- CN106382466B CN106382466B CN201611155894.7A CN201611155894A CN106382466B CN 106382466 B CN106382466 B CN 106382466B CN 201611155894 A CN201611155894 A CN 201611155894A CN 106382466 B CN106382466 B CN 106382466B
- Authority
- CN
- China
- Prior art keywords
- header
- valve
- pressure
- pipeline
- ball valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17D—PIPE-LINE SYSTEMS; PIPE-LINES
- F17D1/00—Pipe-line systems
- F17D1/02—Pipe-line systems for gases or vapours
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17D—PIPE-LINE SYSTEMS; PIPE-LINES
- F17D3/00—Arrangements for supervising or controlling working operations
- F17D3/01—Arrangements for supervising or controlling working operations for controlling, signalling, or supervising the conveyance of a product
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17D—PIPE-LINE SYSTEMS; PIPE-LINES
- F17D3/00—Arrangements for supervising or controlling working operations
- F17D3/18—Arrangements for supervising or controlling working operations for measuring the quantity of conveyed product
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17D—PIPE-LINE SYSTEMS; PIPE-LINES
- F17D5/00—Protection or supervision of installations
- F17D5/005—Protection or supervision of installations of gas pipelines, e.g. alarm
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611155894.7A CN106382466B (zh) | 2016-12-14 | 2016-12-14 | 一种输气管道计量调压装置及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611155894.7A CN106382466B (zh) | 2016-12-14 | 2016-12-14 | 一种输气管道计量调压装置及方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106382466A CN106382466A (zh) | 2017-02-08 |
CN106382466B true CN106382466B (zh) | 2018-02-23 |
Family
ID=57957449
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611155894.7A Active CN106382466B (zh) | 2016-12-14 | 2016-12-14 | 一种输气管道计量调压装置及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106382466B (zh) |
Families Citing this family (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106895263B (zh) * | 2017-02-24 | 2019-05-07 | 中国石油天然气集团公司 | 一种成品油计量调节方法 |
CN106840905B (zh) * | 2017-04-20 | 2023-04-07 | 重庆科技学院 | 油气管道压力综合教学实验装置 |
CN109145012B (zh) * | 2017-06-16 | 2021-01-29 | 中国石油天然气股份有限公司 | 天然气储运系统计量管理方法和装置 |
CN110390414B (zh) * | 2018-04-18 | 2021-07-30 | 中国石油天然气股份有限公司 | 管网基准输配气量的确定方法及装置 |
CN109282145B (zh) * | 2018-11-02 | 2020-02-07 | 中国石油天然气集团有限公司 | 一种输气管道在线热备调压方法 |
CN109340575B (zh) * | 2018-11-02 | 2020-05-22 | 中国石油天然气集团有限公司 | 一种输气管道的在线调压装置及其在线调压方法 |
CN109210376B (zh) * | 2018-11-02 | 2023-05-16 | 中国石油天然气集团有限公司 | 一种输气管道在线热备调压装置 |
CN109555975B (zh) * | 2018-12-18 | 2020-11-17 | 中国石油天然气集团有限公司 | 一种输气管道分输站干线管道爆管监测报警及联锁方法 |
CN109357165B (zh) * | 2018-12-18 | 2020-06-23 | 中国石油天然气集团有限公司 | 一种输气管道主管线压降速率监测报警装置及方法 |
CN109611692B8 (zh) * | 2018-12-18 | 2021-04-23 | 中国石油天然气集团有限公司 | 输气管道分输站干线管道爆管监测报警联锁装置及方法 |
CN109555976B (zh) * | 2018-12-18 | 2021-03-30 | 中国石油天然气集团有限公司 | 输气管道末站干线压降速率监测报警联锁装置及方法 |
CN109357170B (zh) * | 2018-12-18 | 2020-08-04 | 中国石油天然气集团有限公司 | 一种输气管道首站站内主管线压降速率监测报警装置 |
CN109357164B (zh) * | 2018-12-18 | 2021-09-03 | 中国石油天然气集团有限公司 | 一种输气管道分输站干线管道爆管监测报警及联锁装置 |
CN109386738B (zh) * | 2018-12-18 | 2023-11-14 | 中国石油天然气集团有限公司 | 一种输气管道阀室干线管道爆管监测报警及连锁保护装置 |
CN109578817B (zh) * | 2018-12-18 | 2020-11-17 | 中国石油天然气集团有限公司 | 一种输气管道末站干线压降速率监测报警联锁方法 |
CN109373202B (zh) * | 2018-12-18 | 2021-09-03 | 中国石油天然气集团有限公司 | 一种输气管道末站干线压降速率监测报警联锁装置 |
CN110007013A (zh) * | 2019-02-01 | 2019-07-12 | 中国石油天然气集团公司 | 一种输气管道气体组分实时分析系统及实时分析方法 |
CN111692530B (zh) * | 2020-05-19 | 2021-09-03 | 徐州华宝能源科技有限公司 | 一种具有多级安全保护功能的天然气调压橇装装置 |
CN114020059B (zh) * | 2021-11-04 | 2023-08-18 | 国家石油天然气管网集团有限公司 | 天然气分输站场用户多路调压系统自动控制的方法及装置 |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2046078B2 (de) * | 1970-09-18 | 1972-11-16 | Einrichtung zum regeln des drucks in einem einen waermeerzeuger und eine gasturbine enthaltenden geschlossenen gaskreislauf | |
GB9705995D0 (en) * | 1997-03-22 | 1997-05-07 | British Gas Plc | Pressure regulating system |
CN2918966Y (zh) * | 2006-03-29 | 2007-07-04 | 浙江春晖智能控制股份有限公司 | 一种燃气调压计量装置 |
CN201944553U (zh) * | 2011-01-14 | 2011-08-24 | 上海万事红燃气技术发展有限公司 | 压缩天然气供气站的高压调压箱 |
CN202598128U (zh) * | 2012-06-01 | 2012-12-12 | 苏州瑞雪气体设备有限公司 | 一种撬装式天然气气化调压计量输出装置 |
CN203656576U (zh) * | 2013-11-22 | 2014-06-18 | 山东科瑞油气工艺设备有限公司 | 燃气调压计量橇 |
CN104913198A (zh) * | 2015-04-14 | 2015-09-16 | 河南宏天实业有限公司 | 天然气生产井自动调产调压装置及控制方法 |
CN205261226U (zh) * | 2015-11-13 | 2016-05-25 | 天津华迈燃气装备股份有限公司 | 一种简约多功能不间断供气的大型调压装置 |
CN206268798U (zh) * | 2016-12-14 | 2017-06-20 | 中国石油天然气集团公司 | 一种输气管道计量调压装置 |
-
2016
- 2016-12-14 CN CN201611155894.7A patent/CN106382466B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN106382466A (zh) | 2017-02-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106382466B (zh) | 一种输气管道计量调压装置及方法 | |
CN108036201B (zh) | 一种基于负压波法和流量趋势法的输油管道泄漏监测方法 | |
CN206488050U (zh) | 输气管道压力流量控制系统一体化整合橇装装置 | |
CN201705397U (zh) | 火电厂在线汽轮机热耗率监测装置 | |
CN106439495B (zh) | 输气管道压力流量控制系统一体化整合橇装装置 | |
CN103247358A (zh) | 核电站高能管道局部泄漏监测试验台架 | |
CN204027800U (zh) | 气体冷却器性能测试装置 | |
CN106594525A (zh) | 输气管道压力流量控制系统一体化整合橇装方法 | |
Reddy et al. | Leak detection in gas pipeline networks using an efficient state estimator. Part II. Experimental and field evaluation | |
CN103196518A (zh) | 变压器呼吸器在线监测仪及其工作方法 | |
CN203287064U (zh) | 一种基于热平衡的电厂采暖供汽流量测量装置 | |
CN206496792U (zh) | 一种供水管网运行参数检测站点装置 | |
CN201096268Y (zh) | 流量监测型燃气调压装置 | |
CN206268798U (zh) | 一种输气管道计量调压装置 | |
CN102706397A (zh) | 大管径低压头水流量测量装置及方法 | |
CN204201492U (zh) | 一种电厂高压给水加热器旁路管道泄漏的实时监测装置 | |
CN207502554U (zh) | 一种变压器短路冲击时的暂态油流速度测量装置 | |
CN210215228U (zh) | 一种焦炉荒煤气上升管换热器流量监测装置 | |
CN210033413U (zh) | 单井计量系统 | |
CN106895262A (zh) | 一种用于成品油装车的流量调节装置及流量调节方法 | |
CN210322093U (zh) | 一种供热机组热网首站供热量实时辅助校核装置 | |
CN202547737U (zh) | 一种基于热平衡的电厂给水流量在线校验装置 | |
CN208634803U (zh) | 一种消除液体输送管道负压的泄漏监测系统 | |
CN206541200U (zh) | 一种流量测控系统 | |
CN202599454U (zh) | 大管径低压头水流量测量装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20171205 Address after: 100120 Beijing Xicheng District six laying Kang Applicant after: China National Petroleum Corp. Applicant after: China Petroleum Pipeline Engineering Co.,Ltd. Applicant after: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp. Address before: 100007 Beijing, Dongzhimen, North Street, No. 9, No. Applicant before: China National Petroleum Corp. Applicant before: China Petroleum Pipeline Engineering Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 100007 Dongzhimen North Street, Dongcheng District, Dongcheng District, Beijing Co-patentee after: China Petroleum Pipeline Engineering Co.,Ltd. Patentee after: CHINA NATIONAL PETROLEUM Corp. Co-patentee after: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp. Address before: 100120 Xicheng District six paw Kang in Beijing City Co-patentee before: China Petroleum Pipeline Engineering Co.,Ltd. Patentee before: China National Petroleum Corp. Co-patentee before: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190702 Address after: 100007 Dongzhimen North Street, Dongcheng District, Dongcheng District, Beijing Co-patentee after: China Petroleum Pipeline Engineering Co.,Ltd. Patentee after: CHINA NATIONAL PETROLEUM Corp. Co-patentee after: CHINA PETROLEUM PIPELINE ENGINEERING Corp. Address before: 100007 Dongzhimen North Street, Dongcheng District, Dongcheng District, Beijing Co-patentee before: China Petroleum Pipeline Engineering Co.,Ltd. Patentee before: CHINA NATIONAL PETROLEUM Corp. Co-patentee before: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp. |