises the following steps:
S1, mould preparation and cleaning:The first concrete block 1 and the second concrete block 6 can be produced by first getting out two groups Mould, two groups of moulds are cleared up and repaired, and grinding and buffing processing is carried out to the inner mould surface of two groups of moulds;
S2, releasing agent are smeared:After terminating to the inner mould surface sanding and polishing of two groups of moulds, to the internal model table of two groups of moulds Machine oil can be used in the uniform smearing release agent in face, releasing agent;
S3, work-yard prepare:First the ground of work-yard is cleaned, keeps the clean level of work-yard bottom surface And planarization, and by the work-yard of handle well two groups of moulds placements after the cleaning;
S4, reinforcement installation:According to the specification requirement of the second concrete block 6, suitable reinforcing bar length is chosen, reinforcing bar is carried out Position is arranged, and carries out colligation to adjacent reinforcing bar, and the good reinforcing bar group of colligation is arranged on to the mould of the second concrete block 6 of production In.
S5, concreting:The concrete casting being stirred is being produced into the first concrete block 1 and the second concrete block 6 Two moulds in, and the concrete in two moulds is vibrated by vibrating spear, concrete surface present it is flat, do not have When having notable bubble, concrete has filled up mould inside substantial;
S6, metal tube installation:After the completion of the concrete vibrating that will be produced in the mould of the second concrete block 6, metal After the simply cleaning of pipe 5, in the uniform smearing release agent of the internal side wall of metal tube 5, then metal tube 5 is run through as requested and plugged In concrete in the production mould of the second concrete block 6;And by the concrete clearing and retrieving inside metal tube 5;
S7, fixing axle installation:After the completion of the concrete vibrating that will be produced in the mould of the first concrete block 1, by fixation After the simply cleaning of axle 4, fixing axle 4 is plugged on as requested in the concrete in the production mould of the first concrete block 1;
S8, mould form removal:The concrete solidified in two moulds is separated, it is mixed to obtain the first concrete block 1 and second Solidifying soil block 6, and by the concrete block clearing and retrieving inside metal tube 5, and by transporting equipment by the first concrete block 1 and second Concrete block 6 is transported to the place of storage;
S9, concrete block maintenance:The first concrete block 1 on storage space and the second concrete block 6 are carried out concentration and poured Water maintains;
S10, concrete block assembling:When needing to install the component, the second concrete block 6 is socketed in the first concrete block The side of fixing axle 4 on 1, and fixing axle 4 and the metal tube 5 in the second concrete block 6 are welded and fixed.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its Inventive concept is subject to equivalent substitution or change, should all be included within the scope of the present invention.

Claims (4)

1. a kind of bridge pavement component, including the first concrete block(1), first concrete block(1)Cooperation is arranged on bridge In the groove that beam road surface opens up, the groove and the first concrete block(1)Gap be filled with concrete(3), concrete(3) It is filled into and bridge pavement keep level, it is characterised in that first concrete block(1)Inside be plugged with fixing axle (4), and fixing axle(4)Away from the first concrete block(1)One end extend to the top of bridge pavement, above bridge pavement Fixing axle(4)Side coordinate be socketed with metal tube(5), and metal tube(5)Side coordinate be socketed with the second concrete block (6), the second concrete block(6)Internal chiasma be arranged with more reinforcing bars(2), first concrete block(1)In crux Shape, and the groove of bridge pavement is stepped.
A kind of 2. bridge pavement component according to claim 1, it is characterised in that the fixing axle(4)Length with Metal tube(5)Length it is identical, and metal tube(5)Length and the second concrete block(6)Thickness it is identical.
3. the preparation method of a kind of bridge pavement component according to claim 1, it is characterised in that including following step Suddenly:
S1, mould preparation and cleaning:The first concrete block can be produced by first getting out two groups(1)With the second concrete block(6)'s Mould, two groups of moulds are cleared up and repaired, and grinding and buffing processing is carried out to the inner mould surface of two groups of moulds;
S2, releasing agent are smeared:It is equal to the inner mould surface of two groups of moulds after terminating to the inner mould surface sanding and polishing of two groups of moulds Even smearing release agent;
S3, work-yard prepare:First the ground of work-yard is cleaned, keeps the clean level peace of work-yard bottom surface Whole property, and by the work-yard of handle well two groups of moulds placements after the cleaning;
S4, reinforcement installation:According to the second concrete block(6)Specification requirement, choose suitable reinforcing bar length, line position entered to reinforcing bar Arrangement is put, and colligation is carried out to adjacent reinforcing bar, the good reinforcing bar group of colligation is arranged on the second concrete block of production(6)Mould In;
S5, concreting:The concrete casting being stirred is being produced into the first concrete block(1)With the second concrete block(6) Two moulds in, and the concrete in two moulds is vibrated by vibrating spear, concrete surface present it is flat, do not have When having notable bubble, concrete has filled up mould inside substantial;
S6, metal tube installation:The second concrete block will produced(6)After the completion of concrete vibrating in mould, metal tube (5)After simple cleaning, in metal tube(5)The uniform smearing release agent of internal side wall, then by metal tube(5)Run through as requested It is plugged in the second concrete block of production(6)In concrete in mould;And by metal tube(5)Internal concrete clearing and retrieving;
S7, fixing axle installation:The first concrete block will produced(1)After the completion of concrete vibrating in mould, by fixing axle (4)After simple cleaning, by fixing axle(4)The first concrete block of production is plugged on as requested(1)In concrete in mould;
S8, mould form removal:The concrete solidified in two moulds is separated, obtains the first concrete block(1)With the second coagulation Soil block(6), and by metal tube(5)Internal concrete block clearing and retrieving, and by transporting equipment by the first concrete block(1)With Second concrete block(6)It is transported to the place of storage;
S9, concrete block maintenance:By the first concrete block on storage space(1)With the second concrete block(6)Concentration is carried out to pour Water maintains;
S10, concrete block assembling:When needing to install the component, by the second concrete block(6)It is socketed in the first concrete block (1)On fixing axle(4)Side, and by fixing axle(4)With the second concrete block(6)Interior metal tube(5)Weld admittedly It is fixed.
4. the preparation method of a kind of bridge pavement component according to claim 3, it is characterised in that the releasing agent can Use machine oil.
CN201610956051.0A 2016-10-27 2016-10-27 A kind of bridge pavement component and preparation method thereof Expired - Fee Related CN106498850B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201610956051.0A CN106498850B (en) 2016-10-27 2016-10-27 A kind of bridge pavement component and preparation method thereof
CN201711383099.8A CN107974936B (en) 2016-10-27 2016-10-27 Bridge is subassembly for road surface
CN201711383083.7A CN107988905B (en) 2016-10-27 2016-10-27 A kind of preparation method of bridge pavement component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610956051.0A CN106498850B (en) 2016-10-27 2016-10-27 A kind of bridge pavement component and preparation method thereof

Related Child Applications (2)

Application Number Title Priority Date Filing Date
CN201711383083.7A Division CN107988905B (en) 2016-10-27 2016-10-27 A kind of preparation method of bridge pavement component
CN201711383099.8A Division CN107974936B (en) 2016-10-27 2016-10-27 Bridge is subassembly for road surface

Publications (2)

Publication Number Publication Date
CN106498850A CN106498850A (en) 2017-03-15
CN106498850B true CN106498850B (en) 2018-03-30

Family

ID=58322339

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201711383099.8A Active CN107974936B (en) 2016-10-27 2016-10-27 Bridge is subassembly for road surface
CN201711383083.7A Active CN107988905B (en) 2016-10-27 2016-10-27 A kind of preparation method of bridge pavement component
CN201610956051.0A Expired - Fee Related CN106498850B (en) 2016-10-27 2016-10-27 A kind of bridge pavement component and preparation method thereof

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201711383099.8A Active CN107974936B (en) 2016-10-27 2016-10-27 Bridge is subassembly for road surface
CN201711383083.7A Active CN107988905B (en) 2016-10-27 2016-10-27 A kind of preparation method of bridge pavement component

Country Status (1)

Country Link
CN (3) CN107974936B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107974936A (en) * 2016-10-27 2018-05-01 成都亚联科科技有限公司 A kind of bridge pavement component

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09158127A (en) * 1995-12-07 1997-06-17 Mitsubishi Heavy Ind Ltd Fixing structure of pier reinforcing part and footing
JP2001336123A (en) * 2000-05-29 2001-12-07 Nihon Kogyo Co Ltd Concrete support
JP2010106649A (en) * 2008-10-02 2010-05-13 Yasuo Kakizaki Method of performing anticorrosion treatment to fix post, and cylindrical sleeve for use in anticorrosion treatment
CN203795346U (en) * 2014-03-27 2014-08-27 武汉中交交通工程有限责任公司 Frame-structure plug-type movable guardrail
CN104746422A (en) * 2014-09-19 2015-07-01 杭州江润科技有限公司 Bridge prefabricated hollow pier column post-poured connecting structure and construction method
CN105133524A (en) * 2015-07-31 2015-12-09 中国建筑第八工程局有限公司 Mobile crashproof column

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2330706Y (en) * 1998-07-31 1999-07-28 李训华 Selective replaceable guard-rail post base device
KR20040079381A (en) * 2004-08-24 2004-09-14 김길평 Mounting structure of handrail for bridge
JP4058506B2 (en) * 2004-12-03 2008-03-12 株式会社ビルドランド Repair method for concrete floor slab edge bottom surface
CN201386250Y (en) * 2009-02-26 2010-01-20 南京工业大学 Composite material lattice sandwich pipe confined concrete pier column with functions of cushioning and energy absorbing
FI128216B (en) * 2009-04-03 2019-12-31 Rudus Betonituote Oy Barrier to be placed by a road or to separate traffic lanes, and methods for attaching barrier units to and detaching them from each other
CN101597887A (en) * 2009-06-19 2009-12-09 同济大学 Novel combined bridge deck and preparation method thereof
CN203247499U (en) * 2013-05-21 2013-10-23 重庆工商职业学院 Anti-collision vibration-reducing integrated pier column structure
CN104018449A (en) * 2014-06-05 2014-09-03 国网上海市电力公司 Anti-collision device for pole tower
CN204125872U (en) * 2014-08-19 2015-01-28 崔洪军 A kind of highway barrier bracing means
CN104562943A (en) * 2014-12-31 2015-04-29 上海建工一建集团有限公司 Formwork support system of ultrahigh reinforced concrete box girder structure and erection method of formwork support system
CN104612050B (en) * 2015-02-09 2016-06-01 福州大学 A kind of simply supported beam continuous new construction of bridge bridge floor and constructional method
CN104805767A (en) * 2015-05-06 2015-07-29 山东大学 Prefabricated assembly FRP-reinforcing steel-bar-concrete combined bridge deck and construction method
CN107974936B (en) * 2016-10-27 2019-12-27 广东省怡合建设有限公司 Bridge is subassembly for road surface

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09158127A (en) * 1995-12-07 1997-06-17 Mitsubishi Heavy Ind Ltd Fixing structure of pier reinforcing part and footing
JP2001336123A (en) * 2000-05-29 2001-12-07 Nihon Kogyo Co Ltd Concrete support
JP2010106649A (en) * 2008-10-02 2010-05-13 Yasuo Kakizaki Method of performing anticorrosion treatment to fix post, and cylindrical sleeve for use in anticorrosion treatment
CN203795346U (en) * 2014-03-27 2014-08-27 武汉中交交通工程有限责任公司 Frame-structure plug-type movable guardrail
CN104746422A (en) * 2014-09-19 2015-07-01 杭州江润科技有限公司 Bridge prefabricated hollow pier column post-poured connecting structure and construction method
CN105133524A (en) * 2015-07-31 2015-12-09 中国建筑第八工程局有限公司 Mobile crashproof column

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107974936A (en) * 2016-10-27 2018-05-01 成都亚联科科技有限公司 A kind of bridge pavement component
CN107974936B (en) * 2016-10-27 2019-12-27 广东省怡合建设有限公司 Bridge is subassembly for road surface

Also Published As

Publication number Publication date
CN107974936A (en) 2018-05-01
CN107974936B (en) 2019-12-27
CN107988905A (en) 2018-05-04
CN107988905B (en) 2019-10-22
CN106498850A (en) 2017-03-15

Similar Documents

Publication Publication Date Title
CN105401520B (en) A kind of light truss formula bridge united layer full width constructing device and its construction method
CN107366216A (en) A kind of town road cuts joint filling device
CN106498850B (en) A kind of bridge pavement component and preparation method thereof
CN103774561A (en) Streamline operation construction method of precast small box girders for highway in assembling mode
CN207131969U (en) The rail-mounted concrete pump pipe carrier of solid concrete roabed cast-in-place construction in subway tunnel
CN203807923U (en) Road asphalt scraping equipment
CN106639123B (en) Steel construction for mixed mud building block
CN207495722U (en) A kind of concrete slip-form system
CN203238523U (en) Traction type curbstone sliding formwork machine
CN107761548A (en) Line for Passenger Transportation becomes slope Hollow High Pier reverse mould construction method
CN108222072A (en) Reinforced construction method is risen after asphalt concrete pavement inspection shaft
CN210856831U (en) Municipal administration road local reinforcement structure
CN106626049A (en) Cement pile and manufacturing method thereof
CN107327117A (en) The preparation method on flat-die color concrete ground
CN106013799B (en) A kind of construction method of structure bracket clear-water concrete protective cap
CN201635041U (en) Multi-functional snow removal truck
CN207295388U (en) A kind of concrete slip-form device
CN102839595B (en) Method for treating bump at bridge-head
CN206090211U (en) Bamboo reinforced concrete temporary road
CN206143602U (en) Car is repaired from mixing concrete surface crack to plain type
CN206784097U (en) A kind of anti-skidding horse hoofprint mould
CN219430547U (en) Accurate receipts face device is pour to railway steel case roof beam concrete bridge floor
CN213571429U (en) Pavement paving device for pedestrian roads for road construction
CN109468907A (en) Road stores dirt gutter
CN212452841U (en) Highway curb evener convenient to operation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhou Shijun

Inventor after: Cao Ning

Inventor after: Nan Yanjie

Inventor after: Xu Zhimei

Inventor after: Liu Juan

Inventor after: Yu Wu

Inventor after: Jiang Xuezhen

Inventor after: Li Junjun

Inventor before: Dai Yi

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180307

Address after: No. 93, Zhongyuan Road, Zhengzhou, Henan Province, Henan

Applicant after: Zhou Shijun

Applicant after: Cao Ning

Applicant after: Nan Yanjie

Applicant after: Xu Zhimei

Applicant after: Liu Juan

Applicant after: Yu Wu

Applicant after: Jiang Xuezhen

Applicant after: Li Junjun

Address before: 610000 Sichuan high tech Zone in Chengdu City, Tian Hui Road No. 360 24 floor No. 12

Applicant before: Chengdu Yalian science and Technology Co Ltd

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180330

Termination date: 20191027