CN106288933B - Horizontal mineral hot furnace waste heat boiler with the deashing device containing elastic deashing rag - Google Patents

Horizontal mineral hot furnace waste heat boiler with the deashing device containing elastic deashing rag Download PDF

Info

Publication number
CN106288933B
CN106288933B CN201610871891.7A CN201610871891A CN106288933B CN 106288933 B CN106288933 B CN 106288933B CN 201610871891 A CN201610871891 A CN 201610871891A CN 106288933 B CN106288933 B CN 106288933B
Authority
CN
China
Prior art keywords
deashing
boiler
rack
heat exchange
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610871891.7A
Other languages
Chinese (zh)
Other versions
CN106288933A (en
Inventor
魏志峰
李达奇
王存和
周骥
张益铭
鲍劲松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Mingshu Cultural Information Consulting Co., Ltd
Original Assignee
Mdt Infotech Ltd Suzhou
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mdt Infotech Ltd Suzhou filed Critical Mdt Infotech Ltd Suzhou
Priority to CN201610871891.7A priority Critical patent/CN106288933B/en
Publication of CN106288933A publication Critical patent/CN106288933A/en
Application granted granted Critical
Publication of CN106288933B publication Critical patent/CN106288933B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28GCLEANING OF INTERNAL OR EXTERNAL SURFACES OF HEAT-EXCHANGE OR HEAT-TRANSFER CONDUITS, e.g. WATER TUBES OR BOILERS
    • F28G1/00Non-rotary, e.g. reciprocated, appliances
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28GCLEANING OF INTERNAL OR EXTERNAL SURFACES OF HEAT-EXCHANGE OR HEAT-TRANSFER CONDUITS, e.g. WATER TUBES OR BOILERS
    • F28G1/00Non-rotary, e.g. reciprocated, appliances
    • F28G1/02Non-rotary, e.g. reciprocated, appliances having brushes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28GCLEANING OF INTERNAL OR EXTERNAL SURFACES OF HEAT-EXCHANGE OR HEAT-TRANSFER CONDUITS, e.g. WATER TUBES OR BOILERS
    • F28G15/00Details
    • F28G15/02Supports for cleaning appliances, e.g. frames
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28GCLEANING OF INTERNAL OR EXTERNAL SURFACES OF HEAT-EXCHANGE OR HEAT-TRANSFER CONDUITS, e.g. WATER TUBES OR BOILERS
    • F28G15/00Details
    • F28G15/04Feeding and driving arrangements, e.g. power operation

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Incineration Of Waste (AREA)

Abstract

The present invention relates to a kind of horizontal mineral hot furnace waste heat boilers with elastic deashing rag deashing device, the waste heat boiler includes multiple horizontal modules, each horizontal module includes the boiler heat exchange tube bank that the more boiler heat exchange pipes arranged along the vertical direction are constituted, deashing device is provided in each horizontal module, the deashing rack of the deashing device includes several elastic deashing rags for clearing up every boiler heat exchange tube outer surface, the every boiler heat exchange pipe and at least two elastic deashing rags are in close contact, the deashing rack can move back and forth in the vertical direction under the action of transmission drive along boiler heat exchange pipe, to the order of contact and coverage degree with heat exchanger tube of elastic deashing rag in the present invention, the lifting frequency of steel wire brush holder, wire brush or steel wire lump material etc. are rationally designed, so that its cleaning efficiency is up to 99 %, brush head long service life, replacement are convenient, reliable and stable.

Description

Horizontal mineral hot furnace waste heat boiler with the deashing device containing elastic deashing rag
Technical field
The present invention relates to mineral hot furnace waste heat boiler technical fields, and in particular to one kind has elastic deashing rag deashing device Horizontal mineral hot furnace waste heat boiler.
Background technique
Mineral hot furnace plays a very important role in industrial furnace system, mainly includes ferrosilicon, ferrochrome, silicomanganese, work The mines heat boiler such as industry silicon, according to Over About Chinese Ferroalloy Industry association relevant statistics, China is the first in the world ferroalloy big producer, National 2435.5 ten thousand tons of yield of ferroalloy in 2010, increases by 10.23% on a year-on-year basis, accounts for 50% or more of World Ferroalloy total output. The ferroalloy industry 90% or so product in China's is produced using mineral hot furnace electrothermal way, and energy consumption is relatively high, is national energy conservation and emission reduction Key industry.The electricity consumption of mineral hot furnace accounts for the 2% of national generating capacity, and power consumption is concerned, and how to make full use of mine hot The waste heat of furnace is that a country actively encourages the power-saving technology widelyd popularize using cogeneration technology, not only energy saving, more Be conducive to environmental protection.Therefore, promote the mineral hot furnace of field transformation and grassroot project constantly towards the UTILIZATION OF VESIDUAL HEAT IN of boiler and Develop under the main trend of clean burning and improves.
During the mines heat boiler electric furnace smelting such as ferrosilicon, industrial silicon, generated waste heat smoke components, which remove, mainly includes Outside the gas componants such as vapor, carbon dioxide, oxygen, nitrogen, sulfur dioxide, also containing with SiO2(being commonly called as silicon powder) is main The exhaust gas dust of ingredient, these exhaust gas dust average grain diameters only have 200~400nm, and very carefully, dust content concentration is higher, have 8~ 12g/Nm3, large specific surface area, thermal insulation is strong, and it is light and very glutinous, electrostatic is easily adsorbed and has, and its cohesiveness is with temperature Raising and enhance, therefore mineral hot furnace waste heat boiler boiler heat exchange tube wall be easy deposition, adhere to above-mentioned exhaust gas dust, significantly Heat exchange, the heat transfer efficiency for reducing boiler, reduce the utilization rate of boiler afterheat, thus in terms of mineral hot furnace UTILIZATION OF VESIDUAL HEAT IN, and When effectively remove boiler work during exhaust gas dust improve its fume afterheat using this be always also mineral hot furnace waste heat pot The key technology that furnace is studied.
Existing mineral hot furnace waste heat reset mode mainly has steel ball deashing, shock-wave ash-clearing and mechanical tube brush deashing, steel ball clear Grey mode due to it is interbank do not need setting deashing device, manufacture require it is low, because its for loose mail dispatch from the factory, transport at also originally it is low, But steel ball deashing is not clean, deashing rate is 60% hereinafter, steel ball and carbon particle enter SILICA FUME, and sintering agglomeration is easy to cause cigarette Gas channel blockage, while high-altitude being overturned when steel ball lifting system accident, easily lead to personnel casualty accidents;Shock-wave ash-clearing mode second Alkynes dosage is very big, and operating cost expense is very high, and deashing is not thorough, and high fume temperature, utilization rate of waste heat is low, can not adapt to mine The needs of hot stove furnace UTILIZATION OF VESIDUAL HEAT IN.
Mechanical tube brush purge mode is the hot spot studied in each ash-clearing technology at this stage, and cleaning efficiency is relatively high;Example Such as, Chinese patent CN104296592A discloses a kind of mechanical airflow formula exchanging pipe of boiler by waste clearing apparatus, cleans dress It sets including two clamping limbs, metal steel wire cleaning ball and steel wire lump state holder, steel wire lump state holder and metallic steel Silk cleaning ball abuts against;Chinese patent CN201555501U also discloses a kind of exchanging pipe of boiler by waste group and is filled with mechanical sweeper It sets comprising dust cleaning brush is arranged on deashing brush holder in deashing brush holder, brush holder elevating mechanism etc., in the reciprocal fortune of brush holder elevating mechanism The lower every heat exchanger tube for cleaning set of heat exchange tubes of movement;Chinese patent CN 204922925U discloses a kind of heating furnace flue waste heat Recycle the steel brush ash-cleaning device for preventing dust stratification of boiler comprising one is disposed around the steel structure frame of boiler tube bundle periphery, shuttles Girder steel between boiler tube bundle in neutral gear, and the stainless steel brush head being mounted on the girder steel, the girder steel be in each neutral gear It is equidirectional arranged in parallel, and be upper and lower, upper and lower rule dislocation arrangement, every 4 stainless steel brush heads surround a boiler Tube bank;Chinese patent CN202733862U discloses a kind of hot waste heat boiler of horizontal mine with brusher deashing device, the waste heat The deashing device of boiler is equally the fixation device with a frame-type brush, fixes on device at it and divides equipped with upper and lower ends The multiple wire brushes not being fixed on frame, the fixed device of the brush of the frame-type under the drive of the transmission mechanism, move up and down Carry out deashing.
Above-mentioned cited patent document its be the heat exchanger tube using the brush deashing mechanism of mechanical tube to waste heat boiler It is cleaned, and partial monopoly also discloses that its brush head is that multiple stainless steel brushes or steel wire ball brush are fixed on brush holder, is being driven Under the movement of driving mechanism, its heat exchanger tube is cleaned in brush holder reciprocating motion, but existing above-mentioned mechanical tube brush cleaner Its not order of contact to wire brush or steel wire ball brush and heat exchanger tube and coverage degree, the lifting driving method of steel wire brush holder, steel wire Brush or steel wire lump material etc. are rationally designed, or even also unclear to tube brush to the modes of emplacement of waste heat boiler (vertical or horizontal) The influence of grey mode accounts for, therefore already to there is cleaning efficiency not high enough for existing waste heat boiler machinery tube brush purge mode The technical problems such as the service life of (not reaching 99% or more), wire brush or steel wire ball brush is short and brush head is inconvenient to replace.
The first CN103471073A of granted patent of the related invention people of the application discloses a kind of with multiple vertical The waste heat boiler of module, the waste heat boiler have mechanical brush ash removing mechanism, several heat exchanger tubes of the deashing mechanism have edge The coiled pipe membrane wall structure of horizontal direction arrangement or the multilayer tube bundle unit of single extended surface tube structure composition, hanging is installed on every Between two layers of tube bundle unit can horizontal direction move back and forth bar shaped brush unit exchange heat pipe wall dust stratification cleaned with water;But it sends out Bright people institute it is found out that, the vertical exhaust-heat boiler is when using mechanical tube brush purge mode deashing, in prolonged deashing process The boiler heat exchange pipe of horizontality is bent since the weight tube body of itself easily dangles along position of centre of gravity, makes the item of horizontal reciprocating movement Shape brush unit is easy to be stuck, so that the cleaning efficiency of the brush ash removing mechanism of machinery of vertical exhaust-heat boiler is declined.
Summary of the invention
In order to overcome above-mentioned present in mineral hot furnace waste heat boiler machinery tube brush deashing device described in the prior art lack It falls into, the present invention provides a kind of mechanical tube brush purge mode using horizontal arrangement, has high-efficiency cleaning efficiency, brush head service life Long, replacement easily has the horizontal mineral hot furnace waste heat boiler of elastic deashing rag deashing device.Specific technical solution is as follows:
A kind of horizontal mineral hot furnace waste heat boiler with elastic deashing rag deashing device, the waste heat boiler include multiple sleeping Formula module, horizontal steel structure frame are fixed in horizontal steel structure frame and there is the flue gas of gas inlet and exhanst gas outlet at both ends Channel, each horizontal module includes the boiler heat exchange tube bank that the more boiler heat exchange pipes arranged along the vertical direction are constituted, special Sign is, the deashing device restrained boiler heat exchange and carry out deashing is provided in each horizontal module, and the deashing device is main It is changed including deashing rack, fixing element, elastic deashing rag and transmission drive, the deashing rack perpendicular to the boiler Heat pipe bundle setting, the boiler heat exchange pipe radius are R, and the deashing rack includes for clearing up outside every boiler heat exchange pipe Several elastic deashing rags on surface, it is described for being removably secured the fixing element for installing the elastic deashing rag Fixing element is removably mounted on the deashing rack, the every boiler heat exchange pipe and at least two elastic deashing rags It is in close contact, the deashing rack can be past in the vertical direction along boiler heat exchange pipe under the action of the transmission drive Multiple movement.
Preferably, the spacing in adjacent two boiler heat exchanges pipe face is of substantially equal, if the spacing is L;Several described elasticity are clear Grey rag is removably secured at least one fixing element for being installed on deashing rack, the deashing rack of being fixedly installed in Elastic deashing rag in fixing element is essentially in the maximum horizontal section under natural conditions not contacted with boiler heat exchange pipe Circle, the circular diameter are D, and Preferably,
If the spacing in adjacent two boiler heat exchanges pipe face differs greatly, if between the airflow direction boiler heat exchange pipe of horizontal boiler Away from, vertically with the boiler heat exchange tube spacing of airflow direction be respectively L1 and L2 (L1 ≠ L2);Several described elastic deashing rags It is removably secured at least one fixing element for being installed on deashing rack, the fixed member for being fixedly installed in deashing rack Elastic deashing rag on part is substantially circular in the maximum horizontal section under natural conditions not contacted with boiler heat exchange pipe, should Circular diameter is D, and Or Preferably,
Preferably, several described elastic deashing rags can be circular ring shape, the cylindrical branch being provided on deashing rack The hollow interior cylinder of support structure, deashing rag is connected together therewith.
Preferably, the fixing element is metal bead, and the elasticity deashing rag is mounted by means of bolts on described On metal bead.
It is further preferred that adjacent two metal bead intervals and being alternately arranged in up and down described on the deashing rack In two planes of deashing rack.The adjacent spring deashing rag is also staggered in two planes up and down of deashing rack On.
Preferably, the transmission drive can be following one of driving kinds of drive:
A. the transmission drive includes the multiple pulleys for being fixed at the framework two sides of the deashing rack, with What the pulley was slidably matched is arranged in the sliding guide groove and the transmission driving deashing net on boiler heat exchange tube bank fixed frame Driving wheel, transmission steel wire and the driving motor that the pulley of frame two sides pumps along the sliding guide groove;
B. the transmission drive includes the rigid gear for being fixed at the framework two sides of deashing rack, and setting exists Boiler heat exchange restrains the rigid toothed engaged with the gear and the driving rigid gear rack gear engagement biography on fixed frame Dynamic linear drive motor;
C. the transmission drive include the screw nut driven mechanism being fixedly connected with the framework of deashing rack and Driving motor.
Preferably, the transmission drive controls deashing rack using variable-frequency motor using Asynchronous Frequency-variable transmission driving The speed of reciprocating motion so that in the deashing process that the deashing rack moves back and forth, the speed of upward stroke be greater than to The speed of down stroke.
Preferably, the deashing rack uses 310S stainless steel material, and the elastic deashing rag is stainless using 316 Steel wire drawing is made.
Preferably, there are expansion clearance, the expansions between deashing rack edge and the box inside of the rack Gap is 30mm~60mm.
It is further preferred that below the cabinet of the corresponding rack (6) of each horizontal module (8), be respectively arranged with The ash dropping hopper of ash pipe of sauntering connection, the ash pipe of sauntering is equipped with ash-removing valve.
Present invention advantageous effects obtained:
1) present invention employs heat exchanger tube of the purge mode of mechanical tube brush to waste heat boiler to carry out deashing, cleaning efficiency Up to 99% or more, and elastic deashing rag long service life, replacement are convenient;
2) in the deashing process of the invention in elastic deashing rag to exchanging pipe of boiler by waste, to deashing rag and heat exchanger tube Order of contact and coverage degree carried out reasonable design, make elastic deashing rag in the nature not contacted with boiler heat exchange pipe Under circular cross-section D and heat exchanger tube radius R, adjacent heat exchange tube spacing L, therebetween exist It is preferred thatRelationship, can make boiler heat exchange pipe in by the deashing process of elastic deashing rag 100% quilt Contact and cladding;Further, the metal bead interval of elastic deashing rag will be installed and be staggered up and down, so as to same root Heat exchanger tube carries out the clean corresponding elastic deashing rag being arranged on two neighboring metal bead in exchange heat pipe deashing The middle service life for further improving cleaning efficiency there are overlapping region and improve deashing rag;
3) deashing device of the hot waste heat boiler of horizontal mine of the invention, the metal bead for installing flexible deashing rag can It is releasably mounted on deashing rack, when elastic deashing rag needs replacing, it is only necessary to from boiler maintenance mouth by the gold Belong to press strip disassembly extraction, replacement metal bead is whole, is also convenient to replacement by bolt and is mounted on metal bead elasticity clearly Grey rag;
4) in deashing process, transmission drive is driven the present invention using asynchronous transmission, is controlled by variable-frequency motor The speed that deashing rack moves back and forth, and the speed of upward stroke is made to be greater than the speed of downward stroke, being arranged such prevents deashing The exhaust gas dust of lighter weight can be adhered to again on the upper end heat exchanger tube cleaned with ascending air during rack decline, into One step improves cleaning efficiency;
5) present invention reasonably selects the main materials such as deashing rack, elastic deashing rag, and deashing rack uses 310S stainless steel material, elastic deashing rag are made of 316 stainless steel wire drawings, and brake heat resistance temperature can achieve 1150 DEG C, maximum temperature reaches 1250 DEG C, it is ensured that boiler can operate normally under the conditions of the high smoke temperature of the limit (1050 DEG C).
6) there are 30mm~60mm between waste heat boiler deashing rack edge and the box inside of the rack of the invention Expansion clearance, which ensures that deashing racks after expanded by heating, will not cut to pieces with box frame in pumping It rubs, avoids occurring the stuck situation generation of deashing brush holder again;The present invention is single also below the rack cabinet of each horizontal module Only setting ash dropping hopper and ash-removing valve, realize to mineral hot furnace cigarette ash it is autonomous, controllable, stage by stage, deashing step by step.
Detailed description of the invention
The invention will be further described with reference to the accompanying drawings and embodiments:
Fig. 1 is the schematic diagram of internal structure of the horizontal mineral hot furnace waste heat boiler of the present invention;
Fig. 2 is the schematic view of the front view of deashing device involved in the present invention;
Fig. 3 is the side structure schematic view of deashing device involved in the present invention;
Fig. 4 is the overlooking structure diagram of deashing device involved in the present invention;
Fig. 5 is the structural schematic diagram of the preferred transmission drive of deashing device involved in the present invention;
Fig. 6 a, 6b are to use horizontal mineral hot furnace waste heat boiler actual effect figure before and after deashing of the invention.
Detailed description of the invention: 1- boiler heat exchange pipe, 2- boiler heat exchange restrain fixed frame, 3- deashing device, 4- gas inlet, 5- cigarette Gas outlet, 6- rack, 7- exhaust gases passes, the horizontal module of 8-, 31- deashing rack, 32- fixing element, 33- elasticity deashing rag, 34- bolt, 35- transmission device, 351- pulley;352- sliding guide groove, 353- spacing block set, 354- driving wheel, 355- are driven steel Silk, 36- driving device
Specific embodiment
Technical solution for a clearer understanding of the present invention will pass through the drawings and specific embodiments to of the invention below Technical solution is described in further detail.
As shown in Figure 1, the deashing device of the hot waste heat boiler of horizontal mine of the invention, the waste heat boiler include horizontal steel construction Rack 6 is fixed in horizontal steel structure frame 6 and there are the exhaust gases passes 7 of gas inlet 4 and exhanst gas outlet 5 at both ends, are located at flue gas Between import 4 and exhanst gas outlet 5 and dismountable multiple horizontal modules 8;The quantity of the horizontal module is 4-14, wherein every A horizontal module 8 includes the boiler heat exchange tube bank that the more boiler heat exchange pipes 1 arranged along the vertical direction are constituted, for vertical side Transmission dress to the deashing device 3 for back and forth removing the boiler heat exchange tube bank superficial dust, for moving back and forth deashing mechanism 35 are set, and provides the driving device 36 of power to the transmission device.
As in Figure 2-4, the deashing device 3 of the hot waste heat boiler of horizontal mine of the invention includes deashing rack 31, fixes Element 32, elastic deashing rag 33 and bolt 34, more vertical directions possessed by the horizontal module 8 of each of waste heat boiler extend Boiler heat exchange pipe 1 uniformly arrange in matrix form, deashing rack 31 and boiler heat exchange are restrained and are vertically arranged, as fixing element 32 The each row's boiler heat exchange tube bank of metal bead uniform intervals be removably mounted on deashing rack 31, the elasticity deashing is smeared Cloth 33 is removably secured and is mounted on the metal bead by specific bolt 34 so that every boiler heat exchange pipe 1 with extremely Few two elastic deashings smear the close contact of 33 cloth;Wherein, deashing rack 31, metal bead are all made of 310S stainless steel material.
Reasonable design is carried out to the order of contact and coverage degree of deashing rag and heat exchanger tube in the present embodiment, if boiler changes The radius of heat pipe 1 is R, and the spacing in adjacent two boiler heat exchanges pipe face is of substantially equal, if the spacing is L;Bullet on deashing rack 31 Property deashing rag 33 in the maximum horizontal section under natural conditions not contacted with boiler heat exchange pipe be it is substantially round, be directly D will then be such that D meets Or preferablySo that boiler heat exchange pipe is elastic 100% is contacted and is coated in the deashing process of deashing rag, improves cleaning efficiency well.
In addition, the boiler along the airflow direction of horizontal boiler changes if the spacing in adjacent two boiler heat exchanges pipe face differs greatly Heat pipe spacing vertically with the boiler heat exchange tube spacing of airflow direction is set to L1 and L2 (L1 ≠ L2);Several described elasticity Deashing rag is removably secured at least one fixing element for being installed on deashing rack, described to be fixedly installed in deashing rack Fixing element on elastic deashing rag it is basic in the maximum horizontal section under natural conditions not contacted with boiler heat exchange pipe For circle, which is D, andOrPreferably,
(do not show in attached drawing in addition, being additionally provided with access hole on the rack cabinet of horizontal mineral hot furnace waste heat boiler of the invention Out), when elastic deashing rag needs replacing, it is only necessary to dismantle extraction, replacement from boiler maintenance mouth by the metal bead Metal bead is whole, is also convenient to replacement by bolt and is mounted on metal bead elastic deashing rag.
Further, as shown in figure 5, it illustrates transmission driving deashing rack 31 in the present embodiment is past up and down along the vertical direction Multiple movement carries out the transmission device 35 and driver 36 of deashing operation, and transmission device 35 is described including being fixed at Multiple pulleys 351 of the framework two sides of deashing rack are arranged in the setting that pulley is slidably matched and restrain fixed frame in boiler heat exchange On sliding guide groove 352, the retention bead 353 in sliding guide groove upper and lower ends portion is set, and the transmission deashing rack two The driving wheel 354 and transmission steel wire 355 that the pulley 351 of side pumps along the sliding guide groove 352, drive driving wheel 354 driving device 36 with the transmission rotation of steel wire 355 to drive deashing rack 31 to pump is a driving motor; In deashing operation, the pulley 351 of deashing rack two sides is restrained with the setting that pulley is slidably matched is arranged in boiler heat exchange Sliding guide groove 352 on fixed frame is fitted close, and under the driving of driving motor, drives deashing rack edge by transmission device 35 Boiler heat exchange tube bank axial direction is pumped with certain frequency, and the multiple elastic deashings being arranged on deashing rack are smeared Cloth 33 is purged the exhaust gas dust of the upper deposition of every boiler root boiler heat exchange pipe 1, wherein retention bead is used for deashing The reciprocating motion of rack is limited, and prevents it from skidding off boiler heat exchange pipe 1;In addition, in the present embodiment for transmission driving dress It sets using Asynchronous Frequency-variable transmission driving, the speed moved back and forth using variable-frequency motor control deashing rack keeps deashing rack 31 past In the deashing process moved again, the speed of upward stroke is greater than the speed of downward stroke, and 31 rate of climb of deashing rack is set It is set to a, decrease speed b, and a > b, reciprocal deashing frequency is set as 0.2~2 time/min, preferably 1 time/min, is designed in this way, Purge mode has been advanced optimized, effectively dust has been avoided to deposit on brush, and has prevented quality during the decline of deashing rack Lighter exhaust gas dust can be adhered to again on the upper end heat exchanger tube cleaned with ascending air, further improve deashing effect Rate.
As shown in fig. 6, the horizontal mineral hot furnace waste heat boiler for showing deashing device described in the present embodiment is real before and after deashing Border effect picture carries out deashing, deashing effect to horizontal mineral hot furnace waste heat boiler using deashing device described in the embodiment of the present invention For rate up to up to 99%, clean-up performance is high.
Embodiment of above is the preferred embodiment of the present invention, and the present invention can be using preferred side described in summary of the invention Any combination of formula, for example, in another preferred embodiment of the present invention, it can be by two adjacent on deashing rack 31 It metal bead interval and is alternately arranged in two planes of the deashing rack 31 up and down, the adjacent spring deashing rag It is staggered in two planes up and down of deashing rack therewith.It is arranged so that and clean set is carried out to same root heat exchanger tube Setting the corresponding elastic deashing rag on two neighboring metal bead, there are overlapping regions into one in exchange heat pipe deashing Step, which improves cleaning efficiency and improves, extends the service life of deashing rag.Preferably, horizontal mineral hot furnace of the invention In the deashing device of waste heat boiler, it is swollen that there are 30mm~60mm between deashing rack edge and the box inside of the rack Swollen gap, such setting ensure deashing rack after expanded by heating, will not occur with box frame in pumping It scratches, avoids occurring the stuck situation generation of deashing brush holder again;Preferably, horizontal mineral hot furnace waste heat boiler of the invention is every Below the cabinet of the corresponding rack 6 of a horizontal module 8, the ash dropping hopper of the ash pipe that is respectively arranged with and saunters connection, the ash of sauntering Pipe is equipped with ash-removing valve, so set, realize to mineral hot furnace cigarette ash it is autonomous, controllable, stage by stage, deashing step by step;In addition, For the transmission device of deashing rack, pass through a drive except using driving wheel 354 described in above-described embodiment and being driven steel wire 355 It is outer that dynamic motor drive drives the pulley 351 of deashing rack to pump along sliding guide groove 352, driving wheel 354, transmission steel Silk 355 can also be substituted using sprocket wheel with chain, and driving motor is also possible to two, and the left and right sides respectively drives;In addition, Driving transmission device is also possible to other kinds of drive described in the present application content part or other liters in the prior art Drop transmission driving method, is no longer described in detail herein.
In short, horizontal mineral hot furnace waste heat boiler of the invention, cleaning efficiency height, brush head long service life, replacement are convenient, It is reliable and stable, failure rate is low, easy to operate, easy to maintain, cleaning efficiency is up to 99%, and elastic deashing rag deashing is thorough, permanent Fixed, boiler heat exchange tube wall surface can not increase dust stratification over time again, and production air-flow is permanently unattenuated, high-temperature flue gas benefit With rate height, the flue gas discharge opening flue-gas temperature that be averaged falls below 160 DEG C~140 DEG C, and the high-temperature flue gas of relatively existing waste heat filtering is sharp It is greatly improved with rate, following table table 1 is the horizontal mineral hot furnace waste heat boiler and the prior art using deashing device of the present invention (CN103471073A) the running partial parameters comparison of the waste heat boiler of vertical type module.
Table 1
Finally, it is to be noted that, the foregoing is merely specifically embodiment of the invention or preferred embodiment party Formula is not intended to limit the scope of the invention, made by record of all those skilled in the art using present specification Equivalent structure or equivalence changes are directly or indirectly applied in other relevant technical fields, are similarly included in the present invention In the protection scope of patent application.

Claims (8)

1. a kind of horizontal mineral hot furnace waste heat boiler with the deashing device containing elastic deashing rag, which includes multiple Horizontal module (8), horizontal steel structure frame (6), be fixed in horizontal steel structure frame (6) and both ends have gas inlet (4) and The exhaust gases passes (7) of exhanst gas outlet (5), each horizontal module (8) include the more boiler heat exchange pipes arranged along the vertical direction (1) the boiler heat exchange tube bank constituted, which is characterized in that be provided in each horizontal module (8) and progress is restrained to boiler heat exchange The deashing device (3) of deashing, the deashing device (3) mainly include deashing rack (31), fixing element (32), elastic deashing rag (33) and transmission drive, the deashing rack (31) restrain setting, the boiler heat exchange perpendicular to the boiler heat exchange Pipe radius is R, and the deashing rack (31) includes clear for clearing up several elasticity of every boiler heat exchange pipe (1) outer surface Grey rag (33), for being removably secured the fixing element (32) for installing the elastic deashing rag (33), the fixed member Part (32) is removably mounted on the deashing rack (31), and the every boiler heat exchange pipe (1) and at least two elasticity are clear Grey rag (33) is in close contact, and the deashing rack (31) is under the action of the transmission drive along boiler heat exchange pipe (1) it moves back and forth in the vertical direction;The spacing in adjacent two boiler heat exchanges pipe face is of substantially equal, which is L;It is described several Elastic deashing rag is removably secured at least one fixing element (32) for being installed on deashing rack (31), the fixed peace Elastic deashing rag in fixing element (32) loaded on deashing rack (31) is in the natural shape not contacted with boiler heat exchange pipe (1) Maximum horizontal section under state is substantially circular, which is D, and D >=, the horizontal mine heat Access hole is provided on the rack cabinet of furnace waste heat boiler.
2. horizontal mineral hot furnace waste heat boiler according to claim 1, which is characterized in that if adjacent two boiler heat exchanges pipe face Spacing differs greatly, the boiler heat exchange tube spacing along the airflow direction of horizontal boiler, the boiler heat exchange pipe perpendicular to airflow direction Spacing is set to L1 and L2, and L1 ≠ L2;Several described elastic deashing rags, which are removably secured, is installed on deashing rack At least one fixing element (32) on, the elastic deashing in the fixing element (32) for being fixedly installed in deashing rack (31) Rag is substantially circular in the maximum horizontal section under natural conditions not contacted with boiler heat exchange pipe, which is D, And D >=, wherein L1 < L2;Or D >=, wherein L1 > L2.
3. -2 described in any item horizontal mineral hot furnace waste heat boilers according to claim 1, which is characterized in that the fixing element It (32) is metal bead, the elasticity deashing rag (33) is fixedly mounted on the metal bead by bolt (34).
4. horizontal mineral hot furnace waste heat boiler according to claim 3, which is characterized in that adjacent bullet on the deashing rack It property deashing rag interval and is alternately arranged in two planes up and down of the deashing rack (31) up and down.
5. -2 described in any item horizontal mineral hot furnace waste heat boilers according to claim 1, which is characterized in that the transmission driving Device is following one of driving kind of drive:
A. the transmission drive includes the multiple pulleys (351) for being fixed at the framework two sides of the deashing rack, Sliding guide groove (352) and transmission of the setting being slidably matched with the pulley (351) in boiler heat exchange tube bank fixed frame (2) Driving wheel (354), the transmission steel wire for driving the pulley of deashing rack two sides to pump along the sliding guide groove (355) and driving motor;
B. the transmission drive includes the rigid gear for being fixed at the framework two sides of deashing rack, is arranged in pot The rigid toothed engaged with the gear and the driving rigid gear and the rigid teeth on furnace heat-exchanging tube bundle fixed frame The linear drive motor of item engaged transmission;
C. the transmission drive includes the screw nut driven mechanism and driving being fixedly connected with the framework of deashing rack Motor.
6. -2 described in any item horizontal mineral hot furnace waste heat boilers according to claim 1, the transmission drive is using asynchronous Frequency conversion transmission driving, the speed moved back and forth using variable-frequency motor control deashing rack (31), so that the deashing rack (31) In the deashing process of reciprocating motion, the speed of upward stroke is greater than the speed of downward stroke.
7. -2 described in any item horizontal mineral hot furnace waste heat boilers according to claim 1, the deashing rack (31) is used 310S stainless steel material, the elastic deashing rag are made of 316 stainless steel wire drawings.
8. -2 described in any item horizontal mineral hot furnace waste heat boilers according to claim 1, which is characterized in that the deashing rack (31) between edge and the box inside of the horizontal steel structure frame (6) there are certain interval, the gap be 30mm~ 60mm。
CN201610871891.7A 2016-09-30 2016-09-30 Horizontal mineral hot furnace waste heat boiler with the deashing device containing elastic deashing rag Active CN106288933B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610871891.7A CN106288933B (en) 2016-09-30 2016-09-30 Horizontal mineral hot furnace waste heat boiler with the deashing device containing elastic deashing rag

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610871891.7A CN106288933B (en) 2016-09-30 2016-09-30 Horizontal mineral hot furnace waste heat boiler with the deashing device containing elastic deashing rag

Publications (2)

Publication Number Publication Date
CN106288933A CN106288933A (en) 2017-01-04
CN106288933B true CN106288933B (en) 2019-04-30

Family

ID=57715965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610871891.7A Active CN106288933B (en) 2016-09-30 2016-09-30 Horizontal mineral hot furnace waste heat boiler with the deashing device containing elastic deashing rag

Country Status (1)

Country Link
CN (1) CN106288933B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111238288B (en) * 2020-03-11 2024-05-03 广东中鹏热能科技股份有限公司 Ash removal device and ash removal method for tubular heat exchanger
CN116538822A (en) * 2023-05-08 2023-08-04 中国新型建材设计研究院有限公司 Automatic material cleaning device in steam boiling furnace

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0774640A1 (en) * 1995-11-15 1997-05-21 Wehrle-Werk Ag Pipe cleaning device
CN202521621U (en) * 2012-03-05 2012-11-07 大连易世达新能源发展股份有限公司 A waste heat boiler dust removal device
CN103471073A (en) * 2013-09-06 2013-12-25 昆山市利昆机电设备有限公司 Waste heat boiler with a plurality of vertical modules
CN103471072A (en) * 2013-09-06 2013-12-25 昆山市利昆机电设备有限公司 Vertical module of waste heat boiler
CN103471120A (en) * 2013-09-06 2013-12-25 昆山市利昆机电设备有限公司 Ash removing transmission mechanism of waste heat boiler
CN103528427A (en) * 2013-10-31 2014-01-22 昆山市利昆机电设备有限公司 Mechanical brush type ash removing mechanism for stand type waste heat boiler
CN203489294U (en) * 2013-09-06 2014-03-19 昆山市利昆机电设备有限公司 Dust removal transmission mechanism of waste heat boiler
CN203489230U (en) * 2013-09-06 2014-03-19 昆山市利昆机电设备有限公司 Vertical module of waste heat boiler
CN203489229U (en) * 2013-09-06 2014-03-19 昆山市利昆机电设备有限公司 Waste heat boiler with multiple vertical modules
CN203550758U (en) * 2013-10-31 2014-04-16 昆山市利昆机电设备有限公司 Replaceable boiler cleaning brush part
CN203550759U (en) * 2013-10-31 2014-04-16 昆山市利昆机电设备有限公司 Mechanical brush type ash removing mechanism of vertical type waste heat boiler
CN203550760U (en) * 2013-10-31 2014-04-16 昆山市利昆机电设备有限公司 Guide rail structure for ash-removing mechanism of boiler
CN204922925U (en) * 2015-09-01 2015-12-30 钢铁研究总院 Prevent steel brush ash removal device of deposition
CN206399280U (en) * 2016-09-30 2017-08-11 苏州恩闻信息科技有限公司 The horizontal mineral hot furnace waste heat boiler of flexible deashing rag deashing device

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0774640A1 (en) * 1995-11-15 1997-05-21 Wehrle-Werk Ag Pipe cleaning device
CN202521621U (en) * 2012-03-05 2012-11-07 大连易世达新能源发展股份有限公司 A waste heat boiler dust removal device
CN203489294U (en) * 2013-09-06 2014-03-19 昆山市利昆机电设备有限公司 Dust removal transmission mechanism of waste heat boiler
CN103471072A (en) * 2013-09-06 2013-12-25 昆山市利昆机电设备有限公司 Vertical module of waste heat boiler
CN103471120A (en) * 2013-09-06 2013-12-25 昆山市利昆机电设备有限公司 Ash removing transmission mechanism of waste heat boiler
CN103471073A (en) * 2013-09-06 2013-12-25 昆山市利昆机电设备有限公司 Waste heat boiler with a plurality of vertical modules
CN203489230U (en) * 2013-09-06 2014-03-19 昆山市利昆机电设备有限公司 Vertical module of waste heat boiler
CN203489229U (en) * 2013-09-06 2014-03-19 昆山市利昆机电设备有限公司 Waste heat boiler with multiple vertical modules
CN103528427A (en) * 2013-10-31 2014-01-22 昆山市利昆机电设备有限公司 Mechanical brush type ash removing mechanism for stand type waste heat boiler
CN203550758U (en) * 2013-10-31 2014-04-16 昆山市利昆机电设备有限公司 Replaceable boiler cleaning brush part
CN203550759U (en) * 2013-10-31 2014-04-16 昆山市利昆机电设备有限公司 Mechanical brush type ash removing mechanism of vertical type waste heat boiler
CN203550760U (en) * 2013-10-31 2014-04-16 昆山市利昆机电设备有限公司 Guide rail structure for ash-removing mechanism of boiler
CN204922925U (en) * 2015-09-01 2015-12-30 钢铁研究总院 Prevent steel brush ash removal device of deposition
CN206399280U (en) * 2016-09-30 2017-08-11 苏州恩闻信息科技有限公司 The horizontal mineral hot furnace waste heat boiler of flexible deashing rag deashing device

Also Published As

Publication number Publication date
CN106288933A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN106247361B (en) A kind of special deashing device of horizontal mineral hot furnace waste heat boiler
CN103471120B (en) The deashing drive mechanism of waste heat boiler
CN206399280U (en) The horizontal mineral hot furnace waste heat boiler of flexible deashing rag deashing device
CN206398735U (en) A kind of special deashing device of horizontal mineral hot furnace waste heat boiler
CN106288933B (en) Horizontal mineral hot furnace waste heat boiler with the deashing device containing elastic deashing rag
CN101402012A (en) Crystal cotton frameless pulse precipitation apparatus
CN221319813U (en) Novel preheater component of lime rotary kiln
CN101210778A (en) Energy-saving heat exchange compressor
CN203489229U (en) Waste heat boiler with multiple vertical modules
CN108827011A (en) Telescopic bonnet for silicon carbide smelting exhaust collection
CN103528427B (en) A kind of machinery brush ash removing mechanism of vertical exhaust-heat boiler
CN203550759U (en) Mechanical brush type ash removing mechanism of vertical type waste heat boiler
CN205606608U (en) Boiler ash removal device
CN116734279B (en) Straight pipe type flue gas heat exchange device
CN103471073B (en) There is the waste heat boiler of multiple vertical type module
CN202747369U (en) Balance type exhaust-heat boiler dust removal device
CN217274044U (en) Coal economizer device of smoke waste heat boiler of rotary hearth furnace
CN203489294U (en) Dust removal transmission mechanism of waste heat boiler
CN2150514Y (en) Heat-pipe heat exchanger
CN215373545U (en) Efficient cooling mechanism for kiln tail for preparing coal gangue bricks
CN209541155U (en) Hot-blast stove is used in a kind of production of washing powder
CN102052856A (en) Dust collecting and waste heat utilizing system for argon oxygen decarburization furnace
CN101701747A (en) Heating device
CN206831536U (en) Coal-burning boiler back-end ductwork dust stratification remove device
CN203550758U (en) Replaceable boiler cleaning brush part

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Wei Zhifeng

Inventor after: Li Daqi

Inventor after: Wang Cunhe

Inventor after: Zhou Ji

Inventor after: Zhang Yiming

Inventor after: Bao Jinsong

Inventor before: Bao Jinsong

Inventor before: Zhang Yiming

Inventor before: Li Mingping

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191223

Address after: 215000 office building 3-316, 3-317, 3-318, 101 Kefa Road, Suzhou hi tech Zone, Suzhou, Jiangsu Province

Patentee after: Suzhou Mingshu Cultural Information Consulting Co., Ltd

Address before: 215000 No. 225 Middle Road, Suzhou Industrial Park, Suzhou, Jiangsu, China

Patentee before: Mdt InfoTech Ltd Suzhou

TR01 Transfer of patent right
CP03 Change of name, title or address

Address after: 215000 3-316, 3-317, 3-318, No. 101 Kefa Road, high tech Zone, Suzhou, Jiangsu Province

Patentee after: Suzhou Mingshu culture and Technology Development Co., Ltd

Address before: 215000 office building 3-316, 3-317, 3-318, 101 Kefa Road, Suzhou hi tech Zone, Suzhou, Jiangsu Province

Patentee before: Suzhou Mingshu Cultural Information Consulting Co.,Ltd.

CP03 Change of name, title or address