CN106284982A - 一种钢筋混凝土楼板后浇带模板支撑方法 - Google Patents
一种钢筋混凝土楼板后浇带模板支撑方法 Download PDFInfo
- Publication number
- CN106284982A CN106284982A CN201610654730.2A CN201610654730A CN106284982A CN 106284982 A CN106284982 A CN 106284982A CN 201610654730 A CN201610654730 A CN 201610654730A CN 106284982 A CN106284982 A CN 106284982A
- Authority
- CN
- China
- Prior art keywords
- reinforced concrete
- concrete floor
- alter
- mould plate
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/48—Supporting structures for shutterings or frames for floors or roofs
Abstract
一种钢筋混凝土楼板后浇带模板支撑方法,属于建筑安装技术领域。钢筋混凝土楼板后浇带部位模板支撑采用型钢构成的格构柱进行支撑,此支撑方式比钢管脚手管强度高,格构柱支撑不与其他脚手管拉结,不影响现浇钢筋混凝土部门模板拆除;可加大格构柱支撑间距,格构柱中间不设拉结构件,现浇钢筋混凝土部位模板拆除后,施工活动空间不受影响。
Description
技术领域
本发明属于建筑施工技术领域,特别是提供了一种钢筋混凝土楼板后浇带模板支撑方法,适用于现浇钢筋混凝土楼板后浇带部位的施工。
背景技术
目前钢筋混凝土楼板后浇带模板与支撑架均采用与钢筋混凝土楼板相同的模板和支撑架,支撑架为钢管脚手架搭设而成;为保证支撑强度,钢筋混凝土楼板后浇带模板支撑架与钢筋混凝土楼板其他部位支撑架连接。钢筋混凝土楼板浇筑完毕拆模时,钢筋混凝土楼板后浇带部位脚手架也受影响,并一块拆除。为保证钢筋混凝土楼板受力,对钢筋混凝土楼板后浇带部位进行临时支撑。
发明内容
本发明的目的在于提供一种钢筋混凝土楼板后浇带模板支撑方法,钢筋混凝土后浇带模板支撑采用独立的支撑柱,支撑柱是由型钢构成的格构柱,格构柱强度较高,格构柱支撑不与其他脚手管拉结,不影响现浇钢筋混凝土部门模板拆除;可加大格构柱支撑间距,格构柱中间不设拉结构件,现浇钢筋混凝土部位模板拆除后,施工活动空间不受影响。
本发明的工艺步骤如下:
(1)独立设置钢筋混凝土楼板后浇带模板1,钢筋混凝土楼板后浇带模板1延伸到与钢筋混凝土楼板2下一定长度,保证钢筋混凝土楼板后浇带3与钢筋混凝土楼板2的有效连接;。
(2)钢筋混凝土楼板后浇带模板1下设置独立的模板支撑柱4,模板支撑柱4不与钢筋混凝土楼板模板5的脚手管支撑6连接。
(3)钢筋混凝土楼板2混凝土施工完毕,将钢筋混凝土楼板模板(5)和脚手管支撑6拆除后,模板支撑柱4单独对钢筋混凝土楼板后浇带模板1进行支撑。
模板支撑柱4是由型钢构成的格构柱。
模板支撑柱4强度较高,模板支撑柱4不与钢筋混凝土楼板模板模板5的脚手管支撑6连接,钢筋混凝土楼板2混凝土施工完毕,拆除钢筋混凝土楼板模板5及脚手管支撑6时钢筋混凝土楼板后浇带3受力不受影响。
模板支撑柱4间距设置较大,模板支撑柱4间可不设拉结件,钢筋混凝土楼板2混凝土施工完毕,拆除钢筋混凝土楼板模板5及脚手管支撑6后,施工活动空间不受影响。
模板支撑柱4可工厂化制作,可循环利用。
本发明的有益效果
本施工方法提供一种全新模板支撑架体,使钢筋混凝土楼板后浇带模板支撑成为独立的系统,可避免钢筋混凝土楼板拆模时所受的影响,不必对钢筋混凝土后浇带模板及支架拆除,然后在支撑,因此不回出现因模板支撑改变钢筋混凝土楼板受力状态的现象,避免模板拆除后再支的重复做工问题。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1为钢筋混凝土楼板后浇带模板、支架横向剖面图。其中,钢筋混凝土楼板后浇带模板1、钢筋混凝土楼板2、钢筋混凝土楼板后浇带3、模板支撑柱4、钢筋混凝土楼板模板5、脚手管支撑6。
图2为钢筋混凝土楼板后浇带模板、支架纵向剖面图。
具体实施方式
本发明的工艺步骤如下:
(1)独立设置钢筋混凝土楼板后浇带模板1,钢筋混凝土楼板后浇带模板1延伸到与钢筋混凝土楼板2下一定长度,保证钢筋混凝土楼板后浇带3与钢筋混凝土楼板2的有效连接。
(2)钢筋混凝土楼板后浇带模板1下设置独立的模板支撑柱4,模板支撑柱4不与钢筋混凝土楼板模板5的脚手管支撑6连接。
(3)钢筋混凝土楼板2混凝土施工完毕,将钢筋混凝土楼板模板5和脚手管支撑6拆除后,模板支撑柱4单独对钢筋混凝土楼板后浇带模板1进行支撑。
(4)待钢筋混凝土楼板后浇带3部位混凝土施工时,对钢筋混凝土楼板后浇带模板1和模板支撑柱4进行检查和清扫后。即可进行混凝土的浇筑。
Claims (3)
1.一种钢筋混凝土楼板后浇带模板支撑方法,其特征在于,工艺步骤如下:
a、独立设置钢筋混凝土楼板后浇带模板(1),钢筋混凝土楼板后浇带模板(1)延伸到与钢筋混凝土楼板(2)下一定长度,保证钢筋混凝土楼板后浇带(3)与钢筋混凝土楼板(2)的连接;
b、钢筋混凝土楼板后浇带模板(1)下设置独立的模板支撑柱(4),模板支撑柱(4)不与钢筋混凝土楼板模板(5)的脚手管支撑(6)连接;
c、钢筋混凝土楼板(2)混凝土施工完毕,将钢筋混凝土楼板模板(5)和脚手管支撑(6)拆除后,模板支撑柱(4)单独对钢筋混凝土楼板后浇带模板(1)进行支撑。
2.根据权利要求1所述的支撑方法,其特征在于,所述的模板支撑柱(4)是由型钢构成的格构柱。
3.根据权利要求1所述的支撑方法,其特征在于,钢筋混凝土楼板(2)混凝土施工完毕,拆除钢筋混凝土楼板模板(5)及脚手管支撑(6)时钢筋混凝土楼板后浇带(3)受力不受影响。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610654730.2A CN106284982A (zh) | 2016-08-10 | 2016-08-10 | 一种钢筋混凝土楼板后浇带模板支撑方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610654730.2A CN106284982A (zh) | 2016-08-10 | 2016-08-10 | 一种钢筋混凝土楼板后浇带模板支撑方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106284982A true CN106284982A (zh) | 2017-01-04 |
Family
ID=57669604
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610654730.2A Pending CN106284982A (zh) | 2016-08-10 | 2016-08-10 | 一种钢筋混凝土楼板后浇带模板支撑方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106284982A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109779245A (zh) * | 2019-01-29 | 2019-05-21 | 中建七局(上海)有限公司 | 一种组合结构独立式后浇带钢支撑施工设备 |
CN110512897A (zh) * | 2019-07-30 | 2019-11-29 | 中铁建设集团有限公司 | 一种后浇带用支撑系统及安装方法 |
CN111561062A (zh) * | 2019-10-28 | 2020-08-21 | 江苏南通三建集团股份有限公司 | 一种三拼式底模的后浇带施工工艺 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1195366A (en) * | 1966-07-06 | 1970-06-17 | Mills Scaffold Co Ltd | Improved Shuttering Prop and Assembly for use in Building Construction |
CN1175650A (zh) * | 1997-09-25 | 1998-03-11 | 鲁立平 | 地下室后浇带布模胶封防渗法 |
CN2308640Y (zh) * | 1997-08-29 | 1999-02-24 | 鲁立平 | 建筑地下室防渗水后浇带立模装置 |
CN2592740Y (zh) * | 2002-06-26 | 2003-12-17 | 刘宇航 | 后浇带橡胶止水带 |
CN101871262A (zh) * | 2010-06-25 | 2010-10-27 | 中天建设集团有限公司天津分公司 | 具有后浇带的梁板支撑体系施工方法 |
-
2016
- 2016-08-10 CN CN201610654730.2A patent/CN106284982A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1195366A (en) * | 1966-07-06 | 1970-06-17 | Mills Scaffold Co Ltd | Improved Shuttering Prop and Assembly for use in Building Construction |
CN2308640Y (zh) * | 1997-08-29 | 1999-02-24 | 鲁立平 | 建筑地下室防渗水后浇带立模装置 |
CN1175650A (zh) * | 1997-09-25 | 1998-03-11 | 鲁立平 | 地下室后浇带布模胶封防渗法 |
CN2592740Y (zh) * | 2002-06-26 | 2003-12-17 | 刘宇航 | 后浇带橡胶止水带 |
CN101871262A (zh) * | 2010-06-25 | 2010-10-27 | 中天建设集团有限公司天津分公司 | 具有后浇带的梁板支撑体系施工方法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109779245A (zh) * | 2019-01-29 | 2019-05-21 | 中建七局(上海)有限公司 | 一种组合结构独立式后浇带钢支撑施工设备 |
CN109779245B (zh) * | 2019-01-29 | 2021-03-02 | 中建七局(上海)有限公司 | 一种组合结构独立式后浇带钢支撑施工设备 |
CN110512897A (zh) * | 2019-07-30 | 2019-11-29 | 中铁建设集团有限公司 | 一种后浇带用支撑系统及安装方法 |
CN111561062A (zh) * | 2019-10-28 | 2020-08-21 | 江苏南通三建集团股份有限公司 | 一种三拼式底模的后浇带施工工艺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105888108B (zh) | 内置定位预制件钢筋混凝土剪力墙及施工方法 | |
CN103669655B (zh) | 变形缝两侧墙体混凝土浇筑施工工艺 | |
CN104947719B (zh) | 地下室顶板后浇带吊支模结构的后浇带施工方法 | |
CN106284982A (zh) | 一种钢筋混凝土楼板后浇带模板支撑方法 | |
CN103603491B (zh) | 一种梁板后浇带模板支撑架的搭设方法 | |
CN105275097A (zh) | 一种后浇带止水钢板和快易收口网安装方法 | |
CN106320373A (zh) | 一种地下车库顶板后浇带处支撑体系及施工方法 | |
CN106522282B (zh) | 一种可升降后浇带模板结构及体系及其施工方法 | |
CN204098486U (zh) | 浇筑地下室顶板后浇带的混凝土吊模 | |
CN206220489U (zh) | 混凝土柱子浇筑模板紧箍装置 | |
CN103568109A (zh) | 一种预制混凝土空心构件成孔方法 | |
CN104153573A (zh) | V型圆柱混凝土的浇筑模具及施工方法 | |
CN203022222U (zh) | 砖混建筑支座整浇圈梁 | |
CN211396591U (zh) | 混凝土剪力墙根部加固装置 | |
CN106284978A (zh) | 一种变形缝两侧剪力墙同步施工工艺及定型化模板 | |
CN204781931U (zh) | 塑料模板早拆支撑体系 | |
CN204690801U (zh) | 地下室顶板后浇带吊支模结构 | |
CN204370797U (zh) | 一种混凝土楼板施工用模板装置及其支撑组件 | |
CN102936953B (zh) | “大”字型劲钢结构模板施工方法 | |
CN109184193A (zh) | 一种早拆模板体系及其施工方法 | |
CN204679074U (zh) | 一种新型表面观测墩结构 | |
CN204001713U (zh) | V型圆柱斜线段混凝土浇筑模具 | |
CN204001714U (zh) | V型圆柱混凝土的浇筑模具 | |
CN205088634U (zh) | 一种边坡截水沟定型模板 | |
CN209703510U (zh) | 一种适用于大直径人工挖孔环型基桩的模板体系 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170104 |