CN106284360A - A kind of high spraying cement earth concrete pressure fills the engineering method of built pile - Google Patents
A kind of high spraying cement earth concrete pressure fills the engineering method of built pile Download PDFInfo
- Publication number
- CN106284360A CN106284360A CN201510353512.0A CN201510353512A CN106284360A CN 106284360 A CN106284360 A CN 106284360A CN 201510353512 A CN201510353512 A CN 201510353512A CN 106284360 A CN106284360 A CN 106284360A
- Authority
- CN
- China
- Prior art keywords
- construction
- pile
- earth
- concrete
- soil pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The present invention relates to a kind of high spraying cement earth concrete pressure and fill the engineering method of built pile, after comprising the steps: that S1, multifunctional drill are in place, start drilling machine construction, drilling tool creeps into completing drilling construction at the bottom of hole;Start heavy jet grouting device, carry brill and start height spray, stirring concrete earth construction;High spray stirring construction is to design attitude, and high water spray earth pile driving construction is complete;S2, transferring drilling tool to design attitude at the bottom of hole, start coagulation soil pressure filling device, start coagulation soil pressure and fill construction, coagulation soil pressure fills high to stake top mark, and coagulation soil pressure has filled, and the highest spraying cement earth concrete pressure filling built pile has been constructed.The present invention utilizes multifunctional drill to realize height water spray earth and changes a pile with cast-with-pressure concrete pile (CFG stake) by unit technique, construction technology is simple, workable, be easy to quality control, economic and environment-friendly, low cost, comprehensive benefit notable, promotes the use of and will bring bigger social and economic benefits.
Description
Technical field
The present invention relates to foundation construction field of engineering technology, more specifically to a kind of high water spray earth coagulation
Soil pressure fills the engineering method of built pile.
Background technology
In recent years, capital construction scale constantly expands, at soil such as building, water conservancy, electric power, traffic and railways
During wood engineering is built, various unfavorable foundations need to carry out basement process and could meet and build top and build (structure) and make
The requirement of thing, method for processing foundation be selected to control construction quality, reduce construction costs essential condition.
The method of basement process is varied, and wherein rotary churning pile, concrete guncreting pile (also known as CFG stake) are in recent years
Grow up and process the new method of soft subgrade, this pile-type because having excellent technical performance and economic effect,
Promote the use of at home.
Rotary churning pile belongs to Half rigid pile, and pile strength is low, and deformation modulus is little, complex ground treatment pile body pressure-bearing
Time, expansion damage easily occurs.CFG stake belongs to rigid pile, and pile strength is high, and deformation modulus is big, but at present
Composite foundation treatment typically uses paxilla footpath, at the bottom of bearing capacity of single pile, it is impossible to realizes large pile spacing and lays out pile, unit ground
Base processing area stake content is higher, and geographical processing cost can not be greatly lowered.
Summary of the invention
The technical problem to be solved is to provide a kind of high spraying cement earth concrete pressure to fill built pile
Engineering method, to solve above-mentioned technical problem.
A kind of high spraying cement earth concrete pressure that the present invention proposes fills the engineering method of built pile, comprises the steps:
After S1, multifunctional drill are in place, starting drilling machine construction, drilling tool creeps into completing drilling construction at the bottom of hole;
Start heavy jet grouting device, carry brill and start height spray, stirring concrete earth construction;High spray stirring construction is to designing position
Putting, high water spray earth pile driving construction is complete;
After high water spray earth pile driving construction completes in S2, S1, transfer drilling tool to design attitude at the bottom of hole, startup coagulation
Soil pressure filling device, starts coagulation soil pressure and fills construction, and coagulation soil pressure fills high to stake top mark, and coagulation soil pressure has filled,
The highest spraying cement earth concrete pressure fills built pile and has constructed.
Preferably, cement earth pile and concrete guncreting pile can realize combining, lower combination, many combinations and complete
The composite type of combination.
A kind of high spraying cement earth concrete pressure that the present invention proposes fills the engineering method of built pile, utilizes multifunctional drill,
Use long spire pore-forming, utilize the spray of major diameter, many head heights, agitating device, it is achieved the spray of soil cement height, stirring
Compound;High water spray earth has been constructed, and realizes coagulation soil pressure with position at the bottom of discharge hole under drilling tool and fills construction, coagulation
Soil pressure has filled, and high spraying cement earth concrete pressure fills built pile and constructed.This pile-type collection soil cement side frictional resistance
Power is big, and the big two aspect advantages of bored concrete pile rigidity, so that bearing capacity is better than cement earth pile and bored concrete pile, single pile
Bearing capacity, shearing resistance are greatly improved.Because this pile-type top is composited by CFG stake core stake and soil cement,
Stake end cross-sectional area increases, it is achieved large pile spacing lays out pile, and reduces unit basement process area king-pile content, reduces and throws
Money, cost-effective, duration can be greatly shortened simultaneously.
The present invention utilizes multifunctional drill to realize height water spray earth with cast-with-pressure concrete pile (CFG stake) by single
A machine technique pile of conversion, construction technology is simple, workable, it is simple to quality control, economic and environment-friendly,
Low cost, comprehensive benefit are notable.Unit is constructed, and equipment investment amount is few, and equipment use cost is low;Because height sprays
Using major diameter, bull shotcrete construction, speed of application is fast, and the duration is short, high efficiency;Because construction pore-creating is for long
Spiral is constructed, and the geological conditions suitability is strong, is suitable for bad ground construction;This pile-type bearing capacity is high, settles little,
Construction technology is simple, workable, it is simple to quality control, detection, properties are notable;Promote the use of
Bigger social and economic benefits will be brought.
Accompanying drawing explanation
Fig. 1 is that a kind of high spraying cement earth concrete that the present invention proposes presses S1 embodiment in the engineering method filling built pile
The workflow schematic diagram of one.
Fig. 2 is that a kind of high spraying cement earth concrete that the present invention proposes presses S2 embodiment in the engineering method filling built pile
The workflow schematic diagram of one.
Fig. 3 is that a kind of high spraying cement earth concrete that the present invention proposes presses S1 embodiment in the engineering method filling built pile
The workflow schematic diagram of two.
Fig. 4 is that a kind of high spraying cement earth concrete that the present invention proposes presses S2 embodiment in the engineering method filling built pile
The workflow schematic diagram of two.
Fig. 5 is that a kind of high spraying cement earth concrete that the present invention proposes presses S1 embodiment in the engineering method filling built pile
The workflow schematic diagram of three.
Fig. 6 is that a kind of high spraying cement earth concrete that the present invention proposes presses S2 embodiment in the engineering method filling built pile
The workflow schematic diagram of three.
Detailed description of the invention
As shown in figures 1 to 6, Fig. 1 is that a kind of high spraying cement earth concrete pressure that the present invention proposes fills built pile
The workflow schematic diagram of S1 embodiment one in engineering method;Fig. 2 is that a kind of high water spray earth that the present invention proposes mixes
The workflow schematic diagram of S2 embodiment one in the engineering method of solidifying soil pressure filling built pile;Fig. 3 is that the present invention proposes
The workflow schematic diagram of S1 embodiment two in the engineering method of a kind of high spraying cement earth concrete pressure filling built pile;Figure
The work of S2 embodiment two in the engineering method of the 4 a kind of high spraying cement earth concrete pressure filling built piles proposed for the present invention
Make schematic flow sheet;Fig. 5 is the engineering method that a kind of high spraying cement earth concrete pressure that the present invention proposes fills built pile
The workflow schematic diagram of middle S1 embodiment three;Fig. 6 is the one high spraying cement earth concrete that the present invention proposes
The workflow schematic diagram of S2 embodiment three in the engineering method of pressure filling built pile.
Embodiment one
With reference to Fig. 1,2, the present invention propose a kind of high spraying cement earth concrete pressure fill built pile engineering method, bag
Include following steps:
After S1, multifunctional drill are in place, starting drilling machine construction, drilling tool creeps into completing drilling construction at the bottom of hole;
Start heavy jet grouting device, carry brill and start height spray, stirring concrete earth construction;High spray stirring construction is to designing position
Putting, high water spray earth pile driving construction is complete;In the present embodiment, the earth stake of high water spray is positioned at the bottom of boring;
After high water spray earth pile driving construction completes in S2, S1, transfer drilling tool to design attitude at the bottom of hole, startup coagulation
Soil pressure filling device, starts coagulation soil pressure and fills construction, and coagulation soil pressure fills high to stake top mark, and coagulation soil pressure has filled,
The highest spraying cement earth concrete pressure fills built pile and has constructed.
In the present embodiment, before construction, on-the-spot " three supplies and one leveling " prepare, and equipment is marched into the arena assembly and adjustment;Survey
Measuring unwrapping wire, test line, inspection is put in stake position;In S1, multifunctional drill is in place, examination pore-forming, pile, compound determines height
Preventing slurry injection amount, rotating speed and carry drilling speed degree;High spray is stirred embankment under construction rod rotation speed and carries drilling speed degree, it is ensured that
Soil cement diameter, intensity reach to design requirement.After S2 has constructed, rig shifts, and carries out next step stake
Base is constructed, and multi-functional drill machine equipment is pile foundation examination to be carried out when withdrawing.
Embodiment two
With reference to Fig. 3,4, the present invention propose a kind of high spraying cement earth concrete pressure fill built pile engineering method, bag
Include following steps:
After S1, multifunctional drill are in place, starting drilling machine construction, drilling tool creeps into completing drilling construction at the bottom of hole;
Start heavy jet grouting device, carry brill and start height spray, stirring concrete earth construction;High spray stirring construction is to designing position
Putting, high water spray earth pile driving construction is complete;In the present embodiment, multiple high water spray earth stakes are along the degree of depth side of boring
To distribution;
After high water spray earth pile driving construction completes in S2, S1, transfer drilling tool to design attitude at the bottom of hole, startup coagulation
Soil pressure filling device, starts coagulation soil pressure and fills construction, and coagulation soil pressure fills high to stake top mark, and coagulation soil pressure has filled,
The highest spraying cement earth concrete pressure fills built pile and has constructed.
In the present embodiment, before construction, on-the-spot " three supplies and one leveling " prepare, and equipment is marched into the arena assembly and adjustment;Survey
Measuring unwrapping wire, test line, inspection is put in stake position;In S1, multifunctional drill is in place, examination pore-forming, pile, compound determines height
Preventing slurry injection amount, rotating speed and carry drilling speed degree;High spray is stirred embankment under construction rod rotation speed and carries drilling speed degree, it is ensured that
Soil cement diameter, intensity reach to design requirement.After S2 has constructed, rig shifts, and carries out next step stake
Base is constructed, and multi-functional drill machine equipment is pile foundation examination to be carried out when withdrawing.
Embodiment three
With reference to Fig. 5,6, the present invention propose a kind of high spraying cement earth concrete pressure fill built pile engineering method, bag
Include following steps:
After S1, multifunctional drill are in place, starting drilling machine construction, drilling tool creeps into completing drilling construction at the bottom of hole;
Start heavy jet grouting device, carry brill and start height spray, stirring concrete earth construction;High spray stirring construction is to designing position
Putting, high water spray earth pile driving construction is complete;In the present embodiment, the earth stake of high water spray sets along the depth direction of boring
Put;
After high water spray earth pile driving construction completes in S2, S1, transfer drilling tool to design attitude at the bottom of hole, startup coagulation
Soil pressure filling device, starts coagulation soil pressure and fills construction, and coagulation soil pressure fills high to stake top mark, and coagulation soil pressure has filled,
The highest spraying cement earth concrete pressure fills built pile and has constructed.
In the present embodiment, before construction, on-the-spot " three supplies and one leveling " prepare, and equipment is marched into the arena assembly and adjustment;Survey
Measuring unwrapping wire, test line, inspection is put in stake position;In S1, multifunctional drill is in place, examination pore-forming, pile, compound determines height
Preventing slurry injection amount, rotating speed and carry drilling speed degree;High spray is stirred embankment under construction rod rotation speed and carries drilling speed degree, it is ensured that
Soil cement diameter, intensity reach to design requirement.After S2 has constructed, rig shifts, and carries out next step stake
Base is constructed, and multi-functional drill machine equipment is pile foundation examination to be carried out when withdrawing.
The above, the only present invention preferably detailed description of the invention, but protection scope of the present invention not office
Being limited to this, any those familiar with the art is in the technical scope that the invention discloses, according to this
The technical scheme of invention and inventive concept thereof in addition equivalent or change, all should contain the protection in the present invention
Within the scope of.
Claims (2)
1. the engineering method of one kind high spraying cement earth concrete pressure filling built pile, it is characterised in that comprise the steps:
After S1, multifunctional drill are in place, starting drilling machine construction, drilling tool creeps into completing drilling construction at the bottom of hole;
Start heavy jet grouting device, carry brill and start height spray, stirring concrete earth construction;High spray stirring construction is to designing position
Putting, high water spray earth pile driving construction is complete;
After high water spray earth pile driving construction completes in S2, S1, transfer drilling tool to design attitude at the bottom of hole, startup coagulation
Soil pressure filling device, starts coagulation soil pressure and fills construction, and coagulation soil pressure fills high to stake top mark, and coagulation soil pressure has filled,
The highest spraying cement earth concrete pressure fills built pile and has constructed.
Long auger height spraying cement soil pressure the most according to claim 1 fills the engineering method of built pile, and it is special
Levying and be, cement earth pile and concrete guncreting pile can realize combining, lower combination, many combinations and entirely combine
Composite type.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510353512.0A CN106284360A (en) | 2015-06-24 | 2015-06-24 | A kind of high spraying cement earth concrete pressure fills the engineering method of built pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510353512.0A CN106284360A (en) | 2015-06-24 | 2015-06-24 | A kind of high spraying cement earth concrete pressure fills the engineering method of built pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106284360A true CN106284360A (en) | 2017-01-04 |
Family
ID=57650744
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510353512.0A Pending CN106284360A (en) | 2015-06-24 | 2015-06-24 | A kind of high spraying cement earth concrete pressure fills the engineering method of built pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106284360A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1298990A (en) * | 2000-12-20 | 2001-06-13 | 罗明 | High-pressure rotary spray technique for enlarging base of preburied pipe |
CN1730839A (en) * | 2004-08-07 | 2006-02-08 | 曾毅学 | Soil-cement pile with core and diameter enlarged extension section |
CN1814916A (en) * | 2005-11-01 | 2006-08-09 | 区国雄 | Ramming-enlarged pile of premade pile-body |
CN103774645A (en) * | 2014-01-15 | 2014-05-07 | 西安建筑科技大学 | Cemented soil and concrete composite pile and construction method thereof |
CN104074186A (en) * | 2014-07-22 | 2014-10-01 | 王继忠 | Pile casing device for hole formation in building foundation and construction method of building foundation |
CN104294821A (en) * | 2014-09-30 | 2015-01-21 | 杭州江润科技有限公司 | Pile forming method for confined reinforced cement soil pile |
JP2015014165A (en) * | 2013-07-08 | 2015-01-22 | 日本ジオス株式会社 | Construction method of foundation pile |
-
2015
- 2015-06-24 CN CN201510353512.0A patent/CN106284360A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1298990A (en) * | 2000-12-20 | 2001-06-13 | 罗明 | High-pressure rotary spray technique for enlarging base of preburied pipe |
CN1730839A (en) * | 2004-08-07 | 2006-02-08 | 曾毅学 | Soil-cement pile with core and diameter enlarged extension section |
CN1814916A (en) * | 2005-11-01 | 2006-08-09 | 区国雄 | Ramming-enlarged pile of premade pile-body |
JP2015014165A (en) * | 2013-07-08 | 2015-01-22 | 日本ジオス株式会社 | Construction method of foundation pile |
CN103774645A (en) * | 2014-01-15 | 2014-05-07 | 西安建筑科技大学 | Cemented soil and concrete composite pile and construction method thereof |
CN104074186A (en) * | 2014-07-22 | 2014-10-01 | 王继忠 | Pile casing device for hole formation in building foundation and construction method of building foundation |
CN104294821A (en) * | 2014-09-30 | 2015-01-21 | 杭州江润科技有限公司 | Pile forming method for confined reinforced cement soil pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105350523A (en) | High-pressure-jetting cemented soil screw extrusion expansion and variable diameter concrete pile combined pile and manufacturing method thereof | |
CN203452083U (en) | Rotary expanding pile construction equipment and grout feeding device | |
CN205907679U (en) | Cast -in -place strength core stirring stake | |
CN101974905B (en) | Pile-embedding method for hollow pile and auger drill for implementing same | |
CN105113498A (en) | Method for constructing high-strength core composite piles | |
CN204199335U (en) | A kind of pressure release well reducing PHC tube pile construction soil compaction effect | |
CN103628463A (en) | Construction method for ultra-deep vibroflotation gravel pile of complicated stratum | |
JP2015183364A (en) | Method for preventing soil structure from sliding at slope surface layer with geocell fixing operation auxiliary means | |
CN104863132A (en) | Bougainvillea spectabilis willd-shaped cement-soil mixing pile and shaping method thereof | |
CN102979091B (en) | Method for constructing cement jet grouting pile with fine aggregate concrete core | |
CN105297710A (en) | High-pressure-jetting cement soil twist drill and reamed reinforced concrete grouting combined pile and manufacturing method | |
CN105464079A (en) | Forming construction method of long-spiral pore-forming pile-slab-pile supporting and anti-seepage continuous wall | |
CN104153357A (en) | Construction method of composite pile | |
CN105297712A (en) | Construction method for composite pile of auger-bored high-pressure-jetting cemented soil composite variable-cross-section concrete pile | |
CN107338790A (en) | The compound pile construction method of jet mixing | |
CN103015408A (en) | Cast-in-place pile synchronous casing hole-forming constructing method | |
CN207260138U (en) | High-pressure rotary-spray stirs the drilling rod of bearing pile and has its device | |
CN102535452A (en) | Novel engineering pile | |
CN205100209U (en) | High water spray earth spiral is crowded to be expanded, reducing concrete pile composite pile | |
CN107700508A (en) | A kind of shaped steel stirs the construction method of water spray soil curtain support pile | |
CN107653889A (en) | A kind of shaped steel pressure is poured water the construction method of soil curtain support pile | |
CN106759296A (en) | One kind draining odd-shaped cross section ring pile tube and its can take root in formula construction method | |
CN205100208U (en) | Crowded, reaming reinforced concrete bored concrete pile composite pile of high water spray earth anger | |
CN106284360A (en) | A kind of high spraying cement earth concrete pressure fills the engineering method of built pile | |
CN205062809U (en) | End support type screw thread core composite pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170104 |