CN106480866A - Partial equilibrium hydraulic hoisting ship elevator - Google Patents
Partial equilibrium hydraulic hoisting ship elevator Download PDFInfo
- Publication number
- CN106480866A CN106480866A CN201611036605.1A CN201611036605A CN106480866A CN 106480866 A CN106480866 A CN 106480866A CN 201611036605 A CN201611036605 A CN 201611036605A CN 106480866 A CN106480866 A CN 106480866A
- Authority
- CN
- China
- Prior art keywords
- reception chamber
- ship
- ship reception
- gate
- early
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02C—SHIP-LIFTING DEVICES OR MECHANISMS
- E02C5/00—Mechanisms for lifting ships vertically
Landscapes
- Engineering & Computer Science (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Ship Loading And Unloading (AREA)
Abstract
The present invention relates to a kind of partial equilibrium hydraulic hoisting ship elevator, it belongs to Hydraulic and Hydro-Power Engineering navigation structure field.The present invention includes main lift cylinder, China's railway industry, collision prevention girders, support beam, ship reception chamber between two king-posts, multigroup balance weight system, locking device and hold out against guider, the two ends of ship reception chamber are equipped with collision prevention girders and China's railway industry, support beam is arranged on the bottom of ship reception chamber, main lift cylinder is symmetricly set on the both sides of ship reception chamber, the multigroup balance weight system of ship reception chamber both sides distributing installation, locking device is fixed on the top both sides of ship reception chamber, hold out against the both sides that guider is arranged on ship reception chamber, one end that this holds out against guider is connected with ship reception chamber, the guide rail of the other end and king-post that hold out against guider is connected.Present configuration is reasonable in design and simple, runs safety and steady, reliability height, low cost.
Description
Technical field
The present invention relates to a kind of ship lift, especially relate to a kind of partial equilibrium hydraulic hoisting ship elevator, it belongs to water
Diuretic electrical engineering navigation structure field.
Background technology
Ship lift is a kind of common auxiliary building engineering of urban water system insertion, is using machinery or hydraulic means lifting
Ship is to overcome the navigation structure of the urban water system height of water.
The ship lift studied and build up both at home and abroad at present, by lifting device classification, can be divided into steel wire rope winding type, gear
The several types such as tooth bar climbing type, float-type and hydraulic floating type torque balanced ship-lifting mechanism.Domestic built ship lift
Most of steel wire rope winding type ship lift, mostly large scale ship, it is mainly used in solving high dam shipping navigation problem, to take
Comfortableness is less demanding, and most needs build main equipment room at the top of ship railway carriage or compartment room or the underground space, arrange lifting means or join
Weight, overall structure is more complicated.
With the development of urban water system connection project and the construction of middle-size and small-size key water control project, especially some tourism type cities
Rise, progressively built the ship lift of a collection of middle-size and small-size Tourism Nature, and for visitor's navigation, what ship lift was taken is comfortable
Property, safety have higher requirement.
Publication date is on 03 11st, 2015, in the Chinese patent of Publication No. 204199266U, discloses a kind of title
A kind of utility model patent for " hydro powered steel wire rope winding type vertical ship lift ".This patent includes civil engineering structure and setting
Lift system on civil engineering structure, water-carriage system and balance weight, civil engineering structure by king-post and is fixed on the main equipment room on king-post
Platform forms;Although this patent uses multigroup high-performance deadman's brake, substantially increase ship lift security performance, this is special
, by building main equipment room, arrangement lifting means or counterweight, overall structure is more complicated, therefore it still has above-mentioned defect for profit.
Publication date is on 08 27th, 2008, in the Chinese patent of Publication No. 101250865, discloses a kind of entitled
The patent of invention of " hydropower floating quick vertical ship lift ".This patent balances the gross weight of ship reception chamber with the gross weight of surge drum
Amount, by operation water intaking valve or drain valve, the water in winding shaft water-filling or discharge winding shaft, reaches change lifting balance
The weight of cylinder overcomes frictional resistance to promote the purpose of ship reception chamber lifting.Although this patent lifting speed is fast, ships'passing dam can be saved greatly
The time of amount, but be mainly used in solving high dam shipping navigation problem, less demanding to the comfortableness taken, structure is relatively also multiple
Miscellaneous, therefore still there is drawbacks described above in it.
Content of the invention
It is an object of the invention to overcoming above-mentioned deficiency present in prior art, and provide a kind of reasonable in design and
Simply, safety and steady, reliability height, easy to maintenance, the partial equilibrium hydraulic hoisting ship elevator of low cost are run.
The present invention solves the above problems and be employed technical scheme comprise that:This partial equilibrium hydraulic hoisting ship elevator, including
Main lift cylinder, China's railway industry, collision prevention girders, support beam and the ship reception chamber being located between two king-posts, the two ends of described ship reception chamber are all provided with
There are collision prevention girders and China's railway industry, support beam is arranged on the bottom of ship reception chamber, main lift cylinder is symmetricly set on the both sides of ship reception chamber, its
It is characterised by:Also include multigroup balance weight system, locking device and hold out against guider, described ship reception chamber both sides distributing installation is many
Group balance weight system, locking device is fixed on the top both sides of ship reception chamber, holds out against the both sides that guider is arranged on ship reception chamber, should
The one end holding out against guider is connected with ship reception chamber, and the guide rail of the other end and king-post that hold out against guider is connected;Overall structure
Rationally and simple, balance weight system is used cooperatively with main lift cylinder, and balance rebalancing method falls most of weight of ship reception chamber and water body
Amount, main lift cylinder drives ship reception chamber vertical lift, and main lift cylinder driving force is little, and hydraulic system volume is little, elevator configuration
Formula is simple, and operate steadily reliability.
Preferably, balance weight system of the present invention includes assembly pulley, steel wire rope, adjusting means and balance weight, described
One end of steel wire rope is connected with ship reception chamber, the other end of this steel wire rope and assembly pulley solderless wrapped connection, adjusting means be arranged on steel wire rope with
Between balance weight, this adjusting means and balance reconnect;Adjusting means can adjust the rate of tension of steel wire rope it is ensured that all steel wires
Rope can uniform stand under load.
Preferably, present invention additionally comprises early-stage work gate and downstream main gate, described early-stage work gate installation
In the upstream docking location of ship reception chamber, it is little that this early-stage work gate includes early-stage work gate gate and early-stage work gate is droped to the ground
Door, early-stage work gate drop to the ground wicket bottom hinged with early-stage work gate gate;Described downstream main gate is arranged on and holds
The position of the downstream docking in ship railway carriage or compartment, it is little that this downstream main gate includes downstream main gate gate and downstream main gate is droped to the ground
Door, downstream main gate drop to the ground wicket bottom hinged with downstream main gate gate;Early-stage work gate and downstream work lock
It is mounted on Butt sealing device in door and fills drainage system, it is same that early-stage work gate can also make downstream main gate
Version.
Preferably, the piston rod hanger of main lift cylinder of the present invention passes through the support in ship reception chamber bottom for the ball-joint
Liang Shang.
Preferably, locking device of the present invention is four groups, this four groups are symmetrically mounted on the upper of ship reception chamber two main beam
On wing plate;Lock ingot ship reception chamber when overhauling for ship reception chamber, can be hydraulic-driven or motorized motions.
Preferably, the guider that holds out against of the present invention is four groups, this four groups both sides being separately mounted to ship reception chamber, be in
Symmetrical;Ensure ship reception chamber traveling comfort.
Preferably, being symmetrically arranged with guardrail in the top cross-bar of ship reception chamber of the present invention.
Preferably, the lower hinge of China's railway industry of the present invention is on ship reception chamber.
Preferably, balance weight of the present invention is concrete block or the scrap steel of certain unit weight;For balancing ship reception chamber
Weight with water.
Preferably, collision prevention girders of the present invention adopt door beam linkage, hydraulic oil cylinder driving or Motor drive collision prevention girders
Structure;
The present invention compared with prior art, has advantages below and effect:1st, balance weight system and main lift cylinder use cooperatively,
Balance rebalancing method falls most of weight of ship reception chamber and water body, and main lift cylinder drives ship reception chamber vertical lift, main lift cylinder
Driving force is little, and hydraulic system volume is little, and hoisting mechanism pattern is simple, and operate steadily reliability.
2nd, do not use the equipment such as reel and motor, main electromotor room need not be set, assembly pulley and balance weight system can be ensconced
Inside the civil engineering gallery of both sides, ship lift no external buildings, do not affect the overall appearance of tourist attractions.
3rd, lifting load is born by hydraulic system, system pressure can be with load real-time change, when ship reception chamber occurs leak thing
Therefore or during overload, hydraulic system can automatically generate new balance it is not necessary to safeguard protection, and security performance is high.
4th, ship reception chamber can not to be ability of swimming, and using the lifting of four hoisting type hydraulic oil cylinder driving ship reception chambers, ship reception chamber both sides are respectively
Arrange multigroup balance weight system, for equalizing the weight of ship reception chamber and water, when ships'passing dam, ship sails in ship reception chamber, holds
Ship railway carriage or compartment is vertically moved up or down with main lift cylinder and runs, and overcomes water levels of upstream and downstream drop, reaches ship navigation purpose.
5th, adjusting means is arranged between steel wire rope socket and balance weight, for adjusting rope stretch amount it is ensured that owning
Steel wire rope can uniform stand under load.
Brief description
Fig. 1 is the main structure diagram of the embodiment of the present invention.
Fig. 2 is the partial enlargement structural representation one of Fig. 1.
Fig. 3 is the partial enlargement structural representation two of Fig. 1.
Fig. 4 is the overlooking the structure diagram of the embodiment of the present invention.
Fig. 5 is the partial enlargement structural representation one of Fig. 4.
Fig. 6 is the partial enlargement structural representation two of Fig. 4.
Fig. 7 is longitudinal cross section structure diagram of the embodiment of the present invention.
In figure:Downstream bulkhead gate 1, downstream main gate 2, downstream main gate gate 2-1, downstream main gate is droped to the ground
Wicket 2-2, balance weight system 3, assembly pulley 3-1, steel wire rope 3-2, adjusting means 3-3, balance weight 3-4, main lift cylinder 4, ten
Word free bearing 4-1, cylinder body 4-2, ship reception chamber 5, bollard 5-1, hold out against guider 5-2, locking device 5-3, collision prevention girders 5-4, crouch
The 5-5 of falling door, support beam 5-6, guardrail 5-7, early-stage work gate 6, early-stage work gate gate 6-1, early-stage work gate is droped to the ground
Wicket 6-2, hydraulic system 7, upstream bulkhead gate 8, king-post 9.
Specific embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings and by embodiment, and following examples are to this
Bright explanation and the invention is not limited in following examples.
Embodiment.
Referring to Fig. 1 to Fig. 7, the present embodiment partial equilibrium hydraulic hoisting ship elevator mainly includes balance weight system 3, master carries
Oil-lifting jar 4, ship reception chamber 5, hold out against guider 5-2, locking device 5-3, collision prevention girders 5-4, China's railway industry 5-5, support beam 5-6, liquid
Pressure system 7 and king-post 9.
Ship reception chamber 5 in the present embodiment includes ship reception chamber 5 envelope, China's railway industry 5-5, collision prevention girders 5-4, guardrail 5-7, lock ingot dress
Put 5-3, hold out against the ship railway carriage or compartment such as guider 5-2, bollard 5-1 equipment.
Ship reception chamber 5 in the present embodiment is located between two king-posts 9, and the two ends of ship reception chamber 5 are equipped with collision prevention girders 5-4 and drop to the ground
Door 5-5, support beam 5-6 is arranged on the bottom of ship reception chamber 5, and the piston rod hanger of main lift cylinder 4 is connected to by ball pivot and holds ship
In support beam 5-6 of railway carriage or compartment 5 bottom, main lift cylinder 4 is symmetricly set on the both sides of ship reception chamber 5, and this main lift cylinder 4 includes cross
Free bearing 4-1 and cylinder body 4-2, cylinder body 4-2 pass through on the bracket buttress of the vertically-mounted civil engineering of cross free bearing 4-1.
Balance weight system 3 in the present embodiment, locking device 5-3 and hold out against guider 5-2 and be multigroup, ship reception chamber 5
The multigroup balance weight system of both sides distributing installation 3, locking device 5-3 is fixed on the top both sides of ship reception chamber 5, holds out against guider 5-
2 both sides being arranged on ship reception chamber 5, one end that this holds out against guider 5-2 is connected with ship reception chamber 5, holds out against the another of guider 5-2
One end is connected with the guide rail of king-post 9.
Locking device 5-3 in the present embodiment is four groups, this four groups upper flanges being symmetrically mounted on 5 liang of main beams of ship reception chamber
On, lock ingot ship reception chamber 5 when overhauling for ship reception chamber 5, can be hydraulic-driven or motorized motions.
The guider 5-2 that holds out against in the present embodiment is four groups, and this four groups both sides being separately mounted to ship reception chamber 5, in right
Claim distribution, other end holds out against on the guide rail of civil engineering king-post 9 it is ensured that ship reception chamber 5 traveling comfort.
Every group of balance weight system 3 in the present embodiment all includes assembly pulley 3-1, steel wire rope 3-2, adjusting means 3-3, balance
Weight 3-4 and anti-rotating plate, one end of steel wire rope 3-2 is connected on the hanger of ship reception chamber 5 by socket, and this steel wire rope 3-2's is another
End bypasses assembly pulley 3-1, is turned to by assembly pulley 3-1, device for installing and adjusting 3-3 on socket, adjusting means 3-3 is connected to balance
On weight 3-4 otic placode, adjusting means 3-3 is arranged between steel wire rope 3-2 and balance weight 3-4, for adjusting steel wire rope 3-2 elongation
Amount it is ensured that all steel wire rope 3-2 can uniform stand under load, this adjusting means 3-3 is connected with balance weight 3-4, and anti-rotating plate is arranged on phase
Between adjacent steel wire rope 3-2, automatically reverse after preventing steel wire rope 3-2 stand under load, balance weight 3-4 be certain unit weight concrete block or
Scrap steel, assembly pulley 3-1 is made up of multi-disc pulley, and assembly pulley 3-1 is fixed on second stage concrete by frame.
Ship reception chamber 5 in the present embodiment is to have to meet effective waters that navigation requires, and is with some strength and rigidity
Box-beam structure;Locking device 5-3 and guardrail 5-7 is arranged symmetrically on top cross-bar;Ship reception chamber 5 both sides are respectively mounted four groups and hold out against
Guider 5-2;Ship reception chamber 5 two ends are equipped with collision prevention girders 5-4 and China's railway industry 5-5;China's railway industry 5-5 lower hinge is in ship reception chamber 5
On doorframe;China's railway industry 5-5 door leaf is synchronously driven by the China's railway industry 5-5 oil cylinder being arranged in both sides;Collision prevention girders 5-4 can adopt door beam
Linkage is it is also possible to hydraulic oil cylinder driving or Motor drive collision prevention girders 5-4 move up and down.
Downstream main gate 2 in the present embodiment is arranged on the position of the downstream docking of ship reception chamber 5, downstream main gate 2
It is made up of the downstream main gate gate 2-1 and downstream main gate wicket 2-2 that drops to the ground, downstream main gate is droped to the ground under wicket 2-2
Portion is hinged on downstream main gate gate 2-1, and synchronous by the oil cylinder of droping to the ground being arranged on downstream main gate gate 2-1 both sides
Downstream main gate is driven to drop to the ground wicket 2-2 motion;Downstream main gate gate 2-1 can be by hoist engine or hydraulic headstock gear
Lower lifting;Butt sealing device is installed in downstream main gate 2 and fills drainage system.
Early-stage work gate 6 in the present embodiment is arranged on the upstream docking location of ship reception chamber 5, early-stage work gate 6 by
Early-stage work gate gate 6-1 and early-stage work gate are droped to the ground wicket 6-2 composition, and early-stage work gate gate 6-1 is fixed on door
Maintain static in the second stage of embedded part of groove, early-stage work gate drops to the ground wicket 6-2 lower hinge in early-stage work gate gate 6-1
On, and synchronously drive early-stage work gate to drop to the ground wicket 6-2 by the oil cylinder of droping to the ground being arranged on early-stage work gate gate 6-1 both sides
Motion;Butt sealing device is installed in early-stage work gate 6 and fills drainage system, early-stage work gate 6 can also be made down
The same version of trip main gate 2.
In the present embodiment, ship lift carrying out practically flow process is as follows:
First, the ship in Upstream Navigation Waterway drives to channel downstream:
Upstream ship drives to Upstream Navigation Waterway and specifies the position berthed, and now ship reception chamber 5 is risen to upstream pair by main lift cylinder 4
Connect position, early-stage work gate 6 sealing device is released, and fills drainage system and opens, by between early-stage work gate 6 and ship reception chamber 5
Space be full of water, early-stage work gate drop to the ground wicket 6-2 close down, ship reception chamber 5 upstream China's railway industry 5-5 open, upstream anticollision
Beam 5-4 sinks, and ship sails ship reception chamber 5 into according to specified travel speed, rests in after ship reception chamber 5 specified location after ship, will
Ship ties up on bollard 5-1;Ship reception chamber 5 upstream collision prevention girders 5-4 lifting puts in place, and ship reception chamber 5 upstream China's railway industry 5-5 closes, on
Trip main gate drop to the ground wicket 6-2 close, fill drainage system and Interstitial Water taken out, Butt sealing frame withdraw;Main lift cylinder 4 opens
Dynamic, ship reception chamber 5 is dropped to downstream docking specified location;The Butt sealing device of downstream main gate 2 is released, and fills drainage system
Open, the space between downstream main gate 2 and ship reception chamber 5 be full of water, the wicket 2-2 that drops to the ground of downstream main gate opens,
Ship reception chamber 5 downstream China's railway industry 5-5 opens, and ship reception chamber 5 downstream collision prevention girders 5-4 are sunk, and ship releases heaving pile, and ship is according to specified
Travel speed rolls ship reception chamber 5 away from;Ship reception chamber 5 downstream collision prevention girders 5-4 lifting puts in place, and ship reception chamber 5 downstream China's railway industry 5-5 closes, under
Trip main gate drop to the ground wicket 2-2 close, fill drainage system and Interstitial Water taken out, Butt sealing frame withdraw.
2nd, the ship in channel downstream drives to the flow process of Upstream Navigation Waterway with reference to top-operation flow process.
Upstream bulkhead gate 8 and downstream bulkhead gate 1 are released when ship lift overhauls from door storehouse;Early-stage work lock
Door and downstream main gate 2 adjust lock head position according to upstream and downstream navigation channel water level, to meet ship lift to taking over ship water level requirement.
The present embodiment partial equilibrium hydraulic hoisting ship elevator, ship reception chamber 5 does not enter water, and ship railway carriage or compartment room is dry type;Using box
, as main beam, the stress of ship end structure, rigidity and safety in operation are good for beam;Multigroup using ship reception chamber 5 both sides distributing installation
Balancing most of weight of ship reception chamber 5 and water, other weight are overcome balance weight system 3 by main lift cylinder 4.
The present embodiment balance weight system 3 is used cooperatively with main lift cylinder 4, and ship reception chamber and water body are fallen in the equilibrium of balance weight 3-4
Most of weight, main lift cylinder 4 drives ship reception chamber vertical lift, and main lift cylinder 4 driving force is little, hydraulic system 7 capacity
Little, hoisting mechanism pattern is simple, and operate steadily reliability.
By foregoing description, those skilled in the art can implement
Furthermore, it is necessary to illustrate, the specific embodiment described in this specification, the shape of its parts and components, named title etc.
Can be different, the above content described in this specification is only to present configuration example explanation.All foundations are originally
Equivalence changes or simple change that the described construction of patent of invention design, feature and principle are done, are all included in the present invention special
In the protection domain of profit.Those skilled in the art can do various to described specific embodiment
Modification or supplement or substituted using similar mode, the structure without departing from the present invention or surmount the claims institute
The scope of definition, all should belong to protection scope of the present invention.
Claims (9)
1. a kind of partial equilibrium hydraulic hoisting ship elevator, including main lift cylinder, China's railway industry, collision prevention girders, support beam be located at
Ship reception chamber between two king-posts, the two ends of described ship reception chamber are equipped with collision prevention girders and China's railway industry, and support beam is arranged on ship reception chamber
Bottom, main lift cylinder be symmetricly set on ship reception chamber both sides it is characterised in that:Also include multigroup balance weight system, lock ingot dress
Put and hold out against guider, the multigroup balance weight system of described ship reception chamber both sides distributing installation, locking device is fixed on ship reception chamber
Top both sides, hold out against the both sides that guider is arranged on ship reception chamber, and one end that this holds out against guider is connected with ship reception chamber, holds out against
The other end of guider is connected with the guide rail of king-post;Balance weight system includes assembly pulley, steel wire rope, adjusting means and balance
Weight, one end of steel wire rope is connected with ship reception chamber, the other end of this steel wire rope and assembly pulley solderless wrapped connection, and adjusting means is arranged on steel wire rope
And balance weight between, this adjusting means and balance reconnect.
2. partial equilibrium hydraulic hoisting ship elevator according to claim 1 it is characterised in that:Also include early-stage work lock
Door and downstream main gate, described early-stage work gate installation in the upstream docking location of ship reception chamber, this early-stage work gate bag
Include early-stage work gate gate and early-stage work gate is droped to the ground wicket, early-stage work gate is droped to the ground the bottom of wicket and early-stage work
Gate gate is hinged;Described downstream main gate is arranged on the position of the downstream docking of ship reception chamber, and this downstream main gate includes
Downstream main gate gate and downstream main gate are droped to the ground wicket, downstream main gate drops to the ground the bottom of wicket and downstream works lock
Door gate is hinged.
3. partial equilibrium hydraulic hoisting ship elevator according to claim 1 it is characterised in that:Described main lift cylinder
Piston rod hanger passes through ball-joint in the support beam of ship reception chamber bottom.
4. partial equilibrium hydraulic hoisting ship elevator according to claim 1 it is characterised in that:Described locking device is four
Group, this four groups are symmetrically mounted on the upper flange of ship reception chamber two main beam.
5. partial equilibrium hydraulic hoisting ship elevator according to claim 1 it is characterised in that:Described hold out against guider
For four groups, this four groups both sides being separately mounted to ship reception chamber, it is symmetric.
6. partial equilibrium hydraulic hoisting ship elevator according to claim 1 it is characterised in that:The top of described ship reception chamber
Guardrail is symmetrically arranged with crossbeam.
7. partial equilibrium hydraulic hoisting ship elevator according to claim 1 it is characterised in that:The bottom of described China's railway industry
It is hinged on ship reception chamber.
8. partial equilibrium hydraulic hoisting ship elevator according to claim 1 it is characterised in that:Described balance weight is certain
The concrete block of unit weight or scrap steel.
9. partial equilibrium hydraulic hoisting ship elevator according to claim 1 it is characterised in that:Described collision prevention girders adopt door
Beam linkage, hydraulic oil cylinder driving or Motor drive anticollision girder construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611036605.1A CN106480866A (en) | 2016-11-23 | 2016-11-23 | Partial equilibrium hydraulic hoisting ship elevator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611036605.1A CN106480866A (en) | 2016-11-23 | 2016-11-23 | Partial equilibrium hydraulic hoisting ship elevator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106480866A true CN106480866A (en) | 2017-03-08 |
Family
ID=58275009
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611036605.1A Pending CN106480866A (en) | 2016-11-23 | 2016-11-23 | Partial equilibrium hydraulic hoisting ship elevator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106480866A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109178201A (en) * | 2018-10-31 | 2019-01-11 | 宁波大学 | A kind of spitkit inspection platform |
CN110552329A (en) * | 2019-09-18 | 2019-12-10 | 杭州国电机械设计研究院有限公司 | Device and method for linkage opening and closing of lock head working door and ship reception chamber working door of ship lift |
CN110725296A (en) * | 2019-10-17 | 2020-01-24 | 中交海洋工程船舶技术研究中心有限公司 | Ship lift platform |
CN112761129A (en) * | 2021-01-08 | 2021-05-07 | 杭州国电机械设计研究院有限公司 | Novel ship lift without butt joint and capable of fast navigation and working method thereof |
CN115467312A (en) * | 2022-08-25 | 2022-12-13 | 贵州省沙沱通航管理处 | Ship lift compartment door locking device and operation method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030019520A (en) * | 2003-02-06 | 2003-03-06 | 한만엽 | A Ship Lift using CounterWeight Technology of Variable Weight |
CN101029484A (en) * | 2007-04-03 | 2007-09-05 | 太原理工大学 | Hydraulic ship lift |
CN202718078U (en) * | 2012-06-13 | 2013-02-06 | 蒋志勇 | Gear and rack vertical ship lift |
CN103290824A (en) * | 2013-05-27 | 2013-09-11 | 温焕翃 | Dam hydraulic power ship lifter |
CN103614995A (en) * | 2013-11-19 | 2014-03-05 | 杭州国电机械设计研究院有限公司 | Full-hydraulic-lifting type ship lifter |
CN204418148U (en) * | 2015-01-19 | 2015-06-24 | 中国葛洲坝集团股份有限公司 | Ship elevator balancing heavy wire rope double hydraulic cylinder tensioning equipment |
CN206279513U (en) * | 2016-11-23 | 2017-06-27 | 杭州国电机械设计研究院有限公司 | A kind of partial equilibrium hydraulic hoisting ship elevator |
-
2016
- 2016-11-23 CN CN201611036605.1A patent/CN106480866A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030019520A (en) * | 2003-02-06 | 2003-03-06 | 한만엽 | A Ship Lift using CounterWeight Technology of Variable Weight |
CN101029484A (en) * | 2007-04-03 | 2007-09-05 | 太原理工大学 | Hydraulic ship lift |
CN202718078U (en) * | 2012-06-13 | 2013-02-06 | 蒋志勇 | Gear and rack vertical ship lift |
CN103290824A (en) * | 2013-05-27 | 2013-09-11 | 温焕翃 | Dam hydraulic power ship lifter |
CN103614995A (en) * | 2013-11-19 | 2014-03-05 | 杭州国电机械设计研究院有限公司 | Full-hydraulic-lifting type ship lifter |
CN204418148U (en) * | 2015-01-19 | 2015-06-24 | 中国葛洲坝集团股份有限公司 | Ship elevator balancing heavy wire rope double hydraulic cylinder tensioning equipment |
CN206279513U (en) * | 2016-11-23 | 2017-06-27 | 杭州国电机械设计研究院有限公司 | A kind of partial equilibrium hydraulic hoisting ship elevator |
Non-Patent Citations (3)
Title |
---|
孙鸿秉等: "岩滩垂直升船机技术研究及可靠性分析", 《水力发电》 * |
钮新强等: "《船闸与升船机设计》", 30 April 2007, 中国水利水电出版社 * |
钮新强等: "长江三峡水利枢纽通航建筑物设计", 《人民长江》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109178201A (en) * | 2018-10-31 | 2019-01-11 | 宁波大学 | A kind of spitkit inspection platform |
CN109178201B (en) * | 2018-10-31 | 2020-04-10 | 宁波大学 | Small-size boats and ships maintenance platform |
CN110552329A (en) * | 2019-09-18 | 2019-12-10 | 杭州国电机械设计研究院有限公司 | Device and method for linkage opening and closing of lock head working door and ship reception chamber working door of ship lift |
CN110552329B (en) * | 2019-09-18 | 2024-04-02 | 杭州国电机械设计研究院有限公司 | Device and method for linkage opening and closing of lock head working door and ship receiving chamber working door of ship lift |
CN110725296A (en) * | 2019-10-17 | 2020-01-24 | 中交海洋工程船舶技术研究中心有限公司 | Ship lift platform |
CN112761129A (en) * | 2021-01-08 | 2021-05-07 | 杭州国电机械设计研究院有限公司 | Novel ship lift without butt joint and capable of fast navigation and working method thereof |
CN115467312A (en) * | 2022-08-25 | 2022-12-13 | 贵州省沙沱通航管理处 | Ship lift compartment door locking device and operation method |
CN115467312B (en) * | 2022-08-25 | 2023-05-02 | 贵州省沙沱通航管理处 | Ship lift carriage door locking device and operation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101418543B (en) | Self-anchored rope-suspension bridge inclined drawing construction method | |
CN106012864B (en) | A kind of method of the overall erection & lift of bridge arch rib | |
CN106480866A (en) | Partial equilibrium hydraulic hoisting ship elevator | |
CN206553961U (en) | The short light-duty expanded letter combined type Hanging Basket of tower cable-stayed bridge | |
CN202899040U (en) | Crossing tunnel box girder transporting and mounting all-in-one machine | |
CN202247688U (en) | Aerodynamic force prevention protecting shed frame for overpassing of high-speed railways | |
CN202466553U (en) | Full-level balanced vertical ship elevator suitable for ship reception chamber to go in and go out of water | |
CN206279513U (en) | A kind of partial equilibrium hydraulic hoisting ship elevator | |
CN103061264A (en) | Method and device for pre-pressing high-position support single column in water | |
CN108166458A (en) | The integrated gate of ship lift navigation | |
CN103614995B (en) | Full-hydraulic-liftitype type ship lifter | |
CN101100936B (en) | Beam type hydraulic energy-saving pumping unit | |
CN106567321A (en) | Vertical lifting mobile highway bridge | |
CN1327086C (en) | Novel high-efficient dam of boats and ships device | |
CN1099834A (en) | Sum navigation lock | |
CN201351289Y (en) | Variable operation space continuous wall device | |
CN203684196U (en) | Full-hydraulic lifting type ship lift | |
CN202865812U (en) | Flow-isolating structure of ship-lock approach channels | |
CN106013013B (en) | Tubular power station separate combination type factory building system | |
CN107299671B (en) | Pump gate and gate station for urban rainfall flood regulation | |
CN203174516U (en) | Suspension bridge closure segment construction beam segment traction pre-deflection device | |
CN205000328U (en) | Cast -in -place support aquatic steel reinforced concrete composite pile of cable -stay bridge concrete ballast tank roof beam | |
CN105692465A (en) | Cableway type fish collection box dam-loading transfer system | |
CN202283977U (en) | Pontoon hydroelectric generating system | |
CN206157553U (en) | Public road bridge of perpendicular jacking activity |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170308 |