CN106320985B - Coal seam high-pressure water jet drill, which expands, cuts integrated permeability improvement device and its method - Google Patents

Coal seam high-pressure water jet drill, which expands, cuts integrated permeability improvement device and its method Download PDF

Info

Publication number
CN106320985B
CN106320985B CN201610834597.9A CN201610834597A CN106320985B CN 106320985 B CN106320985 B CN 106320985B CN 201610834597 A CN201610834597 A CN 201610834597A CN 106320985 B CN106320985 B CN 106320985B
Authority
CN
China
Prior art keywords
big
duct
pressure
slot
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610834597.9A
Other languages
Chinese (zh)
Other versions
CN106320985A (en
Inventor
张东明
白鑫
王禹博
杨瀚
祖钒莹
樊增瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Original Assignee
Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University filed Critical Chongqing University
Priority to CN201610834597.9A priority Critical patent/CN106320985B/en
Publication of CN106320985A publication Critical patent/CN106320985A/en
Application granted granted Critical
Publication of CN106320985B publication Critical patent/CN106320985B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B10/00Drill bits
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B10/00Drill bits
    • E21B10/26Drill bits with leading portion, i.e. drill bits with a pilot cutter; Drill bits for enlarging the borehole, e.g. reamers
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B10/00Drill bits
    • E21B10/46Drill bits characterised by wear resisting parts, e.g. diamond inserts
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B10/00Drill bits
    • E21B10/60Drill bits characterised by conduits or nozzles for drilling fluids
    • E21B10/61Drill bits characterised by conduits or nozzles for drilling fluids characterised by the nozzle structure
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/06Arrangements for treating drilling fluids outside the borehole
    • E21B21/063Arrangements for treating drilling fluids outside the borehole by separating components
    • E21B21/067Separating gases from drilling fluids
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/18Drilling by liquid or gas jets, with or without entrained pellets

Abstract

Expand the invention discloses a kind of coal seam high-pressure water jet drill and cut integrated permeability improvement device, including rig, drilling rod and drill bit, drill bit includes columned body, the front end of body extends to form circular cone shape reamer forward, cornish bit is fixed with the conical surface of reamer, the small head end end face of reamer extends to form brill tooth forward, the rear end of body extends rearwardly to form slot portion, the rear end in slot portion is fixedly linked with drilling rod, in reamer, the duct passed through for liquid is provided with body and slot portion, the rear end in duct is connected with drilling rod centre bore, punching nozzle is installed in the preceding aperture in duct, horizontal slot nozzle is installed in slot portion, valve element is also equipped with duct.Integrated coal seam permeability improvement device is cut so as to expand there is provided a kind of drill and there is provided a kind of method anti-reflection using device progress coal seam, be efficiently avoid deflection of borehole, is improved construction environment, reduces the waste of water and gas, improve operating efficiency.

Description

Integrated permeability improvement device and its method are expanded-cut in coal seam high-pressure water jet punching-brill-
Technical field
The invention belongs to coal and gas production technical field, specifically, more particularly to a kind of coal seam high-pressure water jet punching- Brill-expansion-cuts integrated permeability improvement device and its method.
Background technology
At present, coal-bed gas is as one of cleaning high heating value energy, and its extraction is of great immediate significance.And China Coal-bed gas gas permeability is low, and gas pumping is difficult, generally requires to carry out coal body fracturing using artificial-strengthening measure, increase coal seam is saturating Gas property coefficient, so as to increase mine gas extraction rate, realizes coal-bed gas scale methane drainage and utilization project.Compare traditional coal seam anti-reflection Method mainly has hydrofracturing method and Deephole pre-splitting blasting method.But, the hydraulic pressure crack of hydraulic fracturing is general along maximum principal stress Directional Extension, larger by Geological Structure Effect, its fracturing crack often has certain directionality;And hydraulic fracturing crack is expanded Exhibition direction is influenceed with larger uncertainty by coal bed texture, causes coal body fracturing effect uneven.Deephole pre-splitting blasting increases The shock wave that saturating method is produced using explosive charge moment carries out fracturing to coal body, can obtain preferable application effect.But, fry The links such as medicine transport, drilling are installed, detonation are it is possible that security incident;Such as occur explosive in application process to miss-fire, The interior residual explosive that drills is caused, the quite dangerous in processing procedure;And government's explosive management and control is strict, explosive examination and approval procedures are answered It is miscellaneous;When actual use, explosive consumption is excessive to cause coal body efflorescence serious, and explosive charge does not reach preferable fracturing radius less.
High pressure water jet is the new technology that last century the fifties start to grow up, in the late three decades, this At home and abroad research and development is rapid for technology.There is high-pressure water jet transmission energy to concentrate, without abrasion, no-spark, depositing dust and adaptation Property it is strong the advantages of, have been widely used the cleaning in the fields such as coal, oil, chemical industry, aviation, building, machinery, cutting, broken etc. Aspect.Coal industry is initially drilled just with high pressure water jet, in recent years, and some scholars and scientific research institutions are in water Force and split and the anti-reflection technology of high-pressure hydraulic slot is had also been proposed on high-pressure water jet Research foundation:Cut using special high-pressure hydraulic The crack quantity in standby, existing mash gas pumping drilling carrying out horizontal or vertical slot in coal seam, increase coal seam is seamed, is made Stress of coal seam discharges, and increases the permeability in coal seam.High-pressure hydraulic slot rock breaking mechanism is different from straight jet, its broken rock machine Reason is mainly:On the one hand by the frontal impact of high-pressure water jet, stretching, water wedge effect is produced to coal and rock and carries out broken rock, separately On the one hand horizontal load is produced in the crack of frontal impact formation, fissure-plane is produced failure by shear and with erosion, stretching The complex process of the diversified forms such as destruction effect.Technology that high-pressure hydraulic slot is anti-reflection can form uniform slot in drilling coal seam section, Realize coal mass relief, promote adsorption gas in coal body to be converted to free gas, increase coal body permeability coefficient, dramatically increase coal seam Gas pumping efficiency.
Existing underground coal mine high-pressure water jet drilling technology and the achievement in research that hydraulic slotted liner technique is carried out using high-pressure water jet It is primarily present following defect:
First, in drilling hydraulic slotted liner technique drilling process, because rock stratum is a kind of heterogeneous anisotropic material, and containing more Natural fissure and defect, drill bit can shift along the weak direction in front during grinding coal and rock, cause practice of construction to bore Hole site produces certain offset error with design bore position, has a strong impact on live coal seam cutting and gas pumping effect;
2nd, it is two complete equipments, it is necessary to first carry out drilling construction to bore reaming and high-pressure hydraulic slot, exits drilling rod peace again afterwards Hydraulic slotted liner technique drill bit is filled, waterpower cutting is carried out, the consuming time is long, and labor intensity is big, inefficiency.Also, must during more bit change Drilling rod all must be exited, if drilling depth is very deep, need to take longer time, during more bit change, frequently assembly and disassembly are bored Bar, accelerates drill rod abrasion, reduces drilling life of drill pipe;
3rd, there is no relevant protection device in aperture, and it is down-hole coal bed in drilling process, it is substantial amounts of due to containing in coal body High pressure gas gas, it is dangerous to there is larger spray orifice, easily caused during drilling construction drilling rod spray, the leakage of a large amount of gases, Gas exceeding limit is caused, or even causes casualties;
4th, waste water circulation recovery system is not provided with, a large amount of ponding of coal mine work area are caused, field working conditions are severe, Limit the application of the technology at the scene;
5th, drill bit is mainly crept into based on rotary grinding broken rock, and drill bit is fragile, and drilling financial cost is big.
The content of the invention
An object of the present invention is that providing a kind of coal seam high-pressure water jet punching-brill-expands-cut integrated permeability improvement device, To avoid borehole throw, and improve drilling and hydraulic slotted liner technique efficiency.
The present invention realizes that the technical scheme of the first purpose is as follows:A kind of coal seam high-pressure water jet punching-brill-expands-cut integration Permeability improvement device, including rig, drilling rod and drill bit, the drilling rod are in hollow structure, and the drill bit includes columned body, described The front end of body extends to form coaxial circular cone shape reamer forward, and the reamer is pre-small post-large, in the conical surface of reamer Upper circumference is uniformly fixed with least two cornish bits, the small head end end face of the reamer extend forward to be formed it is circumferential it is uniform extremely Few three brills tooth, the rear end of the body extends rearwardly to form coaxial cylindric slot portion, the radius ratio sheet in the slot portion The radius of body cylindrical section is small;It is provided with the reamer, body and slot portion before the duct passed through for liquid, the duct Front end, the rear end in the rear end insertion slot portion in duct of insertion reamer are held, punching spray is installed in the preceding aperture in the duct Mouth, is provided with least one horizontal slot nozzle in the slot portion, the outer end insertion slot portion of the slot nozzle The week side of boss wall, the inner of slot nozzle and hole link, valve element is also equipped with the duct, and when hydraulic pressure is small, valve element will be cut Insertion before and after the inner closing of nozzle, the duct is stitched, when hydraulic pressure is big, valve element blocks forward the front portion in duct, while slot Nozzle the inner is connected with duct rear portion;The rear end in the slot portion is fixedly linked with drilling rod, and in the rear end and drilling rod in duct Heart hole is connected.
Using said structure, reamer is set in body front end and tooth is bored, rear end sets slot portion, and reamer, this Duct is set in body and slot portion, and duct front end is installed and slot nozzle is installed in punching nozzle, slot portion, and installed in duct Valve element;When water under high pressure hydraulic pressure is smaller, valve element closes the inner of slot nozzle, and water under high pressure is via duct and punching nozzle to boring Coal body in front of hole is impacted and precrushing, can reduce resistance during drilling so that bore tooth and cornish bit is further crept into Grinding is easier to push ahead when broken, and drilling efficiency is significantly improved, and High-Pressure Water can also cool down drill bit simultaneously;When having crept into Into need carry out hydraulic slotted liner technique when, it is not necessary to more bit change, only need to move back get into specified location increase water under high pressure hydraulic pressure, make valve element to The front portion in duct is blocked in preceding movement, while slot nozzle the inner is connected with duct rear portion, High-Pressure Water enters slot nozzle, with Coal body formation radial impact force carries out hydraulic slotted liner technique in the high speed rotation device to hole of drill bit.So as to there is provided a kind of coal seam high-pressure water shot Integrated permeability improvement device is expanded-cut in stream punching-brill-, passes through pressure water jets impact rock mass or coal body, reduction drilling front coal petrography mechanics Property, and the coal and rock formation high-pressure hydraulic hole in front of drilling, guiding is bored tooth and crept into along along high pressure water impact hole, due to height Pressure water jet direction remained along drill bit axis direction, therefore its impact is made acupuncture point and put and is in drill bit axis direction all the time, i.e., Boring direction is designed, coal body mechanical property reduction in front of tooth is bored after pressure water jets impact, and formation is oriented to cave, so as to protect Brill tooth is demonstrate,proved to creep into along design direction all the time, has reached that pressure water jets impact makes the effect of cave orientation, efficiently avoid brill Hole deviation.Also, by boring after teeth drill bit drilling, the increase of coal and rock internal orifice dimension, but still do not reach mash gas pumping drilling aperture and want Ask, therefore devise expanding structure, after pressure water jets impact makes cave orientation, bores tooth drilling perforate, tooth is bored by cornish bit edge The small size drilling being ground out carries out grinding reaming, because impulse nozzle has carried out precrushing to coal body, bores tooth also to boring Hole is once crept into and ground, coal body release in drilling, when reaming blade carries out secondary abrasive expanding holes, is pushed ahead Resistance greatly reduced, grind more abundant, be more easy to discharge, operating efficiency greatly increases.Finally increase hydraulic pressure make punching-brill- The valve element forward slip for expanding-cutting in integrated three-level drill bit, high-pressure water jet hydraulic blow passage is closed, and water under high pressure sprays along slot Mouth sprays, and is rotated by rig, slot function is realized in coal body, finally considerably improves the effect of drilling and hydraulic slotted liner technique Rate.
The valve element includes coaxial big cylindrical section, middle cylindrical section, roundlet shell of column and conical head, the great circle from back to front The radius of shell of column, middle cylindrical section and roundlet shell of column is sequentially reduced, and the conical head is pre-small post-large, and the stub end half of conical head Footpath is identical with the radius of roundlet shell of column, the via being mutually communicated is provided with the big cylindrical section and middle cylindrical section, described small At least two circumferential uniform radial direction apopores, the inner and the via front end of middle cylindrical section of the apopore are provided with cylindrical section Connection;The duct includes big cylindrical hole, big conical bore, big mounting hole, small mounting hole and small cylindrical opening from back to front, described big Cylindrical hole, big mounting hole, small mounting hole and small cylindrical opening are in the cylindrical hole coaxial with body, and the big conical bore is in and body Coaxial and pre-small post-large conical bore, the rear end face in the rear end insertion slot portion of the big cylindrical hole, the big cylinder of slot portion correspondence The position in hole is connected with drill rod thread;The front end face of the front end insertion reamer of the small cylindrical opening, the punching nozzle is installed The front end of small cylindrical opening in duct;It is in step transition, and small between the big mounting hole, small mounting hole and small cylindrical opening It is fixed with packing ring on step surface in mounting hole, and the big mounting hole site is in slot portion, the inner of the slot nozzle Connected with the rear portion of big mounting hole, be installed with annular retaining ring in the rear end of the big mounting hole, the big cylindrical section of the valve element and Middle cylindrical section is slidably matched with big mounting hole and small mounting hole respectively, the bottom in the big cylindrical section front end of valve element and the big mounting hole in duct Between pad spring is housed, under the action of the spring, the valve element is pushed against with back-up ring backward, and the big cylindrical section of the valve element is by slot The inner closing of nozzle;When hydraulic pressure is increased, and hydraulic pressure overcomes the pressure promotion valve element forward movement of spring, the taper of the valve element Small cylindrical opening is stretched into head front end, and the conical surface of conical head is pushed against with packing ring, duct closed front, the inner of the slot nozzle Connected with big mounting hole.The valve element and duct it is simple in construction, easy for installation, the cooperation between valve element and duct is stable and anti- Should be sensitive.
The brill tooth rim is respectively and fixedly provided with abrasive grains, the grinding to being evenly equipped with three in each front end for boring tooth Particle is made up of diamond particles, and the brill tooth is in fan-shaped column, and being inlaid with three in each front end face for boring tooth grinds Abrasive particle.So set and bore tooth and abrasive grains, on the one hand add brill tooth intensity, extend brill tooth service life, the opposing party Face enhances the abrasive action for boring tooth, reduces the grinding difficulty for boring tooth, is effectively improved drilling efficiency.
The cornish bit is that the cornish bit on diamond blade, the reamer conical surface is circumferentially evenly equipped with three, and is expanded Middle of the hole knife just to adjacent brill space width, the top of each cornish bit is in circular arc.
High pressure water circuit is connected with the one end of the drilling rod away from drill bit, the high pressure water circuit is included by high-pressure water pipe successively The water guide tail of connection connects, the first water pump, the first valve and the first sump, and the water guide tail, which connects, is fixedly connected on drilling rod away from drill bit One end, connected in water guide tail and the second valve be installed, first pressure table is installed on first water pump.Water under high pressure is set Road provides water under high pressure for drill bit, wherein the first valve is in sump exit, for controlling water size;Is set on first water pump One pressure gauge, can show that work progress reclaimed water presses dynamic change;Connected in water guide tail and be provided with the second valve to control high pressure Water-carrying capacity.The first water pump is the capital equipment for carrying out hydraulic pressure lifting in high pressure water circuit, and the high-pressure hydraulic pump of selection should have multistage Regulatory function, it is minimum that there are 4 grades of regulatory functions, it be able to should be met according to drilling object implementatio8 regulation, maximum output hydraulic pressure 120MPa, high-pressure water pipe bearing capacity need to be 1.2 times of high-pressure hydraulic pump maximum output pressure.
Gas and water separator is also equipped with the drilling rod, the gas and water separator includes what is docked by ring flange Tubulose leading portion and back segment, the drilling rod are passed through from the centre bore of moisture trap, and rubber sleeve, rubber are set with outside the leading portion The two ends sealing of set is fixed on leading portion, and air-filled pore is provided with the rear end of rubber sleeve;Two are provided with the middle part of section in the rear relatively Via, extraction pipeline is installed on one of via of back segment, be provided with the extraction pipeline the 3rd valve and Second pressure table;Outlet pipeline is connected with another via of back segment, the other end of the outlet pipeline and the first sump connect It is logical;The rear end of section is connected with sealing ring in the rear, and the seal ring set is on drilling rod.Moisture trap is set, on the one hand Drilling is closed, it is to avoid gas and waste water overflow aggravating working environment;On the other hand gas and waste water are collected, kept away Coal-bed gas release causes gas exceeding limit during having exempted from drilling construction, and gas spray orifice in construction can be reduced to a certain extent The extent of injury, had both reduced the waste of gas, and the potential safety hazard of boring procedure is reduced again;And it can realize in work progress The recycling of water.
There also is provided the second sump and the second water pump on the outlet pipeline, second water pump be located at the second sump and Between first sump.Second sump and the second water pump are set, are easy to precipitate the waste water that moisture trap is collected.
The second object of the present invention is that providing a kind of coal seam high-pressure water jet punching-brill-expands-cut integrated anti-reflection method.
The present invention realizes that the technical scheme of the second purpose is as follows:
Comprise the following steps:
(1) preparatory stage, rig, drilling rod and the drill bit of first purpose technical scheme is installed in down-hole drilling position, are used in combination Work stone piles up the first sump and the second sump, and the first sump filled into water, adjusts rig location arrangements high pressure water circuit, and by water guide Tail connects to be fixedly connected with drilling rod;
(2) pressure testing is crept into, and creeps into 1m;
(3) moisture trap is installed, the leading portion and back segment of moisture trap are enclosed on drilling rod, and leading portion is attached to brill In hole, to be set with outside leading portion rubber sleeve inflation make rubber sleeve expansion fitted with borehole wall, by two holes of back segment adjust to Arrange one on the other, extraction pipeline is installed at via upward, outlet pipeline is connected at via directed downwardly, then by leading portion It is fixedly connected with back segment by ring flange;
(4) creep into, the first water pump is opened successively and rig is crept into, repeat drilling rod in drilling process and add to send to push away Enter, until drillable length meets design requirement;The second water on the extraction valve and outlet pipeline on extraction pipeline is opened simultaneously Pump;
(5) the first water pump and the second valve are closed after the completion of hydraulic slotted liner technique, drilling construction, is carried out according to design slot scheme Brill is moved back, is moved back during brill, when slot position needed for drill bit is retreated to, is again turned on the first water pump and rig, adjusts the first water pump Pressure and the second valve, make High-Pressure Water pressure be more than hydraulic blow pressure when creeping into, and water under high pressure is sprayed from slot nozzle, As bit formation high pressure annular water flow is to incising coal seam 1-2min, then moves back and get into next specified location and repeat to cut Seam.
During drilling and hydraulic slotted liner technique, when water-coal-slurry amount reaches setting degree in the second sump, the second water pump is closed, Appropriate coagulant is added in the second sump to accelerate the sinking speed of water and coal dust intermixture.
Beneficial effect:The present invention on drill bit by setting reamer, boring tooth, slot portion and valve element, so that there is provided one Kind of pressure water jets impact, which makes cave orientation, bore tooth drilling, cornish bit reaming, rush-the boring-of slot portion slot expands-cuts integrated coal Layer permeability improvement device and using the anti-reflection method in device progress coal seam, so as to efficiently avoid deflection of borehole, improve and apply Work environment, reduces the waste of water and gas, improves operating efficiency.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment one.
Fig. 2 is the structural representation of drill bit.
Fig. 3 is Fig. 1 top view.
Fig. 4 is the structural representation of moisture trap.
Fig. 5 is the step schematic diagram of embodiment two.
Marked in figure as follows:First sump 1, the first valve 2, the first water pump 3, first pressure table 4, high-pressure water pipe 5th, water guide tail connects the 6, second valve 7, drill bit 8, body 81, reamer 82, slot portion 83, brill tooth 84, abrasive grains 85th, cornish bit 86, valve element 87, back-up ring 88, spring 89, packing ring 810, punching nozzle 811, slot nozzle 812, great circle Post holes 8a, big conical bore 8b, big mounting hole 8c, small mounting hole 8d, small cylindrical opening 8e, moisture trap 9, leading portion 91, Rubber ring 92, back segment 93, sealing shroud 94, extraction pipeline 10, the 3rd valve 11, second pressure table 12, drilling rod 13, brill Machine 14, the second sump 15, the second water pump 16, outlet pipeline 17.
Embodiment
Embodiments of the invention are described below in detail, described embodiment example is shown in the drawings, wherein from beginning to end Same or similar label represents same or similar element or the element with same or like function.Below with reference to attached Figure description embodiment is exemplary, it is intended to explains the present invention, and is not considered as limiting the invention.With reference to attached Figure, is further described by the embodiment to the present invention, makes technical scheme and its advantage more Plus it is clear, clear and definite.
Embodiment one:
As shown in Figure 1, Figure 2 and Figure 3, the present invention includes rig 14, drilling rod 13 and drill bit 8, and the drilling rod 13 is in hollow knot Structure.The drill bit 8 includes columned body 81, and the front end of the body 81 extends to form coaxial circular cone shape reaming forward Portion 82, the reamer 82 is pre-small post-large, circumferential on the conical surface of reamer 82 to be uniformly fixed with least two cornish bits 86, institute The quantity for stating cornish bit 86 is adjusted according to actual needs, and the cornish bit 86 on the present embodiment preferably conical surface of reamer 82 is circumferential Three are evenly equipped with, and the angle of cornish bit 86 between any two is 120 °.The cornish bit 86 is diamond blade, each described The top of cornish bit 86 is in circular arc.The small head end end face of the reamer 82 extends to form circumferentially uniform at least three forward Individual brill tooth 84, the quantity for boring tooth 84 sets, not limited according to actual needs.The preferably described brill tooth 84 of the present embodiment is circumferential It is evenly equipped with three, and middle of the cornish bit 86 just to the adjacent brill spacing of tooth 84.It is solid in each front end for boring tooth 84 Surely there are abrasive grains 85, the quantity of abrasive grains 85 sets, do not limited according to actual needs;The present embodiment is preferably in each institute The front end face for stating brill tooth 84 is inlaid with three abrasive grains 85.The abrasive grains 85 are made up of diamond particles, described to bore Tooth 84 is in fan-shaped column.
As shown in Figure 1, Figure 2 and Figure 3, the rear end of the body 81 extends rearwardly to form coaxial cylindric slot portion 83, The radius of the cylindrical section of radius ratio body 81 in the slot portion 83 is small.Opened in the reamer 82, body 81 and slot portion 83 There is a duct passed through for liquid, the front end of the front end insertion reamer 82 in the duct, the rear end insertion slot portion 83 in duct Rear end.Punching nozzle 811 is installed in the preceding aperture in the duct, at least one transverse direction is installed in the slot portion 83 Slot nozzle 812, the week side of boss wall in the outer end insertion slot portion 83 of the slot nozzle 812, the inner and duct of slot nozzle 812 Connection.Preferably the slot nozzle 812 is positioned opposite two for the present embodiment.Valve element 87 is also equipped with the duct, when Hydraulic pressure hour, valve element 87 closes the inner of slot nozzle 812, insertion before and after the duct;When hydraulic pressure is big, valve element 87 is forward The front portion in duct is blocked, while the inner of slot nozzle 812 is connected with duct rear portion.The rear end in the slot portion 83 is consolidated with drilling rod 13 It is connected calmly, and the rear end in duct is connected with the centre bore of drilling rod 13.
As shown in Figures 2 and 3, the valve element 87 includes coaxial big cylindrical section, middle cylindrical section, roundlet shell of column from back to front And conical head, the radius of the big cylindrical section, middle cylindrical section and roundlet shell of column is sequentially reduced, and the conical head is pre-small post-large, and And the stub end radius of conical head is identical with the radius of roundlet shell of column.It is provided with and mutually passes through in the big cylindrical section and middle cylindrical section Logical via, is provided with least two circumferential uniform radial direction apopores in the roundlet shell of column, the inner of the apopore with The via front end connection of middle cylindrical section.
As shown in Figures 2 and 3, the duct from back to front include big cylindrical hole 8a, big conical bore 8b, big mounting hole 8c, Small mounting hole 8d and small cylindrical opening 8e, the big cylindrical hole 8a, big mounting hole 8c, small mounting hole 8d and small cylindrical opening 8e be in The cylindrical hole that body 81 is coaxial and radius is sequentially reduced, the big conical bore 8b is in the circular cone coaxial and pre-small post-large with body 81 Hole.The rear end face in the rear end insertion slot portion 83 of the big cylindrical hole 8a, the big cylindrical hole 8a of correspondence of slot portion 83 position and brill Bar 13 is threadedly coupled.The front end face of the front end insertion reamer 82 of the small cylindrical opening 8e, the punching nozzle 811 is arranged on hole Road small cylindrical opening 8e front end.It is in step transition between the big mounting hole 8c, small mounting hole 8d and small cylindrical opening 8e, and Packing ring 810 is fixed with step surface in small mounting hole 8d.The big mounting hole 8c is located in slot portion 83, the slot spray The inner rear portion with big mounting hole 8c of mouth 812 is connected, and annular retaining ring 88 is installed with the rear end of the big mounting hole 8c, described The big cylindrical section and middle cylindrical section of valve element 87 are slidably matched with big mounting hole 8c and small mounting hole 8d respectively.In the big cylinder of valve element 87 In the Duan Qianduan and big mounting hole 8c in duct between bottom pad be equipped with spring 89, in the presence of spring 89, the valve element 87 backward with Back-up ring 88 is pushed against, and the big cylindrical section of the valve element 87 closes the inner of slot nozzle 812.When hydraulic pressure is increased, hydraulic pressure overcomes bullet When the elastic force of spring 89 promotes the forward movement of valve element 87, small cylindrical opening 8e, and taper are stretched into the conical head front end of the valve element 87 The conical surface of head is pushed against with packing ring 810, and duct closed front, the inner of the slot nozzle 812 connects with big mounting hole 8c.
As shown in figure 1, being connected with high pressure water circuit in the described one end of drilling rod 13 away from drill bit 8, the high pressure water circuit includes The water guide tail being sequentially connected by high-pressure water pipe 5 connects the 6, first water pump 3, the first valve 2 and the first sump 1, and the water guide tail connects 6 and consolidated Surely the one end of drilling rod 13 away from drill bit 8 is connected to, is connect in water guide tail and the second valve 7 is installed on 6, on first water pump 3 First pressure table 4 is installed.
As shown in Figure 1 and Figure 4, gas and water separator, the gas and water separator bag are also equipped with the drilling rod 13 The tubulose leading portion 91 and back segment 93 docked by ring flange is included, the centre bore of drilling rod 13 from the moisture trap 9 is passed through.Institute State and rubber sleeve is set with outside leading portion 91, the two ends sealing of rubber sleeve is fixed on leading portion 91, in the rear end of rubber sleeve provided with inflation Hole.The middle part of section 93 is provided with two relative vias in the rear, and extraction pipeline is provided with one of via of back segment 93 10, the 3rd valve 11 and second pressure table 12 are installed on the extraction pipeline 10.Connected on another via of back segment 93 There is outlet pipeline 17, the other end of the outlet pipeline 17 is connected with the first sump 1;The rear end of section 93 is connected with close in the rear Seal ring 94, the sealing ring 94 is sleeved on drilling rod 13.The second sump 15 and second is there also is provided on the outlet pipeline 17 Water pump 16, second water pump 16 is located between the second sump 15 and the first sump 1.
Embodiment two:
As shown in figure 5, a kind of coal seam high-pressure water jet punching-brill-is expanded-cut integrated anti-reflection method, comprises the following steps:
(1) preparatory stage, rigging up, drilling rod and drill bit in down-hole drilling position, and materials clitter build the first sump and Second sump, water is filled by the first sump, adjusts rig location arrangements high pressure water circuit, and water guide tail is connect and drilling rod fixation company Connect.
(2) pressure testing is crept into, and creeps into 1m.
(3) moisture trap is installed, the leading portion and back segment of moisture trap are enclosed on drilling rod, and leading portion is attached to brill In hole, to be set with outside leading portion rubber sleeve inflation make rubber sleeve expansion fitted with borehole wall, by two holes of back segment adjust to Arrange one on the other.Extraction pipeline is installed at via upward, outlet pipeline is connected at via directed downwardly, then by leading portion It is fixedly connected with back segment by ring flange.
(4) creep into, the first water pump is opened successively and rig is crept into, repeat drilling rod in drilling process and add to send to push away Enter, until drillable length meets design requirement.The second water on the extraction valve and outlet pipeline on extraction pipeline is opened simultaneously Pump.
(5) the first water pump and the second valve are closed after the completion of hydraulic slotted liner technique, drilling construction, is carried out according to design slot scheme Brill is moved back, is moved back during brill, when slot position needed for drill bit is retreated to, is again turned on the first water pump and rig, adjusts the first water pump Pressure and the second valve, make High-Pressure Water pressure be more than hydraulic blow pressure when creeping into, and water under high pressure is sprayed from slot nozzle, As bit formation high pressure annular water flow is to incising coal seam 1-2min, then moves back and get into next specified location and repeat to cut Seam.
During drilling and hydraulic slotted liner technique, when water-coal-slurry amount reaches setting degree in the second sump, the second water pump is closed, Appropriate coagulant is added in the second sump to accelerate the sinking speed of water and coal dust intermixture.

Claims (9)

1. integrated permeability improvement device, including rig, drilling rod and drill bit, its feature are expanded-cut to a kind of coal seam high-pressure water jet punching-brill- It is:The drilling rod is in hollow structure, and the drill bit includes columned body, and the front end of the body extends to form same forward The circular cone shape reamer of axle, the reamer is pre-small post-large, circumferential on the conical surface of reamer to be uniformly fixed with least two Cornish bit, the top of each cornish bit is in circular arc, and the small head end end face of the reamer extends to form circumference forward Uniform at least three bore tooth, and the rear end of the body extends rearwardly to form coaxial cylindric slot portion, the slot portion The radius of radius ratio body cylindrical section is small;The duct passed through for liquid is provided with the reamer, body and slot portion, it is described The front end of the front end insertion reamer in duct, the rear end in the rear end insertion slot portion in duct, are installed in the preceding aperture in the duct There is punching nozzle, at least one horizontal slot nozzle, the outer end insertion of the slot nozzle are installed in the slot portion The week side of boss wall in slot portion, the inner of slot nozzle and hole link, valve element is also equipped with the duct, when hydraulic pressure is small, Valve element closes the inner of slot nozzle, insertion before and after the duct, and when hydraulic pressure is big, valve element blocks forward the front portion in duct, Slot nozzle the inner is connected with duct rear portion simultaneously;The rear end in the slot portion is fixedly linked with drilling rod, and the rear end in duct Connected with drilling rod centre bore.
2. integrated permeability improvement device is expanded-cut to coal seam high-pressure water jet punching-brill-according to claim 1, it is characterised in that: The valve element includes coaxial big cylindrical section, middle cylindrical section, roundlet shell of column and conical head from back to front, the big cylindrical section, in The radius of cylindrical section and roundlet shell of column is sequentially reduced, and the conical head is pre-small post-large, and the stub end radius of conical head with it is small The radius of cylindrical section is identical, the via being mutually communicated is provided with the big cylindrical section and middle cylindrical section, in the roundlet shell of column At least two circumferential uniform radial direction apopores are inside provided with, the inner of the apopore is connected with the via front end of middle cylindrical section;
The duct includes big cylindrical hole, big conical bore, big mounting hole, small mounting hole and small cylindrical opening from back to front, described big Cylindrical hole, big mounting hole, small mounting hole and small cylindrical opening are in the cylindrical hole coaxial with body, and the big conical bore is in and body Coaxial and pre-small post-large conical bore, the rear end face in the rear end insertion slot portion of the big cylindrical hole, the big cylinder of slot portion correspondence The position in hole is connected with drill rod thread;The front end face of the front end insertion reamer of the small cylindrical opening, the punching nozzle is installed The front end of small cylindrical opening in duct;It is in step transition, and small between the big mounting hole, small mounting hole and small cylindrical opening It is fixed with packing ring on step surface in mounting hole, and the big mounting hole site is in slot portion, the inner of the slot nozzle Connected with the rear portion of big mounting hole, be installed with annular retaining ring in the rear end of the big mounting hole, the big cylindrical section of the valve element and Middle cylindrical section is slidably matched with big mounting hole and small mounting hole respectively, the bottom in the big cylindrical section front end of valve element and the big mounting hole in duct Between pad spring is housed, under the action of the spring, the valve element is pushed against with back-up ring backward, and the big cylindrical section of the valve element is by slot The inner closing of nozzle;When hydraulic pressure is increased, and hydraulic pressure overcomes the pressure promotion valve element forward movement of spring, the taper of the valve element Small cylindrical opening is stretched into head front end, and the conical surface of conical head is pushed against with packing ring, duct closed front, the inner of the slot nozzle Connected with big mounting hole.
3. integrated permeability improvement device is expanded-cut to coal seam high-pressure water jet punching-brill-according to claim 1 or 2, its feature exists In:The brill tooth rim is respectively and fixedly provided with abrasive grains in each front end for boring tooth to being evenly equipped with three, the abrasive grains by Diamond particles are constituted, and the brill tooth is in fan-shaped column, and three abrasive grains are inlaid with each front end face for boring tooth.
4. integrated permeability improvement device is expanded-cut to coal seam high-pressure water jet punching-brill-according to claim 3, it is characterised in that: The cornish bit is that the cornish bit on diamond blade, the reamer conical surface is circumferentially evenly equipped with three, and cornish bit is just right The adjacent middle for boring space width.
5. integrated permeability improvement device is expanded-cut to coal seam high-pressure water jet punching-brill-according to claim 4, it is characterised in that: High pressure water circuit is connected with the one end of the drilling rod away from drill bit, the high pressure water circuit is included by leading that high-pressure water pipe is sequentially connected Water tail connects, the first water pump, the first valve and the first sump, and the water guide tail, which connects, is fixedly connected on the one end of drilling rod away from drill bit, Connected in water guide tail and the second valve is installed, first pressure table is installed on first water pump.
6. integrated permeability improvement device is expanded-cut to coal seam high-pressure water jet punching-brill-according to claim 5, it is characterised in that: Gas and water separator is also equipped with the drilling rod, the gas and water separator includes the tubulose leading portion docked by ring flange And back segment, the drilling rod passed through from the centre bore of moisture trap, and rubber sleeve, the two ends of rubber sleeve are set with outside the leading portion Sealing is fixed on leading portion, and air-filled pore is provided with the rear end of rubber sleeve;Two relative vias are provided with the middle part of section in the rear, Extraction pipeline is installed on one of via of back segment, the 3rd valve and second pressure are installed on the extraction pipeline Table;Outlet pipeline is connected with another via of back segment, the other end of the outlet pipeline is connected with the first sump;Described The rear end of back segment is connected with sealing ring, and the seal ring set is on drilling rod.
7. integrated permeability improvement device is expanded-cut to coal seam high-pressure water jet punching-brill-according to claim 6, it is characterised in that: The second sump and the second water pump are there also is provided on the outlet pipeline, second water pump is located at the second sump and the first sump Between.
8. the coal seam that integrated permeability improvement device is carried out is expanded-cut to a kind of high-pressure water jet of coal seam according to claim 7 punching-brill- Integrated anti-reflection method is expanded-cut to high-pressure water jet punching-brill-, it is characterised in that comprise the following steps:
(1) preparatory stage, rigging up, drilling rod and drill bit in down-hole drilling position, and materials clitter build the first sump and second Sump, water is filled by the first sump, adjusts rig location arrangements high pressure water circuit, and water guide tail is connect is fixedly connected with drilling rod;
(2) pressure testing is crept into, and creeps into 1m;
(3) moisture trap is installed, the leading portion and back segment of moisture trap are enclosed on drilling rod, and leading portion is attached to drilling It is interior, rubber sleeve expansion is fitted with borehole wall the rubber sleeve inflation being set with outside leading portion, two holes of back segment are adjusted to one On once arrange, at via upward install extraction pipeline, at via directed downwardly connect outlet pipeline, then by leading portion with Back segment is fixedly connected by ring flange;
(4) creep into, the first water pump is opened successively and rig is crept into, repeat drilling rod in drilling process and add to send propulsion, directly Design requirement is met to drillable length;The second water pump on the extraction valve and outlet pipeline on extraction pipeline is opened simultaneously;
(5) the first water pump and the second valve are closed after the completion of hydraulic slotted liner technique, drilling construction, is moved back according to design slot scheme Bore, move back during brill, when slot position needed for drill bit is retreated to, be again turned on the first water pump and rig, adjust the first water pump pressure Power and the second valve, make High-Pressure Water pressure be more than hydraulic blow pressure when creeping into, and water under high pressure is sprayed from slot nozzle, with Bit formation high pressure annular water flow to incising coal seam 1-2min, is then moved back and is got into next specified location and repeat to cut Seam.
9. integrated anti-reflection method is expanded-cut to coal seam high-pressure water jet punching-brill-according to claim 8, it is characterised in that: During drilling and hydraulic slotted liner technique, when water-coal-slurry amount reaches setting degree in the second sump, the second water pump is closed, in the second water Appropriate coagulant is added in storehouse to accelerate the sinking speed of water and coal dust intermixture.
CN201610834597.9A 2016-09-18 2016-09-18 Coal seam high-pressure water jet drill, which expands, cuts integrated permeability improvement device and its method Active CN106320985B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610834597.9A CN106320985B (en) 2016-09-18 2016-09-18 Coal seam high-pressure water jet drill, which expands, cuts integrated permeability improvement device and its method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610834597.9A CN106320985B (en) 2016-09-18 2016-09-18 Coal seam high-pressure water jet drill, which expands, cuts integrated permeability improvement device and its method

Publications (2)

Publication Number Publication Date
CN106320985A CN106320985A (en) 2017-01-11
CN106320985B true CN106320985B (en) 2017-10-31

Family

ID=57787589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610834597.9A Active CN106320985B (en) 2016-09-18 2016-09-18 Coal seam high-pressure water jet drill, which expands, cuts integrated permeability improvement device and its method

Country Status (1)

Country Link
CN (1) CN106320985B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108843379B (en) * 2018-06-25 2019-09-24 中煤科工集团重庆研究院有限公司 A kind of axial grooving release anti-reflection method of coal mine gas extraction borehole

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107035320B (en) * 2017-05-15 2023-08-08 河北永广矿山设备有限公司 Impact-resistant drilling and reaming device
CN107201892A (en) * 2017-07-26 2017-09-26 淮南矿业(集团)有限责任公司 Layer-through drilling hydraulic slotted liner technique device and hydraulic slotted liner technique method
CN108194070B (en) * 2018-01-30 2024-03-12 陕西煤业化工技术研究院有限责任公司 Ultrasonic excitation and hydraulic slotting integrated device, compound reinforced gas extraction system and method
CN108757000B (en) 2018-04-12 2019-09-24 山东科技大学 A kind of quick slot orientation fracturing system in underground based on drilling machine power and method
CN108547604B (en) * 2018-06-20 2023-04-11 河南理工大学 Drilling and stamping integrated device and method
CN111219150B (en) * 2018-11-26 2021-09-03 焦作市全安科技有限公司 Drilling, cutting and punching integrated drill bit
CN109611068A (en) * 2018-12-19 2019-04-12 河南理工大学 A kind of single channel water-jet punching press pipe nipple and method
CN109707436A (en) * 2019-01-29 2019-05-03 王海峰 A kind of multistage conversion permeability improvement device
CN109898994A (en) * 2019-03-21 2019-06-18 程领存 A kind of coal seam pressure relief method and device thereof
CN110454214A (en) * 2019-08-31 2019-11-15 贵州大学 A kind of tapping equipment for gas drainage
CN111088993B (en) * 2020-02-11 2020-12-08 山东科技大学 Drilling-cutting-sealing-pressing drilling equipment and method for deep low-permeability high-gas coal seam
CN111636854B (en) * 2020-04-17 2022-05-27 河南理工大学 Coal rock stratum drilling fixed point hydraulic fracturing balance sealing device
CN111810087B (en) * 2020-06-12 2022-11-08 中煤科工集团沈阳研究院有限公司 Hydraulic large-diameter grading, cave-making, pressure-releasing and permeability-increasing device and method
CN113187478B (en) * 2021-04-20 2021-12-14 南通大学 Two-stage air-entrapping proportion-adjustable gas-liquid mixing nozzle device and use method thereof
CN113294155B (en) * 2021-05-21 2023-12-05 重庆大学 Metal vein auxiliary mining device
CN113685137B (en) * 2021-09-26 2023-04-25 东华理工大学 Drilling equipment for geologic structure analysis and detection
CN113776972B (en) * 2021-09-29 2024-03-12 中煤科工集团重庆研究院有限公司 Dynamic testing method for rock breaking and pore forming process of high-pressure jet drill bit

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201090139Y (en) * 2007-10-11 2008-07-23 中国矿业大学 Press control drill scalpel integration drilling bit
US7909118B2 (en) * 2008-02-01 2011-03-22 Rudy Sanfelice Apparatus and method for positioning extended lateral channel well stimulation equipment
CN101413380B (en) * 2008-11-20 2010-10-13 重庆大学 Multifunctional self-oscillation flow jet flow drill
CN102337840B (en) * 2011-09-19 2013-06-05 中国矿业大学 Self-guiding water pressure-switching cutting type broaching drill bit
JP6012035B2 (en) * 2012-07-06 2016-10-25 東京地下鉄株式会社 High pressure water drilling equipment
CN202788919U (en) * 2012-09-28 2013-03-13 西安美尼矿山设备科技有限公司 Mine drilling and cutting integrated outburst prevention and permeability increasing system
CN102966310B (en) * 2012-12-17 2015-08-19 中国矿业大学 Water jet slot induced flow device and method in a kind of boring
CN203856412U (en) * 2014-05-30 2014-10-01 西安美尼矿山设备科技有限公司 High-pressure water jet drilling and cutting integrated drill bit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108843379B (en) * 2018-06-25 2019-09-24 中煤科工集团重庆研究院有限公司 A kind of axial grooving release anti-reflection method of coal mine gas extraction borehole

Also Published As

Publication number Publication date
CN106320985A (en) 2017-01-11

Similar Documents

Publication Publication Date Title
CN106320985B (en) Coal seam high-pressure water jet drill, which expands, cuts integrated permeability improvement device and its method
CN110656937B (en) Fluidized coal gas simultaneous mining system and method
US10280686B2 (en) Method of performing combined drilling, flushing, and cutting operations on coal seam having high gas content and prone to bursts to relieve pressure and increase permeability
CN101586441B (en) High-pressure water jet system and method for drilling and enlarging holes on coal bed
CN105156085B (en) The coal mine underground coal bed tree-shaped uniform anti-reflection method of drilling composite fracturing
CN110617044B (en) Ultrahigh-pressure water jet slotting system and using method thereof
CN105971663B (en) A kind of the drilling arrangement and anti-reflection method of coal seam high-pressure hydraulic slot pressure break
CN102418549B (en) Technical method for extracting coal bed methane from constructed coal development area
CN201460734U (en) High-pressure water jet coal seam drilling and reaming system
CN104763343B (en) A kind of multistage borehole-enlarging drilling tool and its expanding method of the bionical nozzle of build-in
CN102094668B (en) High-pressure hydraulic tunneling, pressure releasing and protrusion removing method for upper drainage roadway
CN104763368B (en) Major diameter downhole hammer port seal and its reverse circulation construction technique
CN110630181B (en) Coal seam reaming and permeability increasing method utilizing pneumatic coupling effect
CN102635388A (en) Interaction permeability-increasing method of pre-splitting blasting and hydraulic cracking of coal seam
CN106988756B (en) Rock breaking device and method
CN110195580A (en) A kind of gas-liquid two-phase synergy coal seam anti-reflection method
CN104832082A (en) Pneumatic DTH hammer reverse circulation slagging construction process for rotary drilling rig
CN107023295A (en) A kind of hard coal erosion control destressing borehole construction method and equipment
CN102383728A (en) Coal mine rockburst defect segmentation and control method
US3084752A (en) Drill bit tool for well drilling
CN107035376A (en) One kind common law in huge thick bedrock aquifer digs shaft construction method
CN205778536U (en) A kind of drilling in coal anti-blocking instrument of jet deslagging
CN205297592U (en) TBM tunnelling tunnel heavily stressed risk decontrol in face place ahead and structure
CN107575164A (en) A kind of high-pressure hydraulic with the conditions of brill radially creeps into guider and method
CN115638018A (en) Rapid cross-cut coal uncovering system and method based on physical fluidization simultaneous mining of coal and gas

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant