CN106284087B - Construction method suitable for the cluster type assembly arch rib of narrow bridge - Google Patents
Construction method suitable for the cluster type assembly arch rib of narrow bridge Download PDFInfo
- Publication number
- CN106284087B CN106284087B CN201610766880.2A CN201610766880A CN106284087B CN 106284087 B CN106284087 B CN 106284087B CN 201610766880 A CN201610766880 A CN 201610766880A CN 106284087 B CN106284087 B CN 106284087B
- Authority
- CN
- China
- Prior art keywords
- arch rib
- construction
- cluster type
- arch
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 59
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 30
- 239000010959 steel Substances 0.000 claims abstract description 30
- 239000011150 reinforced concrete Substances 0.000 claims description 4
- 230000000875 corresponding Effects 0.000 claims description 3
- 238000003032 molecular docking Methods 0.000 claims description 3
- 239000000463 material Substances 0.000 abstract description 3
- 238000000354 decomposition reaction Methods 0.000 abstract description 2
- 210000000614 Ribs Anatomy 0.000 description 69
- 101700064026 EXT1 Proteins 0.000 description 8
- 101710002310 RNASE1 Proteins 0.000 description 8
- 101710022611 RNASE1B Proteins 0.000 description 8
- 210000002356 Skeleton Anatomy 0.000 description 8
- 238000010586 diagram Methods 0.000 description 6
- 239000004567 concrete Substances 0.000 description 3
- 230000000712 assembly Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002708 enhancing Effects 0.000 description 1
- 239000011372 high-strength concrete Substances 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
The invention discloses a kind of construction method of the cluster type assembly arch rib suitable for narrow bridge, using cluster type assembling method, arch rib is transversely divided into the arch rib beam step-by-step construction of several laid out in parallel, first one by one along the assembled each arch rib beam in longitudinal direction, after assembled complete each arch rib beam, laterally permanently connected, the i.e. construction of completion arch rib is carried out again.Arch rib beam step-by-step construction of the invention by the way that arch rib to be divided into several laid out in parallel according to arch rib span size, arch rib Shu Chongliang after decomposition is small, the bearing capacity of required steel construction bow member diminishes, reduce basic material and equipment is used, so as to reduce cost expense, construction period is shortened, avoids and potential safety hazard is caused to the ground of surrounding enviroment.
Description
Technical field
The present invention relates to the assembled technical field of arch rib, in particular to a kind of applying for cluster type assembly arch rib suitable for narrow bridge
Work method.
Background technology
Existing stiff skeleton method is by cable crane and temporary towers drag-line, first sets up steel pipe stiff skeleton 13,
Using the bearing capacity of the steel pipe stiff skeleton 13 set up, then high-strength concrete is irrigated in steel pipe, to further enhance it
Bearing capacity, then by the use of steel tube concrete soil skeleton as supporter, finally hang mould and construct to form armored concrete arch rib 14.
However, using the armored concrete arch rib of support support or stiff skeleton support, its steel pipe stiff skeleton 13 is forever
Long property structure, it is not possible to reuse, cause the cost of arch rib high.Particularly, when building large span arch rib, to stiff skeleton
Requirement for bearing capacity it is higher, it is necessary to basic material and equipment it is more, further increase cost expense, extend construction week
Phase, also potential safety hazard be present to surrounding enviroment ground.
The content of the invention
Present invention aim to provide a kind of cluster type suitable for narrow bridge safe, that operating expenses is low assembled arch
The construction method of rib.
To achieve the above object, the construction method of a kind of cluster type assembly arch rib suitable for narrow bridge designed by the present invention,
Comprise the following steps:
1) according to the transverse width size of arch rib, the arch rib beam substep that arch rib is transversely divided into several laid out in parallel is applied
Work;
2) according to the transverse width size of arch rib, two spaced apart steel construction bow members, two steel construction bow members are set up
Transverse width be not less than arch rib transverse width, between the bottom of described two steel construction bow members along longitudinal direction set up truss horizontal stroke
Beam;
3) assembly of first arch rib beam, some section arches of first arch rib Shu Caiyong are carried out using truss crossbeam as supporting body
Along longitudinal direction, docking is assembled section by section for rib section, closes up to form entirety, completes the construction of first arch rib beam;
4) assembling construction of second arch rib beam, repeat step 3 are carried out in the laterally adjacent empty place of first arch rib beam)
Assembled second arch rib beam, keeps the lateral connection between first arch rib beam and second arch rib beam;
5) assembling construction of next arch rib beam is carried out in the laterally adjacent empty place of second arch rib beam, is completed per assembled
One arch rib beam, next arch rib beam just is installed in its laterally adjacent empty place, until assembled complete all arch rib beams;
6) finally each arch rib beam is connected using transverse prestress cable wire, completes the construction of arch rib.
Further, in the step 3), truss crossbeam is provided with dismountable height-regulating support, often saves rib-lifting section
Setting height(from bottom) is adjusted by height-regulating support and positioned.
Further, in the step 3), connected between first arch rib beam and adjacent steel construction bow member using horizontal
Cable wire is connect to be fixedly connected.
Further, in the step 5), keep laterally connecting using lateral connection latching between two neighboring arch rib beam
Connect.
Further, in the step 2), each truss crossbeam transversely may be used by some sections crossbeam section (10)
Dismantling connection forms.
Further, in the step 2), each steel construction bow member is detachably connected by some section box beams along longitudinal direction
Connect and form.
Further, using splicing board component connection between box beam described in two adjacent sections.
Further, the splicing board component includes being arranged on the first splice plate on the inside of two adjacent sections box beam, is arranged on
The second splice plate and bolt assembly on the outside of two adjacent sections box beam, first splice plate and the second splice plate are by adjacent two
The side wall for saving box beam clamps, and adjusts the gap between two adjacent sections box beam according to the curvature of corresponding arch rib, finally by bolt
Component is locked.
Further, in the step 3), the erection sequence of each section rib-lifting section of first arch rib beam is by arch springing
Assembly is docked successively to vault.
Further, the arch rib is reinforced concrete structure.
Compared with prior art, the invention has the advantages that:
First, the present invention is applied by the way that arch rib to be divided into the arch rib beam substep of several laid out in parallel according to arch rib span size
Work, the arch rib Shu Chongliang after decomposition is small, and the bearing capacity of required steel construction bow member diminishes, and reduces basic material and equipment is used,
So as to reduce cost expense, construction period is shortened, avoids and potential safety hazard is caused to the ground of surrounding enviroment.
Second, the steel construction bow member of the present invention is detachably connected using splicing board component, so that steel construction bow member can
Recycling, greatlys save operating expenses.
Third, the construction method of the present invention is assembled to all kinds of arch ribs to have generality, and simple and easy, convenient, tool of constructing
There are very strong operability and practicality.
Brief description of the drawings
Fig. 1 is the structural representation of the steel construction bow member set up in the prior art;
Fig. 2 is along the sectional structure chart in A-A directions in Fig. 1;
Fig. 3 is the structural representation of the steel construction bow member set up in the present invention;
Fig. 4 is Fig. 3 overlooking the structure diagram;
Fig. 5 is along the cross section structure diagram in B-B directions in Fig. 4;
Fig. 6 is that the cross section structure diagram after first arch rib beam is installed in the present invention;
Fig. 7 is that the cross section structure diagram after second arch rib beam is installed in the present invention;
Fig. 8 is the structural representation after last arch rib beam of arch rib erection in the present invention;
Fig. 9 is the structural representation of dismounting steel construction bow member after the completion of the arch rib assembly in the present invention;
Figure 10 is the mplifying structure schematic diagram of I in Fig. 3;
Figure 11 is the mplifying structure schematic diagram of II in Figure 10;
Figure 12 is along the sectional structure chart in C-C directions in Figure 11;
Wherein:1- arch ribs, 2- arch ribs beam, 3- steel constructions bow member, 4- truss crossbeam, 5- rib-lifting sections, 6- prestressed cables,
7- height-regulating supports, 8- lateral connections cable wire, 9- lateral connections latching, 10- crossbeams section, 11- box beams, 12- splicing board component,
The splice plates of 12.1- first, the splice plates of 12.2- second, 12.3- bolt assemblies, 13- steel pipes stiff skeleton, 14- reinforced concrete arches
Rib.
Embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
As illustrated, the present embodiment is suitable to the construction method of the cluster type assembly arch rib of narrow bridge, comprise the following steps:
1) according to the transverse width size of arch rib 1, the arch rib beam 2 that arch rib 1 is transversely divided into several laid out in parallel divides
Step construction, the arch rib 1 is reinforced concrete structure;
2) according to the transverse width size of arch rib 1, two spaced apart steel construction bow members 3, two steel construction arches are set up
The transverse width of frame 3 is not less than the transverse width of arch rib 1, is set up between the bottom of described two steel construction bow members 3 along longitudinal direction
Truss crossbeam 4, each truss crossbeam 4 are transversely detachably connected by some section crossbeam sections 10 and formed;Each steel
Structure bow member 3 is detachably connected along longitudinal direction by some section box beams 11 and formed, and splice plate is used between box beam 11 described in two adjacent sections
Component 12 connects, and the splicing board component 12 includes being arranged on the first splice plate 12.1 of the inner side of two adjacent sections box beam 11, set
The second splice plate 12.2 and bolt assembly 12.3 on the outside of two adjacent sections box beam, first splice plate 12.1 and second
Splice plate 12.2 clamps the side wall of two adjacent sections box beam 11, and adjusts two adjacent sections box beam 11 according to the curvature of corresponding arch rib 1
Between gap, locked finally by bolt assembly 12.3;
3) assembly of first arch rib beam 2 is carried out using truss crossbeam 4 as supporting body, first arch rib beam 2 is using some
Saving rib-lifting section 5, docking is assembled section by section along longitudinal direction, and the erection sequence of each section rib-lifting section 5 of first arch rib beam 2 is by arch springing
Assembly is docked successively to vault, and truss crossbeam 4 is provided with dismountable height-regulating support 7, and the setting height(from bottom) for often saving rib-lifting section 5 is led to
Cross height-regulating support 7 regulation positioning, close up to form entirety, complete first arch rib beam 2 construction, first arch rib beam 2 with it is adjacent
Steel construction bow member 3 between be fixedly connected using lateral connection cable wire 8;
4) assembling construction of second arch rib beam 2, repeat step are carried out in the laterally adjacent empty place of first arch rib beam 2
3 assembled second arch rib beam 2, keep the lateral connection between first arch rib beam 2 and second arch rib beam 2;
5) assembling construction of next arch rib beam 2 is carried out in the laterally adjacent empty place of second arch rib beam 2, per assembled complete
Into an arch rib beam 2, next arch rib beam 2 just is installed in its laterally adjacent empty place, used between two neighboring arch rib beam 2
Lateral connection latching 9 keeps lateral connection, until assembled complete all arch rib beams 2;
6) finally each arch rib beam 2 is connected using transverse prestress cable wire 6, completes the construction of arch rib 1.
In whole work progress, before overall arch rib 1 is not formed, between assembled good each arch rib beam 2, arch rib beam
Lateral ties are all remained between 2 and steel construction bow member 3, but without vertical constraint.
The foregoing is only a specific embodiment of the invention, it is noted that any those skilled in the art exist
In disclosed technical scope, the change or replacement that can readily occur in, should all cover protection scope of the present invention it
It is interior.
Claims (10)
1. the construction method of a kind of cluster type assembly arch rib suitable for narrow bridge, it is characterised in that comprise the following steps:
1) according to the transverse width size of arch rib (1), arch rib (1) is transversely divided into the arch rib beam (2) of several laid out in parallel
Step-by-step construction;
2) according to the transverse width size of arch rib (1), two spaced apart steel construction bow members (3), two steel construction arches are set up
The transverse width of frame (3) is not less than the transverse width of arch rib (1), along vertical between the bottom of described two steel construction bow members (3)
To setting up truss crossbeam (4);
3) assembly of first arch rib beam (2) is carried out using truss crossbeam (4) as supporting body, first arch rib beam (2) is if use
Docking is assembled section by section along longitudinal direction for dry section rib-lifting section (5), closes up to form entirety, completes the construction of first arch rib beam (2);
4) assembling construction of second arch rib beam (2), repeat step are carried out in the laterally adjacent empty place of first arch rib beam (2)
3) assembled second arch rib beam (2), keeps the lateral connection between first arch rib beam (2) and second arch rib beam (2);
5) assembling construction of next arch rib beam (2) is carried out in the laterally adjacent empty place of second arch rib beam (2), per assembled complete
Into an arch rib beam (2), next arch rib beam (2) just is installed in its laterally adjacent empty place, until assembled complete all arches
Rib beam (2);
6) finally each arch rib beam (2) is connected using transverse prestress cable wire (6), completes the construction of arch rib (1).
2. the construction method of the cluster type assembly arch rib according to claim 1 suitable for narrow bridge, it is characterised in that described
In step 3), truss crossbeam (4) is provided with dismountable height-regulating support (7), and the setting height(from bottom) for often saving rib-lifting section (5) passes through tune
Height support (7) regulation positioning.
3. the construction method of the cluster type assembly arch rib according to claim 1 suitable for narrow bridge, it is characterised in that described
In step 3), it is fixedly connected between first arch rib beam (2) and adjacent steel construction bow member (3) using lateral connection cable wire (8).
4. the construction method of the cluster type assembly arch rib according to claim 1 suitable for narrow bridge, it is characterised in that described
In step 5), lateral connection is kept using lateral connection latching (9) between two neighboring arch rib beam (2).
5. the construction method of the cluster type assembly arch rib according to claim 1 suitable for narrow bridge, it is characterised in that described
In step 2), each truss crossbeam (4) is transversely detachably connected by some sections crossbeam section (10) and formed.
6. the construction method of the cluster type assembly arch rib according to claim 1 suitable for narrow bridge, it is characterised in that described
In step 2), each steel construction bow member (3) is detachably connected along longitudinal direction by some section box beams (11) and formed.
7. the construction method of the cluster type assembly arch rib according to claim 6 suitable for narrow bridge, it is characterised in that adjacent two
Save between the box beam (11) using splicing board component (12) connection.
8. the construction method of the cluster type assembly arch rib according to claim 7 suitable for narrow bridge, it is characterised in that the spelling
Fishplate bar component (12) includes being arranged on the first splice plate (12.1) on the inside of two adjacent sections box beam (11), is arranged on two adjacent sections case
The second splice plate (12.2) and bolt assembly (12.3) on the outside of beam, first splice plate (12.1) and the second splice plate
(12.2) side wall of two adjacent sections box beam (11) is clamped, and two adjacent sections box beam is adjusted according to the curvature of corresponding arch rib (1)
(11) gap between, locked finally by bolt assembly (12.3).
9. the construction method of the cluster type assembly arch rib according to claim 1 suitable for narrow bridge, it is characterised in that described
In step 3), the erection sequence of each section rib-lifting section (5) of first arch rib beam (2) is to dock spelling successively to vault from arch springing
Dress.
10. the construction method of the cluster type assembly arch rib suitable for narrow bridge according to claim any one of 1-9, its feature exist
In the arch rib (1) is reinforced concrete structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610766880.2A CN106284087B (en) | 2016-08-30 | 2016-08-30 | Construction method suitable for the cluster type assembly arch rib of narrow bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610766880.2A CN106284087B (en) | 2016-08-30 | 2016-08-30 | Construction method suitable for the cluster type assembly arch rib of narrow bridge |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106284087A CN106284087A (en) | 2017-01-04 |
CN106284087B true CN106284087B (en) | 2018-03-09 |
Family
ID=57674667
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610766880.2A Active CN106284087B (en) | 2016-08-30 | 2016-08-30 | Construction method suitable for the cluster type assembly arch rib of narrow bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106284087B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108625272B (en) * | 2018-06-27 | 2020-04-07 | 中铁二院工程集团有限责任公司 | Crack control method and structure for arch ring of large-span concrete arch bridge |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0868014A (en) * | 1994-08-30 | 1996-03-12 | P S Co Ltd | Construction of composite steel pipe arch rib |
JP3059654B2 (en) * | 1995-02-03 | 2000-07-04 | 鹿島建設株式会社 | Construction method of multi span continuous bridge |
KR101372290B1 (en) * | 2012-05-11 | 2014-03-11 | 주식회사 장헌산업 | Construction Method of Arch Rib in Arch Bridge |
CN103437296B (en) * | 2013-08-28 | 2015-06-24 | 山东中宏路桥建设有限公司 | Steel tube arch bridge towerless buckling three-section type double-rib folding hoisting construction method |
CN103711080B (en) * | 2013-12-26 | 2016-04-20 | 中国一冶集团有限公司 | Utilize the method for locating between coordinate method of comparison determination steel pipe arch bridge arch rib |
CN105672134A (en) * | 2016-01-26 | 2016-06-15 | 河海大学 | Through concrete-filled steel tube tied-arch bridge erection construction method |
CN105586834B (en) * | 2016-02-26 | 2017-07-28 | 江苏中铁山桥重工有限公司 | A kind of bridge arch rib section manufacture craft |
-
2016
- 2016-08-30 CN CN201610766880.2A patent/CN106284087B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN106284087A (en) | 2017-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104775522B (en) | A kind of detachable house box | |
CN101787796B (en) | Suspended formwork bracing system for steel structure concrete floor slab construction | |
CN104018581A (en) | Prestress concrete F slab and framework structure system | |
KR101648008B1 (en) | Temporary bridge using precast truss assembly construction method | |
SA119410085B1 (en) | Strengthening System for Beam-Column Connection in Steel Frame Buildings to Resist Progressive Collapse | |
CN104372961A (en) | Anti-seismic integrated lightweight steel construction house | |
CN105350454A (en) | Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge | |
CN105256836A (en) | Construction method for fast restoring road traffic in construction of underground project | |
CN106284087B (en) | Construction method suitable for the cluster type assembly arch rib of narrow bridge | |
CN107191000A (en) | The temporary support of telescopic in height regulation reinforces combination steel construction | |
CN109812010A (en) | A kind of whole template of shear Wall steel joist exempts from aperture formwork and its construction method | |
CN202430994U (en) | Template limiting clamp | |
CN203834926U (en) | Formwork erecting structure for bare concrete basement exterior wall | |
CN105780989B (en) | A kind of twin beams building cover structure | |
CN212003212U (en) | Two lining quick construction structures in multiple variable cross section undercut tunnel | |
CN103790376A (en) | Wall framework applied to hyperboloid building construction and wall construction method | |
CN203756190U (en) | Trolley device for herringbone forked tunnel | |
CN204626637U (en) | The girder steel agent structure of steel concrete integrated building | |
CN106368126B (en) | The construction method of cluster type assembly arch rib | |
CN204370797U (en) | A kind of concrete floor slab construction plate device and supporting component thereof | |
CN203879037U (en) | Inclined strut widening structure for reconstruction of in-use platform | |
CN102913007B (en) | Steel reinforcement processing shed and construction method therefor | |
CN206070378U (en) | A kind of steel construction bow member | |
CN103924789B (en) | Come into operation platform transformation diagonal brace widening structure | |
CN211422659U (en) | Movable high formwork side wall formwork for subway station made in same direction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |