CN106368241A - Inspection well for fast-connected newly-built pipeline and construction method thereof - Google Patents

Inspection well for fast-connected newly-built pipeline and construction method thereof Download PDF

Info

Publication number
CN106368241A
CN106368241A CN201610052372.8A CN201610052372A CN106368241A CN 106368241 A CN106368241 A CN 106368241A CN 201610052372 A CN201610052372 A CN 201610052372A CN 106368241 A CN106368241 A CN 106368241A
Authority
CN
China
Prior art keywords
pipeline
newly
built
original
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610052372.8A
Other languages
Chinese (zh)
Inventor
张永远
吴纪东
贾冠南
任峰
李宗杰
王曼
康朝静
代璐
王东柱
兰和彬
王刚
巴超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Municipal Engineering General Corp
Original Assignee
Zhengzhou Municipal Engineering General Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Municipal Engineering General Corp filed Critical Zhengzhou Municipal Engineering General Corp
Priority to CN201610052372.8A priority Critical patent/CN106368241A/en
Publication of CN106368241A publication Critical patent/CN106368241A/en
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00—Independent underground or underwater structures; Retaining walls
    • E02D29/12—Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E—FIXED CONSTRUCTIONS
    • E03—WATER SUPPLY; SEWERAGE
    • E03F—SEWERS; CESSPOOLS
    • E03F5/00—Sewerage structures
    • E03F5/02—Manhole shafts or other inspection chambers; Snow-filling openings; accessories

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention provides an inspection well for a fast-connected newly-built pipeline and a construction method thereof, and relates to the field of construction of municipal pipelines. By adoption of the inspection well and the construction method thereof, the technical problems that a newly-built connected pipeline during pipeline construction is high in construction difficulty and high in time consumption are solved. The inspection well mainly comprises a foundation, a well wall, an original pipeline and the newly-built pipeline. The construction method comprises the following steps that (1) the newly-built pipeline is constructed to the original pipeline; (2) the foundation of the inspection well is poured with concrete at the joint of the newly-built pipeline and the original pipeline; (3) the inspection well is laid and constructed, and an outlet of the newly-built pipeline and the original pipeline are included into the inspection well; (4) a rope saw penetrates through the position, below the well wall, of the original pipeline to saw off the original pipeline perpendicularly after the structure of the inspection well is stabilized; and (5) the cut-off portion of the original pipeline is crushed and taken out, and the newly-built pipeline is connected to the original pipeline successfully. According to the inspection well for the fast-connected newly-built pipeline and the construction method thereof, the structure is simple, construction difficulty is low, time and labor are saved, the newly-built pipeline can be fast and easily connected to the original pipeline perpendicularly, and the construction progress is greatly accelerated.

Description

A kind of inspection shaft quickly accessing newly-built pipeline and its construction method
Technical field
The present invention relates to municipal pipeline construction field, especially a kind of inspection shaft quickly accessing newly-built pipeline and its construction Method.
Background technology
With social development, China's Development of China's Urbanization is constantly accelerated.Accordingly, this change proposes to urban construction person Higher requirement.It is known that the urban inner construction construction surely belonging to underground utilities the most complicated.The construction warp of underground utilities Often need large-area excavation construction groove, cause urban road congestion.It is then the most when needing to carry out pipeline docking Trouble, needs to excavate sufficiently large construction surface, wastes time and energy, and extends the duration.
Content of the invention
In order to solve to access newly-built pipeline construction difficulty during pipeline construction greatly, the technical problem that time-consuming, the present invention provides A kind of inspection shaft quickly accessing newly-built pipeline and its construction method.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of inspection shaft quickly accessing newly-built pipeline and its construction method, including by basis, the borehole wall, original pipeline, newly-built pipe Road a few part composition, described basis upper end is apart from original lower end of duct distance more than 20cm.
As preferred, described original pipe centerline is at base a quarter.
As preferred, described newly-built lower end of duct and original lower end of duct flush.
As preferred, described original pipeline and newly-built pipeline project borehole wall length and are less than 5cm and be more than 1cm.
A kind of inspection shaft quickly accessing newly-built pipeline and its construction method, its construction procedure is as follows:
1. newly-built pipeline construction is to original pipeline;
2. use concreting inspection shaft basis in newly-built pipeline and original pipeline junction;
3. build inspection shaft by laying bricks or stones, newly-built pipe outlet and original pipeline are ensphered in inspection shaft;
4. after well construction to be checked is stable, using rope saw from original pipeline near the borehole wall at below pass through, will be vertical for original pipeline Sawed-off;
5. the primary tube road after cut-out is crushed, take out, newly-built pipeline smoothly accesses original pipeline.
Preferably, also fracture is polished smooth after described step 4. will be sawed-off for original pipeline.
The invention has the beneficial effects as follows: present configuration is simple, and difficulty of construction is little, time saving and energy saving, and newly-built pipeline can be made fast The easy original pipeline of vertical access of speed, greatly speeds up construction speed.
Brief description
The constructing structure schematic diagram of Fig. 1 present invention.
In figure 1, basis, 2, the borehole wall, 3, original pipeline, 4, newly-built pipeline, 5, rope saw.
Specific embodiment
The present invention will be further described below in conjunction with the accompanying drawings:
A kind of inspection shaft quickly accessing newly-built pipeline and its construction method, including by basis, the borehole wall, original pipeline, newly-built pipe Road a few part composition, described basis upper end is apart from original lower end of duct apart from 25cm.Further, described original pipe centerline At base a quarter.Further described newly-built lower end of duct and original lower end of duct flush.Further described original Pipeline and newly-built pipeline project borehole wall length for 4cm.
A kind of inspection shaft quickly accessing newly-built pipeline and its construction method, its construction procedure is as follows:
1. newly-built pipeline construction is to original pipeline;
2. use concreting inspection shaft basis in newly-built pipeline and original pipeline junction;
3. build inspection shaft by laying bricks or stones, newly-built pipe outlet and original pipeline are ensphered in inspection shaft;
4. after well construction to be checked is stable, using rope saw from original pipeline near the borehole wall at below pass through, will be vertical for original pipeline Sawed-off;
5. the primary tube road after cut-out is crushed, take out, newly-built pipeline smoothly accesses original pipeline.
Preferably, also fracture is polished smooth after described step 4. will be sawed-off for original pipeline.
Finally it should be noted that specific embodiment is unrestricted to further illustrating of the present invention, to this area For those of ordinary skill, can do in the case of without departing from flesh and blood of the present invention and convert further, and all these change Change the protection domain that all should belong to claims of the present invention.

Claims (6)

1. a kind of inspection shaft quickly accessing newly-built pipeline and its construction method it is characterised in that: include by basic (1), the borehole wall (2), original pipeline (3), newly-built pipeline (4) a few part composition, described basis (1) upper end is apart from original pipeline (3) lower end distance More than 20cm.
2. a kind of inspection shaft quickly accessing newly-built pipeline according to claim 1 and its construction method it is characterised in that: Described original pipeline (3) centrage is at basic (1) a quarter.
3. a kind of inspection shaft quickly accessing newly-built pipeline according to claim 1 and its construction method it is characterised in that: Described newly-built pipeline (4) lower end and original pipeline (3) lower end flush.
4. a kind of inspection shaft quickly accessing newly-built pipeline according to claim 1 and its construction method it is characterised in that: Described original pipeline (3) and newly-built pipeline (4) project the borehole wall (2) length and are less than 5cm more than 1cm.
5. a kind of inspection shaft quickly accessing newly-built pipeline and its construction method it is characterised in that: its construction procedure is as follows:
1. newly-built pipeline (4) is constructed to original pipeline (3) place;
2. use concreting inspection shaft basis (1) in newly-built pipeline (4) with original pipeline (3) junction;
3. build inspection shaft by laying bricks or stones, newly-built pipeline (4) outlet and original pipeline (3) are ensphered in inspection shaft;
4., after well construction to be checked is stable, passed through below original pipeline (3) is from the borehole wall (2) using rope saw (5), will be original Pipeline (3) is vertically sawed-off;
5. the original pipeline (3) after cut-out is crushed, take out, newly-built pipeline (4) smoothly accesses original pipeline (3).
6. a kind of inspection shaft quickly accessing newly-built pipeline according to claim 5 and its construction method it is characterised in that: Described step 4. will be sawed-off for original pipeline (3) after also fracture is polished smooth.
CN201610052372.8A 2016-01-27 2016-01-27 Inspection well for fast-connected newly-built pipeline and construction method thereof Pending CN106368241A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610052372.8A CN106368241A (en) 2016-01-27 2016-01-27 Inspection well for fast-connected newly-built pipeline and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610052372.8A CN106368241A (en) 2016-01-27 2016-01-27 Inspection well for fast-connected newly-built pipeline and construction method thereof

Publications (1)

Publication Number Publication Date
CN106368241A true CN106368241A (en) 2017-02-01

Family

ID=57880102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610052372.8A Pending CN106368241A (en) 2016-01-27 2016-01-27 Inspection well for fast-connected newly-built pipeline and construction method thereof

Country Status (1)

Country Link
CN (1) CN106368241A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109160676A (en) * 2018-09-07 2019-01-08 成都市工业设备安装公司 Sewage treatment plant does not stop transport capacity expansion revamping construction method
CN109610606A (en) * 2018-12-26 2019-04-12 中铁隧道局集团有限公司 Underground piping, which moves, changes cutover construction and method
CN110593599A (en) * 2019-09-12 2019-12-20 浙江大学城市学院 Temporary opening protective structure and construction method for roof of operating high-voltage cable well
CN112095747A (en) * 2020-09-03 2020-12-18 北京建工土木工程有限公司 Safe construction method for non-stop butt joint of newly-built sewage pipeline and operation pipeline
CN112282029A (en) * 2020-11-05 2021-01-29 上海交通建设总承包有限公司 A connection construction method of urban high water level large diameter reinforced concrete sewage pipeline

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6223475B1 (en) * 2000-03-15 2001-05-01 Jamie Hume Method and apparatus for lining manholes
CN1851165A (en) * 2006-05-24 2006-10-25 贵阳铝镁设计研究院 Pipeline crossing method for water supply and sewerage pipeline and its structure
CN101956421A (en) * 2010-07-22 2011-01-26 中国一冶集团有限公司 Fast diversion method of drain pipe in drainage construction
CN102121268A (en) * 2011-02-22 2011-07-13 北京万兴建筑集团有限公司 Method for replacing sewage pipeline
CN204876019U (en) * 2015-08-20 2015-12-16 宁波市新亚建设有限公司 Reverse construction method well that old and new's pipeline was linked up

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6223475B1 (en) * 2000-03-15 2001-05-01 Jamie Hume Method and apparatus for lining manholes
CN1851165A (en) * 2006-05-24 2006-10-25 贵阳铝镁设计研究院 Pipeline crossing method for water supply and sewerage pipeline and its structure
CN101956421A (en) * 2010-07-22 2011-01-26 中国一冶集团有限公司 Fast diversion method of drain pipe in drainage construction
CN102121268A (en) * 2011-02-22 2011-07-13 北京万兴建筑集团有限公司 Method for replacing sewage pipeline
CN204876019U (en) * 2015-08-20 2015-12-16 宁波市新亚建设有限公司 Reverse construction method well that old and new's pipeline was linked up

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109160676A (en) * 2018-09-07 2019-01-08 成都市工业设备安装公司 Sewage treatment plant does not stop transport capacity expansion revamping construction method
CN109610606A (en) * 2018-12-26 2019-04-12 中铁隧道局集团有限公司 Underground piping, which moves, changes cutover construction and method
CN110593599A (en) * 2019-09-12 2019-12-20 浙江大学城市学院 Temporary opening protective structure and construction method for roof of operating high-voltage cable well
CN110593599B (en) * 2019-09-12 2021-04-20 浙江大学城市学院 Temporary opening protective structure and construction method for roof of operating high-voltage cable well
CN112095747A (en) * 2020-09-03 2020-12-18 北京建工土木工程有限公司 Safe construction method for non-stop butt joint of newly-built sewage pipeline and operation pipeline
CN112282029A (en) * 2020-11-05 2021-01-29 上海交通建设总承包有限公司 A connection construction method of urban high water level large diameter reinforced concrete sewage pipeline

Similar Documents

Publication Publication Date Title
CN102926770B (en) Underground draining and grouting process in thin bedrock and thick loose sand layer rich water areas
CN103485343B (en) Filling pile head processing method
CN202001023U (en) Improved shield machine grouting pipeline system
CN109026012A (en) Vertical shaft surrounding rock supporting structure and its excavation supporting method
CN102493822A (en) Method for performing curtain grouting construction on tunnel by water rich fault influence zone
CN104612696B (en) Construction method for large-section underground excavation subway station to pass through viaduct in fine sand layer by using column hole method
CN103924793B (en) Old house reinforcement structure and reinforcement means thereof
CN105297742A (en) Structure and method of water stopping support of underground space
CN103643961A (en) End-free reinforcing shield receiving structure and receiving method
CN206408655U (en) The top plate sidewall structure of covered back-digging construction
CN204343460U (en) Buried flood control baffle plate
CN110439353A (en) A construction method for erecting cement utility poles against tipping
CN104018865B (en) Bamboo reinforcement grouting anchor rod
CN203669876U (en) Non-end shield reinforcement arrival structure
CN103410529B (en) A kind of support of tunnel arch springing ruggedized construction for weak surrounding rock and construction method
CN206158753U (en) Shield constructs well end bassoon canopy system of consolidating based on major structure
CN102619521A (en) Construction method for vertical shaft bedrock section wall structure
CN205776359U (en) A kind of inspection shaft quickly accessing newly-built pipeline
CN108930323A (en) A kind of pipe jacking construction method
CN205116201U (en) Open caisson construction equipment
CN208982058U (en) Vertical shaft surrounding rock supporting structure
CN107268635A (en) Deep foundation pit supporting structure and construction method of the karst area adjacent to existing structure
CN109750688A (en) An assembled prefabricated foundation
CN108019209B (en) The drawing anchor construction method of upper overburden layer sedimentation and deformation suitable for shallow tunnel
CN207673370U (en) A kind of existing tunnel road surface drainage modernization system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170201