CN106288152A - Apparatus monitoring method and device - Google Patents
Apparatus monitoring method and device Download PDFInfo
- Publication number
- CN106288152A CN106288152A CN201610630718.8A CN201610630718A CN106288152A CN 106288152 A CN106288152 A CN 106288152A CN 201610630718 A CN201610630718 A CN 201610630718A CN 106288152 A CN106288152 A CN 106288152A
- Authority
- CN
- China
- Prior art keywords
- equipment
- monitored
- whole machine
- abnormal
- software implementation
- Prior art date
Links
- 230000002159 abnormal effects Effects 0.000 claims abstract description 29
- 238000009434 installation Methods 0.000 claims abstract description 7
- 238000004378 air conditioning Methods 0.000 claims description 9
- 239000003570 air Substances 0.000 claims description 2
- 238000005538 encapsulation Methods 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 6
- 238000000034 methods Methods 0.000 abstract description 6
- 230000000875 corresponding Effects 0.000 description 3
- 239000000203 mixtures Substances 0.000 description 3
- 238000010586 diagrams Methods 0.000 description 2
- 238000005516 engineering processes Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000006011 modification reactions Methods 0.000 description 2
- 239000012141 concentrates Substances 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000000051 modifying Effects 0.000 description 1
- 230000001105 regulatory Effects 0.000 description 1
- 238000006467 substitution reactions Methods 0.000 description 1
- 230000000153 supplemental Effects 0.000 description 1
- 230000033772 system development Effects 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/30—Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/62—Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/50—Control or safety arrangements characterised by user interfaces or communication
- F24F11/52—Indication arrangements, e.g. displays
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/50—Control or safety arrangements characterised by user interfaces or communication
- F24F11/56—Remote control
- F24F11/59—Remote control for presetting
Abstract
Description
Technical field
The present invention relates to equipment processing technology field, in particular to a kind of apparatus monitoring method and device.
Background technology
For large commercial equipment, in use, equipment is carried out maintenance and be to ensure that air-conditioning can be grown The guarantee of effect safe operation.But, in actual use, it is difficult to ensure that there is sufficient amount of technical staff can arrive various places to setting For carrying out real-time servicing.
Existing mode is by monitoring after data software gets substantial amounts of unit data, then is shown to set by software Meter developer be analyzed, and Air-conditioner design personnel need to analyze problem Producing reason from substantial amounts of unit data, this The mode of kind wastes time and energy, and inefficient.
For the problems referred to above, effective solution is the most not yet proposed.
Summary of the invention
Embodiments provide a kind of apparatus monitoring method, to solve monitoring of tools of the prior art and to safeguard behaviour Take time and effort, the technical problem of inefficiency, the method includes:
Obtain ambient parameter and the real time execution parameter of the installation site of equipment to be monitored;
Load the software implementation whole machine model of described equipment to be monitored, and joined by described ambient parameter and described real time execution Number drives the software implementation whole machine model of described equipment to be monitored;
According to being in the whole machine model of negative load condition, determine that described equipment to be monitored is the most abnormal;
If it is determined that described equipment to be monitored exists abnormal, then show the out-of-the way position of described equipment to be monitored and abnormal shape State.
In one embodiment, according to being in the whole machine model of negative load condition, whether described equipment to be monitored is determined Abnormal, including:
According to default unit exception management logic, perform whether to run to the described whole machine model being in negative load condition Abnormal judgement, to determine that described equipment to be monitored is the most abnormal.
In one embodiment, after determining that described equipment to be monitored exists extremely, also include:
Determine and extremely whether can carry out remote control and regulation;
If it is then carry out preconditioning in described whole machine model, after debugging successfully, transmitting control commands is to described Equipment to be monitored carries out remote control and regulation;
If it is not possible, then carry out preconditioning in described whole machine model, after debugging successfully, generate abnormality processing side Case.
In one embodiment, before loading the software implementation whole machine model of described equipment to be monitored, described method is also Including:
Obtain the data file of all parts in the 3D model of described equipment to be monitored, and described equipment to be monitored;
According to the logical relation between described all parts, described all parts is carried out assembly and in described 3D model It is packaged, forms described software implementation whole machine model.
In one embodiment, described equipment to be monitored is air conditioning unit.
The embodiment of the present invention additionally provides a kind of equipment monitoring apparatus, to solve monitoring of tools of the prior art and maintenance Operation takes time and effort, the technical problem of inefficiency, and this device includes:
First acquisition module, for obtaining ambient parameter and the real time execution parameter of the installation site of equipment to be monitored;
Load-on module, for loading the software implementation whole machine model of described equipment to be monitored, and by described ambient parameter with The software implementation whole machine model of equipment to be monitored described in described real time execution driving parameter;
First determines module, is in the whole machine model of negative load condition for basis, whether determines described equipment to be monitored Abnormal;
Display module, for determining that described equipment to be monitored is deposited in an exceptional case, shows described equipment to be monitored Out-of-the way position and abnormality.
In one embodiment, described first determine module specifically for according to default unit exception management logic, Perform to run the most abnormal judgement, whether to determine described equipment to be monitored to the described whole machine model being in negative load condition Abnormal.
In one embodiment, the said equipment supervising device also includes:
Whether second determines module, for after determining that described equipment to be monitored exists extremely, determine extremely can enter Row remote control and regulation;
First pre-conditioner modules, for, in the case of determining and can carrying out remote control and regulation, entering in described whole machine model Row preconditioning, after debugging successfully, carries out remote control and regulation in transmitting control commands to described equipment to be monitored;
Second pre-conditioner modules, in the case of determining and cannot carrying out remote control and regulation, in described whole machine model Carry out preconditioning, after debugging successfully, generate abnormality processing scheme.
In one embodiment, the said equipment supervising device also includes:
Second acquisition module, for, before loading the software implementation whole machine model of described equipment to be monitored, treating described in acquisition The data file of all parts in the 3D model of monitoring device, and described equipment to be monitored;
Package module, for according to the logical relation between described all parts, carries out assembly also by described all parts Described 3D model is packaged, forms described software implementation whole machine model.
In one embodiment, described equipment to be monitored is air conditioning unit.
In the above-described embodiments, by presetting the software implementation whole machine model of equipment to be monitored, by the ring of equipment to be monitored Border parameter and this software implementation whole machine model of real time execution driving parameter, may thereby determine that equipment to be monitored is the most abnormal, it is achieved Treat the effective monitoring of monitoring device, solve monitoring of tools of the prior art by the way and attended operation is time-consuming Effort, the technical problem of inefficiency, reached to be effectively improved the technique effect of monitoring of tools and maintenance efficiency.
Accompanying drawing explanation
The accompanying drawing of the part constituting the application is used for providing a further understanding of the present invention, and the present invention's is schematic real Execute example and illustrate for explaining the present invention, being not intended that inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the method flow diagram of apparatus monitoring method according to embodiments of the present invention;
Fig. 2 is 3D model functional part control schematic diagram according to embodiments of the present invention;
Fig. 3 is 3D model global design operation workflow figure according to embodiments of the present invention;
Fig. 4 is the structured flowchart of equipment monitoring apparatus according to embodiments of the present invention.
Detailed description of the invention
For making the object, technical solutions and advantages of the present invention clearer, below in conjunction with embodiment and accompanying drawing, right The present invention is described in further details.Here, the exemplary embodiment of the present invention and explanation thereof are used for explaining the present invention, but also Not as a limitation of the invention.
Inventor is in view of the model that existing modeling pattern can be used to build equipment to be monitored, the most in the model The state modulator modeling equipment to be monitored inputting equipment to be monitored runs, such that it is able to the most different by Model Monitoring equipment Often, specifically, a kind of apparatus monitoring method is provided in this example, as it is shown in figure 1, may comprise steps of:
Step 101: obtain ambient parameter and the real time execution parameter of the installation site of equipment to be monitored;
Step 102: load the software implementation whole machine model of described equipment to be monitored, and by described ambient parameter and described reality Time operational factor drive described equipment to be monitored software implementation whole machine model;
Above-mentioned software implementation whole machine model can be 3D model, actual realization when, can first pass through acquisition to be monitored The 3D model of equipment, and the data file of all parts in equipment to be monitored, then further according to the logic between all parts Relation, carries out all parts assembly and is packaged in described 3D model, forms software implementation whole machine model.
Step 103: according to being in the whole machine model of negative load condition, determines that described equipment to be monitored is the most abnormal;
In one embodiment, according to being in the whole machine model of negative load condition, whether described equipment to be monitored is determined Abnormal, including:
Specifically, can be according to default unit exception management logic, to the described whole machine model being in negative load condition Performing to run the most abnormal judgement, to determine that described equipment to be monitored is the most abnormal, above-mentioned exception management logic can be passed through Configuration file provides.
Step 104: if it is determined that described equipment to be monitored exists abnormal, then show the out-of-the way position of described equipment to be monitored And abnormality.
After determining that equipment to be monitored exists extremely, it is also possible to first determine extremely whether can carry out remote control and regulation;As The most permissible, then can carry out preconditioning in whole machine model, after debugging successfully, transmitting control commands to equipment to be monitored enter Row remote control and regulation;If remote control and regulation cannot be carried out, then in whole machine model, carry out preconditioning, after debugging successfully, generate Abnormality processing scheme, can be supplied to field adjustable personnel by this abnormality processing scheme.
In each embodiment above-mentioned, equipment to be monitored can be air conditioning unit, it is also possible to is other equipment.
Below in conjunction with a specific embodiment, the said equipment monitoring method is illustrated, it is important to note, however, that this tool Body embodiment, merely to the present invention is better described, is not intended that inappropriate limitation of the present invention.
In this example, inventor is in view of embedding dynamic 3D model by software, thus the state of unit is led to Cross 3D model to reproduce out.Further, preconditioning function can be carried out by this 3D model, if preconditioning is passed through, the most permissible Remotely located parameter is to carry out plant maintenance, or Field Force directly safeguards physical equipment so that the user of use equipment can To obtain real efficient service experience.
In this example, by the 3D modelling of air-conditioning equipment, it is achieved that the user interactivity of air-conditioning phantom, it is simple to use Family carries out preconditioning, and solving technical staff needs to be in the action the problem carrying out air-conditioning maintenance.
It is illustrated in figure 2 3D model functional part control figure, first obtains a series of unit functional part model, the most again Obtain system development logic, and configure the configuration file of corresponding type;When program is run, read XML (extensible markup language Speech) configuration file and model data file.
It is illustrated in figure 3 3D model global design operation workflow figure, specifically, can open according to overall design according to type Send out the assemble flow of personnel setting, claim whole set equipment by software controls assembling corresponding for the air-conditioner assembly designed;Further , configure the interaction relation parameter between good each assembly;Operationally, corresponding project data and engineering site ambient parameter are loaded Realize monitoring;Judge that operating states of the units is loaded in whole machine model according to parameter;When judging abnormal, according to different exceptions Provide different solutions.
The apparatus monitoring method that this example is provided go for commercial Air Conditioner theoretical research, design and develop, Sell the long-range real-time servicing of air-conditioner.Specifically, may comprise steps of:
The 3D model of S1: acquisition complete machine and the data file of partial model thereof are (such as: the FBX literary composition used in Unity3D Part), it is assemblied into whole machine model according to the logical relation between complete machine, and is encapsulated into program control;
S2: operationally, loading procedure control realizes by supplemental characteristic driver whole machine model equipment, thus realizes Real-time monitoring to remote parameter equipment;
S3: whether manage logic (can be to provide in configuration file) execution operation exception according to default unit exception Judgement;
S5: if there is exception or early warning, then judge whether that appearance can be with remote adjustment, if it is then carry out presetting Joint (that is, debugging in unit model), after debugging successfully, transmitting control commands to set remote regulates and controls;If cannot Remote adjustment (such as: controlled plant relates to hardware), it is also possible to carry out preconditioning, after regulating successfully, provides solution To field adjustable personnel.
In upper example, unit preconditioning pattern is used to solve site problems, for sides such as exploitation, maintenance, data analysiss Face effect is the most directly perceived so that developer and attendant are as being in the action, thus improve experience.By above-mentioned side The analysis carrying out preliminary experiment and complex situations in formula beneficially product design R&D process efficiently solves, and is also beneficial to solve specially The problem that industry field technician is difficult in maintenance so that terminal use can obtain the service quality of efficient quick and making of high-quality With experience.
Based on same inventive concept, the embodiment of the present invention additionally provides a kind of equipment monitoring apparatus, such as following enforcement Described in example.Owing to the principle of equipment monitoring apparatus solution problem is similar to apparatus monitoring method, the therefore reality of equipment monitoring apparatus Execute the enforcement that may refer to apparatus monitoring method, repeat no more in place of repetition.Used below, term " unit " or " mould Block " software of predetermined function and/or the combination of hardware can be realized.Although the device described by following example is preferably with soft Part realizes, but hardware, or the realization of the combination of software and hardware also may and be contemplated.Fig. 4 is that the present invention is real Execute a kind of structured flowchart of the equipment monitoring apparatus of example, may include that the first acquisition module 401, load-on module as shown in Figure 4 402, first determines module 403 and display module 404, illustrates this structure below.
First acquisition module 401, for obtaining ambient parameter and the real time execution parameter of the installation site of equipment to be monitored;
Load-on module 402, for loading the software implementation whole machine model of described equipment to be monitored, and by described ambient parameter Software implementation whole machine model with equipment to be monitored described in described real time execution driving parameter;
First determines module 403, is in the whole machine model of negative load condition for basis, determines that described equipment to be monitored is No exception;
Display module 404, for determining that described equipment to be monitored is deposited in an exceptional case, shows described to be monitored set Standby out-of-the way position and abnormality.
In one embodiment, first determines module 403 specifically to may be used for according to default unit exception management to patrol Volume, perform to run the most abnormal judgement, to determine described equipment to be monitored to the described whole machine model being in negative load condition The most abnormal.
In one embodiment, the said equipment supervising device can also include: second determines module, for determining After stating equipment to be monitored existence extremely, determine extremely whether can carry out remote control and regulation;First pre-conditioner modules, for really Surely in the case of can carrying out remote control and regulation, described whole machine model carries out preconditioning, after debugging successfully, send and control life Order carries out remote control and regulation to described equipment to be monitored;Second pre-conditioner modules, for carrying out remote control and regulation determining In the case of, described whole machine model carries out preconditioning, after debugging successfully, generates abnormality processing scheme.
In one embodiment, the said equipment supervising device can also include: the second acquisition module, for loading institute Before stating the software implementation whole machine model of equipment to be monitored, obtain the 3D model of described equipment to be monitored, and described to be monitored set The data file of standby middle all parts;Package module, for according to the logical relation between described all parts, by described each Parts carry out assembly and are packaged in described 3D model, form described software implementation whole machine model.
In one embodiment, described equipment to be monitored is air conditioning unit.
In another embodiment, additionally providing a kind of software, this software is used for performing above-described embodiment and the most real Execute the technical scheme described in mode.
In another embodiment, additionally providing a kind of storage medium, in this storage medium, storage has above-mentioned software, should Storage medium includes but not limited to: CD, floppy disk, hard disk, scratch pad memory etc..
As can be seen from the above description, the embodiment of the present invention achieves following technique effect: to be monitored by presetting The software implementation whole machine model of equipment, by ambient parameter and this software implementation complete machine mould of real time execution driving parameter of equipment to be monitored Type, may thereby determine that equipment to be monitored is the most abnormal, it is achieved that treat the effective monitoring of monitoring device, solve by the way Determine monitoring of tools of the prior art and attended operation takes time and effort, the technical problem of inefficiency, reached to be effectively improved Monitoring of tools and the technique effect of maintenance efficiency.
Obviously, those skilled in the art should be understood that each module of the above-mentioned embodiment of the present invention or each step are permissible Realizing with general calculating device, they can concentrate on single calculating device, or is distributed in multiple calculating device On the network formed, alternatively, they can realize with calculating the executable program code of device, it is thus possible to by it Store and perform by calculating device in the storage device, and in some cases, can hold with the order being different from herein Step shown or described by row, or they are fabricated to respectively each integrated circuit modules, or multiple by them Module or step are fabricated to single integrated circuit module and realize.So, the embodiment of the present invention is not restricted to any specific hard Part and software combine.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for the skill of this area For art personnel, the embodiment of the present invention can have various modifications and variations.All within the spirit and principles in the present invention, made Any modification, equivalent substitution and improvement etc., should be included within the scope of the present invention.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610630718.8A CN106288152B (en) | 2016-08-01 | 2016-08-01 | Apparatus monitoring method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610630718.8A CN106288152B (en) | 2016-08-01 | 2016-08-01 | Apparatus monitoring method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106288152A true CN106288152A (en) | 2017-01-04 |
CN106288152B CN106288152B (en) | 2019-04-09 |
Family
ID=57664986
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610630718.8A CN106288152B (en) | 2016-08-01 | 2016-08-01 | Apparatus monitoring method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106288152B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109469962A (en) * | 2018-10-29 | 2019-03-15 | 珠海格力电器股份有限公司 | A kind of air-conditioning defrosting method, device and storage medium |
CN109586998A (en) * | 2018-11-09 | 2019-04-05 | 珠海格力电器股份有限公司 | A kind of method, cloud and the equipment of indicating equipment operating status |
CN110594945A (en) * | 2019-09-10 | 2019-12-20 | 江苏航天大为科技股份有限公司 | Intelligent group control method for water chilling unit of subway station |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07162484A (en) * | 1993-12-08 | 1995-06-23 | Hitachi Telecom Technol Ltd | Method and device for monitoring fault of carrier control line |
CN1487247A (en) * | 2003-07-31 | 2004-04-07 | 上海交通大学 | Cooling air conditioner unit fault simulating and diagnosing system |
CN1955747A (en) * | 2005-10-28 | 2007-05-02 | 华为技术有限公司 | Equipment detection monitoring control method and system |
JP4288482B2 (en) * | 2003-10-16 | 2009-07-01 | 伊藤 正裕 | Vehicle display device using three-dimensional images |
CN101604155A (en) * | 2009-07-08 | 2009-12-16 | 洪荣廷 | 3D virtual reality monitoring system and method for supervising thereof |
CN103312583A (en) * | 2013-07-15 | 2013-09-18 | 孟凡忠 | System and method for monitoring home intelligently and remotely |
CN103327126A (en) * | 2013-07-15 | 2013-09-25 | 孟凡忠 | Home all-around remote control system, control method and monitoring method |
CN104239185A (en) * | 2014-09-26 | 2014-12-24 | 深圳市奥拓电子股份有限公司 | Monitoring method and device of LED (Light Emitting Diode) display screen |
CN105510038A (en) * | 2015-12-31 | 2016-04-20 | 北京金风科创风电设备有限公司 | Wind turbine generator set fault monitoring method and device |
-
2016
- 2016-08-01 CN CN201610630718.8A patent/CN106288152B/en active IP Right Grant
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07162484A (en) * | 1993-12-08 | 1995-06-23 | Hitachi Telecom Technol Ltd | Method and device for monitoring fault of carrier control line |
CN1487247A (en) * | 2003-07-31 | 2004-04-07 | 上海交通大学 | Cooling air conditioner unit fault simulating and diagnosing system |
JP4288482B2 (en) * | 2003-10-16 | 2009-07-01 | 伊藤 正裕 | Vehicle display device using three-dimensional images |
CN1955747A (en) * | 2005-10-28 | 2007-05-02 | 华为技术有限公司 | Equipment detection monitoring control method and system |
CN101604155A (en) * | 2009-07-08 | 2009-12-16 | 洪荣廷 | 3D virtual reality monitoring system and method for supervising thereof |
CN103312583A (en) * | 2013-07-15 | 2013-09-18 | 孟凡忠 | System and method for monitoring home intelligently and remotely |
CN103327126A (en) * | 2013-07-15 | 2013-09-25 | 孟凡忠 | Home all-around remote control system, control method and monitoring method |
CN104239185A (en) * | 2014-09-26 | 2014-12-24 | 深圳市奥拓电子股份有限公司 | Monitoring method and device of LED (Light Emitting Diode) display screen |
CN105510038A (en) * | 2015-12-31 | 2016-04-20 | 北京金风科创风电设备有限公司 | Wind turbine generator set fault monitoring method and device |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109469962A (en) * | 2018-10-29 | 2019-03-15 | 珠海格力电器股份有限公司 | A kind of air-conditioning defrosting method, device and storage medium |
CN109586998A (en) * | 2018-11-09 | 2019-04-05 | 珠海格力电器股份有限公司 | A kind of method, cloud and the equipment of indicating equipment operating status |
CN110594945A (en) * | 2019-09-10 | 2019-12-20 | 江苏航天大为科技股份有限公司 | Intelligent group control method for water chilling unit of subway station |
CN110594945B (en) * | 2019-09-10 | 2020-05-26 | 江苏航天大为科技股份有限公司 | Intelligent group control method for water chilling unit of subway station |
Also Published As
Publication number | Publication date |
---|---|
CN106288152B (en) | 2019-04-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10388075B2 (en) | Virtual reality and augmented reality for industrial automation | |
Vogel-Heuser et al. | Guest editorial industry 4.0–prerequisites and visions | |
Larsen et al. | Integrated tool chain for model-based design of Cyber-Physical Systems: The INTO-CPS project | |
CN104142663B (en) | Industrial equipment and system in cloud platform are proved | |
CN104142661B (en) | Trained using the data based on cloud for industrial automation system | |
CN104142629B (en) | For the system and method virtualized to industrial machine environment | |
US7024258B2 (en) | System and method for model-based control of a building fluid distribution system | |
EP2345015B1 (en) | System and method for improved coordination between control and safety systems | |
Nasereddin et al. | Automated simulator development: A strategy for modeling modular housing production | |
CN101196740B (en) | Analytical server integrated in a process control network | |
US20100222899A1 (en) | Process plant monitoring based on multivariate statistical analysis and on-line process simulation | |
US20120239164A1 (en) | Graphical language for optimization and use | |
US9261869B2 (en) | Hybrid sequential and simultaneous process simulation system | |
US7809529B2 (en) | Remote monitoring and diagnostic system | |
CN104144204A (en) | Using cloud-based data for industrial simulation | |
CN107870600A (en) | A kind of transparent monitoring method in intelligent workshop and system | |
Younis et al. | Formalization of existing PLC programs: A survey | |
US6529780B1 (en) | Method for automatic operation of industrial plants | |
US20090112350A1 (en) | Process for generating control sequence of operations | |
DE102010036757A1 (en) | Graphical sidebar for a process control system | |
Li et al. | A model for simulating schedule risks in prefabrication housing production: A case study of six-day cycle assembly activities in Hong Kong | |
EP2871544A2 (en) | Interface for data exchange between industrial controllers and simulation applications for simulating a machine | |
Büscher et al. | Integrated Smart Grid simulations for generic automation architectures with RT-LAB and mosaik | |
US7756696B2 (en) | Simulation system of technical plant | |
CN102934039B (en) | Method and system for providing monitoring characteristics in an soa based industrial environment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |