CN106383259A - Induced current and inducted voltage measurement method of multi-circuit transmission lines on same tower - Google Patents

Induced current and inducted voltage measurement method of multi-circuit transmission lines on same tower Download PDF

Info

Publication number
CN106383259A
CN106383259A CN201610806858.6A CN201610806858A CN106383259A CN 106383259 A CN106383259 A CN 106383259A CN 201610806858 A CN201610806858 A CN 201610806858A CN 106383259 A CN106383259 A CN 106383259A
Authority
CN
China
Prior art keywords
loop
maintenance loop
voltage
induced
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610806858.6A
Other languages
Chinese (zh)
Inventor
潘松波
陈立斌
林志军
陈亦
李晓斌
陈轶群
王锡森
关华深
曾远
李子新
关俊峰
林小鹏
马炳健
易坤明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangmen Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Jiangmen Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangmen Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Jiangmen Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority to CN201610806858.6A priority Critical patent/CN106383259A/en
Publication of CN106383259A publication Critical patent/CN106383259A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R19/00Arrangements for measuring currents or voltages or for indicating presence or sign thereof
    • G01R19/0046Arrangements for measuring currents or voltages or for indicating presence or sign thereof characterised by a specific application or detail not covered by any other subgroup of G01R19/00

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The present invention discloses an induced current and inducted voltage measurement method of multi-circuit transmission lines on the same tower. The method comprises: determining the upkeep loop in the multi-circuit transmission lines on the same tower which have faults; changing the upkeep loop grounding mode; and employing a measurement instrument to measure the upkeep loop to obtain the corresponding inducted current and inducted voltage, wherein the inducted current includes electro-magnetic induction current and the electrostatic induction current, and the inducted voltage includes electro-magnetic induction voltage and the electrostatic induction voltage. After the multi-circuit transmission lines on the same tower have faults, through changing the grounding mode of the upkeep loop, a measurement instrument with simple operation is employed to conveniently and rapidly measure the inducted current and the inducted voltage of the upkeep loop, and because the measurement instrument is directly accessed into the upkeep loop for measurement, and the accuracy of the measurement result is relatively high, so that the technical problems can be solved that the measurement data accuracy is low and the operation of a device is complex in the prior art.

Description

A kind of faradic current of multiple-loop line transmission line of electricity and induced voltage measuring method
Technical field
The present invention relates to ultra-high-tension power transmission line field of measuring technique, particularly to a kind of sensing of multiple-loop line transmission line of electricity Electric current and induced voltage measuring method.
Background technology
With the development of China's industrial level, high voltage power transmission be to ensure that productive life run well an important ring.When When in exchange multiple-loop line transmission line of electricity, break down and have a power failure in a certain road, easily induced voltage in power failure loop, for example, The electromagnetic induction voltage of 500kV electric pressure is up to 6kV, the induced voltage therefore in line maintenance, on interruption maintenance loop With faradic current, Construction and Maintenance personnel are caused with very big threat.
At present, China only carries out electrical verification measure to transmission line of electricity interruption maintenance it is impossible to accurately judge the concrete faradism of wire Pressure value and current value are examined it is impossible to provide accurate data to wipe for Construction and Maintenance personnel.Measurement in prior art, to induced voltage Mostly calculate the induced voltage of wire by measurement space field intensity, the method is measured due to indirect, there is data inaccurate Probability, meanwhile, measuring instrument is complicated, relatively costly, and complex operation for maintainer.
Therefore, how using measuring instrument simple to operate, easily and accurately measure maintenance loop induced voltage and Faradic current is the current technical issues that need to address.
Content of the invention
In view of this, it is an object of the invention to provide a kind of faradic current of multiple-loop line transmission line of electricity and induced voltage Measuring method, by changing the maintenance loop earthing mode in the multiple-loop line route road broken down, thus simple and conveniently Measure corresponding faradic current and induced voltage using measuring instrument.Its concrete scheme is as follows:
A kind of faradic current of multiple-loop line transmission line of electricity and induced voltage measuring method, including:
Confirm the maintenance loop in the multiple-loop line transmission line of electricity breaking down;
Change described maintenance loop earthing mode;
Using measuring instrument, described maintenance loop is measured, obtains corresponding faradic current and induced voltage,
Wherein, described faradic current includes em induced current and static induced current, and described induced voltage includes electromagnetism Induced voltage and electrostatic induction voltage.
Preferably, described measuring instrument is clamp on amperemeter and no partial discharge coupling capacitive divider.
Preferably, described maintenance loop ground connection, the step described maintenance loop being measured using described measuring instrument are changed Including:
By described maintenance loop two-terminal-grounding, measure em induced current using described clamp on amperemeter;
Described maintenance loop one end is grounded, using described clamp on amperemeter measurement static induced current electrostatic induction electricity Stream, measures electromagnetic induction voltage using described no partial discharge coupling capacitive divider;
Will be earth-free for described maintenance loop two ends, using described no partial discharge coupling capacitive divider measurement electrostatic induction electricity Pressure.
Preferably, the step of described measurement em induced current includes:
Described maintenance loop two-termial line is disconnected, and by described maintenance loop two-terminal-grounding;
Hang three-phase test wiring in described maintenance loop one end, wherein, described three-phase test wiring one end connects described Maintenance loop, the other end is grounded;
Test wiring by described clamp on amperemeter to described three-phase to measure respectively, obtain described electromagnetic induction electricity Stream.
Preferably, the step of described measurement static induced current includes:
Described maintenance loop two-termial line is disconnected, and described maintenance loop one end is grounded;
Hang described three-phase in described maintenance loop earth terminal and test wiring, wherein, described three-phase test wiring one end is even Connect described maintenance loop, the other end is grounded;
Test wiring by described clamp on amperemeter to described three-phase to measure respectively, obtain described electrostatic induction electricity Stream.
Preferably, the step of described measurement electromagnetic induction voltage includes:
Described maintenance loop two-termial line is disconnected, and maintenance loop one end ground connection will be stated;
Test wiring by described no partial discharge coupling capacitive divider to described three-phase to measure respectively, obtain described electricity Magnetic induction voltage,
Wherein, described no partial discharge coupling capacitive divider one end connects the ungrounded end in described maintenance loop, and the other end is grounded.
Preferably, the step of described measurement electrostatic induction voltage includes:
Described maintenance loop two-termial line is disconnected, and will be earth-free for described maintenance loop two ends;
Test wiring by described no partial discharge coupling capacitive divider to described three-phase to measure respectively, obtain described quiet Electric induction voltage,
Wherein, described no partial discharge coupling capacitive divider one end connects described maintenance loop one end, and the other end is grounded.
The invention discloses a kind of faradic current of multiple-loop line transmission line of electricity and induced voltage measuring method, confirm to occur Maintenance loop in the multiple-loop line transmission line of electricity of fault;Change described maintenance loop earthing mode;Using measuring instrument to upper State the measurement of maintenance loop, obtain corresponding faradic current and induced voltage, wherein, faradic current includes em induced current and quiet Inductance induced current, induced voltage includes electromagnetic induction voltage and electrostatic induction voltage.It can be seen that when multiple-loop line route in the present invention After breaking down in road, using measuring instrument simple to operate, by changing the earthing mode in maintenance loop, conveniently and efficiently measure Go out to overhaul faradic current and the induced voltage in loop, simultaneously as measuring instrument is directly accessed maintenance loop measuring, measurement The accuracy of result is of a relatively high, thus solving measurement data poor accuracy in prior art, the technology of equipment operation complexity Problem, has reached using measuring instrument simple to operate, easily and accurately measures induced voltage and the faradism in maintenance loop The technique effect on road.
Brief description
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing Have technology description in required use accompanying drawing be briefly described it should be apparent that, drawings in the following description be only this Inventive embodiment, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis The accompanying drawing providing obtains other accompanying drawings.
Fig. 1 is a kind of faradic current of multiple-loop line transmission line of electricity and induced voltage measurement side disclosed in the embodiment of the present invention Method flow chart;
Fig. 2 is the ground connection schematic diagram of the em induced current in the embodiment of the present invention disclosed measurement maintenance loop;
Fig. 3 is the testing circuit schematic diagram of the em induced current in the embodiment of the present invention disclosed measurement maintenance loop;
Fig. 4 is the ground connection schematic diagram of the static induced current in the embodiment of the present invention disclosed measurement maintenance loop;
Fig. 5 is the testing circuit schematic diagram of the static induced current in the embodiment of the present invention disclosed measurement maintenance loop;
Fig. 6 is the ground connection schematic diagram of the electromagnetic induction voltage in the embodiment of the present invention disclosed measurement maintenance loop;
Fig. 7 is the testing circuit schematic diagram of the electromagnetic induction voltage in the embodiment of the present invention disclosed measurement maintenance loop;
Fig. 8 is the ground connection schematic diagram of the electrostatic induction voltage in the embodiment of the present invention disclosed measurement maintenance loop;
Fig. 9 is the testing circuit schematic diagram of the electrostatic induction voltage in the embodiment of the present invention disclosed measurement maintenance loop.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation description is it is clear that described embodiment is only a part of embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of not making creative work Embodiment, broadly falls into the scope of protection of the invention.
The embodiment of the invention discloses a kind of faradic current of multiple-loop line transmission line of electricity and induced voltage measuring method, such as Shown in Fig. 1, specifically include below step S1-S3:
Step S1:Confirm the maintenance loop in the multiple-loop line transmission line of electricity breaking down.
In the embodiment of the present invention, when line failure a certain in multiple-loop line transmission line of electricity, need to disconnect this power transmission line The circuit disconnecting link of road two ends transformer station, makes this transmission line of electricity be in inspecting state, thus to this multiple-loop line road transmission line of electricity Maintenance loop is determined.The mode of open-circuit line can make circuit electric brake or the open-circuit line at open-circuit line two ends Two ends transformators connect.
Step S2:Change above-mentioned maintenance loop earthing mode.
In the embodiment of the present invention, change the substation grounding that maintenance loop earthing mode can be by overhauling loop two ends Plug-in strip lock, it would however also be possible to employ loop ground connection will be overhauled by earth lead.
It is understood that the earthing mode changing maintenance loop is divided three classes:One end ground connection, two-terminal-grounding, two ends are equal Earth-free.
Step S3:Using measuring instrument, above-mentioned maintenance loop is measured, obtains corresponding faradic current and induced voltage,
Wherein, above-mentioned faradic current includes em induced current and static induced current, and above-mentioned induced voltage includes electromagnetism Induced voltage and electrostatic induction voltage.
Overhaul in the inventive embodiments of loop earthing mode in above-mentioned change, the different sensing of different earthing mode correspondences Electric current or induced voltage.The electromagnetism sense in maintenance loop when overhauling loop two-terminal-grounding, now can be measured by measuring instrument Induced current;When overhaul loop one end ground connection when, now can by measuring instrument measurement maintenance loop static induced current with Electromagnetic induction voltage;When maintenance loop two ends are all earth-free, the electrostatic in maintenance loop now can be measured by measuring instrument Induced voltage.
In the embodiment of the present invention, measuring instrument is directly accessed maintenance loop and measures sensor circuit or induced voltage. During measurement, measuring instrument can be directly accessed in maintenance loop and measure, and now measuring instrument one end connects maintenance loop, another End ground connection.Certainly, the present invention also for example, will be able to be examined using the faradic current in other modes measurement maintenance loop or induced voltage Repair loop connecting test wire, and wire other end ground connection, maintenance loop is obtained by measurement faradic to wire Faradic current.
The invention discloses a kind of faradic current of multiple-loop line transmission line of electricity and induced voltage measuring method, confirm to occur Maintenance loop in the multiple-loop line transmission line of electricity of fault;Change above-mentioned maintenance loop earthing mode;Using measuring instrument to upper State the measurement of maintenance loop, obtain corresponding faradic current and induced voltage, wherein, faradic current includes em induced current and quiet Inductance induced current, induced voltage includes electromagnetic induction voltage and electrostatic induction voltage.It can be seen that when multiple-loop line route in the present invention After breaking down in road, the simple measuring instrument of access operation, by changing the earthing mode in maintenance loop, conveniently and efficiently measure Go out to overhaul faradic current and the induced voltage in loop, simultaneously as measuring instrument is directly accessed maintenance loop measuring, measurement The accuracy of result is of a relatively high, thus solving measurement data poor accuracy in prior art, the technology of equipment operation complexity Problem, has reached using measuring instrument simple to operate, easily and accurately measures induced voltage and the faradism in maintenance loop The technique effect on road.
The embodiment of the invention discloses a kind of faradic current of specific multiple-loop line transmission line of electricity and induced voltage measurement Method, with respect to a upper embodiment, the present embodiment has made further instruction and optimization to technical scheme.Specifically:
In the embodiment of the present invention, in order to reduce operation, improve and measure convenient degree, measuring instrument select clamp on amperemeter and No partial discharge coupling capacitive divider.Wherein, clamp on amperemeter is used for measuring faradic current, and no partial discharge coupling capacitive divider is used for Measurement induced voltage.
It is understood that clamp on amperemeter with respect to common current table have the characteristics that measurement simple and convenient it is not necessary to Ammeter is connected into circuit the electric current in circuit can be measured.Therefore,
In foregoing invention embodiment, change above-mentioned maintenance loop ground connection, using above-mentioned measuring instrument, above-mentioned maintenance is returned The step of drive test amount includes:
Step S4:By above-mentioned maintenance loop two-terminal-grounding, described clamp on amperemeter is now utilized to measure em induced current;
Step S5:Above-mentioned maintenance loop one end is grounded, now utilizes described clamp on amperemeter to measure static induced current, Measure electromagnetic induction voltage using described no partial discharge coupling capacitive divider;
Step S6:Will be earth-free for above-mentioned maintenance loop two ends, now utilize described no partial discharge coupling capacitive divider measurement Electrostatic induction voltage.
It is understandable that above-mentioned steps S4-6 are no successively distinguished.
Referring to shown in Fig. 2 and Fig. 3, in the embodiment of the present invention, the step of measurement em induced current includes:
Disconnect the first transformer station and overhaul loop-coupled circuit electric brake and grounding switch, disconnect the second transformer station and maintenance Loop-coupled circuit electric brake and grounding switch are it is ensured that disconnect and two-terminal-grounding above-mentioned maintenance loop two-termial line;Upper State maintenance loop one end and hang three-phase test wiring, wherein, above-mentioned three-phase test wiring one end connects above-mentioned maintenance loop, another End ground connection;Test wiring by above-mentioned clamp on amperemeter to above-mentioned three-phase to measure respectively, obtain em induced current.
It is understood that guaranteeing that above-mentioned maintenance loop ground connection may also take on the mode connecting earth lead.
Referring to shown in Fig. 4 and Fig. 5, in the embodiment of the present invention, the step of measurement static induced current includes:
Disconnect the first transformer station and overhaul loop-coupled circuit electric brake and grounding switch, disconnect the second transformer station and maintenance Loop-coupled circuit electric brake is it is ensured that disconnect above-mentioned maintenance loop two-termial line, and above-mentioned maintenance loop and the first power transformation Stand connection end ground connection;Hang above-mentioned three-phase in above-mentioned maintenance loop earth terminal and test wiring, wherein, above-mentioned three-phase tests wiring one End connects above-mentioned maintenance loop, and the other end is grounded;Test wiring by above-mentioned clamp on amperemeter to above-mentioned three-phase to survey respectively Amount, obtains static induced current.
It is understood that guaranteeing that above-mentioned maintenance loop ground connection may also take on the mode connecting earth lead.
Referring to shown in Fig. 6 and Fig. 7, in the embodiment of the present invention, the step of above-mentioned measurement electromagnetic induction voltage includes:
Disconnect the first transformer station and overhaul loop-coupled circuit electric brake, disconnect the second transformer station loop-coupled with maintenance Circuit electric brake and grounding switch are it is ensured that disconnect above-mentioned maintenance loop two-termial line, and above-mentioned maintenance loop and the second power transformation Stand connection end ground connection;Test wiring by above-mentioned no partial discharge coupling capacitive divider to above-mentioned three-phase to measure respectively, obtain Electromagnetic induction voltage, wherein, above-mentioned no partial discharge coupling capacitive divider one end connects the ungrounded end in above-mentioned maintenance loop, the other end Ground connection.
It is understood that guaranteeing that above-mentioned maintenance loop ground connection may also take on the mode connecting earth lead.
Referring to shown in Fig. 8 and Fig. 9, in the embodiment of the present invention, the step of above-mentioned measurement electrostatic induction voltage includes:
Disconnect the first transformer station and overhaul loop-coupled circuit electric brake, disconnect the second transformer station loop-coupled with maintenance Circuit electric brake it is ensured that by above-mentioned maintenance loop two-termial line disconnect and two ends are all earth-free;By above-mentioned no partial discharge coupling electricity Hold potentiometer the test wiring of above-mentioned three-phase is measured respectively, obtain electrostatic induction voltage, wherein, above-mentioned no partial discharge coupling electricity Hold potentiometer one end and connect above-mentioned maintenance loop one end, the other end is grounded.
Last in addition it is also necessary to explanation, herein, such as first and second or the like relational terms be used merely to by One entity or operation are made a distinction with another entity or operation, and not necessarily require or imply these entities or operation Between there is any this actual relation or order.And, term " inclusion ", "comprising" or its any other variant meaning Covering comprising of nonexcludability, so that including a series of process of key elements, method, article or equipment not only include that A little key elements, but also include other key elements being not expressly set out, or also include for this process, method, article or The intrinsic key element of equipment.In the absence of more restrictions, the key element being limited by sentence "including a ...", does not arrange Remove and also there is other identical element in the process including described key element, method, article or equipment.
Above to a kind of faradic current of multiple-loop line transmission line of electricity provided by the present invention and induced voltage measuring method It is described in detail, specific case used herein is set forth to the principle of the present invention and embodiment, above reality The explanation applying example is only intended to help and understands the method for the present invention and its core concept;General technology simultaneously for this area Personnel, according to the thought of the present invention, all will change in specific embodiments and applications, in sum, this theory Bright book content should not be construed as limitation of the present invention.

Claims (7)

1. a kind of faradic current of multiple-loop line transmission line of electricity and induced voltage measuring method are it is characterised in that include:
Confirm the maintenance loop in the multiple-loop line transmission line of electricity breaking down;
Change described maintenance loop earthing mode;
Using measuring instrument, described maintenance loop is measured, obtains corresponding faradic current and induced voltage,
Wherein, described faradic current includes em induced current and static induced current, and described induced voltage includes electromagnetic induction Voltage and electrostatic induction voltage.
2. faradic current according to claim 1 and induced voltage measuring method are it is characterised in that described measuring instrument is Clamp on amperemeter and no partial discharge coupling capacitive divider.
3. faradic current according to claim 2 and induced voltage measuring method are it is characterised in that change described maintenance back Road is grounded, and is included using the step that described measuring instrument measures to described maintenance loop:
By described maintenance loop two-terminal-grounding, measure em induced current using described clamp on amperemeter;
Described maintenance loop one end is grounded, measures static induced current using described clamp on amperemeter, put using described no office Coupled capacitor potentiometer measures electromagnetic induction voltage;
Will be earth-free for described maintenance loop two ends, measure electrostatic induction voltage using described no partial discharge coupling capacitive divider.
4. faradic current according to claim 3 and induced voltage measuring method are it is characterised in that described measurement electromagnetism sense The step of induced current includes:
Described maintenance loop two-termial line is disconnected, and by described maintenance loop two-terminal-grounding;
Hang three-phase test wiring in described maintenance loop one end, wherein, described three-phase test wiring one end connects described maintenance Loop, the other end is grounded;
Test wiring by described clamp on amperemeter to described three-phase to measure respectively, obtain described em induced current.
5. faradic current according to claim 3 and induced voltage measuring method are it is characterised in that described measurement electrostatic sense The step of induced current includes:
Described maintenance loop two-termial line is disconnected, and described maintenance loop one end is grounded;
Hang described three-phase in described maintenance loop earth terminal and test wiring, wherein, described three-phase test wiring one end connects institute State maintenance loop, the other end is grounded;
Test wiring by described clamp on amperemeter to described three-phase to measure respectively, obtain described static induced current.
6. faradic current according to claim 3 and induced voltage measuring method are it is characterised in that described measurement electromagnetism sense The step answering voltage includes:
Described maintenance loop two-termial line is disconnected, and described maintenance loop one end is grounded;
Test wiring by described no partial discharge coupling capacitive divider to described three-phase to measure respectively, obtain described electromagnetism sense Answer voltage,
Wherein, described no partial discharge coupling capacitive divider one end connects the ungrounded end in described maintenance loop, and the other end is grounded.
7. faradic current according to claim 3 and induced voltage measuring method are it is characterised in that described measurement electrostatic sense The step answering voltage includes:
Described maintenance loop two-termial line is disconnected, and will be earth-free for described maintenance loop two ends;
Test wiring by described no partial discharge coupling capacitive divider to described three-phase to measure respectively, obtain described electrostatic sense Answer voltage,
Wherein, described no partial discharge coupling capacitive divider one end connects described maintenance loop one end, and the other end is grounded.
CN201610806858.6A 2016-09-06 2016-09-06 Induced current and inducted voltage measurement method of multi-circuit transmission lines on same tower Pending CN106383259A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610806858.6A CN106383259A (en) 2016-09-06 2016-09-06 Induced current and inducted voltage measurement method of multi-circuit transmission lines on same tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610806858.6A CN106383259A (en) 2016-09-06 2016-09-06 Induced current and inducted voltage measurement method of multi-circuit transmission lines on same tower

Publications (1)

Publication Number Publication Date
CN106383259A true CN106383259A (en) 2017-02-08

Family

ID=57939188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610806858.6A Pending CN106383259A (en) 2016-09-06 2016-09-06 Induced current and inducted voltage measurement method of multi-circuit transmission lines on same tower

Country Status (1)

Country Link
CN (1) CN106383259A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107462772A (en) * 2017-09-18 2017-12-12 海南电网有限责任公司电力科学研究院 A kind of anti-induced voltage phase checking device of contactless transmission line of electricity
CN107727920A (en) * 2017-09-18 2018-02-23 国网浙江省电力公司嘉兴供电公司 A kind of induced voltage control system and its method
CN108490315A (en) * 2018-05-18 2018-09-04 云南电网有限责任公司电力科学研究院 A kind of defeated, distribution line failure positioning device based on electromagnetic induction
CN109946566A (en) * 2019-03-22 2019-06-28 广东辰誉电力科技有限公司 A kind of high-pressure parallel transmission line of electricity induced voltage and induced current analysis method
CN110568243A (en) * 2019-09-25 2019-12-13 国网上海市电力公司 A method for measuring the induced voltage and current of a four-circuit line on the same tower
CN112904226A (en) * 2021-01-19 2021-06-04 国网河北省电力有限公司 Method for rapidly judging short-circuit fault of high-voltage bus based on induced electricity

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101699301A (en) * 2009-10-29 2010-04-28 江苏省电力试验研究院有限公司 Method for measuring line parameter through induced electricity
CN202502136U (en) * 2012-03-29 2012-10-24 上海市电力公司 Measuring device for induced voltage and induced current of AC line
CN103078313A (en) * 2012-11-14 2013-05-01 陕西省电力公司规划评审中心 Method for inhibiting induction voltage and current of 750kV parallel single-line construction line
CN104101815A (en) * 2014-07-24 2014-10-15 国家电网公司 High tension transmission line comprehensive tester and testing method
CN205103299U (en) * 2015-11-20 2016-03-23 韶关市擎能设计有限公司 With two return circuit induced voltage current detection device of tower

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101699301A (en) * 2009-10-29 2010-04-28 江苏省电力试验研究院有限公司 Method for measuring line parameter through induced electricity
CN202502136U (en) * 2012-03-29 2012-10-24 上海市电力公司 Measuring device for induced voltage and induced current of AC line
CN103078313A (en) * 2012-11-14 2013-05-01 陕西省电力公司规划评审中心 Method for inhibiting induction voltage and current of 750kV parallel single-line construction line
CN104101815A (en) * 2014-07-24 2014-10-15 国家电网公司 High tension transmission line comprehensive tester and testing method
CN205103299U (en) * 2015-11-20 2016-03-23 韶关市擎能设计有限公司 With two return circuit induced voltage current detection device of tower

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周浩: "《特高压交直流输电技术》", 30 June 2014, 浙江大学出版社 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107462772A (en) * 2017-09-18 2017-12-12 海南电网有限责任公司电力科学研究院 A kind of anti-induced voltage phase checking device of contactless transmission line of electricity
CN107727920A (en) * 2017-09-18 2018-02-23 国网浙江省电力公司嘉兴供电公司 A kind of induced voltage control system and its method
CN108490315A (en) * 2018-05-18 2018-09-04 云南电网有限责任公司电力科学研究院 A kind of defeated, distribution line failure positioning device based on electromagnetic induction
CN109946566A (en) * 2019-03-22 2019-06-28 广东辰誉电力科技有限公司 A kind of high-pressure parallel transmission line of electricity induced voltage and induced current analysis method
CN110568243A (en) * 2019-09-25 2019-12-13 国网上海市电力公司 A method for measuring the induced voltage and current of a four-circuit line on the same tower
CN112904226A (en) * 2021-01-19 2021-06-04 国网河北省电力有限公司 Method for rapidly judging short-circuit fault of high-voltage bus based on induced electricity

Similar Documents

Publication Publication Date Title
CN106383259A (en) Induced current and inducted voltage measurement method of multi-circuit transmission lines on same tower
CN101216543B (en) DC system earth fault detection and calibration method and its special equipment
CN103926510A (en) A method for on-line monitoring and fault diagnosis and positioning of cable sheath current and ampacity
CN111521919A (en) Low-voltage transformer area zero line live fault diagnosis device and diagnosis and positioning method
CN106597158A (en) Distribution transformer integrated detection device
CN109884467B (en) A device and method for locating insulation faults of insulated tubular busbars
CN108303617A (en) A kind of fault location system
CN201438213U (en) Electronic current transformer polarity measurement system
CN103616616B (en) Fault detection method for large-scale grounding grid
CN109633374A (en) A kind of low pressure fault to ground point intellectual search instrument and intellectual search method
CN205429680U (en) Cable cross -bonding case
CN106771843B (en) Fault traveling wave distance measurement method for single-core power cable
CN106546940A (en) A kind of field testing procedure of optical voltage transformer
CN106483390A (en) A kind of field assembling type distribution transformer gear measuring device with electricity
CN103176048B (en) A kind of method of quick measuring transformer delta connection mode winding D.C. resistance
CN205450243U (en) Fault indicator coil tester
CN203870240U (en) Voltage transformer on-site detector
CN106771514A (en) A kind of device and method of quick lookup voltage transformer failure
CN110531214A (en) For detecting the detection verification method of Secondary Circuit of Potential Transformer winding short circuit
CN109283396A (en) Grounding resistance measurement method and system, clamp resistance instrument for quantifying anti-interference characteristics
CN204789785U (en) Portable intelligent substation relay protection testing arrangement
CN2142574Y (en) Electric power system grounding detection device
CN107843866A (en) Examine and determine the connection circuit and method for the distribution transformer that three-phase and four-line neutral point is extracted out
CN208013311U (en) A kind of arrester Coupling Between Phases capacitor test system based on alien frequencies method
CN205049676U (en) Volt-ampere phase meter for checking wiring in case of power failure or electrification

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170208

RJ01 Rejection of invention patent application after publication