CN106437839A - Water-permeable brick for mine down-hole filling retaining wall and laying method of water-permeable brick - Google Patents

Water-permeable brick for mine down-hole filling retaining wall and laying method of water-permeable brick Download PDF

Info

Publication number
CN106437839A
CN106437839A CN201611058727.0A CN201611058727A CN106437839A CN 106437839 A CN106437839 A CN 106437839A CN 201611058727 A CN201611058727 A CN 201611058727A CN 106437839 A CN106437839 A CN 106437839A
Authority
CN
China
Prior art keywords
water
permeable brick
mine down
hole filling
permeable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611058727.0A
Other languages
Chinese (zh)
Other versions
CN106437839B (en
Inventor
徐明生
梁伟章
姚金蕊
赵国彦
何忠国
张海云
孔维江
王梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Guizhou Kailin Group Co Ltd
Original Assignee
Central South University
Guizhou Kailin Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University, Guizhou Kailin Group Co Ltd filed Critical Central South University
Priority to CN201611058727.0A priority Critical patent/CN106437839B/en
Publication of CN106437839A publication Critical patent/CN106437839A/en
Application granted granted Critical
Publication of CN106437839B publication Critical patent/CN106437839B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/02Supporting means, e.g. shuttering, for filling-up materials
    • E21F15/04Stowing mats; Goaf wire netting; Partition walls
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00241Physical properties of the materials not provided for elsewhere in C04B2111/00
    • C04B2111/00284Materials permeable to liquids
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00474Uses not provided for elsewhere in C04B2111/00
    • C04B2111/00724Uses not provided for elsewhere in C04B2111/00 in mining operations, e.g. for backfilling; in making tunnels or galleries

Abstract

The invention discloses a water-permeable brick for a mine down-hole filling retaining wall and a laying method of the water-permeable brick. The water-permeable brick comprises a water-permeable brick body, a water-permeable brick body pulp partitioning layer and a water-permeable layer connected with the pulp partitioning layer. A drain hole is formed in the water-permeable layer, and the drain hole is inclined downwards from the pulp partitioning layer to the exterior. The pulp partitioning layer and the water-permeable layer are both formed by mixing and curing dolomite and cement, and the mass ratio of the dolomite to the cement is 9:1 to 11:1. The method includes the steps that 1, the laying position of the filling retaining wall is demarcated; 2, a foundation trench is dug to a hardcore along the demarcated position before laying; 3, the concrete is laid; 4, the water-permeable brick is laid, and filling work can be carried out after maintenance is carried out for 3-5 d. The water-permeable brick is prepared from the dolomite dead rock generated after mining and the cement, the water-permeable brick is used for laying of the mine down-hole filling retaining wall, and the filling retaining wall has high strength, good water permeability and low pulp permeability, and is low in cost, easy to manufacture and convenient to construct.

Description

A kind of water-permeable brick for mine down-hole filling counterfort and its building method
Technical field
The invention belongs to mine down-hole goaf filling technical field, it is specifically related to one kind for mine down-hole filling gear The water-permeable brick of wall and its building method.
Background technology
Underground goaf filling counterfort Main Function is to intercept goaf filling slip to overflow, and has good infiltration work( Effect, so that cemented fill quick-hardening, reaches the purpose supporting goaf top plate.Therefore, filling counterfort building materials should be expired Foot basic demand be:(1) there is higher intensity, meet the lateral pressure to barricade for the slip after filling;(2) have preferably permeable Property, to reduce secondary filling interval time, improve pack effectiveness;(3) have relatively low ooze slurry, filling slurry can be stoped to overflow, Improve filling quality;(4) low price, easy construction, meet the execution conditions that down-hole barricade is built by laying bricks or stones.
At present, mine applies filter pipe to carry out goaf filling slurry dewatering mostly, and filling counterfort building materials itself Do not possess dehydrating function, and filter pipe sets up trouble, there is potential safety hazard.Though some filling counterfort building materials possess dehydration work( Can, but can not effectively stop filling slurry from overflowing, filling quality is poor, and price is costly.Therefore how to build by laying bricks or stones good water permeability, Ooze that slurry property is low, intensity is high, speed of application is fast and the barricade of low cost, the effectively shortening cementing setting time of filling slurry, raising is filled Fill out efficiency and quality, be the emphasis that mine is studied always.Meanwhile, create a large amount of barren rocks during mining, store up for a long time In earth's surface, do not only take up tract, destroy ecological environment, and easily induction geology and engineering project disaster, bring to mining production Serious safety and environmental protection hidden danger.
Content of the invention
The invention reside in for existing filling counterfort building materials bad hydraulic permeability, oozing slurry property height, low intensity, expensive etc. Not enough, there is provided a kind of water-permeable brick for mine down-hole filling counterfort and its building method.
The present invention is achieved by the following technical programs.
A kind of water-permeable brick for mine down-hole filling counterfort, including water-permeable brick body, described water-permeable brick body is every pulp layer And the pervious bed being connected with every pulp layer, described pervious bed is internally provided with discharge orifice, and discharge orifice by every pulp layer to dipping down outward Tiltedly, described form by dolomite and the blended solidification of cement every pulp layer and pervious bed, and the mass ratio of dolomite and cement is 9:1~11:1.
The described thickness every pulp layer accounts for the 1/3~1/5 of water-permeable brick body gross thickness.
Described dolomite particle diameter in pulp layer is 2~3mm.
The thickness of described pervious bed accounts for the 2/3~4/5 of water-permeable brick body gross thickness.
Dolomite particle diameter in described pervious bed is 3~6mm.
Described discharge orifice runs through two side surfaces of pervious bed, and downward-sloping angle is 10 °~30 °.
The aperture of described discharge orifice is 5~10cm.
A kind of method using above-mentioned permeable brick masonry mine down-hole filling counterfort, its concrete grammar step is as follows:
(1) demarcate filling counterfort and build position by laying bricks or stones:Field survey unwrapping wire is carried out according to design requirement, demarcates filling counterfort concrete Build position by laying bricks or stones;
(2) build forward position calibration position by laying bricks or stones and excavate foundation trench to hardcore;
(3) lay concrete:Hardcore described in step (2) lays the concrete that a layer thickness is 0.3~0.5m;
(4) build water-permeable brick by laying bricks or stones:Treat concrete coagulation, concrete builds water-permeable brick by laying bricks or stones using the cement mortar fissure of displacement;
(5), after the completion for the treatment of that step (4) is built by laying bricks or stones, maintenance 3~5d can carry out packing job.
Described concrete is formed by the stirring of deads, cement and water.
The beneficial effects of the present invention is:
Using the filling counterfort of above-mentioned permeable brick masonry, its advantage is:
(1) good water permeability:Described water-permeable brick be respectively provided with good water penetration every pulp layer and pervious bed, can by discharge orifice Quickly pervious bed drainage is discharged, accelerate permeable efficiency, shorten filling slurry gelling time;
(2) ooze slurry property low:Described water-permeable brick can be effectively isolated filling slurry every pulp layer, improve filling quality;
(3) intensity is high:Due to having excavated a foundation trench before building by laying bricks or stones to hardcore, and lay a layer concrete, then Build the higher water-permeable brick of intensity by laying bricks or stones, filling counterfort can resist the pressure to barricade for the slip after filling;
(4) safety is good:Because filling counterfort building materials possess dehydrating function in itself, personnel need not enter goaf frame If filter pipe, there is not roof fall accident risk;
(5) with low cost:Described water-permeable brick and concrete are all made up with deads of raw material, and it is former that filling counterfort is built by laying bricks or stones Material cost is relatively low, and takes full advantage of the barren rock of down-hole generation, reduces land seizure, turns waste into wealth.
Brief description
Fig. 1 is the end face structure schematic diagram of water-permeable brick of the present invention;
Fig. 2 is the A-A direction view of Fig. 1;
Fig. 3 is the B-B direction view of Fig. 2;
Fig. 4 is the structural representation becoming filling counterfort using permeable brick masonry of the present invention;
Fig. 5 is the C-C direction view of Fig. 4.
In figure:1- is every pulp layer, 2- pervious bed, 3- discharge orifice, 4- water-permeable brick body, 5- country rock, 6- concrete, 7- higher slice Ore body, 8- tunnel, 9- goaf, 10- lower leaf obturator.
Specific embodiment
Further describe technical scheme below in conjunction with the accompanying drawings, but claimed scope is not limited to institute State.
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of water-permeable brick for mine down-hole filling counterfort of the present invention, including thoroughly Water brick body 4, described water-permeable brick body 4 every pulp layer 1 and the pervious bed 2 that is connected with every pulp layer 1, the internal setting of described pervious bed 2 Have discharge orifice 3, and discharge orifice 3 by every pulp layer 1 to outer downward-sloping, described every pulp layer 1 and pervious bed 2 by dolomite and cement Blended solidification forms, and the mass ratio of dolomite and cement is 9:1~11:1.The technical program with mining produce white Cloud rock barren rock and water mud as a raw material make water-permeable brick, for building by laying bricks or stones of mine down-hole filling counterfort.This filling counterfort not only has Higher intensity, preferable water penetration and relatively low ooze slurry, and the barren rock producing during taking full advantage of mining, With low cost, making is simple, easy construction, improves production efficiency.
The described thickness every pulp layer 1 accounts for the 1/3~1/5 of water-permeable brick body 4 gross thickness.
Described dolomite particle diameter in pulp layer 1 is 2~3mm.
The thickness of described pervious bed 2 accounts for the 2/3~4/5 of water-permeable brick body 4 gross thickness.
Dolomite particle diameter in described pervious bed 2 is 3~6mm.
Described discharge orifice 3 runs through two side surfaces of pervious bed 2, and downward-sloping angle is 10 °~30 °.
The aperture of described discharge orifice 3 is 5~10cm.
A kind of method using above-mentioned permeable brick masonry mine down-hole filling counterfort, its concrete grammar step is as follows:
(1) demarcate filling counterfort and build position by laying bricks or stones:Field survey unwrapping wire is carried out according to design requirement, demarcates filling counterfort concrete Build position by laying bricks or stones;As shown in Figure 4, Figure 5, built by laying bricks or stones using water-permeable brick body 4 inside country rock 5 and be divided into gat 8 and goaf 9;Described Goaf 9 is passed through upper strata ore body 7 respectively and is connected with country rock 5 with lower floor obturator 10.
(2) build forward position calibration position by laying bricks or stones and excavate foundation trench to hardcore;
(3) lay concrete 6:Hardcore described in step (2) lays the concrete 6 that a layer thickness is 0.3~0.5m, This concrete 6 is stirred by a certain percentage by deads, cement and water and forms;
(4) build water-permeable brick by laying bricks or stones:Treat concrete coagulation, concrete builds water-permeable brick by laying bricks or stones using the cement mortar fissure of displacement;
(5), after the completion for the treatment of that step (4) is built by laying bricks or stones, maintenance 3~5d can carry out packing job.
With reference to embodiment, water-permeable brick of the present invention is further illustrated:
Embodiment 1:A kind of water-permeable brick for mine down-hole filling counterfort, including water-permeable brick body 4, described water-permeable brick is originally Every pulp layer 1 and the pervious bed 2 that is connected with every pulp layer 1, described pervious bed 2 is internally provided with discharge orifice 3 to body 4, and discharge orifice 3 by every Pulp layer 1 to outer downward-sloping, described form by dolomite and the blended solidification of cement every pulp layer 1 and pervious bed 2, and dolomite Mass ratio with cement is 9:1;The described thickness every pulp layer 1 accounts for the 1/3 of water-permeable brick body 4 gross thickness;Described in pulp layer 1 Dolomite particle diameter is 2mm;The thickness of described pervious bed 2 accounts for the 2/3 of water-permeable brick body 4 gross thickness;White clouds in described pervious bed 2 Rock particle diameter is 3mm;Described discharge orifice 3 runs through two side surfaces of pervious bed 2, and downward-sloping angle is 10 °, discharge orifice 3 Aperture be 5cm.
Embodiment 2:A kind of water-permeable brick for mine down-hole filling counterfort, including water-permeable brick body 4, described water-permeable brick is originally Every pulp layer 1 and the pervious bed 2 that is connected with every pulp layer 1, described pervious bed 2 is internally provided with discharge orifice 3 to body 4, and discharge orifice 3 by every Pulp layer 1 to outer downward-sloping, described form by dolomite and the blended solidification of cement every pulp layer 1 and pervious bed 2, and dolomite Mass ratio with cement is 10:1;The described thickness every pulp layer 1 accounts for the 4/15 of water-permeable brick body 4 gross thickness;Described in pulp layer 1 Dolomite particle diameter be 2.5mm;The thickness of described pervious bed 2 accounts for the 11/15 of water-permeable brick body 4 gross thickness;In described pervious bed 2 Dolomite particle diameter be 4mm;Described discharge orifice 3 runs through two side surfaces of pervious bed 2, and downward-sloping angle is 20 °, stream The aperture in water hole 3 is 8cm.
Embodiment 3:A kind of water-permeable brick for mine down-hole filling counterfort, including water-permeable brick body 4, described water-permeable brick is originally Every pulp layer 1 and the pervious bed 2 that is connected with every pulp layer 1, described pervious bed 2 is internally provided with discharge orifice 3 to body 4, and discharge orifice 3 by every Pulp layer 1 to outer downward-sloping, described form by dolomite and the blended solidification of cement every pulp layer 1 and pervious bed 2, and dolomite Mass ratio with cement is 11:1;The described thickness every pulp layer 1 accounts for the 1/5 of water-permeable brick body 4 gross thickness;Described in pulp layer 1 Dolomite particle diameter be 3mm;The thickness of described pervious bed 2 accounts for the 4/5 of water-permeable brick body 4 gross thickness;White in described pervious bed 2 Cloud rock particle diameter is 6mm;Described discharge orifice 3 runs through two side surfaces of pervious bed 2, and downward-sloping angle is 30 °, discharge orifice 3 aperture is 10cm.

Claims (9)

1. a kind of water-permeable brick for mine down-hole filling counterfort it is characterised in that:Including water-permeable brick body (4), described permeable Every pulp layer (1) and the pervious bed (2) that is connected with every pulp layer (1), described pervious bed (2) is internally provided with discharge orifice to brick body (4) (3), and discharge orifice (3) by every pulp layer (1) to outer downward-sloping, described every pulp layer (1) and pervious bed (2) by dolomite and water The blended solidification of mud forms, and the mass ratio of dolomite and cement is 9:1~11:1.
2. as claimed in claim 1 a kind of water-permeable brick for mine down-hole filling counterfort it is characterised in that:Described every pulp layer (1) thickness accounts for the 1/3~1/5 of water-permeable brick body (4) gross thickness.
3. as claimed in claim 1 a kind of water-permeable brick for mine down-hole filling counterfort it is characterised in that:Described every pulp layer (1) the dolomite particle diameter in is 2~3mm.
4. as claimed in claim 1 a kind of water-permeable brick for mine down-hole filling counterfort it is characterised in that:Described pervious bed (2) thickness accounts for the 2/3~4/5 of water-permeable brick body (4) gross thickness.
5. as claimed in claim 1 a kind of water-permeable brick for mine down-hole filling counterfort it is characterised in that:Described pervious bed (2) the dolomite particle diameter in is 3~6mm.
6. as claimed in claim 1 a kind of water-permeable brick for mine down-hole filling counterfort it is characterised in that:Described discharge orifice (3) run through two side surfaces of pervious bed (2), and downward-sloping angle is 10 °~30 °.
7. as claimed in claim 6 a kind of water-permeable brick for mine down-hole filling counterfort it is characterised in that:Described discharge orifice (3) aperture is 5~10cm.
8. a kind of method using the permeable brick masonry mine down-hole filling counterfort as described in claim 1-7 any one, its It is characterised by:Concrete grammar step is as follows:
(1) demarcate filling counterfort and build position by laying bricks or stones:Field survey unwrapping wire is carried out according to design requirement, demarcates filling counterfort and specifically build by laying bricks or stones Position;
(2) build forward position calibration position by laying bricks or stones and excavate foundation trench to hardcore;
(3) lay concrete:Hardcore described in step (2) lays the concrete (6) that a layer thickness is 0.3~0.5m;
(4) build water-permeable brick by laying bricks or stones:Treat concrete coagulation, concrete builds water-permeable brick by laying bricks or stones using the cement mortar fissure of displacement;
(5), after the completion for the treatment of that step (4) is built by laying bricks or stones, maintenance 3~5d can carry out packing job.
9. the method using permeable brick masonry mine down-hole filling counterfort as claimed in claim 8 it is characterised in that:Described step Suddenly in (3), concrete (6) is formed by the stirring of deads, cement and water.
CN201611058727.0A 2016-11-24 2016-11-24 A kind of water-permeable brick and its building method for mine down-hole filling counterfort Expired - Fee Related CN106437839B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611058727.0A CN106437839B (en) 2016-11-24 2016-11-24 A kind of water-permeable brick and its building method for mine down-hole filling counterfort

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611058727.0A CN106437839B (en) 2016-11-24 2016-11-24 A kind of water-permeable brick and its building method for mine down-hole filling counterfort

Publications (2)

Publication Number Publication Date
CN106437839A true CN106437839A (en) 2017-02-22
CN106437839B CN106437839B (en) 2018-06-19

Family

ID=58218615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611058727.0A Expired - Fee Related CN106437839B (en) 2016-11-24 2016-11-24 A kind of water-permeable brick and its building method for mine down-hole filling counterfort

Country Status (1)

Country Link
CN (1) CN106437839B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723490A (en) * 2019-01-22 2019-05-07 福州大学 A kind of filling counterfort and its construction method for underground metal mine

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101881181A (en) * 2010-06-23 2010-11-10 华唯金属矿产资源高效循环利用国家工程研究中心有限公司 Mine goaf tailing-filled concrete enclosing wall
CN102155259A (en) * 2011-03-08 2011-08-17 北京科技大学 Filling retaining wall constructed by using tunneling waste stones, and construction method of retaining wall
CN202065007U (en) * 2011-04-15 2011-12-07 中南大学 Rapid dehydration system of afterwards filling slurries for underground metal mine stope
CN103046955A (en) * 2012-12-24 2013-04-17 河北钢铁集团矿业有限公司 Large-range goaf group filling method
CN103089300A (en) * 2013-01-16 2013-05-08 中国矿业大学 Structure and method for constructing multilayer heterogeneous gob-side entry retaining filling wall
CN103089299A (en) * 2013-01-16 2013-05-08 中国矿业大学 Obligate cavity channel gob-side entry retaining wall filling method
CN103696803A (en) * 2013-12-06 2014-04-02 西北矿冶研究院 Be used for mine underground tailings cemented filling barricade device
CH707184A1 (en) * 2012-11-15 2014-05-15 Kapyfract Tunnel wall coating for refurbishment of tunnel wall of traffic tunnel, has drainage layer consisting of surface-active mortar, which is sealed in tunnel interior side with solid, water-tight impregnation layer
CN105134287A (en) * 2015-08-31 2015-12-09 山东科技大学 Reserved deformation stage-type grading yielding gob-side entry retaining gob-side filling body and construction method thereof

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101881181A (en) * 2010-06-23 2010-11-10 华唯金属矿产资源高效循环利用国家工程研究中心有限公司 Mine goaf tailing-filled concrete enclosing wall
CN102155259A (en) * 2011-03-08 2011-08-17 北京科技大学 Filling retaining wall constructed by using tunneling waste stones, and construction method of retaining wall
CN202065007U (en) * 2011-04-15 2011-12-07 中南大学 Rapid dehydration system of afterwards filling slurries for underground metal mine stope
CH707184A1 (en) * 2012-11-15 2014-05-15 Kapyfract Tunnel wall coating for refurbishment of tunnel wall of traffic tunnel, has drainage layer consisting of surface-active mortar, which is sealed in tunnel interior side with solid, water-tight impregnation layer
CN103046955A (en) * 2012-12-24 2013-04-17 河北钢铁集团矿业有限公司 Large-range goaf group filling method
CN103089300A (en) * 2013-01-16 2013-05-08 中国矿业大学 Structure and method for constructing multilayer heterogeneous gob-side entry retaining filling wall
CN103089299A (en) * 2013-01-16 2013-05-08 中国矿业大学 Obligate cavity channel gob-side entry retaining wall filling method
CN103696803A (en) * 2013-12-06 2014-04-02 西北矿冶研究院 Be used for mine underground tailings cemented filling barricade device
CN105134287A (en) * 2015-08-31 2015-12-09 山东科技大学 Reserved deformation stage-type grading yielding gob-side entry retaining gob-side filling body and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723490A (en) * 2019-01-22 2019-05-07 福州大学 A kind of filling counterfort and its construction method for underground metal mine

Also Published As

Publication number Publication date
CN106437839B (en) 2018-06-19

Similar Documents

Publication Publication Date Title
CN103590425B (en) A kind of Peaty soft soil stratum subway station construction technology
CN107237651B (en) A kind of multi-level grouting water-tight reinforcement means of coal mine underground reservoir and reservoir dam
CN102587358B (en) Construction technology of high polymer material post-grouting squeezed cast-in-place pile
CN102705005B (en) Technology for plugging water bursting in mine by directional diversion grouting
CN103696803B (en) Be used for mine underground tailings cemented filling barricade device
CN105041325A (en) Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN206667278U (en) Lava crack Tunnel gushing treatment constructing structure
CN102660952B (en) Controllable clay paste slurry grouting technique
CN101881181A (en) Mine goaf tailing-filled concrete enclosing wall
CN104612134A (en) Cast-in place pile post-grouting construction method for pouring construction
CN106948340B (en) A kind of construction method of the Manual excavated pile structure of high polymer grouting protection
CN102587859A (en) Technology for blocking mine water bursting through backflow grouting
CN104806267A (en) Shield end socket reinforcing system of scree soil layer advance large pipe roof and construction method thereof
CN203393530U (en) Anti-floating lightweight high-fill embankment structure
RU2537711C1 (en) Erection of tunnels in structurally unstable soils with karst phenomena and/or boil processes
CN106545361A (en) A kind of mine down-hole high permeability filling counterfort and its construction method
CN105569071A (en) Cement-based material underwater grouting or mud-jack rock block foundation construction method
CN106120822B (en) A kind of method for protecting support and device that prevent mud stone from coming down
CN102174818A (en) Controlled impermeable leaking stoppage grout-extruding water-stopping technology of strong water permeable stratum of quaternary system
CN207795260U (en) The tunneling main body of electric power tunnel is worn under a kind of
CN106437839A (en) Water-permeable brick for mine down-hole filling retaining wall and laying method of water-permeable brick
CN103572680A (en) Road roadbed filling construction method of coal mine gob
CN1115447C (en) Anchor-spraying concrete for treating water and support
CN103993609B (en) The multi-functional fast hard concrement manual repair foundation pit waterproof curtain of silicon ash sand guide drainage
CN107524154B (en) The artificial dam apparatus for building and construction process of coal seam goaf

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180619

Termination date: 20211124