CN106395667A - High-voltage line anchor throwing method and portable throwing device - Google Patents
High-voltage line anchor throwing method and portable throwing device Download PDFInfo
- Publication number
- CN106395667A CN106395667A CN201610458262.1A CN201610458262A CN106395667A CN 106395667 A CN106395667 A CN 106395667A CN 201610458262 A CN201610458262 A CN 201610458262A CN 106395667 A CN106395667 A CN 106395667A
- Authority
- CN
- China
- Prior art keywords
- fixed pulley
- column
- master
- channel
- cable quadrant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D3/00—Portable or mobile lifting or hauling appliances
- B66D3/12—Chain or like hand-operated tackles with or without power transmission gearing between operating member and lifting rope, chain or cable
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D3/00—Portable or mobile lifting or hauling appliances
- B66D3/04—Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage
- B66D3/06—Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage with more than one pulley
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明涉及一种高压线路拉线盘投放方法及便携式投放装置,属于电高压线路拉线施工技术领域。技术方案:角钢底座(1)上部固定设置有主吊立柱安装座(2),主吊立柱(3)顶端的内部设置有槽钢吊臂支架(5),槽钢吊臂支架上部通过90度弯曲后的横梁与角钢底座平行,横梁的下侧通过蝶形固定螺栓二(13)固定设置两个定滑轮;主吊立柱侧面设置有双向棘轮(6),双向棘轮啮合连接有绞线盘及摇把手(7);钢丝绳(9)一端固定连接有吊钩(10),钢丝绳另一端与绞线盘及摇把手连接。本发明方便调整投放位置与角度,减少拉线盘的损害;提高工作效率;结构简单,拆装方便,使用便利,减少劳动力,投放安全、准确,同时兼具单个拉线盘运输的功能。
The invention relates to a high-voltage line pulling reel feeding method and a portable feeding device, which belong to the technical field of electric high-voltage line pulling wire construction. Technical solution: The upper part of the angle steel base (1) is fixed with the main hanging column mounting seat (2), and the inner part of the top of the main hanging column (3) is equipped with a channel steel boom bracket (5), and the upper part of the channel steel boom bracket passes through 90 degrees The bent beam is parallel to the angle steel base, and the lower side of the beam is fixed with two fixed pulleys through the butterfly fixing bolt 2 (13); the side of the main suspension column is equipped with a two-way ratchet (6), and the two-way ratchet is meshed with a winch and a Shake handle (7); one end of wire rope (9) is fixedly connected with suspension hook (10), and the other end of wire rope is connected with winch reel and shake handle. The invention is convenient to adjust the feeding position and angle, reduces the damage of the wire reel, improves the work efficiency, has a simple structure, is convenient to disassemble and assemble, is convenient to use, reduces labor force, safe and accurate feeding, and simultaneously has the function of single wire reel transportation.
Description
技术领域technical field
本发明涉及一种高压线路拉线盘投放方法及便携式投放装置,属于电高压线路拉线施工技术领域。The invention relates to a high-voltage line pulling reel feeding method and a portable feeding device, which belong to the technical field of electric high-voltage line pulling wire construction.
背景技术Background technique
拉线盘是通常埋在土中的装置,用于提供防止上拔的固定点。在输电线路检修与施工中,尤其是超高压和特高压送电线路组立铁塔、展放导地线等施工时,均要考虑临时拉线安装。目前,背景技术是用人工将小型拉线盘拖入拉线坑,或使用挖掘机在挖出拉线坑的同时将大型拉线盘(如:LP-8型)投入坑中,背景技术存在的问题是:人工拖入费力而且危险,而且人工投放,有时会投放不正,修正起来很麻烦;一些山地或居民聚居地等挖掘机不能进入的地带,投放大型拉线盘时再靠纯人工的方法就很难实现,且单个运输至投放点时也不方便。Guy reels are devices, usually buried in the soil, used to provide an anchor point to prevent uplifting. In the maintenance and construction of transmission lines, especially in the construction of ultra-high voltage and ultra-high voltage transmission lines, such as erecting iron towers and laying out conductive ground wires, temporary cable installation should be considered. At present, the background technology is to drag the small wire reel into the wire pit manually, or use an excavator to dig out the wire pit while putting the large wire reel (such as: LP-8 type) into the pit. The problems in the background technology are: It is labor-intensive and dangerous to drag in manually, and sometimes it will be placed incorrectly, and it is very troublesome to correct; in some mountainous areas or residential areas where excavators cannot enter, it is difficult to rely on purely manual methods when placing large pulleys. , and it is also inconvenient when a single transport to the delivery point.
发明内容Contents of the invention
本发明的目的是提供一种高压线路拉线盘投放方法及便携式投放装置,实现安全投放,减少拉线盘的损害,提高稳定性和移动的平稳性,方便人工操作,省时省力,提高工作效率,投放安全、准确,提高工作效率,解决背景技术存在的上述问题。The purpose of the present invention is to provide a high-voltage line cable reel delivery method and a portable delivery device to achieve safe delivery, reduce damage to the cable reel, improve stability and smoothness of movement, facilitate manual operation, save time and effort, and improve work efficiency. The delivery is safe and accurate, the work efficiency is improved, and the above-mentioned problems existing in the background technology are solved.
本发明的技术方案是:Technical scheme of the present invention is:
一种高压线路拉线盘的便携式投放装置,包含角钢底座、主吊立柱安装座、主吊立柱、槽钢吊臂支架、双向棘轮、绞线盘及摇把手、定滑轮一、钢丝绳、吊钩、槽钢吊臂安装座、定滑轮二和定滑轮三,所述角钢底座上部固定设置有主吊立柱安装座,主吊立柱底部通过蝶形固定螺栓一与主吊立柱安装座固定连接,主吊立柱顶端的内部设置有槽钢吊臂支架,槽钢吊臂支架的下端通过槽钢吊臂安装座与主吊立柱固定连接,槽钢吊臂支架上部通过90度弯曲后的横梁与角钢底座平行,横梁的下侧通过蝶形固定螺栓二固定设置两个定滑轮,分别是定滑轮一和定滑轮二;所述主吊立柱侧面设置有双向棘轮,双向棘轮啮合连接有绞线盘及摇把手;所述角钢底座上设置有一个定滑轮三;钢丝绳一端固定连接有吊钩,钢丝绳另一端依次绕过定滑轮一、定滑轮三和定滑轮二后,与绞线盘及摇把手连接。A portable delivery device for a high-voltage line cable reel, including an angle steel base, a main hanging column mounting seat, a main hanging column, a channel steel boom bracket, a two-way ratchet, a twisted cable reel and a crank handle, a fixed pulley, a steel wire rope, a hook, Channel steel boom mounting seat, fixed pulley 2 and fixed pulley 3, the upper part of the angle steel base is fixed with the main hoisting column mounting seat, the bottom of the main hoisting column is fixedly connected with the main hoisting column mounting seat through the butterfly-shaped fixing bolt 1, the main hoisting The top of the column is equipped with a channel steel boom bracket, the lower end of the channel steel boom bracket is fixedly connected with the main hanging column through the channel steel boom mounting seat, and the upper part of the channel steel boom bracket is parallel to the angle steel base through a 90-degree bent beam , the lower side of the crossbeam is fixed with two fixed pulleys by butterfly-shaped fixing bolts 2, which are fixed pulley 1 and fixed pulley 2 respectively; the side of the main suspension column is provided with a two-way ratchet, and the two-way ratchet is meshed with a winch reel and a crank handle The angle steel base is provided with a fixed pulley three; one end of the steel wire rope is fixedly connected with a suspension hook, and the other end of the steel wire rope bypasses the fixed pulley one, the fixed pulley three and the fixed pulley two successively, and is connected with the winch reel and the crank handle.
所述角钢底座的侧面通过蝶形固定螺栓三固定设置有推拉扶手,角钢底座底部通过蝶形固定螺栓四设置有橡胶万向轮。The side of the angle steel base is fixed with push-pull handrails through butterfly-shaped fixing bolts 3, and the bottom of the angle steel base is provided with rubber universal wheels through butterfly-shaped fixing bolts 4.
所述橡胶万向轮至少四只,通过蝶形固定螺栓四与调节伸缩杆固定连接,且橡胶万向轮上设置有固定装置。There are at least four rubber universal wheels, which are fixedly connected to the adjusting telescopic rod through four butterfly-shaped fixing bolts, and the rubber universal wheels are provided with fixing devices.
所述吊钩至少设有两个,两个吊钩之间设置有收放装置,互为备用。There are at least two hanging hooks, and a retractable device is arranged between the two hanging hooks, which are used as spares for each other.
所述定滑轮一、定滑轮三和定滑轮二组成滑轮组,绞线盘及摇把手一端通过蝶形固定螺栓五固定在主吊立柱上,并与双向棘轮匹配。The first fixed pulley, the third fixed pulley and the second fixed pulley form a pulley block, and one end of the twisting coil and the crank handle is fixed on the main hanging column by the butterfly-shaped fixing bolt five, and is matched with the two-way ratchet.
本发明所有主要部件均可通过蝶形固定螺栓进行组装与拆卸。All main components of the present invention can be assembled and disassembled by butterfly fixing bolts.
一种高压线路拉线盘投放方法,包含如下步骤:A method for putting in a cable reel for a high-voltage line, comprising the following steps:
首先,操作人员在施工现场组装便携式投放装置,角钢底座上部设置有主吊立柱安装座,主吊立柱底部通过蝶形固定螺栓一与主吊立柱安装座固定连接,主吊立柱顶端的内部设置有槽钢吊臂支架,槽钢吊臂支架的下端通过槽钢吊臂安装座与主吊立柱固定连接,槽钢吊臂支架上部通过90度弯曲后的横梁与角钢底座平行,横梁的下侧通过蝶形固定螺栓二固定设置两个定滑轮,分别是定滑轮一和定滑轮二;主吊立柱侧面设置有双向棘轮,双向棘轮啮合连接有绞线盘及摇把手;角钢底座上设置有一个定滑轮三;钢丝绳一端固定连接有吊钩,钢丝绳另一端依次绕过定滑轮一、定滑轮三和定滑轮二后,与绞线盘及摇把手连接; First, the operator assembles the portable delivery device at the construction site. The upper part of the angle steel base is provided with the main hoisting column mounting seat, the bottom of the main hoisting column is fixedly connected with the main hoisting column mounting seat through the butterfly-shaped fixing bolt 1, and the interior of the top of the main hoisting column is provided with a Channel steel boom bracket, the lower end of the channel steel boom bracket is fixedly connected with the main hanging column through the channel steel boom mounting seat, the upper part of the channel steel boom bracket is parallel to the angle steel base through a 90-degree bent beam, and the lower side of the beam passes through The butterfly-shaped fixing bolt 2 is fixed with two fixed pulleys, which are the first fixed pulley and the second fixed pulley; the side of the main suspension column is equipped with a two-way ratchet, and the two-way ratchet is meshed with a twisted reel and a crank handle; the angle steel base is provided with a fixed pulley. Pulley 3; one end of the wire rope is fixedly connected with a hook, and the other end of the wire rope bypasses fixed pulley 1, fixed pulley 3 and fixed pulley 2 in turn, and is connected with the winch reel and the crank handle;
然后,将拉线盘挂在吊钩上,一名操作人员手摇绞线盘及摇把手,另一名操作人员扶持拉线盘,两名操作人员进行配合,通过定滑轮一、定滑轮三和定滑轮二组成滑轮组和实现吊钩吊起拉线盘,方便省力,当拉线盘被吊起时,扶持拉线盘的操作人员调整投放位置与角度,实现安全投放,减少拉线盘的损害; Then, hang the cable reel on the hook, one operator manually shakes the cable reel and the handle, the other operator supports the cable reel, and the two operators cooperate to pass fixed pulley one, fixed pulley three and fixed pulley. The two pulleys are composed of a pulley block and a hook to lift the cable reel, which is convenient and labor-saving. When the cable reel is hoisted, the operator who supports the cable reel adjusts the position and angle of delivery to achieve safe delivery and reduce damage to the cable reel;
完成拉线盘投放后,施工结束,拆解便携式投放装置,便于携带运输和存放。 After the wire reel is put in, the construction is over, and the portable throwing device is disassembled, which is easy to carry, transport and store.
操作人员推动推拉扶手来移动便携式投放装置的位置,调节伸缩杆调节橡胶万向轮的高度,提高稳定性和移动的平稳性;操作人员通过推动双向棘轮上的滑动棘爪,实现正反向吊起和吊起中途固定的功能,绞线盘及摇把手可以方便人工操作,省时省力,提高工作效率。The operator pushes the push-pull armrest to move the position of the portable delivery device, adjusts the telescopic rod to adjust the height of the rubber universal wheel, and improves the stability and smoothness of movement; the operator realizes forward and reverse hanging by pushing the sliding pawl on the two-way ratchet The function of fixing in the middle of lifting and hoisting, the winch reel and crank handle can facilitate manual operation, save time and effort, and improve work efficiency.
本发明的有益效果:两名操作人员进行配合,实现吊钩吊起拉线盘,方便调整投放位置与角度,实现安全投放,减少拉线盘的损害;提高稳定性和移动的平稳性,省时省力,提高工作效率;结构简单,拆装方便,使用便利,减少劳动力,投放安全、准确,提高工作效率,同时兼具单个拉线盘运输的功能。Beneficial effects of the present invention: two operators cooperate to realize the lifting of the cable reel by the hook, conveniently adjust the position and angle of delivery, realize safe delivery, and reduce damage to the cable reel; improve stability and smoothness of movement, saving time and effort , improve work efficiency; simple structure, easy disassembly and assembly, convenient use, reduce labor force, safe and accurate delivery, improve work efficiency, and at the same time have the function of single pull reel transportation.
附图说明Description of drawings
图1为本发明结构示意图;Fig. 1 is a structural representation of the present invention;
图中:角钢底座1、主吊立柱安装座2、主吊立柱3、车轮高度调节螺栓4、槽钢吊臂支架5、双向棘轮6、绞线盘及摇把手7、定滑轮一8、钢丝绳9、吊钩10、推拉扶手11、橡胶万向轮12、蝶形固定螺栓二13、槽钢吊臂安装座14、调节伸缩杆15、蝶形固定螺栓一16、定滑轮二17、定滑轮三18、蝶形固定螺栓三19、蝶形固定螺栓四20、蝶形固定螺栓五21。In the figure: Angle steel base 1, main hoist column mounting seat 2, main hoist column 3, wheel height adjustment bolt 4, channel steel boom bracket 5, two-way ratchet 6, winch reel and crank handle 7, fixed pulley 8, wire rope 9. Hook 10, push-pull handrail 11, rubber universal wheel 12, butterfly-shaped fixing bolt 2 13, channel steel boom mounting seat 14, adjusting telescopic rod 15, butterfly-shaped fixing bolt 1 16, fixed pulley 2 17, fixed pulley Three 18, butterfly fixing bolts three 19, butterfly fixing bolts four 20, butterfly fixing bolts five 21.
具体实施方式detailed description
以下结合附图,对本发明作进一步说明。Below in conjunction with accompanying drawing, the present invention will be further described.
一种高压线路拉线盘的便携式投放装置,包含角钢底座1、主吊立柱安装座2、主吊立柱3、槽钢吊臂支架5、双向棘轮6、绞线盘及摇把手7、定滑轮一8、钢丝绳9、吊钩10、槽钢吊臂安装座14、定滑轮二17和定滑轮三18,所述角钢底座1上部固定设置有主吊立柱安装座2,主吊立柱3底部通过蝶形固定螺栓一16与主吊立柱安装座2固定连接,主吊立柱3顶端的内部设置有槽钢吊臂支架5,槽钢吊臂支架5的下端通过槽钢吊臂安装座14与主吊立柱3固定连接,槽钢吊臂支架5上部通过90度弯曲后的横梁与角钢底座1平行,横梁的下侧通过蝶形固定螺栓二13固定设置两个定滑轮,分别是定滑轮一8和定滑轮二17;所述主吊立柱3侧面设置有双向棘轮6,双向棘轮6啮合连接有绞线盘及摇把手7;所述角钢底座1上设置有一个定滑轮三18;钢丝绳9一端固定连接有吊钩10,钢丝绳9另一端依次绕过定滑轮一8、定滑轮三18和定滑轮二17后,与绞线盘及摇把手7连接。A portable delivery device for a high-voltage line cable reel, including an angle steel base 1, a main suspension column mounting seat 2, a main suspension column 3, a channel steel boom bracket 5, a two-way ratchet 6, a winch reel and a crank handle 7, and a fixed pulley 8. Steel wire rope 9, hook 10, channel steel boom mounting seat 14, fixed pulley 2 17 and fixed pulley 3 18, the upper part of the angle steel base 1 is fixed with the main hanging column mounting seat 2, and the bottom of the main hanging column 3 passes through the butterfly Shaped fixing bolt one 16 is fixedly connected with the main hanger column mounting seat 2, and the inside of the main hanger column 3 top is provided with a channel steel boom bracket 5, and the lower end of the channel steel boom bracket 5 connects with the main hanger column through the channel steel boom mounting seat 14. The column 3 is fixedly connected, and the upper part of the channel steel boom support 5 is parallel to the angle steel base 1 through the beam bent at 90 degrees. Fixed pulley 2 17; the side of the main hanging column 3 is provided with a two-way ratchet 6, and the two-way ratchet 6 is meshed with a twisted coil and a crank handle 7; the angle steel base 1 is provided with a fixed pulley 3 18; one end of the wire rope 9 is fixed Be connected with suspension hook 10, after steel wire rope 9 other ends walk around fixed pulley one 8, fixed pulley three 18 and fixed pulley two 17 successively, are connected with winch reel and crank handle 7.
所述角钢底座1的侧面通过蝶形固定螺栓三19固定设置有推拉扶手11,角钢底座1底部通过蝶形固定螺栓四20设置有橡胶万向轮12。The side of the angle steel base 1 is fixedly provided with push-pull handrails 11 through butterfly-shaped fixing bolts 3 19 , and the bottom of the angle steel base 1 is provided with rubber universal wheels 12 through butterfly-shaped fixing bolts 4 20 .
所述橡胶万向轮至少四只,通过蝶形固定螺栓四20与调节伸缩杆15固定连接,且橡胶万向轮上设置有固定装置。There are at least four rubber universal wheels, which are fixedly connected with the adjusting telescopic rod 15 through butterfly-shaped fixing bolts 20, and the rubber universal wheels are provided with fixing devices.
所述吊钩至少设有两个,两个吊钩之间设置有收放装置,互为备用。There are at least two hanging hooks, and a retractable device is arranged between the two hanging hooks, which are used as spares for each other.
所述定滑轮一8、定滑轮三18和定滑轮二17组成滑轮组,绞线盘及摇把手一端通过蝶形固定螺栓五21固定在主吊立柱3上,并与双向棘轮6匹配。Described fixed pulley one 8, fixed pulley three 18 and fixed pulley two 17 form a pulley block, and one end of the winch and the crank handle is fixed on the main hanging column 3 by butterfly-shaped fixing bolt five 21, and matches with the two-way ratchet 6.
本发明所有主要部件均可通过蝶形固定螺栓进行组装与拆卸。All main components of the present invention can be assembled and disassembled by butterfly fixing bolts.
一种高压线路拉线盘投放方法,包含如下步骤:A method for putting in a cable reel for a high-voltage line, comprising the following steps:
首先,操作人员在施工现场组装便携式投放装置,角钢底座1上部设置有主吊立柱安装座2,主吊立柱3底部通过蝶形固定螺栓一16与主吊立柱安装座2固定连接,主吊立柱3顶端的内部设置有槽钢吊臂支架5,槽钢吊臂支架5的下端通过槽钢吊臂安装座14与主吊立柱3固定连接,槽钢吊臂支架5上部通过90度弯曲后的横梁与角钢底座1平行,横梁的下侧通过蝶形固定螺栓二13固定设置两个定滑轮,分别是定滑轮一8和定滑轮二17;主吊立柱3侧面设置有双向棘轮6,双向棘轮6啮合连接有绞线盘及摇把手7;角钢底座1上设置有一个定滑轮三18;钢丝绳9一端固定连接有吊钩10,钢丝绳9另一端依次绕过定滑轮一8、定滑轮三18和定滑轮二17后,与绞线盘及摇把手7连接; First, the operator assembles the portable delivery device at the construction site. The upper part of the angle steel base 1 is provided with the main hoisting column mounting seat 2, and the bottom of the main hoisting column 3 is fixedly connected with the main hoisting column mounting seat 2 through the butterfly-shaped fixing bolt 16. The main hoisting column The inside of the top 3 is provided with a channel steel boom bracket 5, the lower end of the channel steel boom bracket 5 is fixedly connected with the main hanging column 3 through the channel steel boom mounting seat 14, and the upper part of the channel steel boom bracket 5 is bent through 90 degrees. The beam is parallel to the angle steel base 1, and the lower side of the beam is fixed with two fixed pulleys by butterfly-shaped fixing bolts 2 13, which are respectively fixed pulley 1 8 and fixed pulley 2 17; 6 is meshed with a twisted reel and a crank handle 7; the angle steel base 1 is provided with a fixed pulley 3 18; one end of the steel wire rope 9 is fixedly connected with a hook 10, and the other end of the steel wire rope 9 bypasses the fixed pulley 1 8 and the fixed pulley 3 18 in turn After the fixed pulley 2 17, it is connected with the winch reel and the crank handle 7;
然后,将拉线盘挂在吊钩10上,一名操作人员手摇绞线盘及摇把手7,另一名操作人员扶持拉线盘,两名操作人员进行配合,通过定滑轮一8、定滑轮三18和定滑轮二17组成滑轮组和实现吊钩吊起拉线盘,方便省力,当拉线盘被吊起时,扶持拉线盘的操作人员调整投放位置与角度,实现安全投放,减少拉线盘的损害; Then, the cable reel is hung on the hook 10, an operator manually shakes the cable reel and the handle 7, another operator supports the cable reel, and two operators cooperate to pass the fixed pulley-8, the fixed pulley The third 18 and the fixed pulley two 17 form a pulley block and realize the lifting of the cable reel by the hook, which is convenient and labor-saving. When the cable reel is hoisted, the operator who supports the cable reel adjusts the position and angle of delivery to achieve safe delivery and reduce damage to the cable reel. ;
完成拉线盘投放后,施工结束,拆解便携式投放装置,便于携带运输和存放。 After the wire reel is put in, the construction is over, and the portable throwing device is disassembled, which is easy to carry, transport and store.
操作人员推动推拉扶手11来移动便携式投放装置的位置,调节伸缩杆15调节橡胶万向轮的高度,提高稳定性和移动的平稳性;操作人员通过推动双向棘轮6上的滑动棘爪,实现正反向吊起和吊起中途固定的功能,绞线盘及摇把手可以方便人工操作,省时省力,提高工作效率。The operator pushes the push-pull armrest 11 to move the position of the portable delivery device, adjusts the telescopic rod 15 to adjust the height of the rubber universal wheel, improves stability and smoothness of movement; Reverse hoisting and mid-hoisting fixed functions, winch reel and crank handle can facilitate manual operation, save time and effort, and improve work efficiency.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610458262.1A CN106395667A (en) | 2016-06-23 | 2016-06-23 | High-voltage line anchor throwing method and portable throwing device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610458262.1A CN106395667A (en) | 2016-06-23 | 2016-06-23 | High-voltage line anchor throwing method and portable throwing device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN106395667A true CN106395667A (en) | 2017-02-15 |
Family
ID=58006092
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610458262.1A Pending CN106395667A (en) | 2016-06-23 | 2016-06-23 | High-voltage line anchor throwing method and portable throwing device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106395667A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108466950A (en) * | 2018-04-02 | 2018-08-31 | 国网山东省电力公司日照供电公司 | A kind of Intelligent high voltage switch cabinet is accurately positioned mounting robot |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20020070376A1 (en) * | 2000-10-13 | 2002-06-13 | Jan Vetesnik | Hoist with shock absorbing device for the load |
| CN201186862Y (en) * | 2008-03-06 | 2009-01-28 | 朴云红 | Floor hoisting machine |
| CN202609861U (en) * | 2012-05-20 | 2012-12-19 | 安徽省电力公司蚌埠供电公司 | Hoisting device for replacement of transformer cooling fan |
| CN104444907A (en) * | 2014-09-28 | 2015-03-25 | 常州工学院 | Simple heavy stuff carrying and feeding trolley |
| CN204643705U (en) * | 2015-03-24 | 2015-09-16 | 陕煤集团神木红柳林矿业有限公司 | A kind of vehicle gear box dismounting lifting appliance |
| CN205257818U (en) * | 2015-12-15 | 2016-05-25 | 江苏天赋新能源工程技术有限公司 | Aerogenerator end cover lifts by crane instrument |
| CN205294696U (en) * | 2015-12-18 | 2016-06-08 | 中国建筑第七工程局有限公司 | Construct small -size traveling hoist |
| CN205687456U (en) * | 2016-06-23 | 2016-11-16 | 国网冀北电力有限公司唐山供电公司 | A kind of portable high-pressure line guy dish delivery device |
-
2016
- 2016-06-23 CN CN201610458262.1A patent/CN106395667A/en active Pending
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20020070376A1 (en) * | 2000-10-13 | 2002-06-13 | Jan Vetesnik | Hoist with shock absorbing device for the load |
| CN201186862Y (en) * | 2008-03-06 | 2009-01-28 | 朴云红 | Floor hoisting machine |
| CN202609861U (en) * | 2012-05-20 | 2012-12-19 | 安徽省电力公司蚌埠供电公司 | Hoisting device for replacement of transformer cooling fan |
| CN104444907A (en) * | 2014-09-28 | 2015-03-25 | 常州工学院 | Simple heavy stuff carrying and feeding trolley |
| CN204643705U (en) * | 2015-03-24 | 2015-09-16 | 陕煤集团神木红柳林矿业有限公司 | A kind of vehicle gear box dismounting lifting appliance |
| CN205257818U (en) * | 2015-12-15 | 2016-05-25 | 江苏天赋新能源工程技术有限公司 | Aerogenerator end cover lifts by crane instrument |
| CN205294696U (en) * | 2015-12-18 | 2016-06-08 | 中国建筑第七工程局有限公司 | Construct small -size traveling hoist |
| CN205687456U (en) * | 2016-06-23 | 2016-11-16 | 国网冀北电力有限公司唐山供电公司 | A kind of portable high-pressure line guy dish delivery device |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108466950A (en) * | 2018-04-02 | 2018-08-31 | 国网山东省电力公司日照供电公司 | A kind of Intelligent high voltage switch cabinet is accurately positioned mounting robot |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104276514B (en) | Installation method of ground self-balancing pole | |
| CN104201613B (en) | Far-end operation changes device and the application process thereof of straight line list insulator string | |
| CN104627849B (en) | Hoisting equipment and hoisting method for hoisting inner courtyard pipeline | |
| CN204782031U (en) | Interior climbing tower hangs entrance to a cave from promoting safety protection platform | |
| CN214326960U (en) | Indoor equipment for existing high-rise building hoisting large-scale device | |
| CN204434116U (en) | A kind of hanging device for interior courtyard lifting pipeline | |
| CN114368672A (en) | Lifting-lug-free self-aligning lifting method for inclined and straight flue of steel-making system | |
| CN108775196A (en) | A combined lifting and self-climbing mechanism for erecting transmission towers | |
| CN203794533U (en) | Light portable mobile lifting equipment | |
| CN204401999U (en) | Climbing scaffolding with unloading platform | |
| CN209226456U (en) | A kind of height-adjustable air hose sling cart of movable type | |
| US20130259609A1 (en) | Truss lifter and stabilizer | |
| CN110080083A (en) | The method for installing basket type steel truss arch main chord | |
| CN102709849A (en) | Manual multifunctional wire tightening device and wire tightening method | |
| CN205687456U (en) | A kind of portable high-pressure line guy dish delivery device | |
| CN203359890U (en) | Small-sized electric pole hoisting device | |
| CN204349336U (en) | Overhead-groundwire lifter | |
| CN201336516Y (en) | Device for manually installing pole top switch | |
| CN209038922U (en) | Large-span glass hanging device | |
| CN103849709B (en) | The installation method of the tilting system of steel-making converter | |
| CN110697585A (en) | A mechanism for self-detaching attachment device | |
| CN203699783U (en) | Hanging bracket fixed with wire pole | |
| CN205500654U (en) | Apron jack -up tool of transformer substation | |
| CN104192469B (en) | A kind of electricity tower sliding conveying arrangement and using method thereof | |
| CN206841278U (en) | A kind of new-type electric pole handling device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170215 |