CN106284087B - Construction method suitable for the cluster type assembly arch rib of narrow bridge - Google Patents

Construction method suitable for the cluster type assembly arch rib of narrow bridge Download PDF

Info

Publication number
CN106284087B
CN106284087B CN201610766880.2A CN201610766880A CN106284087B CN 106284087 B CN106284087 B CN 106284087B CN 201610766880 A CN201610766880 A CN 201610766880A CN 106284087 B CN106284087 B CN 106284087B
Authority
CN
China
Prior art keywords
arch rib
construction
cluster type
arch
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610766880.2A
Other languages
Chinese (zh)
Other versions
CN106284087A (en
Inventor
饶少臣
曾敏
史娣
文望青
薛照钧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201610766880.2A priority Critical patent/CN106284087B/en
Publication of CN106284087A publication Critical patent/CN106284087A/en
Application granted granted Critical
Publication of CN106284087B publication Critical patent/CN106284087B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The invention discloses a kind of construction method of the cluster type assembly arch rib suitable for narrow bridge, using cluster type assembling method, arch rib is transversely divided into the arch rib beam step-by-step construction of several laid out in parallel, first one by one along the assembled each arch rib beam in longitudinal direction, after assembled complete each arch rib beam, laterally permanently connected, the i.e. construction of completion arch rib is carried out again.Arch rib beam step-by-step construction of the invention by the way that arch rib to be divided into several laid out in parallel according to arch rib span size, arch rib Shu Chongliang after decomposition is small, the bearing capacity of required steel construction bow member diminishes, reduce basic material and equipment is used, so as to reduce cost expense, construction period is shortened, avoids and potential safety hazard is caused to the ground of surrounding enviroment.

Description

Construction method suitable for the cluster type assembly arch rib of narrow bridge
Technical field
The present invention relates to the assembled technical field of arch rib, in particular to a kind of applying for cluster type assembly arch rib suitable for narrow bridge Work method.
Background technology
Existing stiff skeleton method is by cable crane and temporary towers drag-line, first sets up steel pipe stiff skeleton 13, Using the bearing capacity of the steel pipe stiff skeleton 13 set up, then high-strength concrete is irrigated in steel pipe, to further enhance it Bearing capacity, then by the use of steel tube concrete soil skeleton as supporter, finally hang mould and construct to form armored concrete arch rib 14.
However, using the armored concrete arch rib of support support or stiff skeleton support, its steel pipe stiff skeleton 13 is forever Long property structure, it is not possible to reuse, cause the cost of arch rib high.Particularly, when building large span arch rib, to stiff skeleton Requirement for bearing capacity it is higher, it is necessary to basic material and equipment it is more, further increase cost expense, extend construction week Phase, also potential safety hazard be present to surrounding enviroment ground.
The content of the invention
Present invention aim to provide a kind of cluster type suitable for narrow bridge safe, that operating expenses is low assembled arch The construction method of rib.
To achieve the above object, the construction method of a kind of cluster type assembly arch rib suitable for narrow bridge designed by the present invention, Comprise the following steps:
1) according to the transverse width size of arch rib, the arch rib beam substep that arch rib is transversely divided into several laid out in parallel is applied Work;
2) according to the transverse width size of arch rib, two spaced apart steel construction bow members, two steel construction bow members are set up Transverse width be not less than arch rib transverse width, between the bottom of described two steel construction bow members along longitudinal direction set up truss horizontal stroke Beam;
3) assembly of first arch rib beam, some section arches of first arch rib Shu Caiyong are carried out using truss crossbeam as supporting body Along longitudinal direction, docking is assembled section by section for rib section, closes up to form entirety, completes the construction of first arch rib beam;
4) assembling construction of second arch rib beam, repeat step 3 are carried out in the laterally adjacent empty place of first arch rib beam) Assembled second arch rib beam, keeps the lateral connection between first arch rib beam and second arch rib beam;
5) assembling construction of next arch rib beam is carried out in the laterally adjacent empty place of second arch rib beam, is completed per assembled One arch rib beam, next arch rib beam just is installed in its laterally adjacent empty place, until assembled complete all arch rib beams;
6) finally each arch rib beam is connected using transverse prestress cable wire, completes the construction of arch rib.
Further, in the step 3), truss crossbeam is provided with dismountable height-regulating support, often saves rib-lifting section Setting height(from bottom) is adjusted by height-regulating support and positioned.
Further, in the step 3), connected between first arch rib beam and adjacent steel construction bow member using horizontal Cable wire is connect to be fixedly connected.
Further, in the step 5), keep laterally connecting using lateral connection latching between two neighboring arch rib beam Connect.
Further, in the step 2), each truss crossbeam transversely may be used by some sections crossbeam section (10) Dismantling connection forms.
Further, in the step 2), each steel construction bow member is detachably connected by some section box beams along longitudinal direction Connect and form.
Further, using splicing board component connection between box beam described in two adjacent sections.
Further, the splicing board component includes being arranged on the first splice plate on the inside of two adjacent sections box beam, is arranged on The second splice plate and bolt assembly on the outside of two adjacent sections box beam, first splice plate and the second splice plate are by adjacent two The side wall for saving box beam clamps, and adjusts the gap between two adjacent sections box beam according to the curvature of corresponding arch rib, finally by bolt Component is locked.
Further, in the step 3), the erection sequence of each section rib-lifting section of first arch rib beam is by arch springing Assembly is docked successively to vault.
Further, the arch rib is reinforced concrete structure.
Compared with prior art, the invention has the advantages that:
First, the present invention is applied by the way that arch rib to be divided into the arch rib beam substep of several laid out in parallel according to arch rib span size Work, the arch rib Shu Chongliang after decomposition is small, and the bearing capacity of required steel construction bow member diminishes, and reduces basic material and equipment is used, So as to reduce cost expense, construction period is shortened, avoids and potential safety hazard is caused to the ground of surrounding enviroment.
Second, the steel construction bow member of the present invention is detachably connected using splicing board component, so that steel construction bow member can Recycling, greatlys save operating expenses.
Third, the construction method of the present invention is assembled to all kinds of arch ribs to have generality, and simple and easy, convenient, tool of constructing There are very strong operability and practicality.
Brief description of the drawings
Fig. 1 is the structural representation of the steel construction bow member set up in the prior art;
Fig. 2 is along the sectional structure chart in A-A directions in Fig. 1;
Fig. 3 is the structural representation of the steel construction bow member set up in the present invention;
Fig. 4 is Fig. 3 overlooking the structure diagram;
Fig. 5 is along the cross section structure diagram in B-B directions in Fig. 4;
Fig. 6 is that the cross section structure diagram after first arch rib beam is installed in the present invention;
Fig. 7 is that the cross section structure diagram after second arch rib beam is installed in the present invention;
Fig. 8 is the structural representation after last arch rib beam of arch rib erection in the present invention;
Fig. 9 is the structural representation of dismounting steel construction bow member after the completion of the arch rib assembly in the present invention;
Figure 10 is the mplifying structure schematic diagram of I in Fig. 3;
Figure 11 is the mplifying structure schematic diagram of II in Figure 10;
Figure 12 is along the sectional structure chart in C-C directions in Figure 11;
Wherein:1- arch ribs, 2- arch ribs beam, 3- steel constructions bow member, 4- truss crossbeam, 5- rib-lifting sections, 6- prestressed cables, 7- height-regulating supports, 8- lateral connections cable wire, 9- lateral connections latching, 10- crossbeams section, 11- box beams, 12- splicing board component, The splice plates of 12.1- first, the splice plates of 12.2- second, 12.3- bolt assemblies, 13- steel pipes stiff skeleton, 14- reinforced concrete arches Rib.
Embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
As illustrated, the present embodiment is suitable to the construction method of the cluster type assembly arch rib of narrow bridge, comprise the following steps:
1) according to the transverse width size of arch rib 1, the arch rib beam 2 that arch rib 1 is transversely divided into several laid out in parallel divides Step construction, the arch rib 1 is reinforced concrete structure;
2) according to the transverse width size of arch rib 1, two spaced apart steel construction bow members 3, two steel construction arches are set up The transverse width of frame 3 is not less than the transverse width of arch rib 1, is set up between the bottom of described two steel construction bow members 3 along longitudinal direction Truss crossbeam 4, each truss crossbeam 4 are transversely detachably connected by some section crossbeam sections 10 and formed;Each steel Structure bow member 3 is detachably connected along longitudinal direction by some section box beams 11 and formed, and splice plate is used between box beam 11 described in two adjacent sections Component 12 connects, and the splicing board component 12 includes being arranged on the first splice plate 12.1 of the inner side of two adjacent sections box beam 11, set The second splice plate 12.2 and bolt assembly 12.3 on the outside of two adjacent sections box beam, first splice plate 12.1 and second Splice plate 12.2 clamps the side wall of two adjacent sections box beam 11, and adjusts two adjacent sections box beam 11 according to the curvature of corresponding arch rib 1 Between gap, locked finally by bolt assembly 12.3;
3) assembly of first arch rib beam 2 is carried out using truss crossbeam 4 as supporting body, first arch rib beam 2 is using some Saving rib-lifting section 5, docking is assembled section by section along longitudinal direction, and the erection sequence of each section rib-lifting section 5 of first arch rib beam 2 is by arch springing Assembly is docked successively to vault, and truss crossbeam 4 is provided with dismountable height-regulating support 7, and the setting height(from bottom) for often saving rib-lifting section 5 is led to Cross height-regulating support 7 regulation positioning, close up to form entirety, complete first arch rib beam 2 construction, first arch rib beam 2 with it is adjacent Steel construction bow member 3 between be fixedly connected using lateral connection cable wire 8;
4) assembling construction of second arch rib beam 2, repeat step are carried out in the laterally adjacent empty place of first arch rib beam 2 3 assembled second arch rib beam 2, keep the lateral connection between first arch rib beam 2 and second arch rib beam 2;
5) assembling construction of next arch rib beam 2 is carried out in the laterally adjacent empty place of second arch rib beam 2, per assembled complete Into an arch rib beam 2, next arch rib beam 2 just is installed in its laterally adjacent empty place, used between two neighboring arch rib beam 2 Lateral connection latching 9 keeps lateral connection, until assembled complete all arch rib beams 2;
6) finally each arch rib beam 2 is connected using transverse prestress cable wire 6, completes the construction of arch rib 1.
In whole work progress, before overall arch rib 1 is not formed, between assembled good each arch rib beam 2, arch rib beam Lateral ties are all remained between 2 and steel construction bow member 3, but without vertical constraint.
The foregoing is only a specific embodiment of the invention, it is noted that any those skilled in the art exist In disclosed technical scope, the change or replacement that can readily occur in, should all cover protection scope of the present invention it It is interior.

Claims (10)

1. the construction method of a kind of cluster type assembly arch rib suitable for narrow bridge, it is characterised in that comprise the following steps:
1) according to the transverse width size of arch rib (1), arch rib (1) is transversely divided into the arch rib beam (2) of several laid out in parallel Step-by-step construction;
2) according to the transverse width size of arch rib (1), two spaced apart steel construction bow members (3), two steel construction arches are set up The transverse width of frame (3) is not less than the transverse width of arch rib (1), along vertical between the bottom of described two steel construction bow members (3) To setting up truss crossbeam (4);
3) assembly of first arch rib beam (2) is carried out using truss crossbeam (4) as supporting body, first arch rib beam (2) is if use Docking is assembled section by section along longitudinal direction for dry section rib-lifting section (5), closes up to form entirety, completes the construction of first arch rib beam (2);
4) assembling construction of second arch rib beam (2), repeat step are carried out in the laterally adjacent empty place of first arch rib beam (2) 3) assembled second arch rib beam (2), keeps the lateral connection between first arch rib beam (2) and second arch rib beam (2);
5) assembling construction of next arch rib beam (2) is carried out in the laterally adjacent empty place of second arch rib beam (2), per assembled complete Into an arch rib beam (2), next arch rib beam (2) just is installed in its laterally adjacent empty place, until assembled complete all arches Rib beam (2);
6) finally each arch rib beam (2) is connected using transverse prestress cable wire (6), completes the construction of arch rib (1).
2. the construction method of the cluster type assembly arch rib according to claim 1 suitable for narrow bridge, it is characterised in that described In step 3), truss crossbeam (4) is provided with dismountable height-regulating support (7), and the setting height(from bottom) for often saving rib-lifting section (5) passes through tune Height support (7) regulation positioning.
3. the construction method of the cluster type assembly arch rib according to claim 1 suitable for narrow bridge, it is characterised in that described In step 3), it is fixedly connected between first arch rib beam (2) and adjacent steel construction bow member (3) using lateral connection cable wire (8).
4. the construction method of the cluster type assembly arch rib according to claim 1 suitable for narrow bridge, it is characterised in that described In step 5), lateral connection is kept using lateral connection latching (9) between two neighboring arch rib beam (2).
5. the construction method of the cluster type assembly arch rib according to claim 1 suitable for narrow bridge, it is characterised in that described In step 2), each truss crossbeam (4) is transversely detachably connected by some sections crossbeam section (10) and formed.
6. the construction method of the cluster type assembly arch rib according to claim 1 suitable for narrow bridge, it is characterised in that described In step 2), each steel construction bow member (3) is detachably connected along longitudinal direction by some section box beams (11) and formed.
7. the construction method of the cluster type assembly arch rib according to claim 6 suitable for narrow bridge, it is characterised in that adjacent two Save between the box beam (11) using splicing board component (12) connection.
8. the construction method of the cluster type assembly arch rib according to claim 7 suitable for narrow bridge, it is characterised in that the spelling Fishplate bar component (12) includes being arranged on the first splice plate (12.1) on the inside of two adjacent sections box beam (11), is arranged on two adjacent sections case The second splice plate (12.2) and bolt assembly (12.3) on the outside of beam, first splice plate (12.1) and the second splice plate (12.2) side wall of two adjacent sections box beam (11) is clamped, and two adjacent sections box beam is adjusted according to the curvature of corresponding arch rib (1) (11) gap between, locked finally by bolt assembly (12.3).
9. the construction method of the cluster type assembly arch rib according to claim 1 suitable for narrow bridge, it is characterised in that described In step 3), the erection sequence of each section rib-lifting section (5) of first arch rib beam (2) is to dock spelling successively to vault from arch springing Dress.
10. the construction method of the cluster type assembly arch rib suitable for narrow bridge according to claim any one of 1-9, its feature exist In the arch rib (1) is reinforced concrete structure.
CN201610766880.2A 2016-08-30 2016-08-30 Construction method suitable for the cluster type assembly arch rib of narrow bridge Active CN106284087B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610766880.2A CN106284087B (en) 2016-08-30 2016-08-30 Construction method suitable for the cluster type assembly arch rib of narrow bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610766880.2A CN106284087B (en) 2016-08-30 2016-08-30 Construction method suitable for the cluster type assembly arch rib of narrow bridge

Publications (2)

Publication Number Publication Date
CN106284087A CN106284087A (en) 2017-01-04
CN106284087B true CN106284087B (en) 2018-03-09

Family

ID=57674667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610766880.2A Active CN106284087B (en) 2016-08-30 2016-08-30 Construction method suitable for the cluster type assembly arch rib of narrow bridge

Country Status (1)

Country Link
CN (1) CN106284087B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625272B (en) * 2018-06-27 2020-04-07 中铁二院工程集团有限责任公司 Crack control method and structure for arch ring of large-span concrete arch bridge

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0868014A (en) * 1994-08-30 1996-03-12 P S Co Ltd Construction of composite steel pipe arch rib
JP3059654B2 (en) * 1995-02-03 2000-07-04 鹿島建設株式会社 Construction method of multi span continuous bridge
KR101372290B1 (en) * 2012-05-11 2014-03-11 주식회사 장헌산업 Construction Method of Arch Rib in Arch Bridge
CN103437296B (en) * 2013-08-28 2015-06-24 山东中宏路桥建设有限公司 Steel tube arch bridge towerless buckling three-section type double-rib folding hoisting construction method
CN103711080B (en) * 2013-12-26 2016-04-20 中国一冶集团有限公司 Utilize the method for locating between coordinate method of comparison determination steel pipe arch bridge arch rib
CN105672134A (en) * 2016-01-26 2016-06-15 河海大学 Through concrete-filled steel tube tied-arch bridge erection construction method
CN105586834B (en) * 2016-02-26 2017-07-28 江苏中铁山桥重工有限公司 A kind of bridge arch rib section manufacture craft

Also Published As

Publication number Publication date
CN106284087A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN104775522B (en) A kind of detachable house box
CN101787796B (en) Suspended formwork bracing system for steel structure concrete floor slab construction
CN104018581A (en) Prestress concrete F slab and framework structure system
KR101648008B1 (en) Temporary bridge using precast truss assembly construction method
SA119410085B1 (en) Strengthening System for Beam-Column Connection in Steel Frame Buildings to Resist Progressive Collapse
CN104372961A (en) Anti-seismic integrated lightweight steel construction house
CN105350454A (en) Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge
CN105256836A (en) Construction method for fast restoring road traffic in construction of underground project
CN106284087B (en) Construction method suitable for the cluster type assembly arch rib of narrow bridge
CN107191000A (en) The temporary support of telescopic in height regulation reinforces combination steel construction
CN109812010A (en) A kind of whole template of shear Wall steel joist exempts from aperture formwork and its construction method
CN202430994U (en) Template limiting clamp
CN203834926U (en) Formwork erecting structure for bare concrete basement exterior wall
CN105780989B (en) A kind of twin beams building cover structure
CN212003212U (en) Two lining quick construction structures in multiple variable cross section undercut tunnel
CN103790376A (en) Wall framework applied to hyperboloid building construction and wall construction method
CN203756190U (en) Trolley device for herringbone forked tunnel
CN204626637U (en) The girder steel agent structure of steel concrete integrated building
CN106368126B (en) The construction method of cluster type assembly arch rib
CN204370797U (en) A kind of concrete floor slab construction plate device and supporting component thereof
CN203879037U (en) Inclined strut widening structure for reconstruction of in-use platform
CN102913007B (en) Steel reinforcement processing shed and construction method therefor
CN206070378U (en) A kind of steel construction bow member
CN103924789B (en) Come into operation platform transformation diagonal brace widening structure
CN211422659U (en) Movable high formwork side wall formwork for subway station made in same direction

Legal Events

Date Code Title Description