CN106437075B - A kind of decorating structure of metope - Google Patents
A kind of decorating structure of metope Download PDFInfo
- Publication number
- CN106437075B CN106437075B CN201610970591.4A CN201610970591A CN106437075B CN 106437075 B CN106437075 B CN 106437075B CN 201610970591 A CN201610970591 A CN 201610970591A CN 106437075 B CN106437075 B CN 106437075B
- Authority
- CN
- China
- Prior art keywords
- stringcourse
- horizontal line
- pedestal
- programme
- last item
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 68
- 238000005034 decoration Methods 0.000 claims description 31
- 230000003014 reinforcing effect Effects 0.000 claims description 7
- 238000005452 bending Methods 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 7
- 238000010586 diagram Methods 0.000 description 4
- 230000003796 beauty Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 210000003205 muscle Anatomy 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0832—Separate fastening elements without load-supporting elongated furring elements between wall and covering elements
- E04F13/0833—Separate fastening elements without load-supporting elongated furring elements between wall and covering elements not adjustable
- E04F13/0846—Separate fastening elements without load-supporting elongated furring elements between wall and covering elements not adjustable the fastening elements engaging holes or grooves in the side faces of the covering elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0889—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements characterised by the joints between neighbouring elements, e.g. with joint fillings or with tongue and groove connections
- E04F13/0894—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements characterised by the joints between neighbouring elements, e.g. with joint fillings or with tongue and groove connections with tongue and groove connections
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Finishing Walls (AREA)
Abstract
The present invention relates to a kind of decorating structures of metope, stringcourse and horizontal line are installed on wallboard, stringcourse is fixed by stringcourse pedestal, horizontal line is fixed by horizontal line pedestal, horizontal line pedestal is mounted between two stringcourse pedestals, and stringcourse is mounted on stringcourse pedestal, and the A that presents a theatrical performance as the last item on a programme of the stringcourse of two sides squeezes snap-gauge B respectively, horizontal line is mounted on horizontal line pedestal, and the B that presents a theatrical performance as the last item on a programme is located on the card slot and the A that presents a theatrical performance as the last item on a programme.The invention has the following advantages: stringcourse and horizontal line are easy for installation, and connected reliably between wallboard;It can not externally see that the connection structure between profile, the overall structure of wallboard are beautiful after being installed.
Description
Technical field
The present invention relates to building decoration area more particularly to a kind of decorating structures of metope.
Background technique
For beauty, decorative wall panels are installed on wall, and the decorating structures such as stringcourse, horizontal line are installed on wallboard.It is existing
The profiles such as stringcourse, horizontal line be generally adhered directly on decorative wall panels, the case where falling off is agreed in subsequent use process,
Influence the aesthetics of wallboard entirety.
Summary of the invention
To solve the above-mentioned problems, it is beautiful, easy for installation, structurally stable that the purpose of the present invention is to provide a kind of structures
The decorating structure of metope.
In order to achieve the above purpose, present invention employs technical solutions below:
A kind of decorating structure of metope is equipped with stringcourse and horizontal line on wallboard, and stringcourse is fixed by stringcourse pedestal, stringcourse bottom
Seat includes fixing bottom plate A and two snap-gauge A, and internal tooth A is equipped on the inside of snap-gauge A, and fixed bottom plate A and snap-gauge A, which is formed, to be open outwardly
Rectangular recess;Stringcourse is equipped with balustrade exterior panelling A and interconnecting piece A, and interconnecting piece A is equipped with the external tooth A, interconnecting piece A cooperated with internal tooth A
It is buckled in the rectangular recess of stringcourse pedestal, stringcourse and stringcourse pedestal pass through external tooth A and internal tooth A cooperation clamping;External decoration plate body A
Upper/lower terminal be equipped with the transverse slat of inner bending, the upper and lower ends of stringcourse are respectively equipped with the A that presents a theatrical performance as the last item on a programme being affixed with wallboard, transverse slat and pressure
Card slot is formed between platform A;Horizontal line pedestal includes fixed bottom plate B and two snap-gauge B, and internal tooth B, fixed bottom plate B are equipped on the inside of snap-gauge B
The rectangular recess of opening outwardly is formed with snap-gauge B;Horizontal line is fixed by horizontal line pedestal, and horizontal line includes external decoration plate body B and connection
Portion B, interconnecting piece B are buckled in the rectangular recess of horizontal line pedestal, and interconnecting piece B is equipped with the external tooth B cooperated with internal tooth B;External decoration
The both ends of plate body B are equipped with the B that presents a theatrical performance as the last item on a programme;Horizontal line pedestal is mounted between two stringcourse pedestals, and stringcourse is mounted on stringcourse pedestal, and
The A that presents a theatrical performance as the last item on a programme of the stringcourse of two sides squeezes snap-gauge B respectively, and horizontal line is mounted on horizontal line pedestal, and the B that presents a theatrical performance as the last item on a programme is located on the card slot and compresses
Present a theatrical performance as the last item on a programme A.
The decorating structure of above-mentioned metope, stringcourse pedestal and horizontal line bottom are fixed in the reserved position first on wallboard during installation
Seat, then the stringcourse of upper and lower ends is snapped into the rectangular recess of stringcourse pedestal, after stringcourse is installed, horizontal line is snapped into
On horizontal line pedestal.The snap-gauge that the A that presents a theatrical performance as the last item on a programme on the stringcourse of both ends squeezes horizontal line pedestal cooperates tooth form between horizontal line and horizontal line pedestal more
It is quiet, it is easy for installation, and mounting structure is secured.After being installed can not from external observation to stringcourse with stringcourse pedestal, stringcourse pedestal
With the junction between wallboard, horizontal line and horizontal line pedestal, horizontal line pedestal and plate, metope is overall beautiful.
As optimal technical scheme, the outer surface for the B that presents a theatrical performance as the last item on a programme and the flush with outer surface of external decoration plate body B.
As optimal technical scheme, end and the transverse slat for the B that presents a theatrical performance as the last item on a programme offset;The outer end of transverse slat is outer higher than external decoration plate body B
Surface.Gap is not present between stringcourse and horizontal line, and can not see the upper and lower end face of horizontal line from above or below, overall structure beauty
It sees.
As optimal technical scheme, external decoration plate body A includes sequentially connected first arc depression from top to bottom, the second circle
Arc protrusion and third arc depression.External decoration plate body A entirety lines are beautiful.
As optimal technical scheme, the first arc depression and third arc depression are symmetrical, and arc depression and third circular arc are recessed
Sunken radius is identical, and the radius of the second circular arc protrusion is greater than the radius of arc depression and third arc depression.External decoration plate body A from
It is more beautiful in visual effect.
As optimal technical scheme, several reinforcing rib A are equipped between external decoration plate body A and interconnecting piece A;External decoration plate body B
Several reinforcing rib B are equipped between interconnecting piece B.The intensity that reinforcing rib is conducive to enhance stringcourse and horizontal line entirety is set.
As optimal technical scheme, interconnecting piece A includes two strips for being equipped with external tooth, passes through connecting plate between two strips
Connection.The structure of interconnecting piece is simple, mitigates the weight of frieze structure under the premise of can guarantee the sufficient intensity of interconnecting piece.
As optimal technical scheme, first groove is formed between strip and the A that presents a theatrical performance as the last item on a programme at both ends;It presents a theatrical performance as the last item on a programme and has between B and interconnecting piece B
There is second groove.On the one hand, first groove is used to accommodate the snap-gauge on stringcourse pedestal, and second groove is for accommodating horizontal line pedestal
Snap-gauge, on the other hand, first groove can increase the stress intensity of strip end, and second groove can increase the end interconnecting piece B
Stress intensity.
The decorating structure of the wallboard of above structure, stringcourse and horizontal line are easy for installation, and connect reliably between wallboard.It installs
It can not externally see that the connection structure between profile, the overall structure of wallboard are beautiful after.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention.
Fig. 2 is the frieze structure schematic diagram in the present invention.
Fig. 3 is the horizontal line structural schematic diagram in the present invention.
Fig. 4 is the stringcourse schematic diagram of base structure in the present invention.
Fig. 5 is the horizontal line schematic diagram of base structure in the present invention.
Specific embodiment
The preferred embodiment of this patent is described in further detail with reference to the accompanying drawing.Orientation in the present embodiment
Orientation shown in Figure of description is subject in description, wherein close to the side of wallboard is inside, the side far from wallboard is outer
Side.
The decorating structure of metope as shown in Figure 1 is equipped with decorative wall panels 1 on wall, 2 He of stringcourse is equipped on wallboard 1
Horizontal line 3.Horizontal line 3 is arranged between two adjacent stringcourses 2.
The stringcourse 2 is fixed by stringcourse pedestal 4, and the stringcourse pedestal 4 is the profile of strip, including fixed bottom plate
Internal tooth A421, fixed bottom plate are equipped on the inside of A41 and two snap-gauge A42 that the fixed two sides bottom plate A41 or more are set, snap-gauge A42
A41 and snap-gauge A42 forms the rectangular recess of opening outwardly.The stringcourse pedestal 4 is integrally formed.
Stringcourse 2 includes in the external decoration plate body A23 and interconnecting piece A21 of camber line setting, and external decoration plate body A23 includes from upper past
Under sequentially connected first arc depression 231, the second circular arc protrusion 232 and third arc depression 233, wherein the first arc depression
231 and third arc depression 233 it is symmetrical, arc depression 231 is identical with the radius of third arc depression 233, the second circular arc protrusion
232 radius is greater than the radius of arc depression 231 and third arc depression 233.External decoration plate body A23 is arranged by above structure,
Whole lines are beautiful.The upper/lower terminal of external decoration plate body A23 is equipped with the transverse slat 25 of inner bending.The upper and lower ends of stringcourse 2 are set respectively
There is the A26 that presents a theatrical performance as the last item on a programme being affixed with wallboard 1, forms card slot 27 between transverse slat 25 and the A26 that presents a theatrical performance as the last item on a programme.
Interconnecting piece A21 is equipped with the external tooth A211 cooperated with the internal tooth A421, and interconnecting piece A21 is buckled in stringcourse pedestal 4
Rectangular recess in and locked by external tooth A211 and internal tooth A421.The interconnecting piece A21 includes two and is equipped with external tooth
The strip of A211 is connected by connecting plate 22 between two strips.First groove 28 is formed between strip and the A26 that presents a theatrical performance as the last item on a programme at both ends,
On the one hand, first groove 28 is used to accommodate the snap-gauge 42 on stringcourse pedestal 4, on the other hand, due between stringcourse 2 and stringcourse pedestal 4
Cooperated by the tooth form between strip and snap-gauge and fixed, strip end stress is maximum on stringcourse 2, and setting first groove 28 can increase card
The stress intensity of end.
There are gaps between connecting plate 22 and fixed bottom plate 41.Since the fixation hole setting of stringcourse pedestal 4 is on fixed bottom plate,
Stringcourse pedestal 4 is fixed on wallboard by screw etc., and after the completion of stringcourse pedestal 4 is fixed, the outer surface of fixed bottom plate A41 has spiral shell
The nut of nail exposes, and there are gap is to accommodate the nut between connecting plate 22 and fixed bottom plate A41.
External decoration plate body A23 is oppositely arranged with interconnecting piece A21, is equipped with and is reinforced between external decoration plate body A23 and interconnecting piece A21
Muscle A24, the both ends of reinforcing rib A24 are separately connected the inner surface of external decoration plate body A23 and the outer surface of connecting plate 22.Be conducive to increase
Add the integral strength of stringcourse.
The horizontal line 3 is fixed by horizontal line pedestal 5, and horizontal line pedestal 5 includes fixed bottom plate B51 and two snap-gauge B52, snap-gauge
Internal tooth B521 is equipped on the inside of B52, fixed bottom plate B51 and snap-gauge B52 forms the rectangular recess of opening outwardly.
The horizontal line 3 includes the external decoration plate body B31 and interconnecting piece B32 for fixing with the horizontal line pedestal 5, interconnecting piece
B32 is buckled in the rectangular recess of horizontal line pedestal 5, and interconnecting piece B32 is equipped with the external tooth 321 cooperated with internal tooth B521.This implementation
The both ends of interconnecting piece B32 and snap-gauge B52 clamping in example.There are gaps between interconnecting piece B32 and fixed bottom plate.External decoration plate body B31
It is oppositely arranged with interconnecting piece B32, several reinforcing rib B33 is equipped between external decoration plate body B31 and interconnecting piece B32.External decoration plate body B
Extend to upper and lower ends and is equipped with the B34 that presents a theatrical performance as the last item on a programme, the outer surface for the B34 that presents a theatrical performance as the last item on a programme and the flush with outer surface of external decoration plate body B31.Present a theatrical performance as the last item on a programme B34
There is second groove 35 between interconnecting piece B32.On the one hand, second groove 35 is used to accommodate the snap-gauge on horizontal line pedestal 5, another
Aspect, setting second groove 35 can increase the stress intensity of the end interconnecting piece B.
The A26 that presents a theatrical performance as the last item on a programme on stringcourse 2 squeezes the snap-gauge B of horizontal line pedestal 5, and the B31 that presents a theatrical performance as the last item on a programme on horizontal line 3 presents a theatrical performance as the last item on a programme A26.It is above-mentioned
Setting clamps intermediate horizontal line pedestal 5 by the stringcourse 2 of two sides, so that 5 external tooth and interior between cog between horizontal line 3 and horizontal line pedestal
What is be engaged is closer, is not easy to loosen.It presents a theatrical performance as the last item on a programme the end of B31 simultaneously and the flange 25 offsets, the outer end of the flange 25 on stringcourse 2
Higher than the outer surface of horizontal line 3.It is left no gaps between stringcourse 2 and horizontal line 3, and the stringcourse 2 of two sides is higher than intermediate horizontal line 3, so that wall
Plate is more beautiful on the whole.
The decorating structure of above-mentioned metope, stringcourse pedestal 4 and horizontal line are fixed in the reserved position first on wallboard during installation
Then pedestal 5 snaps into the stringcourse of upper and lower ends 2 in the rectangular recess of stringcourse pedestal 4, after stringcourse 2 is installed, upper and lower two
The A that presents a theatrical performance as the last item on a programme of the stringcourse 2 of side squeezes the snap-gauge B of horizontal line pedestal 5, then snaps into horizontal line 3 on horizontal line pedestal 4, horizontal line 3 is presented a theatrical performance as the last item on a programme
B34 is located on card slot 27, and the B34 that presents a theatrical performance as the last item on a programme presents a theatrical performance as the last item on a programme A26.It is easy for installation, and mounting structure is secured, it can not be from outer after being installed
Observe the connection between stringcourse and stringcourse pedestal, stringcourse pedestal and wallboard, horizontal line and horizontal line pedestal, horizontal line pedestal and plate in portion
Place, metope are overall beautiful.
Claims (8)
1. a kind of decorating structure of metope, stringcourse (2) and horizontal line (3) are installed on wallboard, which is characterized in that stringcourse (2) passes through
Stringcourse pedestal (4) is fixed, and stringcourse pedestal (4) includes fixed bottom plate A (41) and two snap-gauge A (42), is equipped on the inside of snap-gauge A (42)
Internal tooth A (421), fixed bottom plate A (41) and snap-gauge A (42) form the rectangular recess of opening outwardly;Stringcourse (2) is equipped with external decoration
Plate A (23) and interconnecting piece A (21), interconnecting piece A (21) are equipped with the external tooth A (211), interconnecting piece A cooperated with internal tooth A (421)
(21) it is buckled in the rectangular recess of stringcourse pedestal (4), stringcourse (2) and stringcourse pedestal (4) are blocked by external tooth A and internal tooth A cooperation
Tightly;The upper/lower terminal of external decoration plate body A (23) be equipped with inner bending transverse slat (25), the upper and lower ends of stringcourse (2) be respectively equipped with
The A that presents a theatrical performance as the last item on a programme (26) that wallboard (1) is affixed forms card slot (27) between transverse slat (25) and the A that presents a theatrical performance as the last item on a programme (26);Horizontal line pedestal (5) includes solid
Determine bottom plate B (51) and two snap-gauge B (52), is equipped with internal tooth B (521) on the inside of snap-gauge B (52), fixed bottom plate B (51) and snap-gauge B
(52) rectangular recess of opening outwardly is formed;Horizontal line (3) is fixed by horizontal line pedestal (5), and horizontal line (3) includes external decoration plate body B
(31) it is buckled in the rectangular recess of horizontal line pedestal (5) with interconnecting piece B (32), interconnecting piece B (32), interconnecting piece B (32) is equipped with
With the external tooth B of internal tooth B cooperation;The both ends of external decoration plate body B (31) are equipped with and present a theatrical performance as the last item on a programme B (34);Horizontal line pedestal (5) is mounted at two
Between stringcourse pedestal (4), stringcourse (2) is mounted on stringcourse pedestal (4), and the A that presents a theatrical performance as the last item on a programme of the stringcourse (2) of two sides squeezes snap-gauge respectively
B (52), horizontal line (3) are mounted on horizontal line pedestal (5), and the B that presents a theatrical performance as the last item on a programme (34) is located on the card slot (27) and presents a theatrical performance as the last item on a programme A (26).
2. a kind of decorating structure of metope according to claim 1, which is characterized in that the outer surface of the B that presents a theatrical performance as the last item on a programme (34) and outer
Decorate the flush with outer surface of plate body B (31).
3. a kind of decorating structure of metope according to claim 1, which is characterized in that the end and transverse slat (25) for the B that presents a theatrical performance as the last item on a programme
It offsets;The outer end of transverse slat (25) is higher than the outer surface of external decoration plate body B (31).
4. a kind of decorating structure of metope according to claim 1, which is characterized in that external decoration plate body A (23) include from
On sequentially connected first arc depression (231), the second circular arc raised (232) and third arc depression (233) down.
5. a kind of decorating structure of metope according to claim 4, which is characterized in that the first arc depression (231) and
Three-arc is recessed (233) symmetrically, and arc depression (231) is identical with the radius of third arc depression (233), the second circular arc protrusion
(232) radius is greater than the radius of arc depression (231) and third arc depression (233).
6. a kind of decorating structure of metope according to claim 1, which is characterized in that external decoration plate body A (23) with connect
Several reinforcing rib A (24) are equipped between portion A (21);Several reinforcing ribs are equipped between external decoration plate body B (31) and interconnecting piece B (32)
B(33)。
7. a kind of decorating structure of metope according to claim 1, which is characterized in that interconnecting piece A (21) includes two and sets
There is the strip of external tooth (421), is connected between two strips by connecting plate (22).
8. a kind of decorating structure of metope according to claim 7, which is characterized in that the A that presents a theatrical performance as the last item on a programme (26) of strip and both ends
Between formed first groove (28);Presenting a theatrical performance as the last item on a programme between B (34) and interconnecting piece B (32) has second groove (35).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610970591.4A CN106437075B (en) | 2016-10-28 | 2016-10-28 | A kind of decorating structure of metope |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610970591.4A CN106437075B (en) | 2016-10-28 | 2016-10-28 | A kind of decorating structure of metope |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106437075A CN106437075A (en) | 2017-02-22 |
CN106437075B true CN106437075B (en) | 2019-04-26 |
Family
ID=58180652
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610970591.4A Expired - Fee Related CN106437075B (en) | 2016-10-28 | 2016-10-28 | A kind of decorating structure of metope |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106437075B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107816185A (en) * | 2017-10-27 | 2018-03-20 | 浙江巨奥铝业有限公司 | One kind has relief aluminum alloy wall surface decorative components and its installation method |
CN107938999A (en) * | 2018-01-02 | 2018-04-20 | 浙江爱尔菲集成家居有限公司 | A kind of combined module lines of integrated wall |
CN112443093A (en) * | 2020-11-30 | 2021-03-05 | 广亚铝业有限公司 | Outer wall decorative plate |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2584708Y (en) * | 2002-11-25 | 2003-11-05 | 李西藤 | Dalle |
EP1801314A1 (en) * | 2005-12-21 | 2007-06-27 | Herm. Friedr. Künne GmbH & Co. | Profile rail system for covering expansion joints and/or finishing the edges of flooring elements |
CN202012172U (en) * | 2011-02-21 | 2011-10-19 | 芜湖市佳利塑业有限公司 | Nail-free decorative plate with convenient mounting |
CN203174970U (en) * | 2012-12-11 | 2013-09-04 | 广州金发绿可木塑科技有限公司 | Composite rapidly-installed section bar |
CN204282696U (en) * | 2014-12-04 | 2015-04-22 | 张应波 | Two line-pressing section moulded by wood |
CN206337776U (en) * | 2016-10-28 | 2017-07-18 | 浙江华夏杰高分子建材有限公司 | A kind of decorating structure of metope |
-
2016
- 2016-10-28 CN CN201610970591.4A patent/CN106437075B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2584708Y (en) * | 2002-11-25 | 2003-11-05 | 李西藤 | Dalle |
EP1801314A1 (en) * | 2005-12-21 | 2007-06-27 | Herm. Friedr. Künne GmbH & Co. | Profile rail system for covering expansion joints and/or finishing the edges of flooring elements |
CN202012172U (en) * | 2011-02-21 | 2011-10-19 | 芜湖市佳利塑业有限公司 | Nail-free decorative plate with convenient mounting |
CN203174970U (en) * | 2012-12-11 | 2013-09-04 | 广州金发绿可木塑科技有限公司 | Composite rapidly-installed section bar |
CN204282696U (en) * | 2014-12-04 | 2015-04-22 | 张应波 | Two line-pressing section moulded by wood |
CN206337776U (en) * | 2016-10-28 | 2017-07-18 | 浙江华夏杰高分子建材有限公司 | A kind of decorating structure of metope |
Also Published As
Publication number | Publication date |
---|---|
CN106437075A (en) | 2017-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205557972U (en) | Reassembling type corner furred ceiling layer | |
CN106437075B (en) | A kind of decorating structure of metope | |
US9376802B2 (en) | Unitary bathroom | |
CN204898991U (en) | Reassembling type corner furred ceiling layer | |
CN206337758U (en) | Wire section bar and its mounting structure | |
CN212478247U (en) | Suspended ceiling structure easy to close up | |
CN107842539B (en) | Buckling structure of main machine panel of clothes airing machine | |
CN104453154B (en) | Combined wall board assembly wall fixing device | |
CN101625094B (en) | Ceiling electric appliance embedded into ceiling board and mounting method | |
CN209053360U (en) | A kind of aluminium alloy wall and Alminum Project finishing | |
CN202575643U (en) | Inserted and hung type decorating component for elevator car interior decoration | |
CN209429448U (en) | A kind of aluminium alloy furred ceiling and ceiling system that surrounding is hanging | |
CN206337776U (en) | A kind of decorating structure of metope | |
CN208563849U (en) | Exterior wall cladding external corner connecting elements | |
CN201310178Y (en) | Skirting line | |
CN209990004U (en) | Light and shade joint formula smallpox system | |
CN205259528U (en) | Press mounting type wall system | |
CN211499598U (en) | Assembled fitment structure subassembly | |
CN212295503U (en) | Buckle mounting, decoration material structure and decoration material fixed component | |
CN209277444U (en) | A kind of skirting structure | |
CN208219907U (en) | A kind of removable socket assembled wall board | |
CN209509365U (en) | A kind of inside-corner decoration plate mounting assembly | |
CN208220117U (en) | A kind of skirting | |
CN203284922U (en) | Hanging-buckle type pendant for curtain walls | |
CN209397865U (en) | A kind of buckle-type installation wall board structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190426 |
|
CF01 | Termination of patent right due to non-payment of annual fee |