CN106284722A - The Building Fire Protection wall of a kind of band active fire protection system and construction method thereof - Google Patents
The Building Fire Protection wall of a kind of band active fire protection system and construction method thereof Download PDFInfo
- Publication number
- CN106284722A CN106284722A CN201610657602.3A CN201610657602A CN106284722A CN 106284722 A CN106284722 A CN 106284722A CN 201610657602 A CN201610657602 A CN 201610657602A CN 106284722 A CN106284722 A CN 106284722A
- Authority
- CN
- China
- Prior art keywords
- fire protection
- fire
- core layer
- layer
- fighting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 21
- 239000012792 core layer Substances 0.000 claims abstract description 97
- 239000010410 layer Substances 0.000 claims abstract description 92
- 238000000465 moulding Methods 0.000 claims abstract description 10
- 239000000463 material Substances 0.000 claims description 30
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 claims description 19
- 229910052760 oxygen Inorganic materials 0.000 claims description 19
- 239000001301 oxygen Substances 0.000 claims description 19
- 239000004567 concrete Substances 0.000 claims description 13
- 229910010293 ceramic material Inorganic materials 0.000 claims description 9
- 239000006260 foam Substances 0.000 claims description 9
- 239000004568 cement Substances 0.000 claims description 7
- 239000011490 mineral wool Substances 0.000 claims description 7
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 5
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 claims description 4
- 150000001350 alkyl halides Chemical class 0.000 claims description 4
- 235000011089 carbon dioxide Nutrition 0.000 claims description 4
- 239000011810 insulating material Substances 0.000 claims description 3
- 238000000926 separation method Methods 0.000 claims description 2
- 238000009413 insulation Methods 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 4
- 238000004519 manufacturing process Methods 0.000 abstract description 4
- 239000004794 expanded polystyrene Substances 0.000 description 9
- 239000000835 fiber Substances 0.000 description 4
- 230000006698 induction Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 206010000210 abortion Diseases 0.000 description 1
- 231100000176 abortion Toxicity 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 239000011162 core material Substances 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 239000012774 insulation material Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000010297 mechanical methods and process Methods 0.000 description 1
- 230000005226 mechanical processes and functions Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/92—Protection against other undesired influences or dangers
- E04B1/94—Protection against other undesired influences or dangers against fire
- E04B1/945—Load-supporting structures specially adapted therefor
-
- A—HUMAN NECESSITIES
- A62—LIFE-SAVING; FIRE-FIGHTING
- A62C—FIRE-FIGHTING
- A62C35/00—Permanently-installed equipment
- A62C35/58—Pipe-line systems
- A62C35/60—Pipe-line systems wet, i.e. containing extinguishing material even when not in use
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Building Environments (AREA)
Abstract
The invention discloses Building Fire Protection wall and the construction method thereof of a kind of band active fire protection system, including the core layer and the trigger layer of core layer two sides that are arranged on centre position, described core layer is built-in with fire chief road and fire-fighting looped pipeline road, is all filled with fire-fighting medium in the pipeline of described fire chief road and in fire-fighting pair circuit line;Described trigger layer, by concreting molding, described trigger layer is provided with from fire-fighting pair circuit line the shower nozzle extended and controls the sensing unit of shower nozzle.The Building Fire Protection wall of the present invention is when the condition of a disaster occurs, and trigger layer sensing unit can trigger, according to the condition of a disaster, ejection firing-fighting medium of meeting and discussing, and plays active fire effect.The construction method of the Building Fire Protection wall of the program can be produced finished product in workshop in advance and install to job site, and such Building Fire Protection wall can realize standardized production, hence it is evident that reduces the potential safety hazard of Building Fire Protection wall.
Description
Technical field
The invention belongs to structural fire protection field, particularly relate to Building Fire Protection wall and the construction thereof of a kind of band active fire protection system
Method.
Background technology
Building Fire Protection wall is to prevent fire spread to be not less than 3 to adjacent architectural or adjacent level fire compartment and fire endurance
Hour noninflammability body of wall.Conventional firewalls separates according to fire protection design of building area and function, and fire wall is considered as to pacify most
Full fire separation wall.
But in actual mechanical process, fire wall due to material, construct, there is potential safety hazard in the factor such as maintenance, adds general
Logical common people's fire-fighting consciousness shortcoming, often transforms privately according to the use of oneself, and particularly business public building transformation situation is particularly
Prominent, therefore cause fire wall can not reach safety requirements, when fire occurs, the firewall security time limit not, or collapse or
Time can not support to the specification time limit.Finally bring disaster to adjacent architectural or adjacent level fire compartment.Especially large-scale commercial building,
Construction area, from several ten thousand square metres to hundreds of thousands square metre, is a building body that tissue is accurate, structure is complicated, form is abundant
Amount, building function varies, and gathers artificial abortion continuously large number of, is particularly easy to fire-fighting accident under emergency case.By
In large scale in construction area, poly-to dissipate personnel numerous, periphery and internal transportation tissue complexity and the intensive formation of commodity extraordinary
The fire load of rule, equipment electricity consumption frequently waits various factors, makes the Firewall of large-scale commercial building run into many new difficulties
Topic.If the fire in single fire compartment is not effectively controlled, there occurs the fire spread of adjacent fire compartment, cause
Broad masses of the people's life, the massive losses of property, cause a lot of tragedies that this should not occur and occur, and cause
Bad social influence.In a word, common firewall standardization level is low, the condition of a disaster takes place without active fire function.
Summary of the invention
The technical problem to be solved is: common firewall standardization level is low, the condition of a disaster takes place without actively
Fire-fighting function.
In order to solve above-mentioned technical problem, the invention discloses the Building Fire Protection wall of a kind of band active fire protection system, it is special
Levy and be: including being arranged on core layer and the trigger layer of core layer two sides in centre position, described core layer is built-in with fire-fighting
Main line and fire-fighting looped pipeline road, be all filled with fire-fighting medium in the pipeline of described fire chief road and in fire-fighting pair circuit line;Institute
State trigger layer by concreting molding, described trigger layer is provided with from fire-fighting pair circuit line the shower nozzle and control extended
The sensing unit of shower nozzle.
Preferably, described core layer includes that supporting part and non-bearing part, described supporting part materials for wall are coagulation
Soil or concrete and foam ceramic material or concrete and cement fibrolite plate;Described non-bearing wall segment material is insulation
Material.
Preferably, described heat preserving and insulating material is EPS or rock wool.
Preferably, described fire-fighting medium is water or alkyl halide or dry ice.
Preferably, described shower nozzle protrudes trigger layer outer surface.
Preferably, described sensing unit includes device for image or infrared inductor.
Preferably, described core layer thickness be 200MM, described trigger layer thickness is 50MM.
The invention also discloses the construction method of the Building Fire Protection wall of a kind of band active fire protection system, comprise the following steps:
Step one: install core layer locating template;
Step 2: be set to template centre position in core layer and lay fire chief road and fire-fighting looped pipeline road;
Step 3: build core layer: oxygen and steam pour core layer supporting part xoncrete structure, have poured 2
Detach core layer locating template after hour, non-bearing wall segment material is installed;
Step 4: install trigger layer locating template;
Step 5: build trigger layer: oxygen and steam pour trigger layer xoncrete structure, removes trigger layer after 8 hours
Locating template;
Step 6: install sensing unit and shower nozzle.
Compared with prior art, the present invention can obtain techniques below effect:
1) in the present invention, core layer two sides also have trigger layer, trigger layer include sensing unit and are evenly distributed on trigger layer
On shower nozzle, when the condition of a disaster occurs, trigger layer sensing unit can trigger according to the condition of a disaster and meet and discuss ejection firing-fighting medium, plays and actively disappears
Anti-effect.
The construction method of the Building Fire Protection wall of the program can be produced finished product in workshop in advance and install to job site,
So Building Fire Protection wall can realize standardized production, hence it is evident that reduces the potential safety hazard of Building Fire Protection wall.
2) in the present invention, core material layer is foam ceramic material, cement fibrolite plate or concrete;Core layer non-load bearing wall
Body material is heat preserving and insulating material, EPS or rock wool, which decreases Building Fire Protection wall own wt and cost, standardized production
More easy.
3) in the present invention, shower nozzle protrudes trigger layer outer surface, and the sprinkling firing-fighting medium of meeting and discussing of the program is wider, enters one
Step improves active fire effect.
4) in the present invention, the construction method of Building Fire Protection wall includes that oxygen and steam pour core layer xoncrete structure, hence it is evident that
Improve speed and the construction effect of standardized production.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
In having technology to describe, the required accompanying drawing used is briefly described, it should be apparent that, those of ordinary skill in the art are come
Say, on the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is Building Fire Protection wall and the schematic perspective view of construction method thereof of the real a kind of band active fire protection system of the present invention.
In figure: 1. trigger layer, 2. core layer, 3. fire chief road, 4. fire-fighting looped pipeline road, 5. shower nozzle, 6. sensing unit.
Detailed description of the invention
In order to make the purpose of the present invention, technical scheme and advantage clearer, below in conjunction with embodiment, to the present invention
It is further elaborated.Should be appreciated that specific embodiment described herein, only in order to explain the present invention, is not used to
Limit the present invention.
Below in conjunction with the accompanying drawings and the application principle of the present invention is further described by specific embodiment.
Embodiment one
A kind of Building Fire Protection wall of band active fire protection system, as shown in Figure 1: include the core layer 2 being arranged on centre position
And the trigger layer 1 of core layer 2 two sides, core layer 2 thickness is 200MM, and trigger layer 1 thickness is 50MM;Core layer 2 is built-in with and disappears
Anti-main line 3 and fire-fighting looped pipeline road 4, in the pipeline of fire chief road 3 and being all filled with fire-fighting medium in the pipeline of fire-fighting looped pipeline road 4 is
Water;Trigger layer 1, by concreting molding, trigger layer 1 is provided with from the pipeline of fire-fighting looped pipeline road 4 shower nozzle 5 extended and control
The sensing unit 6 of shower nozzle 5 processed.
Wherein: core layer 2 includes supporting part and non-bearing part, supporting part materials for wall is concrete;Non-bearing
Wall segment material is EPS;Shower nozzle 5 protrudes trigger layer 1 outer surface;Sensing unit 6 includes device for image.
The construction method of the Building Fire Protection wall of a kind of band active fire protection system, comprises the following steps:
Step one: install core layer 2 locating template;
Step 2: be set to template centre position in core layer 2 and lay fire chief road 3 and fire-fighting looped pipeline road 4;
Step 3: build core layer 2: oxygen and steam pour core layer 2 supporting part xoncrete structure, have poured
Detach core layer 2 locating template after 2 hours, non-bearing wall segment material EPS is installed;
Step 4: install trigger layer 1 locating template;
Step 5: build trigger layer 1: oxygen and steam pour trigger layer 1 xoncrete structure, removes after 8 hours and triggers
Layer 1 locating template;
Step 6: install device for image and the shower nozzle 5 of sensing unit 6.
Embodiment two
A kind of Building Fire Protection wall of band active fire protection system, as shown in Figure 1: include the core layer 2 being arranged on centre position
And the trigger layer 1 of core layer 2 two sides, core layer 2 thickness is 200MM, and trigger layer 1 thickness is 50MM;Core layer 2 is built-in with and disappears
Anti-main line 3 and fire-fighting looped pipeline road 4, in the pipeline of fire chief road 3 and being all filled with fire-fighting medium in the pipeline of fire-fighting looped pipeline road 4 is
Alkyl halide;Trigger layer 1, by concreting molding, trigger layer 1 is provided with from the pipeline of fire-fighting looped pipeline road 4 shower nozzle 5 extended
With the sensing unit 6 controlling shower nozzle 5.
Wherein: core layer 2 includes supporting part and non-bearing part, supporting part materials for wall is concrete and foam pottery
Ceramic material;Non-bearing wall segment material is EPS;Shower nozzle 5 protrudes trigger layer 1 outer surface;Sensing unit 6 includes device for image.
The construction method of the Building Fire Protection wall of a kind of band active fire protection system, comprises the following steps:
Step one: install core layer 2 locating template;
Step 2: be set to template centre position in core layer 2 and lay fire chief road 3 and fire-fighting looped pipeline road 4;
Step 3: build core layer 2: oxygen and steam pour core layer 2 supporting part xoncrete structure, at load receiving part
Divide and around xoncrete structure, paste foam ceramic material, detach core layer 2 locating template after having poured 2 hours, non-holding is installed
Weight wall segment material EPS;
Step 4: install trigger layer 1 locating template;
Step 5: build trigger layer 1: oxygen and steam pour trigger layer 1 xoncrete structure, removes after 8 hours and triggers
Layer 1 locating template;
Step 6: install device for image and the shower nozzle 5 of sensing unit 6.
Embodiment three
A kind of Building Fire Protection wall of band active fire protection system, as shown in Figure 1: include the core layer 2 being arranged on centre position
And the trigger layer 1 of core layer 2 two sides, core layer 2 thickness is 200MM, and trigger layer 1 thickness is 50MM;Core layer 2 is built-in with and disappears
Anti-main line 3 and fire-fighting looped pipeline road 4, in the pipeline of fire chief road 3 and being all filled with fire-fighting medium in the pipeline of fire-fighting looped pipeline road 4 is
Dry ice;Trigger layer 1, by concreting molding, trigger layer 1 is provided with from the pipeline of fire-fighting looped pipeline road 4 shower nozzle 5 He extended
Control the sensing unit 6 of shower nozzle 5.
Wherein: core layer 2 includes supporting part and non-bearing part, supporting part materials for wall is concrete and cement fibre
Dimension plate;Non-bearing wall segment material is EPS;Shower nozzle 5 protrudes trigger layer 1 outer surface;Sensing unit 6 includes device for image.
The construction method of the Building Fire Protection wall of a kind of band active fire protection system, comprises the following steps:
Step one: install core layer 2 locating template;
Step 2: be set to template centre position in core layer 2 and lay fire chief road 3 and fire-fighting looped pipeline road 4;
Step 3: build core layer 2: oxygen and steam pour core layer 2 supporting part xoncrete structure, at load receiving part
Divide binding cement fibre board around xoncrete structure, after having poured 2 hours, detach core layer 2 locating template, non-bearing is installed
Wall segment material EPS;
Step 4: install trigger layer 1 locating template;
Step 5: build trigger layer 1: oxygen and steam pour trigger layer 1 xoncrete structure, removes after 8 hours and triggers
Layer 1 locating template;
Step 6: install device for image and the shower nozzle 5 of sensing unit 6.
Embodiment four
A kind of Building Fire Protection wall of band active fire protection system, as shown in Figure 1: include the core layer 2 being arranged on centre position
And the trigger layer 1 of core layer 2 two sides, core layer 2 thickness is 200MM, and trigger layer 1 thickness is 50MM;Core layer 2 is built-in with and disappears
Anti-main line 3 and fire-fighting looped pipeline road 4, in the pipeline of fire chief road 3 and being all filled with fire-fighting medium in the pipeline of fire-fighting looped pipeline road 4 is
Water;Trigger layer 1, by concreting molding, trigger layer 1 is provided with from the pipeline of fire-fighting looped pipeline road 4 shower nozzle 5 extended and control
The sensing unit 6 of shower nozzle 5 processed.
Wherein: core layer 2 includes supporting part and non-bearing part, supporting part materials for wall is concrete;Non-bearing
Wall segment material is rock wool;Shower nozzle 5 protrudes trigger layer 1 outer surface;Sensing unit 6 includes infrared inductor.
The construction method of the Building Fire Protection wall of a kind of band active fire protection system, comprises the following steps:
Step one: install core layer 2 locating template;
Step 2: be set to template centre position in core layer 2 and lay fire chief road 3 and fire-fighting looped pipeline road 4;
Step 3: build core layer 2: oxygen and steam pour core layer 2 supporting part xoncrete structure, have poured
Detach core layer 2 locating template after 2 hours, non-bearing wall segment material rock wool is installed;
Step 4: install trigger layer 1 locating template;
Step 5: build trigger layer 1: oxygen and steam pour trigger layer 1 xoncrete structure, removes after 8 hours and triggers
Layer 1 locating template;
Step 6: install infrared inductor and the shower nozzle 5 of sensing unit 6.
Embodiment five
A kind of Building Fire Protection wall of band active fire protection system, as shown in Figure 1: include the core layer 2 being arranged on centre position
And the trigger layer 1 of core layer 2 two sides, core layer 2 thickness is 200MM, and trigger layer 1 thickness is 50MM;Core layer 2 is built-in with and disappears
Anti-main line 3 and fire-fighting looped pipeline road 4, in the pipeline of fire chief road 3 and being all filled with fire-fighting medium in the pipeline of fire-fighting looped pipeline road 4 is
Alkyl halide;Trigger layer 1, by concreting molding, trigger layer 1 is provided with from the pipeline of fire-fighting looped pipeline road 4 shower nozzle 5 extended
With the sensing unit 6 controlling shower nozzle 5.
Wherein: core layer 2 includes supporting part and non-bearing part, supporting part materials for wall is concrete and foam pottery
Ceramic material;Non-bearing wall segment material is rock wool;Shower nozzle 5 protrudes trigger layer 1 outer surface;Sensing unit 6 includes infrared induction
Device.
The construction method of the Building Fire Protection wall of a kind of band active fire protection system, comprises the following steps:
Step one: install core layer 2 locating template;
Step 2: be set to template centre position in core layer 2 and lay fire chief road 3 and fire-fighting looped pipeline road 4;
Step 3: build core layer 2: oxygen and steam pour core layer 2 supporting part xoncrete structure, at load receiving part
Divide and around xoncrete structure, paste foam ceramic material, detach core layer 2 locating template after having poured 2 hours, non-holding is installed
Weight wall segment material;
Step 4: install trigger layer 1 locating template;
Step 5: build trigger layer 1: oxygen and steam pour trigger layer 1 xoncrete structure, removes after 8 hours and triggers
Layer 1 locating template;
Step 6: install infrared inductor and the shower nozzle 5 of sensing unit 6.
Embodiment six
A kind of Building Fire Protection wall of band active fire protection system, as shown in Figure 1: include the core layer 2 being arranged on centre position
And the trigger layer 1 of core layer 2 two sides, core layer 2 thickness is 200MM, and trigger layer 1 thickness is 50MM;Core layer 2 is built-in with and disappears
Anti-main line 3 and fire-fighting looped pipeline road 4, in the pipeline of fire chief road 3 and being all filled with fire-fighting medium in the pipeline of fire-fighting looped pipeline road 4 is
Dry ice;Trigger layer 1, by concreting molding, trigger layer 1 is provided with from the pipeline of fire-fighting looped pipeline road 4 shower nozzle 5 He extended
Control the sensing unit 6 of shower nozzle 5.
Wherein: core layer 2 includes supporting part and non-bearing part, supporting part materials for wall is concrete and cement fibre
Dimension plate;Non-bearing wall segment material is rock wool;Shower nozzle 5 protrudes trigger layer 1 outer surface;Sensing unit 6 includes that infrared induction fills
Put.
The construction method of the Building Fire Protection wall of a kind of band active fire protection system, comprises the following steps:
Step one: install core layer 2 locating template;
Step 2: be set to template centre position in core layer 2 and lay fire chief road 3 and fire-fighting looped pipeline road 4;
Step 3: build core layer 2: oxygen and steam pour core layer 2 supporting part xoncrete structure, at load receiving part
Divide binding cement fibre board around xoncrete structure, after having poured 2 hours, detach core layer 2 locating template, non-bearing is installed
Wall segment material;
Step 4: install trigger layer 1 locating template;
Step 5: build trigger layer 1: oxygen and steam pour trigger layer 1 xoncrete structure, removes after 8 hours and triggers
Layer 1 locating template;
Step 6: install infrared inductor and the shower nozzle 5 of sensing unit 6.
Embodiment seven
A kind of Building Fire Protection wall of band active fire protection system, as shown in Figure 1: include the core layer 2 being arranged on centre position
And the trigger layer 1 of core layer 2 two sides, core layer 2 thickness is 200MM, and trigger layer 1 thickness is 50MM;Core layer 2 is built-in with and disappears
Anti-main line 3 and fire-fighting looped pipeline road 4, in the pipeline of fire chief road 3 and being all filled with fire-fighting medium in the pipeline of fire-fighting looped pipeline road 4 is
Water;Trigger layer 1, by concreting molding, trigger layer 1 is provided with from the pipeline of fire-fighting looped pipeline road 4 shower nozzle 5 extended and control
The sensing unit 6 of shower nozzle 5 processed.
Wherein: core layer 2 includes supporting part and non-bearing part, supporting part materials for wall is concrete and foam pottery
Ceramic material;Non-bearing wall segment material is EPS;Shower nozzle 5 protrudes trigger layer 1 outer surface;Sensing unit 6 includes that infrared induction fills
Put.
The construction method of the Building Fire Protection wall of a kind of band active fire protection system, comprises the following steps:
Step one: install core layer 2 locating template;
Step 2: be set to template centre position in core layer 2 and lay fire chief road 3 and fire-fighting looped pipeline road 4;
Step 3: build core layer 2: oxygen and steam pour core layer 2 supporting part xoncrete structure, at load receiving part
Divide and around xoncrete structure, paste foam ceramic material, detach core layer 2 locating template after having poured 2 hours, non-holding is installed
Weight wall segment material;
Step 4: install trigger layer 1 locating template;
Step 5: build trigger layer 1: oxygen and steam pour trigger layer 1 xoncrete structure, removes after 8 hours and triggers
Layer 1 locating template;
Step 6: install infrared inductor and the shower nozzle 5 of sensing unit 6.
Claims (8)
1. the Building Fire Protection wall of a band active fire protection system, it is characterised in that: the core layer that includes being arranged on centre position and
The trigger layer of core layer two sides, described core layer is built-in with fire chief road and fire-fighting looped pipeline road, and described fire chief road is managed
In road and all it is filled with fire-fighting medium in fire-fighting pair circuit line;Described trigger layer is by concreting molding, described trigger layer
On be provided with from fire-fighting pair circuit line extend shower nozzle and control shower nozzle sensing unit.
The Building Fire Protection wall of a kind of band active fire protection system the most according to claim 1, it is characterised in that: described core layer
Including supporting part and non-bearing part, described supporting part materials for wall be concrete or concrete and foam ceramic material or
Concrete and cement fibrolite plate;Described non-bearing wall segment material is heat preserving and insulating material.
The Building Fire Protection wall of a kind of band active fire protection system the most according to claim 2, it is characterised in that: described thermal insulation separation
Hot material is EPS or rock wool.
The Building Fire Protection wall of a kind of band active fire protection system the most according to claim 1, it is characterised in that: described fire-fighting is situated between
Matter is water or alkyl halide or dry ice.
The Building Fire Protection wall of a kind of band active fire protection system the most according to claim 1, it is characterised in that: described shower nozzle is convex
Go out trigger layer outer surface.
The Building Fire Protection wall of a kind of band active fire protection system the most according to claim 1, it is characterised in that: described sensing is single
Unit includes device for image or infrared inductor.
The Building Fire Protection wall of a kind of band active fire protection system the most according to claim 1, it is characterised in that: described core layer
Thickness is 200MM, and described trigger layer thickness is 50MM.
8. the construction method of the Building Fire Protection wall of a kind of band active fire protection system as described in any one of claim 1 to 7, it is special
Levy and be: the construction method of described Building Fire Protection wall comprises the following steps:
Step one: install core layer locating template;
Step 2: be set to template centre position in core layer and lay fire chief road and fire-fighting looped pipeline road;
Step 3: build core layer: oxygen and steam pour core layer supporting part xoncrete structure, have poured 2 hours
After detach core layer locating template, non-bearing wall segment material is installed;
Step 4: install trigger layer locating template;
Step 5: build trigger layer: oxygen and steam pour trigger layer xoncrete structure, removes trigger layer location after 8 hours
Template;
Step 6: install sensing unit and shower nozzle.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610657602.3A CN106284722B (en) | 2016-08-11 | 2016-08-11 | A kind of building fire protection wall and its construction method with active fire protection system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610657602.3A CN106284722B (en) | 2016-08-11 | 2016-08-11 | A kind of building fire protection wall and its construction method with active fire protection system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106284722A true CN106284722A (en) | 2017-01-04 |
| CN106284722B CN106284722B (en) | 2019-06-21 |
Family
ID=57669272
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610657602.3A Active CN106284722B (en) | 2016-08-11 | 2016-08-11 | A kind of building fire protection wall and its construction method with active fire protection system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106284722B (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107313525A (en) * | 2017-08-10 | 2017-11-03 | 温州市华昌建设有限公司 | A kind of Building Fire Protection system and construction method |
| CN107654095A (en) * | 2017-10-16 | 2018-02-02 | 江苏鹏程钢结构有限公司 | One kind fire prevention factory building and its construction method |
| WO2019114180A1 (en) * | 2017-12-14 | 2019-06-20 | 江苏跃发建设工程有限公司 | Ultralight steel wall panel having built-in firefighting pipeline |
| CN111749358A (en) * | 2020-06-18 | 2020-10-09 | 周口师范学院 | building firewall |
| CN111877664A (en) * | 2020-07-11 | 2020-11-03 | 温州绿瑜建设有限公司 | Fireproof plate for interior decoration |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102009018501A1 (en) * | 2009-04-23 | 2010-10-28 | Peter Fuchs | Fire extinguishing system for closed storage tank system, has water spray nozzles implementing extinguishing process during thermal activation such that amount of water is reduced at regions of storage tank system |
| CN202658772U (en) * | 2012-05-11 | 2013-01-09 | 象山宝盛建设有限公司 | Light-core reinforced concrete wall |
| CN202850258U (en) * | 2012-04-16 | 2013-04-03 | 万薇薇 | External envelope structure of compound insulation wall for energy saving building |
| CN203379528U (en) * | 2013-05-08 | 2014-01-08 | 宣中光 | Automatic fire extinguishing system for steel building |
| CN203777567U (en) * | 2013-12-25 | 2014-08-20 | 广州市设计院 | Automatic spray-type fire extinguishing device applied to oblique-roof structure |
| CN204275340U (en) * | 2014-11-24 | 2015-04-22 | 西南交通大学 | A kind of post a tree, used in making timber for boats extinction by automatic sprinkling structure modelled after an antique |
| CN204940581U (en) * | 2015-07-02 | 2016-01-06 | 山东省建设科技与产业化中心 | A kind of complex heat-preservation plate cast-in-place concrete sandwich wall structure |
| CN105569212A (en) * | 2013-07-30 | 2016-05-11 | 朱保生 | Thermal-insulated wall body communicated with fire water supply and capable of cutting off fire |
-
2016
- 2016-08-11 CN CN201610657602.3A patent/CN106284722B/en active Active
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102009018501A1 (en) * | 2009-04-23 | 2010-10-28 | Peter Fuchs | Fire extinguishing system for closed storage tank system, has water spray nozzles implementing extinguishing process during thermal activation such that amount of water is reduced at regions of storage tank system |
| CN202850258U (en) * | 2012-04-16 | 2013-04-03 | 万薇薇 | External envelope structure of compound insulation wall for energy saving building |
| CN202658772U (en) * | 2012-05-11 | 2013-01-09 | 象山宝盛建设有限公司 | Light-core reinforced concrete wall |
| CN203379528U (en) * | 2013-05-08 | 2014-01-08 | 宣中光 | Automatic fire extinguishing system for steel building |
| CN105569212A (en) * | 2013-07-30 | 2016-05-11 | 朱保生 | Thermal-insulated wall body communicated with fire water supply and capable of cutting off fire |
| CN203777567U (en) * | 2013-12-25 | 2014-08-20 | 广州市设计院 | Automatic spray-type fire extinguishing device applied to oblique-roof structure |
| CN204275340U (en) * | 2014-11-24 | 2015-04-22 | 西南交通大学 | A kind of post a tree, used in making timber for boats extinction by automatic sprinkling structure modelled after an antique |
| CN204940581U (en) * | 2015-07-02 | 2016-01-06 | 山东省建设科技与产业化中心 | A kind of complex heat-preservation plate cast-in-place concrete sandwich wall structure |
Non-Patent Citations (1)
| Title |
|---|
| 王余胜: "《建筑消防工程设计与施工系列丛书 建筑电气消防细节详解》", 30 September 2015 * |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107313525A (en) * | 2017-08-10 | 2017-11-03 | 温州市华昌建设有限公司 | A kind of Building Fire Protection system and construction method |
| CN107313525B (en) * | 2017-08-10 | 2019-05-14 | 温州市华昌建设有限公司 | A kind of building fire protection system and construction method |
| CN107654095A (en) * | 2017-10-16 | 2018-02-02 | 江苏鹏程钢结构有限公司 | One kind fire prevention factory building and its construction method |
| CN107654095B (en) * | 2017-10-16 | 2019-06-28 | 江苏鹏程钢结构有限公司 | A kind of fire prevention workshop and its construction method |
| WO2019114180A1 (en) * | 2017-12-14 | 2019-06-20 | 江苏跃发建设工程有限公司 | Ultralight steel wall panel having built-in firefighting pipeline |
| CN111749358A (en) * | 2020-06-18 | 2020-10-09 | 周口师范学院 | building firewall |
| CN111877664A (en) * | 2020-07-11 | 2020-11-03 | 温州绿瑜建设有限公司 | Fireproof plate for interior decoration |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106284722B (en) | 2019-06-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106284722B (en) | A kind of building fire protection wall and its construction method with active fire protection system | |
| Lawson et al. | Application of modular construction in high-rise buildings | |
| CN106168058A (en) | A kind of prefabricated sandwich style Sandwich insulation wallboard and manufacture method | |
| CN103482944A (en) | Fire-retardant impervious insulation board and preparation method thereof | |
| CN103015542A (en) | External heat insulation construction method of cast-in-place foam external wall | |
| CN208088560U (en) | A kind of foam-in-place polyurethane external wall heat insulation system | |
| CN203096970U (en) | Thermal insulation composite board | |
| CN103174224A (en) | External thermal insulation system of external wall | |
| CN107143141A (en) | External wall of high-rise building warming plate construction | |
| CN102601849A (en) | Method for rapidly manufacturing composite insulation board | |
| CN108265854A (en) | A kind of foam-in-place polyurethane external wall heat insulation system and its construction method | |
| CN104805928A (en) | Pump watering core material fibreboard wrapping sandwich insulation outer wall | |
| CN205100422U (en) | Self thermal insulating building block | |
| CN205242785U (en) | Coincide floor | |
| CN204728753U (en) | A kind of movable plank house | |
| CN105484389A (en) | Steel structure shear wall structure | |
| CN103741860A (en) | Self-thermal insulation concrete composite building block with inner straw steel mesh mold core and preparation method of self-thermal insulation concrete composite building block | |
| CN104481043B (en) | A kind of venting of dust explosion plate and preparation method thereof | |
| CN107989207A (en) | A kind of HL building heat preservations system and HL construction walls | |
| CN209975824U (en) | Homogeneous modified fireproof heat-preservation floor structure | |
| CN209369086U (en) | A kind of heat preserving exterior wall for building | |
| CN203145306U (en) | Aerated concrete self-insulation compound building block | |
| CN203213325U (en) | Outer wall external insulation system | |
| CN203821926U (en) | Light steel keel structure system of earthquake-proof house | |
| CN103206030A (en) | Heat-insulating wall and construction method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |