CN106301913A - Operation/maintenance data acquisition system and operation/maintenance data acquisition method - Google Patents
Operation/maintenance data acquisition system and operation/maintenance data acquisition method Download PDFInfo
- Publication number
- CN106301913A CN106301913A CN201610671910.1A CN201610671910A CN106301913A CN 106301913 A CN106301913 A CN 106301913A CN 201610671910 A CN201610671910 A CN 201610671910A CN 106301913 A CN106301913 A CN 106301913A
- Authority
- CN
- China
- Prior art keywords
- maintenance data
- center
- collection information
- data acquisition
- monitored node
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/08—Configuration management of networks or network elements
- H04L41/085—Retrieval of network configuration; Tracking network configuration history
- H04L41/0853—Retrieval of network configuration; Tracking network configuration history by actively collecting configuration information or by backing up configuration information
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/04—Network management architectures or arrangements
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of operation/maintenance data acquisition system and operation/maintenance data acquisition method, this operation/maintenance data acquisition system includes: configuration center, for configuring the collection information of each monitored node and described collection information being handed down to task center;Described task center, for when receiving the described collection information that described configuration center issues, generates acquisition tasks according to described collection information, and gathers operation/maintenance data at each monitored node described according to described acquisition tasks.Application technical scheme, system design complexity reduces, and disposes and the trouble of upgrading without agency, and owing to being task center directly acquisition data at monitored node, interaction times being reduced, reduces the pressure of monitored node, safety, stability, reliability are greatly improved.
Description
Technical field
Operation/maintenance data acquisition technique field of the present invention, particularly relates to operation/maintenance data acquisition system and operation/maintenance data collection side
Method.
Background technology
Along with building and the informationization of enterprises system of the privately owned cloud of enterprise, the complexity of enterprises IT system is more come
The highest.Usually, in order to enterprises IT safeguards system can the stable operation of high-quality and high-efficiency, enterprises is equipped with sole duty
Operation maintenance personnel and the own operation/maintenance data acquisition system developed, it is intended to index of correlation data are collected.
In prior art, as it is shown in figure 1, operation/maintenance data acquisition system 1 includes configuration center 11 and data center 12, and
Individual monitored node disposes corresponding agency.Configuration center 11 issues frequency acquisition to the agency of each monitored node respectively,
The frequency acquisition that the agency of each monitored node issues according to configuration center corresponding monitor node is carried out data collection with
Arrange, and according to the Automatic Frequency that respective proxy configurations is good, collection data are reported data center 12.
Above-mentioned this operation/maintenance data acquisition system based on agency, also exists some shortcomings, such as:
1, agency needs to obtain in real time data item and the frequency acquisition of monitoring to configuration center 11, and with self report
Frequency, and need to accomplish energy real-time informing after data change, so can considerably increase the complexity of whole system;
2, the deployment of agency is because having certain intrusion to enterprise self existed system, there is potential safety hazard, so typically
Do not accepted by enterprise;
3, act on behalf of the data of collection to be reported, but also need to monitored node gathering data in real time, Yi Jiyao
Keeping being connected with configuration center 11, the long-time of data center 12, the burden so making agency is the heaviest, event easily occurs
Barrier is stable the highest with reliability;And the deployment to agency is the most extremely onerous with upgrading, need respectively at each monitored node
Dispose and upgrade, easily occurring forgeing or makeing mistakes.
Summary of the invention
Present invention is primarily targeted at proposition operation/maintenance data acquisition system and operation/maintenance data acquisition method, it is intended to solve existing
Have system complexity in operation/maintenance data acquisition system based on agency high, agency is stable strong with reliability and agency disposes and
The problems such as upgrading trouble.
For achieving the above object, the operation/maintenance data acquisition system that the present invention provides, including:
Configuration center, for configuring the collection information of each monitored node and described collection information being handed down in task
The heart;
Described task center, for when receiving the described collection information that described configuration center issues, adopts according to described
Collection information generates acquisition tasks, and gathers operation/maintenance data at each monitored node described according to described acquisition tasks.
Wherein, described operation/maintenance data acquisition system also includes:
Data center, for receiving and store the described operation/maintenance data that described task center is submitted to, and by described O&M
Data persistence.
Wherein, described operation/maintenance data acquisition system also includes:
Calculating center, the described operation/maintenance data after receiving described data center persistence, and carry out sorting out calculating.
Wherein, when the collection information updating of each monitored node that described configuration center configures, described configuration center
Issue and gather the notice of information updating to described task center;
Described task center, for when receiving the described notice that described configuration center issues, from described task center
When obtaining the collection information after updating, generate new acquisition tasks according to the collection information after described renewal, and newly adopt according to described
Set task gathers operation/maintenance data at each monitored node described.
Wherein, described collection information includes: the information of each monitored node described, frequency acquisition and acquisition index.
Correspondingly, present invention also offers a kind of operation/maintenance data acquisition method, described method includes:
Configure the collection information of each monitored node;
Generate acquisition tasks according to described collection information, and supervised from described each according to the described acquisition tasks generated
Operation/maintenance data is gathered at control node.
Wherein, described method also includes:
Receive and store the described operation/maintenance data of collection, and by described operation/maintenance data persistence.
Wherein, described method also includes:
Unify the described operation/maintenance data after persistence to sort out and calculate.
Wherein, described method also includes:
When the collection information updating of each monitored node described, adopting after configuration each monitored node described renewal
Collection information;
According to after described renewal collection information generate new acquisition tasks, and according to generate described new acquisition tasks from
Operation/maintenance data is gathered at each monitored node described.
Wherein, described collection information includes: the information of each monitored node described, frequency acquisition and acquisition index.
Effective effect of the present invention:
The operation/maintenance data acquisition system of embodiment of the present invention offer and operation/maintenance data acquisition method, operation/maintenance data acquisition system
When gathering operation/maintenance data, task center directly obtain collection information from configuration center and carry out adopting of corresponding operation/maintenance data
Collection, has abandoned in prior art by being issued frequency acquisition by agent acquisition task also to each agency respectively by configuration center
The scheme at reported data center respectively so that the conceptual design complexity of the operation/maintenance data acquisition system of the embodiment of the present invention subtracts
Little, nothing agency disposes and the trouble of upgrading, and owing to being task center directly acquisition data at monitored node so that hand over
Number of times reduces mutually, reduces the pressure of monitored node, and safety, stability, reliability are greatly improved
Accompanying drawing explanation
Fig. 1 is the falsework composition of operation/maintenance data acquisition system in prior art;
The structural representation of the first embodiment of the operation/maintenance data acquisition system that Fig. 2 provides for the present invention;
Fig. 3 is the schematic diagram that the operation/maintenance data acquisition system in Fig. 2 realizes when operation/maintenance data gathers;
The structural representation of the second embodiment of the operation/maintenance data acquisition system that Fig. 4 provides for the present invention;
Fig. 5 is the schematic diagram that the operation/maintenance data acquisition system in Fig. 4 realizes when operation/maintenance data gathers;
Fig. 6 is the schematic flow sheet of the first embodiment of the operation/maintenance data acquisition method that the present invention provides;
Fig. 7 is the schematic flow sheet of the second embodiment of the operation/maintenance data acquisition method that the present invention provides;
The realization of the object of the invention, functional characteristics and advantage will in conjunction with the embodiments, are described further referring to the drawings.
Detailed description of the invention
Should be appreciated that specific embodiment described herein, only in order to explain the present invention, is not intended to limit the present invention.
Refer to Fig. 2, be the structural representation of the first embodiment of the operation/maintenance data acquisition system 2 that the present invention provides.This
The operation/maintenance data acquisition system 2 that inventive embodiments provides includes: configuration center 21 and task center 22.Wherein, configuration center 21
Can be realized by server or server cluster with task center 22.Below, in conjunction with Fig. 3, the fortune that the embodiment of the present invention is provided
The work process of dimension data acquisition system 2 is described in detail.
Refer to Fig. 2 to Fig. 3, configuration center 21, mainly each monitored node is carried out some configuration managements, i.e. use
In the collection information of each monitored node of configuration, the most also collection information is handed down to task center 22.Configuration center 21 is joined
The collection information put includes but not limited to: monitored node information, frequency acquisition and acquisition index etc..Wherein, monitored node
Information such as may include that the IP address information of each monitored node, the port numbers etc. of monitored node.Task center 22 is then
For receiving the collection information that configuration center 21 issues, and generate, according to this collection information, the acquisition tasks that can run accordingly, with
And at each monitored node, operation/maintenance data is directly gathered according to the acquisition tasks generated.
In embodiments of the present invention, task center 22 directly obtain collection information from configuration center 21 and transport accordingly
The collection of dimension data, has abandoned in prior art by being issued frequency acquisition and by acting on behalf of to each agency respectively by configuration center
The scheme at acquisition tasks respectively reported data center so that the conceptual design of the operation/maintenance data acquisition system of the embodiment of the present invention
Complexity reduces, and disposes and the trouble of upgrading without acting on behalf of, and owing to being task center 22 directly acquisition at monitored node
Data so that interaction times reduces, reduce the pressure of monitored node, and safety, stability, reliability are greatly improved.
It is understood that the operation/maintenance data acquisition system 2 that the embodiment of the present invention provides, when configuration center 21 is collected
When collection information has renewal, such as monitored node information has renewal or frequency acquisition to have renewal, and configuration center also can enter accordingly
The renewal of row configuration, the collection information after being updated, and the notice gathering information updating is handed down to task center 22.Accordingly
Ground, after task center 22 receives the notice gathering information updating, can active collection letter after configuration center 21 pulls renewal
Breath, and generate new acquisition tasks accordingly according to the collection information after this renewal, and according to the new acquisition tasks generated from monitored
Node gathers operation/maintenance data.So, even if when collection information has renewal, the configuration center horse of this operation/maintenance data acquisition system 2
Upper just energy will newly gather information and notify task center 22, and without going one by one to notify all monitored joints as prior art
The agency of point so that the control to operation/maintenance data acquisition system is more flexible.
Refer to Fig. 4, be the structural representation of the second embodiment of the operation/maintenance data acquisition system that the present invention provides, this
Bright embodiment is with the difference of the embodiment shown in Fig. 2: operation/maintenance data acquisition system 2 is except including in configuration center 21 and task
Outside the heart 22, also include: data center 23 and calculating center 24.It is understood that configuration center 21, task center 22, data
Center 23 and calculating center 24 can be realized by server or server cluster.Below in conjunction with Fig. 5, describe the present invention and implement
The work process of the operation/maintenance data acquisition system 2 that example provides.
Refer to Fig. 4 to Fig. 5, the purposes of data center 23 is the operation/maintenance data that reception task center 22 gathers and submits to,
And the operation/maintenance data collecting task center 22 unifies storage, and this operation/maintenance data is carried out persistence.Persistence
The purpose of operation/maintenance data is that operation/maintenance data is saved in data base, in order to can conveniently adjust when calculating center 24 calculates operation/maintenance data
Take.Correspondingly, calculating center 24 then for unifying to sort out calculating to the operation/maintenance data after persistence in data center 23, logical
Cross to unify operation/maintenance data to sort out and calculate, to realize the monitoring to monitored node.
The operation/maintenance data acquisition system 2 of the embodiment of the present invention, when carrying out operation/maintenance data and gathering, direct by task center 22
Obtain collection information from configuration center 21 and carry out the collection of corresponding operation/maintenance data, eliminating agency, and task center 22 is adopted
Collection is directly persisted in data center 23, with prior art then be reported by agency by agent acquisition data to operation/maintenance data
Scheme to data center 12 is compared, owing to decreasing the deployment of agency at monitored node, thus without taking monitored joint
The resource of point;Simultaneously as do not act on behalf of, correspondingly also without disposing or upgrading agency, therefore task center 23 can be entered
The unified upgrading of row;And configuration center 21 has relevant configuration change can notify task center 22, it is not necessary to originally the most at once
Equally go to notify all of agency, control more flexible;The operation/maintenance data acquisition system of the embodiment of the present invention, overall architecture is simple,
Safe and reliable.
Based on above-mentioned operation/maintenance data acquisition system, each embodiment of operation/maintenance data acquisition method of the present invention is proposed.
Refer to Fig. 6, be the method flow diagram of the first embodiment of the operation/maintenance data acquisition method that invention provides.This enforcement
Operation/maintenance data acquisition method described by example, for realizing the collection of monitored node operation/maintenance data.This operation/maintenance data collection side
Method includes:
S601, configures the collection information of each monitored node;
In operation/maintenance data acquisition system, it is achieved configure the collection information of each monitored node task specifically can be by
Configuration center completes.Configuration center configuration collection information include but not limited to: monitored node information, frequency acquisition and
Acquisition index etc..Wherein, monitored node information such as may include that the IP address information of each monitored node, monitored
The port numbers etc. of node.Configuration center, after the collection information of configuration each monitored node good, the most also will gather information
It is handed down to task center.
S602, according to described collection information generate acquisition tasks, and according to generate described acquisition tasks from described respectively
Operation/maintenance data is gathered at individual monitored node.
In operation/maintenance data acquisition system, this step specifically can be completed by task center.Task center receives in configuration
The collection information that the heart issues, and generate, according to this collection information received, the acquisition tasks that can run accordingly, and according to life
The acquisition tasks become directly gathers operation/maintenance data at each monitored node.
The operation/maintenance data acquisition method of the embodiment of the present invention is when carrying out operation/maintenance data and gathering, by task center directly from joining
Center of putting obtains collection information and is acquired task accordingly according to the generation of collection information and carries out corresponding operation/maintenance data
Gather, abandoned in prior art by being issued frequency acquisition and by agent acquisition task to each agency respectively by configuration center
And the scheme at difference reported data center so that the conceptual design complexity of the operation/maintenance data acquisition system of the embodiment of the present invention subtracts
Little, nothing agency disposes and the trouble of upgrading, and owing to being task center directly acquisition data at monitored node so that hand over
Number of times reduces mutually, reduces the pressure of monitored node, and safety, stability, reliability are greatly improved.
It is understood that when collection information has renewal, the operation/maintenance data acquisition method of the embodiment of the present invention is all right
Including:
S603, the collection information after configuration each monitored node described renewal;
S604, generates new acquisition tasks according to the collection information after updating, and according to the new acquisition tasks generated from respectively
Operation/maintenance data is gathered at individual monitored node.
In step S603 to S604, when the collection information that configuration center is collected has renewal, such as monitored node letter
When breath has renewal or frequency acquisition to have renewal, configuration center also can carry out the renewal configured accordingly, the collection letter after being updated
Breath, and the notice gathering information updating is handed down to task center.Correspondingly, task center receives and gathers the logical of information updating
After knowing, meeting active collection information after configuration center pulls renewal, and generate accordingly newly according to the collection information after this renewal
Acquisition tasks, and gather operation/maintenance data according to the new acquisition tasks generated from monitored node.So, even if having in collection information
During renewal, the configuration center of this operation/maintenance data acquisition system the most just will can newly gather information and notify task center, and without
As prior art, go to notify the agency of all monitored nodes one by one to the control of operation/maintenance data acquisition system more
Flexibly.
Refer to Fig. 7, be the schematic flow sheet of the second embodiment of the operation/maintenance data acquisition method that the present invention provides, this
The operation/maintenance data acquisition method of bright embodiment includes:
The step S701 to S704 identical with step S601 to S604, except for the difference that, the operation/maintenance data of the embodiment of the present invention
Acquisition method can also include:
S705, receives and stores the operation/maintenance data of collection, and by this operation/maintenance data persistence;
In operation/maintenance data acquisition system, this step can be performed by data center.Data center receives task center and adopts
The operation/maintenance data collected and submit to, and to task central data to operation/maintenance data unify storage, and to this operation/maintenance data
Carry out persistence.The purpose of persistence operation/maintenance data is that operation/maintenance data is saved in data base, in order to calculate center calculation O&M
Can conveniently transfer during data.
S706, unifies this operation/maintenance data after persistence to sort out calculating.
In operation/maintenance data acquisition system, this step can be performed by calculating center.Calculating center is for data center
In 23, the operation/maintenance data after persistence carries out unifying to sort out calculating, and calculates by unifying operation/maintenance data to sort out, right to realize
The monitoring of monitored node.
The operation/maintenance data acquisition method of the embodiment of the present invention, carry out operation/maintenance data gather time, by task center directly from
Configuration center obtains collection information and carries out the collection of corresponding operation/maintenance data, eliminates agency, and task central data is to fortune
Directly it is persisted to after dimension data then data center, with prior art are reported to data by agency by agent acquisition data
The scheme at center is compared, owing to decreasing the deployment of agency at monitored node, thus without the resource taking monitored node;
Simultaneously as do not act on behalf of, correspondingly also without disposing or upgrading agency, therefore task center can be unified upgrading;
And configuration center has relevant configuration change just at once can notify task center, it is not necessary to original equally go to notify all of
Agency, controls more flexible;The operation/maintenance data acquisition system of the embodiment of the present invention, overall architecture is simple, safe and reliable.
It should be noted that in this article, term " includes ", " comprising " or its any other variant are intended to non-row
Comprising of his property, so that include that the process of a series of key element, method, article or device not only include those key elements, and
And also include other key elements being not expressly set out, or also include intrinsic for this process, method, article or device
Key element.In the case of there is no more restriction, statement " including ... " key element limited, it is not excluded that including
The process of this key element, method, article or device there is also other identical element.
The invention described above embodiment sequence number, just to describing, does not represent the quality of embodiment.
Through the above description of the embodiments, those skilled in the art is it can be understood that arrive above-described embodiment side
Method can add the mode of required general hardware platform by software and realize, naturally it is also possible to by hardware, but a lot of in the case of
The former is more preferably embodiment.Based on such understanding, prior art is done by technical scheme the most in other words
The part going out contribution can embody with the form of software product, and this computer software product is stored in a storage medium
In (such as ROM/RAM, magnetic disc, CD), including some instructions with so that a station terminal equipment (can be mobile phone, computer, take
Business device, air-conditioner, or the network equipment etc.) perform the method described in each embodiment of the present invention.
These are only the preferred embodiments of the present invention, not thereby limit the scope of the claims of the present invention, every utilize this
Equivalent structure or equivalence flow process that bright description and accompanying drawing content are made convert, or are directly or indirectly used in other relevant skills
Art field, is the most in like manner included in the scope of patent protection of the present invention.
Claims (10)
1. an operation/maintenance data acquisition system, it is characterised in that including:
Configuration center, for configuring the collection information of each monitored node and described collection information being handed down to task center;
Described task center, for when receiving the described collection information that described configuration center issues, gathers letter according to described
Breath generates acquisition tasks, and gathers operation/maintenance data at each monitored node described according to described acquisition tasks.
Operation/maintenance data acquisition system the most according to claim 1, it is characterised in that described operation/maintenance data acquisition system is also wrapped
Include:
Data center, for receiving and store the described operation/maintenance data that described task center is submitted to, and by described operation/maintenance data
Persistence.
Operation/maintenance data acquisition system the most according to claim 2, it is characterised in that described operation/maintenance data acquisition system is also wrapped
Include:
Calculating center, the described operation/maintenance data after receiving described data center persistence, and carry out unifying to sort out calculating.
Operation/maintenance data acquisition system the most according to any one of claim 1 to 3, it is characterised in that when in described configuration
During the collection information updating of each monitored node of heart configuration, described configuration center issues and gathers the notice of information updating to institute
State task center;
Described task center, for when receiving the described notice that described configuration center issues, obtaining from described task center
During collection information after renewal, generate new acquisition tasks according to the collection information after described renewal, and appoint according to described new collection
Business gathers operation/maintenance data at each monitored node described.
Operation/maintenance data acquisition system the most according to claim 1, it is characterised in that described collection information includes: described respectively
The information of individual monitored node, frequency acquisition and acquisition index.
6. an operation/maintenance data acquisition method, it is characterised in that described method includes:
Configure the collection information of each monitored node;
Acquisition tasks is generated according to described collection information, and according to the described acquisition tasks generated from each monitored joint described
Operation/maintenance data is gathered at Dian.
Operation/maintenance data acquisition method the most according to claim 6, it is characterised in that described method also includes:
Receive and store the described operation/maintenance data of collection, and by described operation/maintenance data persistence.
Operation/maintenance data acquisition method the most according to claim 7, it is characterised in that described method also includes:
Unify the described operation/maintenance data after persistence to sort out and calculate.
9. according to the operation/maintenance data acquisition method according to any one of claim 6 to 8, it is characterised in that described method is also wrapped
Include:
When the collection information updating of each monitored node described, the collection after configuration each monitored node described updates is believed
Breath;
New acquisition tasks is generated according to the collection information after described renewal, and according to the described new acquisition tasks generated from described
Operation/maintenance data is gathered at each monitored node.
Operation/maintenance data acquisition method the most according to claim 6, it is characterised in that described collection information includes: described respectively
The information of individual monitored node, frequency acquisition and acquisition index.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610671910.1A CN106301913B (en) | 2016-08-15 | 2016-08-15 | Operation/maintenance data acquisition system and operation/maintenance data acquisition method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610671910.1A CN106301913B (en) | 2016-08-15 | 2016-08-15 | Operation/maintenance data acquisition system and operation/maintenance data acquisition method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106301913A true CN106301913A (en) | 2017-01-04 |
CN106301913B CN106301913B (en) | 2019-08-09 |
Family
ID=57670475
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610671910.1A Active CN106301913B (en) | 2016-08-15 | 2016-08-15 | Operation/maintenance data acquisition system and operation/maintenance data acquisition method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106301913B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109542031A (en) * | 2018-11-20 | 2019-03-29 | 上海电器科学研究所(集团)有限公司 | A kind of device configuration method in novel maintenance system |
CN110377488A (en) * | 2019-07-15 | 2019-10-25 | 福建威盾科技集团有限公司 | A kind of method and system for unifying O&M and dynamic expansion |
CN111782901A (en) * | 2020-08-20 | 2020-10-16 | 支付宝(杭州)信息技术有限公司 | Data acquisition method and device |
CN112380107A (en) * | 2020-12-08 | 2021-02-19 | 无锡无边网络技术有限公司 | Operation and maintenance system data acquisition system and method based on management information system |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101345652A (en) * | 2008-08-15 | 2009-01-14 | 北京立通无限科技有限公司 | Data acquisition method and data acquisition equipment |
US8159948B2 (en) * | 2007-07-11 | 2012-04-17 | Hewlett-Packard Development Company, L.P. | Methods and apparatus for many-to-one connection-rate monitoring |
CN102752131A (en) * | 2012-06-04 | 2012-10-24 | 国网电力科学研究院 | Task-driven based power telecommunication network data acquisition method |
CN102761454A (en) * | 2011-04-28 | 2012-10-31 | 中兴通讯股份有限公司 | Method and system for monitoring internet of things |
CN103037019A (en) * | 2013-01-07 | 2013-04-10 | 北京华胜天成科技股份有限公司 | Distributed data acquisition system and method based on cloud computing |
CN103236949A (en) * | 2013-04-27 | 2013-08-07 | 北京搜狐新媒体信息技术有限公司 | Monitoring method, device and system for server cluster |
CN104301130A (en) * | 2013-07-17 | 2015-01-21 | 腾讯科技(深圳)有限公司 | Method and system of collecting monitoring data as well as task distribution server and collection device |
-
2016
- 2016-08-15 CN CN201610671910.1A patent/CN106301913B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8159948B2 (en) * | 2007-07-11 | 2012-04-17 | Hewlett-Packard Development Company, L.P. | Methods and apparatus for many-to-one connection-rate monitoring |
CN101345652A (en) * | 2008-08-15 | 2009-01-14 | 北京立通无限科技有限公司 | Data acquisition method and data acquisition equipment |
CN102761454A (en) * | 2011-04-28 | 2012-10-31 | 中兴通讯股份有限公司 | Method and system for monitoring internet of things |
CN102752131A (en) * | 2012-06-04 | 2012-10-24 | 国网电力科学研究院 | Task-driven based power telecommunication network data acquisition method |
CN103037019A (en) * | 2013-01-07 | 2013-04-10 | 北京华胜天成科技股份有限公司 | Distributed data acquisition system and method based on cloud computing |
CN103236949A (en) * | 2013-04-27 | 2013-08-07 | 北京搜狐新媒体信息技术有限公司 | Monitoring method, device and system for server cluster |
CN104301130A (en) * | 2013-07-17 | 2015-01-21 | 腾讯科技(深圳)有限公司 | Method and system of collecting monitoring data as well as task distribution server and collection device |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109542031A (en) * | 2018-11-20 | 2019-03-29 | 上海电器科学研究所(集团)有限公司 | A kind of device configuration method in novel maintenance system |
CN109542031B (en) * | 2018-11-20 | 2021-10-26 | 上海电器科学研究所(集团)有限公司 | Equipment configuration method in remote operation and maintenance system |
CN110377488A (en) * | 2019-07-15 | 2019-10-25 | 福建威盾科技集团有限公司 | A kind of method and system for unifying O&M and dynamic expansion |
CN111782901A (en) * | 2020-08-20 | 2020-10-16 | 支付宝(杭州)信息技术有限公司 | Data acquisition method and device |
CN111782901B (en) * | 2020-08-20 | 2024-08-09 | 支付宝(杭州)信息技术有限公司 | Data acquisition method and device |
CN112380107A (en) * | 2020-12-08 | 2021-02-19 | 无锡无边网络技术有限公司 | Operation and maintenance system data acquisition system and method based on management information system |
Also Published As
Publication number | Publication date |
---|---|
CN106301913B (en) | 2019-08-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106301913A (en) | Operation/maintenance data acquisition system and operation/maintenance data acquisition method | |
CN106375951B (en) | self-optimizing network (SON) system for mobile network | |
US9204329B2 (en) | Distributed RAN information collection, consolidation and RAN-analytics | |
CN100554985C (en) | A kind of method of inspection of north direction interface data integrity | |
EP1394984A1 (en) | Method and Apparatus for Network Resource Utilization Assessment | |
US10684890B2 (en) | Network deployment for cellular, backhaul, fiber optic and other network infrastructure | |
CN106330540A (en) | Automatic operation and maintenance management method of internet | |
EP3958508A1 (en) | Data processing method and device, storage medium and electronic device | |
CN105867837A (en) | Method, equipment and system for updating configurations of clients in distributed high-speed cache systems | |
CN102820984A (en) | Automatic network topology detection and modeling | |
US20220044180A1 (en) | User interface-based mobility transaction management on a maas platform | |
CN105446724B (en) | The management method and device of software parameter | |
CN103514245A (en) | Creating searchable and global data base whose processing tracking is visible to user | |
US20170230272A1 (en) | Fault monitoring in a utility supply network | |
CN108964949A (en) | Virtual machine migration method, SDN controller and computer readable storage medium | |
US20090144743A1 (en) | Mailbox Configuration Mechanism | |
CN105119736A (en) | Data check method and device in network function virtualization architecture | |
CN103532729B (en) | The transmission method and device of information | |
CN107085552A (en) | Method of testing and device | |
CN103778026A (en) | Object calling method and device | |
CN103546563B (en) | terminal software intelligent updating method and system | |
CN107562435A (en) | A kind of batch upgrading method and system based on snapshot | |
CN107005424A (en) | The distributed of the network development process of network element in being disposed for cloud is followed the trail of | |
CN106658378A (en) | Method and system for loading balancing of ecological monitoring IPv6 sensor network | |
EP3424182B1 (en) | Neighbor monitoring in a hyperscaled environment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |