CN106481105A - A kind of method of construction of water system Natural Circulation methane-generating pit - Google Patents

A kind of method of construction of water system Natural Circulation methane-generating pit Download PDF

Info

Publication number
CN106481105A
CN106481105A CN201610841464.4A CN201610841464A CN106481105A CN 106481105 A CN106481105 A CN 106481105A CN 201610841464 A CN201610841464 A CN 201610841464A CN 106481105 A CN106481105 A CN 106481105A
Authority
CN
China
Prior art keywords
methane
generating pit
construction
fermentation vat
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610841464.4A
Other languages
Chinese (zh)
Other versions
CN106481105B (en
Inventor
叶新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUIZHOU XINGMU ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd
Original Assignee
HUIZHOU XINGMU ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUIZHOU XINGMU ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd filed Critical HUIZHOU XINGMU ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd
Priority to CN201610841464.4A priority Critical patent/CN106481105B/en
Publication of CN106481105A publication Critical patent/CN106481105A/en
Application granted granted Critical
Publication of CN106481105B publication Critical patent/CN106481105B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • CCHEMISTRY; METALLURGY
    • C12BIOCHEMISTRY; BEER; SPIRITS; WINE; VINEGAR; MICROBIOLOGY; ENZYMOLOGY; MUTATION OR GENETIC ENGINEERING
    • C12MAPPARATUS FOR ENZYMOLOGY OR MICROBIOLOGY; APPARATUS FOR CULTURING MICROORGANISMS FOR PRODUCING BIOMASS, FOR GROWING CELLS OR FOR OBTAINING FERMENTATION OR METABOLIC PRODUCTS, i.e. BIOREACTORS OR FERMENTERS
    • C12M21/00Bioreactors or fermenters specially adapted for specific uses
    • C12M21/04Bioreactors or fermenters specially adapted for specific uses for producing gas, e.g. biogas
    • CCHEMISTRY; METALLURGY
    • C12BIOCHEMISTRY; BEER; SPIRITS; WINE; VINEGAR; MICROBIOLOGY; ENZYMOLOGY; MUTATION OR GENETIC ENGINEERING
    • C12MAPPARATUS FOR ENZYMOLOGY OR MICROBIOLOGY; APPARATUS FOR CULTURING MICROORGANISMS FOR PRODUCING BIOMASS, FOR GROWING CELLS OR FOR OBTAINING FERMENTATION OR METABOLIC PRODUCTS, i.e. BIOREACTORS OR FERMENTERS
    • C12M23/00Constructional details, e.g. recesses, hinges
    • C12M23/36Means for collection or storage of gas; Gas holders
    • CCHEMISTRY; METALLURGY
    • C12BIOCHEMISTRY; BEER; SPIRITS; WINE; VINEGAR; MICROBIOLOGY; ENZYMOLOGY; MUTATION OR GENETIC ENGINEERING
    • C12MAPPARATUS FOR ENZYMOLOGY OR MICROBIOLOGY; APPARATUS FOR CULTURING MICROORGANISMS FOR PRODUCING BIOMASS, FOR GROWING CELLS OR FOR OBTAINING FERMENTATION OR METABOLIC PRODUCTS, i.e. BIOREACTORS OR FERMENTERS
    • C12M27/00Means for mixing, agitating or circulating fluids in the vessel
    • C12M27/02Stirrer or mobile mixing elements
    • CCHEMISTRY; METALLURGY
    • C12BIOCHEMISTRY; BEER; SPIRITS; WINE; VINEGAR; MICROBIOLOGY; ENZYMOLOGY; MUTATION OR GENETIC ENGINEERING
    • C12MAPPARATUS FOR ENZYMOLOGY OR MICROBIOLOGY; APPARATUS FOR CULTURING MICROORGANISMS FOR PRODUCING BIOMASS, FOR GROWING CELLS OR FOR OBTAINING FERMENTATION OR METABOLIC PRODUCTS, i.e. BIOREACTORS OR FERMENTERS
    • C12M37/00Means for sterilizing, maintaining sterile conditions or avoiding chemical or biological contamination
    • C12M37/04Seals
    • CCHEMISTRY; METALLURGY
    • C12BIOCHEMISTRY; BEER; SPIRITS; WINE; VINEGAR; MICROBIOLOGY; ENZYMOLOGY; MUTATION OR GENETIC ENGINEERING
    • C12MAPPARATUS FOR ENZYMOLOGY OR MICROBIOLOGY; APPARATUS FOR CULTURING MICROORGANISMS FOR PRODUCING BIOMASS, FOR GROWING CELLS OR FOR OBTAINING FERMENTATION OR METABOLIC PRODUCTS, i.e. BIOREACTORS OR FERMENTERS
    • C12M41/00Means for regulation, monitoring, measurement or control, e.g. flow regulation
    • C12M41/12Means for regulation, monitoring, measurement or control, e.g. flow regulation of temperature
    • C12M41/18Heat exchange systems, e.g. heat jackets or outer envelopes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E50/00Technologies for the production of fuel of non-fossil origin
    • Y02E50/30Fuel from waste, e.g. synthetic alcohol or diesel

Abstract

The invention discloses a kind of method of construction of water system Natural Circulation methane-generating pit, comprise the following steps:S1, determine the volume of fermentation vat, determine position relationship, structure draws construction drawing;S2, analysis select optimal building biomass pool position;S4, digged pit according to the size on construction drawing, recessed position in hole is filled and led up, does compacting and process, surrounding coats Calx in hole, removes the debris in hole;S5, hole in concrete pour into a mould, encapsulation process is done to methane-generating pit;S6, foundation construction drawing, pour into a mould methane-generating pit safety head, reserve the position of airway, check process;S7, installation airway, install water pressure chamber top cover, methane-generating pit safety head is pacified, and does encapsulation process, pressure testing is qualified, obtains final product.A kind of method of construction of water system Natural Circulation methane-generating pit proposed by the present invention, constructed methane-generating pit cannot ferment completely and while discharging is difficult it is ensured that air-tightness solving, and easy to use, gas production is high, and method of construction is simple, rational in infrastructure, is worthy to be popularized.

Description

A kind of method of construction of water system Natural Circulation methane-generating pit
Technical field
The present invention relates to building biomass pool field, more particularly, to a kind of method of construction of water system Natural Circulation methane-generating pit.
Background technology
Biogas is various organic substance, in isolation air (reducing condition), and under suitable temperature, pH value, Jing Guowei A kind of combustible gas that biological Fermentation produces.Biogas belongs to secondary energy sources, and is regenerative resource.Chinese conduct Energy-consuming big country, the exploitation of new forms of energy have great importance to the sustainable development of national economy, with rural area society Economic the developing rapidly of meeting, rural energy consumption also increasingly increases, in this context, before Methane Resources are as a great application The new forms of energy of scape, it develops the effective behave being to solve rural energy supply problem under energy shortage situation, and it develops day Benefit is paid attention to by country.Under the support of central-government policy guiding and fund input, the scale of Chinese biogas industry presents year by year The quantity of incremental trend, especially domestic methane tank increases substantially, has become as the main force of biogas industry.Chinese countryside family is used Methane-generating pit increased in recent years year by year, but had fermentation methane-generating pit for farm household not exclusively more, and gas production is not high, discharging difficulty etc. Problem.The present invention proposes a kind of method of construction of water system Natural Circulation methane-generating pit and can effectively solve the problem that the problems referred to above.
Content of the invention
The invention aims to shortcoming present in solution prior art, and a kind of water system Natural Circulation proposing The method of construction of methane-generating pit.
A kind of method of construction of water system Natural Circulation methane-generating pit, comprises the following steps:
S1, according to practical situation, determine the volume of fermentation vat, determine fermentation vat, feed pipe, discharge nozzle, airway, hydraulic pressure Between and connect water pressure chamber water pipe A and water pipe B position relationship, structure draw construction drawing;
S2, comprehensive analysis charging, discharging, with gas and the ground factor such as condition, select optimal building biomass pool position;
S4, digged pit according to the size on construction drawing, dig out the water of fermentation vat, feed pipe, discharge nozzle, water pressure chamber and water pressure chamber Pipe A and the relevant position of water pipe B, fill and lead up to recessed position in hole, do compacting process, surrounding coats Calx in hole, removes in hole Debris;
S5, hole in concrete pour into a mould, encapsulation process is done to the corner of the methane-generating pit of molding, gap and seam;
S6, foundation construction drawing, build template, pour into a mould methane-generating pit safety head with mixed mud, cover and reserve peace in template The position of dress airway, refine, do leak detection and process;
S7, airway is installed to the top of methane-generating pit safety head after, methane-generating pit safety head is installed on methane-generating pit, will Water pressure chamber top cover is installed above water pressure chamber, does encapsulation process, pressure testing is qualified, obtains final product.
Preferably, in described step S1, fermentation vat is irregular roundness cylindricality, and the volume of fermentation vat is 6-8m3.
Preferably, in described step S1, one end of feed pipe should enter fermentation vat from oblique cutting above the left side of fermentation vat Portion, the length that the other end is reserved is flushed with the position of methane-generating pit safety head, and feed tube diameter is 30-50cm.
Preferably, the position oblique cutting that in described step S1, discharge nozzle one end should be on the upper side from the middle part of fermentation vat enters fermentation vat Bottom position on the upper side, the other end reserve length be less than methane-generating pit safety head position 20-30cm, discharge nozzle a diameter of 50-70cm.
Preferably, in described step S1, airway is copper pipe, a diameter of 12-16mm.
Preferably, the water pressure chamber in described step S1 is located at top in the right side of fermentation vat.
Preferably, the water pipe A in described step S1 and water pipe B are used to connect fermentation vat and water pressure chamber, the peace of water pipe A Holding position 15-20cm higher than the installation site of water pipe B.
Preferably, in described step S5, concrete used is 150 or No. 200 concrete.
Preferably, in described step S7, the top cover of water pressure chamber is cladded with safety glass by solar heat-collection plate and constitutes, and area is 0.5-1m2.
A kind of method of construction of water system Natural Circulation methane-generating pit proposed by the present invention, by the size before building and position Fermentation and aerogenesis situation to improve methane-generating pit for the material choice in determining and building, has considered charging, discharging during addressing And the situation with gas, facilitate use in the future, the design of water pressure chamber top cover, can effectively absorb solar energy, heat water pressure chamber Slag liquid, make hot water enter blood circulation, improve the temperature of fermentation, accelerate fermentation efficiency, improve the speed of aerogenesis, go out The position setting of expects pipe and diameter avoid the difficulty of discharging, and also can be from the position poking bar of discharge nozzle to fermentation vat The slag muck of bottom is stirred, and makes fermentation more complete, and gas production improves, and method of construction proposed by the present invention is simple, rational in infrastructure, It is worthy to be popularized.
Specific embodiment
With reference to specific embodiment, the present invention is explained further.
Embodiment one
A kind of method of construction of water system Natural Circulation methane-generating pit proposed by the present invention, comprises the following steps:
S1, the volume of selection irregular roundness cylindricality fermentation vat are 7m3, by one end of a diameter of 50cm feed pipe from fermentation vat Left side above oblique cutting enter the middle part of fermentation vat, the length that the other end is reserved is flushed with the position of methane-generating pit safety head;By diameter Enter the bottom position on the upper side of fermentation vat for 70cm discharge nozzle one end position oblique cutting on the upper side from the middle part of fermentation vat, the other end is pre- The length stayed is less than the position 28cm of methane-generating pit safety head;Water pressure chamber is located at top in the right side of fermentation vat;Water pipe A and water pipe B It is used for connecting fermentation vat and water pressure chamber, the installation site 18cm higher than the installation site of water pipe B of water pipe A;According to foregoing description, structure Draw construction drawing;
S2, comprehensive analysis charging, discharging, with gas and the ground factor such as condition, select optimal building biomass pool position;
S4, digged pit according to the size on construction drawing, dig out the water of fermentation vat, feed pipe, discharge nozzle, water pressure chamber and water pressure chamber Pipe A and the relevant position of water pipe B, fill and lead up to recessed position in hole, do compacting process, surrounding coats Calx in hole, removes in hole Debris;
S5, in hole with the cast of No. 150 concrete, the corner of the methane-generating pit of molding, gap and seam are done at sealing Reason;
S6, foundation construction drawing, build template, pour into a mould methane-generating pit safety heads with No. 200 mixed muds, cover reserved in template Go out the position installing a diameter of 13mm inducing QI copper pipe, refine, do leak detection and process;
S7, airway is installed to the top of methane-generating pit safety head after, methane-generating pit safety head is installed on methane-generating pit, will Being cladded with the area that safety glass constitutes by solar heat-collection plate is 1m2Water pressure chamber top cover is installed above water pressure chamber, does encapsulation process, Pressure testing is qualified, obtains final product.
Embodiment two
A kind of method of construction of water system Natural Circulation methane-generating pit proposed by the present invention, comprises the following steps:
S1, the volume of selection irregular roundness cylindricality fermentation vat are 8m3, by one end of a diameter of 30cm feed pipe from fermentation vat Left side above oblique cutting enter the middle part of fermentation vat, the length that the other end is reserved is flushed with the position of methane-generating pit safety head;By diameter Enter the bottom position on the upper side of fermentation vat for 65cm discharge nozzle one end position oblique cutting on the upper side from the middle part of fermentation vat, the other end is pre- The length stayed is less than the position 20cm of methane-generating pit safety head;Water pressure chamber is located at top in the right side of fermentation vat;Water pipe A and water pipe B It is used for connecting fermentation vat and water pressure chamber, the installation site 20cm higher than the installation site of water pipe B of water pipe A;According to foregoing description, structure Draw construction drawing;
S2, comprehensive analysis charging, discharging, with gas and the ground factor such as condition, select optimal building biomass pool position;
S4, digged pit according to the size on construction drawing, dig out the water of fermentation vat, feed pipe, discharge nozzle, water pressure chamber and water pressure chamber Pipe A and the relevant position of water pipe B, fill and lead up to recessed position in hole, do compacting process, surrounding coats Calx in hole, removes in hole Debris;
S5, in hole with the cast of No. 200 concrete, the corner of the methane-generating pit of molding, gap and seam are done at sealing Reason;
S6, foundation construction drawing, build template, pour into a mould methane-generating pit safety heads with No. 150 mixed muds, cover reserved in template Go out the position installing a diameter of 14mm inducing QI copper pipe, refine, do leak detection and process;
S7, airway is installed to the top of methane-generating pit safety head after, methane-generating pit safety head is installed on methane-generating pit, will Being cladded with the area that safety glass constitutes by solar heat-collection plate is 0.6m2Water pressure chamber top cover is installed above water pressure chamber, does at sealing Reason, pressure testing is qualified, obtains final product.
Embodiment three
A kind of method of construction of water system Natural Circulation methane-generating pit proposed by the present invention, comprises the following steps:
S1, the volume of selection irregular roundness cylindricality fermentation vat are 6m3, by one end of a diameter of 45cm feed pipe from fermentation vat Left side above oblique cutting enter the middle part of fermentation vat, the length that the other end is reserved is flushed with the position of methane-generating pit safety head;By diameter Enter the bottom position on the upper side of fermentation vat for 50cm discharge nozzle one end position oblique cutting on the upper side from the middle part of fermentation vat, the other end is pre- The length stayed is less than the position 30cm of methane-generating pit safety head;Water pressure chamber is located at top in the right side of fermentation vat;Water pipe A and water pipe B It is used for connecting fermentation vat and water pressure chamber, the installation site 16cm higher than the installation site of water pipe B of water pipe A;According to foregoing description, structure Draw construction drawing;
S2, comprehensive analysis charging, discharging, with gas and the ground factor such as condition, select optimal building biomass pool position;
S4, digged pit according to the size on construction drawing, dig out the water of fermentation vat, feed pipe, discharge nozzle, water pressure chamber and water pressure chamber Pipe A and the relevant position of water pipe B, fill and lead up to recessed position in hole, do compacting process, surrounding coats Calx in hole, removes in hole Debris;
S5, in hole with the cast of No. 150 concrete, the corner of the methane-generating pit of molding, gap and seam are done at sealing Reason;
S6, foundation construction drawing, build template, pour into a mould methane-generating pit safety heads with No. 200 mixed muds, cover reserved in template Go out the position installing a diameter of 12mm inducing QI copper pipe, refine, do leak detection and process;
S7, airway is installed to the top of methane-generating pit safety head after, methane-generating pit safety head is installed on methane-generating pit, will Being cladded with the area that safety glass constitutes by solar heat-collection plate is 0.9m2Water pressure chamber top cover is installed above water pressure chamber, does at sealing Reason, pressure testing is qualified, obtains final product.
Example IV
A kind of method of construction of water system Natural Circulation methane-generating pit proposed by the present invention, comprises the following steps:
S1, the volume of selection irregular roundness cylindricality fermentation vat are 6.5m3, by one end of a diameter of 40cm feed pipe from fermentation Above the left side in pond, oblique cutting enters the middle part of fermentation vat, and the length that the other end is reserved is flushed with the position of methane-generating pit safety head;Will be straight Footpath is the bottom position on the upper side that 55cm discharge nozzle one end position oblique cutting on the upper side from the middle part of fermentation vat enters fermentation vat, the other end Reserved length is less than the position 22cm of methane-generating pit safety head;Water pressure chamber is located at top in the right side of fermentation vat;Water pipe A and water pipe B is used for connecting fermentation vat and water pressure chamber, the installation site 19cm higher than the installation site of water pipe B of water pipe A;According to foregoing description, Structure draws construction drawing;
S2, comprehensive analysis charging, discharging, with gas and the ground factor such as condition, select optimal building biomass pool position;
S4, digged pit according to the size on construction drawing, dig out the water of fermentation vat, feed pipe, discharge nozzle, water pressure chamber and water pressure chamber Pipe A and the relevant position of water pipe B, fill and lead up to recessed position in hole, do compacting process, surrounding coats Calx in hole, removes in hole Debris;
S5, in hole with the cast of No. 150 concrete, the corner of the methane-generating pit of molding, gap and seam are done at sealing Reason;
S6, foundation construction drawing, build template, pour into a mould methane-generating pit safety heads with No. 150 mixed muds, cover reserved in template Go out the position installing a diameter of 15mm inducing QI copper pipe, refine, do leak detection and process;
S7, airway is installed to the top of methane-generating pit safety head after, methane-generating pit safety head is installed on methane-generating pit, will Being cladded with the area that safety glass constitutes by solar heat-collection plate is 0.8m2Water pressure chamber top cover is installed above water pressure chamber, does at sealing Reason, pressure testing is qualified, obtains final product.
Embodiment five
A kind of method of construction of water system Natural Circulation methane-generating pit proposed by the present invention, comprises the following steps:
S1, the volume of selection irregular roundness cylindricality fermentation vat are 7.5m3, by one end of a diameter of 35cm feed pipe from fermentation Above the left side in pond, oblique cutting enters the middle part of fermentation vat, and the length that the other end is reserved is flushed with the position of methane-generating pit safety head;Will be straight Footpath is the bottom position on the upper side that 60cm discharge nozzle one end position oblique cutting on the upper side from the middle part of fermentation vat enters fermentation vat, the other end Reserved length is less than the position 25cm of methane-generating pit safety head;Water pressure chamber is located at top in the right side of fermentation vat;Water pipe A and water pipe B is used for connecting fermentation vat and water pressure chamber, the installation site 15cm higher than the installation site of water pipe B of water pipe A;According to foregoing description, Structure draws construction drawing;
S2, comprehensive analysis charging, discharging, with gas and the ground factor such as condition, select optimal building biomass pool position;
S4, digged pit according to the size on construction drawing, dig out the water of fermentation vat, feed pipe, discharge nozzle, water pressure chamber and water pressure chamber Pipe A and the relevant position of water pipe B, fill and lead up to recessed position in hole, do compacting process, surrounding coats Calx in hole, removes in hole Debris;
S5, in hole with the cast of No. 200 concrete, the corner of the methane-generating pit of molding, gap and seam are done at sealing Reason;
S6, foundation construction drawing, build template, pour into a mould methane-generating pit safety heads with No. 200 mixed muds, cover reserved in template Go out the position installing a diameter of 16mm inducing QI copper pipe, refine, do leak detection and process;
S7, airway is installed to the top of methane-generating pit safety head after, methane-generating pit safety head is installed on methane-generating pit, will Being cladded with the area that safety glass constitutes by solar heat-collection plate is 0.5m2Water pressure chamber top cover is installed above water pressure chamber, does at sealing Reason, pressure testing is qualified, obtains final product.
According to the construction cost to the method for construction that above-mentioned five groups of embodiments propose, and the methane-generating pit building fermentation, Aerogenesis situation, the convenient situation of discharging etc. carry out Integrated comparative and learn:In the method for construction that above-mentioned five groups of embodiments propose, embodiment The methane tank gas production amount highest that one builds, stir, slag tap the most convenient;Construction cost in embodiment three is minimum, is to use gas Measure the first-selection of few family.A kind of method of construction of water system Natural Circulation methane-generating pit proposed by the present invention, before building Size and position determine and build in fermentation and aerogenesis situation to improve methane-generating pit for the material choice, consider during addressing Charging, discharging and the situation with gas, facilitate use in the future, the design of water pressure chamber top cover, effectively can absorb solar energy, The slag liquid of heating water pressure chamber, makes hot water enter blood circulation, improves the temperature of fermentation, accelerate fermentation efficiency, improve product The speed of gas, the position setting of discharge nozzle and diameter avoid the difficulty of discharging, and also can be from the position of discharge nozzle with stirring Mix rod the slag muck of fermentation vat bottom is stirred, make fermentation more complete, gas production improves, method of construction letter proposed by the present invention Single, rational in infrastructure, low cost, it is worthy to be popularized.
The above, the only present invention preferably specific embodiment, but protection scope of the present invention is not limited thereto, Any those familiar with the art the invention discloses technical scope in, technology according to the present invention scheme and its Inventive concept equivalent or change in addition, all should be included within the scope of the present invention.

Claims (9)

1. a kind of method of construction of water system Natural Circulation methane-generating pit is it is characterised in that comprise the following steps:
S1, according to practical situation, determine the volume of fermentation vat, determine fermentation vat, feed pipe, discharge nozzle, airway, water pressure chamber and Connect the position relationship of the water pipe A and water pipe B of water pressure chamber, structure draws construction drawing;
S2, comprehensive analysis charging, discharging, with gas and the ground factor such as condition, select optimal building biomass pool position;
S4, digged pit according to the size on construction drawing, dig out the water pipe A of fermentation vat, feed pipe, discharge nozzle, water pressure chamber and water pressure chamber With the relevant position of water pipe B, recessed position in hole is filled and led up, does compacting process, surrounding coats Calx in hole, remove miscellaneous in hole Thing;
S5, hole in concrete pour into a mould, encapsulation process is done to the corner of the methane-generating pit of molding, gap and seam;
S6, according to construction drawing, build template, in template, pour into a mould methane-generating pit safety head with mixed mud, cover and reserve installation and lead The position of trachea, refine, do leak detection and process;
S7, airway is installed to the top of methane-generating pit safety head after, methane-generating pit safety head is installed on methane-generating pit, by hydraulic pressure Between top cover install water pressure chamber above, do encapsulation process, pressure testing is qualified, obtains final product.
2. a kind of method of construction of water system Natural Circulation methane-generating pit according to claim 1 is it is characterised in that described step In rapid S1, fermentation vat is irregular roundness cylindricality, and the volume of fermentation vat is 6-8m3.
3. a kind of method of construction of water system Natural Circulation methane-generating pit according to claim 1 is it is characterised in that described step In rapid S1, one end of feed pipe should enter the middle part of fermentation vat, length and natural pond that the other end is reserved by oblique cutting above the left side of fermentation vat The position of gas pond safety head flushes, and feed tube diameter is 30-50cm.
4. a kind of method of construction of water system Natural Circulation methane-generating pit according to claim 1 is it is characterised in that described step The position oblique cutting that in rapid S1, discharge nozzle one end should be on the upper side from the middle part of fermentation vat enters the bottom position on the upper side of fermentation vat, the other end Reserved length is less than the position 20-30cm, a diameter of 50-70cm of discharge nozzle of methane-generating pit safety head.
5. a kind of method of construction of water system Natural Circulation methane-generating pit according to claim 1 is it is characterised in that described step In rapid S1, airway is copper pipe, a diameter of 12-16mm.
6. a kind of method of construction of water system Natural Circulation methane-generating pit according to claim 1 is it is characterised in that described step Water pressure chamber in rapid S1 is located at top in the right side of fermentation vat.
7. a kind of method of construction of water system Natural Circulation methane-generating pit according to claim 1 is it is characterised in that described step Water pipe A in rapid S1 and water pipe B are used to connect fermentation vat and water pressure chamber, the installation site of the water pipe A installation position than water pipe B Put high 15-20cm.
8. a kind of method of construction of water system Natural Circulation methane-generating pit according to claim 1 is it is characterised in that described step In rapid S5, concrete used is 150 or No. 200 concrete.
9. a kind of method of construction of water system Natural Circulation methane-generating pit according to claim 1 is it is characterised in that described step In rapid S7, the top cover of water pressure chamber is cladded with safety glass by solar heat-collection plate and constitutes, and area is 0.5-1m2.
CN201610841464.4A 2016-09-23 2016-09-23 Method for building natural circulation methane tank of water system Active CN106481105B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610841464.4A CN106481105B (en) 2016-09-23 2016-09-23 Method for building natural circulation methane tank of water system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610841464.4A CN106481105B (en) 2016-09-23 2016-09-23 Method for building natural circulation methane tank of water system

Publications (2)

Publication Number Publication Date
CN106481105A true CN106481105A (en) 2017-03-08
CN106481105B CN106481105B (en) 2019-12-20

Family

ID=58268657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610841464.4A Active CN106481105B (en) 2016-09-23 2016-09-23 Method for building natural circulation methane tank of water system

Country Status (1)

Country Link
CN (1) CN106481105B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2180646Y (en) * 1994-02-06 1994-10-26 杨广安 Multi-function automatically slag discharging methane-generating pits
CN2269394Y (en) * 1996-10-15 1997-12-03 保定市新能源办公室 Solar energy methane generating pit
CN2804112Y (en) * 2005-07-07 2006-08-09 徐志武 Spotilight heat collecting solar methane tank
CN1904295A (en) * 2006-07-31 2007-01-31 四川省沼气协会 Solidification soil structure sewage gas pond and its building method
CN201062268Y (en) * 2007-11-23 2008-05-21 秦忠新 Methane tank feed-liquid automatic circulating device
CN101735942A (en) * 2010-01-14 2010-06-16 江西省宜春市林海生态技术有限公司 Domestic methane tank and method for building same
CN204325359U (en) * 2014-12-20 2015-05-13 张文俊 A kind of energy-conservation water cycle high temperature methane tank

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2180646Y (en) * 1994-02-06 1994-10-26 杨广安 Multi-function automatically slag discharging methane-generating pits
CN2269394Y (en) * 1996-10-15 1997-12-03 保定市新能源办公室 Solar energy methane generating pit
CN2804112Y (en) * 2005-07-07 2006-08-09 徐志武 Spotilight heat collecting solar methane tank
CN1904295A (en) * 2006-07-31 2007-01-31 四川省沼气协会 Solidification soil structure sewage gas pond and its building method
CN201062268Y (en) * 2007-11-23 2008-05-21 秦忠新 Methane tank feed-liquid automatic circulating device
CN101735942A (en) * 2010-01-14 2010-06-16 江西省宜春市林海生态技术有限公司 Domestic methane tank and method for building same
CN204325359U (en) * 2014-12-20 2015-05-13 张文俊 A kind of energy-conservation water cycle high temperature methane tank

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵民善: "《太阳能沼气设备维修》", 31 August 2013, 中原农民出版社 *

Also Published As

Publication number Publication date
CN106481105B (en) 2019-12-20

Similar Documents

Publication Publication Date Title
CN204550537U (en) A kind of complete mixed biogas production system
CN104357322B (en) A kind of use for laboratory continous way marsh gas anaerobic fermentation apparatus
CN103602581B (en) Multistage stirring solar-assisted heating energy-saving fermentation device
CN203582851U (en) Energy-saving biogas fermentation tank
CN105907631A (en) Channel-combined multifunctional anaerobic reactor
CN104031825B (en) Anaerobic in low temperature marsh-gas fermentation tank
CN202193658U (en) Dry-method anaerobic reactor
CN106481105A (en) A kind of method of construction of water system Natural Circulation methane-generating pit
CN207483762U (en) Large-scale full-mixing type anaerobic marsh-gas fermentation tank thermal compensation system
CN2937141Y (en) Anaerobic digestor
CN110373314A (en) A kind of rubbish dry-type anaerobic fermentation recycling set device
CN202440509U (en) Gas stripping convective circulation anaerobic digestion reactor
CN102417880B (en) Synergizing device for delivering warm water for piping manifold in methane tank wall by utilizing geothermy
CN205088241U (en) A system agitating unit for straw anaerobic fermentation
CN204311055U (en) Box organic waste system for anaerobic treatment
CN210030684U (en) Steel-concrete assembled anaerobic fermentation tank
CN203079746U (en) Sewage anaerobic reaction system
CN207727066U (en) A kind of organic waste materials fermentation drying system
CN100529048C (en) Continuous dry fermenting mathane generating pool
CN202717772U (en) Combined anaerobic fermentation tank
CN201416006Y (en) Steel mesh cement methane tank
CN202508921U (en) Efficient anaerobic reaction device
CN206902141U (en) The waste material waste heat temperature-raising marsh pool system discharged using methane-generating pit
CN205635580U (en) Biogas digester
CN204848883U (en) Jar of oil ferment fermentation organic medium release internal energy

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 516000, four floor, Xingmu building, Guang Shan Road, Xinle industrial area, Ma An Town, Huizhou, Guangdong.

Applicant after: Huizhou Xingmu environmental protection Polytron Technologies Inc

Address before: 516000, four floor, Xingmu building, Guang Shan Road, Xinle industrial area, Ma An Town, Huizhou, Guangdong.

Applicant before: HUIZHOU XINGMU ENVIRONMENTAL PROTECTION TECHNOLOGY CO., LTD.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant