CN106271012A - Hot isostatic press welding method - Google Patents

Hot isostatic press welding method Download PDF

Info

Publication number
CN106271012A
CN106271012A CN201510312745.6A CN201510312745A CN106271012A CN 106271012 A CN106271012 A CN 106271012A CN 201510312745 A CN201510312745 A CN 201510312745A CN 106271012 A CN106271012 A CN 106271012A
Authority
CN
China
Prior art keywords
perforate
workpiece
hot isostatic
isostatic press
mould
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510312745.6A
Other languages
Chinese (zh)
Inventor
姚力军
潘杰
相原俊夫
大岩彦
大岩一彦
王学泽
李超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Jiangfeng Electronic Material Co Ltd
Original Assignee
Ningbo Jiangfeng Electronic Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Jiangfeng Electronic Material Co Ltd filed Critical Ningbo Jiangfeng Electronic Material Co Ltd
Priority to CN201510312745.6A priority Critical patent/CN106271012A/en
Publication of CN106271012A publication Critical patent/CN106271012A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K20/00Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating
    • B23K20/02Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating by means of a press ; Diffusion bonding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K20/00Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating
    • B23K20/14Preventing or minimising gas access, or using protective gases or vacuum during welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K20/00Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating
    • B23K20/22Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating taking account of the properties of the materials to be welded

Abstract

A kind of hot isostatic press welding method, including: the first workpiece and second workpiece are provided;Making mould, described mould includes the first perforate for accommodating the first workpiece and for accommodating the second perforate of second workpiece, and described first aperture bottom and the second aperture bottom are interconnected;Described first workpiece and second workpiece are respectively put into described first perforate and the second perforate;Jacket is wrapped up outside described mould;Described jacket is carried out heat and other static pressuring processes, makes described first workpiece and second workpiece welding form Welding Structure;Remove described jacket, take out described Welding Structure.During heat and other static pressuring processes; the position of described first workpiece and second workpiece is fixed by described mould; and the first workpiece and second workpiece surrounding are protected by described mould; make described first workpiece and second workpiece be not easy under high pressure to be extruded and cause damage, and then improve the first workpiece and welded quality that second workpiece welding is formed.

Description

Hot isostatic press welding method
Technical field
The present invention relates to field of semiconductor manufacture, particularly relate to a kind of hot isostatic press welding method.
Background technology
Tungsten alloy is to add other elementary composition alloys with tungsten for base.In a metal, the fusing point of tungsten is higher, Elevated temperature strength and creep-resistant property and heat conduction, conduction and electron emission capability are the best, and ratio is great, except big Amount is used for manufacturing hard alloy and making outside alloy addition, and tungsten and alloy thereof are widely used in electronics, electric light source Industry, also is used for making rocket nozzle, die casting, armour-piercing in the departments such as space flight, casting, weapon Play core, contact, heater and heat screen etc..
Prior art generally uses hot isostatic pressing technique to weld tungsten alloy, and high temperature insostatic pressing (HIP) is close in High Temperature High Pressure In envelope container, with high-pressure inert gas as medium, thing to be welded therein is applied each to equal isostatic pressure, The method forming high-compactness blank.
But, the tungsten alloy that prior art hot isostatic press welding method is formed is of low quality, yield is relatively low, Cannot meet and manufacture the demand produced.
Summary of the invention
The problem that the present invention solves is to propose a kind of hot isostatic press welding method, to improve hot isostatic press welding Quality.
For solving the problems referred to above, the present invention provides a kind of hot isostatic press welding method, including:
First workpiece and second workpiece are provided;
Making mould, described mould includes the first perforate for accommodating the first workpiece and for accommodating second Second perforate of workpiece, described first perforate and the second perforate are interconnected;
Described first workpiece and second workpiece are respectively put into described first perforate and the second perforate;
Jacket is wrapped up outside described mould;
Described jacket is carried out heat and other static pressuring processes, makes described first workpiece and second workpiece welding form weldering Access node structure;
Remove described jacket, take out described Welding Structure.
Optionally, the material of described first workpiece and second workpiece is tungsten alloy.
Optionally, described first workpiece and second workpiece be shaped as cylinder, in the step making mould In, making described first perforate and the second perforate is cylindrical aperture.
Optionally, make the radius of described first perforate match with the radius of described first workpiece, make described The radius of the second perforate matches with the radius of described second workpiece.
Optionally, in the step making mould, make described first perforate relative with the center of the second perforate Together.
Optionally, in the step making mould, making described mould is tabular cuboid, has the first table Face and the second surface relative with described first surface, described first perforate is opened in described first surface, Described second perforate is opened in described second surface.
Optionally, in the step making mould, the material of described mould is metal.
Optionally, described first workpiece and second workpiece are respectively put into described first perforate and the second perforate Before, described first perforate and the second perforate sidewall arrange sark.
Optionally, the step arranging sark in described first perforate and the second perforate sidewall includes: It is coated with sealing coat in described first perforate and the second perforate sidewall, and makes described sealing coat cover described first Perforate and the second perforate sidewall and the first perforate and the joint face of the second perforate sidewall.
Optionally, the material of described sealing coat is boron nitride.
Optionally, the step arranging sark in described first perforate and the second perforate sidewall includes: In described first perforate and the second perforate sidewall, spacer is set, makes described spacer cover and state the first perforate Sidewall with the second perforate.
Optionally, the material of described spacer is pottery.
Optionally, described first perforate and the second perforate are cylindrical aperture, and described spacer is for cover respectively It is placed on the ring-type spacer on the first perforate and the second perforate sidewall, the vertical described circle of described ring-type spacer The cross section of cylindrical openings generatrix direction is ring-type.
Optionally, described first workpiece has the first solder side and first back side relative with the first solder side, Described second workpiece has the second solder side and second back side relative with the first solder side, by described One workpiece and second workpiece are respectively put in the step of described first perforate and the second perforate, make described first Solder side and the second solder side contact in the connectivity part of described first perforate and the second perforate.
Optionally, after wrapping up jacket outside described mould, described jacket is carried out heat and other static pressuring processes Before, also include: be de-gassed technique to inside described jacket.
Optionally, the step of degassing internal to described jacket includes: heats described jacket to temperature and reaches 300 DEG C ~after 400 DEG C, carry out incubation step, in described heating and insulating process, in lasting evacuation makes jacket Vacuum is at least 2 × 10-3Pa, described temperature retention time is 2~4 hours.
Optionally, the step that described jacket carries out heat and other static pressuring processes includes: the temperature of heat and other static pressuring processes Spending in the range of spending 750 to 900, environmental stress is more than 120 MPas, and the heat-insulation pressure keeping time is 4 By 6 hours.
Compared with prior art, the invention have the advantages that the present invention is to the first workpiece and the second work Part makes mould before carrying out hot isostatic press welding technique, and described mould includes for accommodating the first workpiece First perforate and for accommodating the second perforate of second workpiece.Afterwards by described first workpiece and second workpiece It is respectively put into described first perforate and the second perforate, and outside described mould, wraps up jacket, to described bag Set carries out heat and other static pressuring processes.During heat and other static pressuring processes, described first workpiece and second workpiece Position fixed by described mould, and the first workpiece and second workpiece surrounding are protected by described mould, make Described first workpiece and second workpiece are not easy under high pressure to be extruded and cause damage, and then improve the The welded quality that one workpiece and second workpiece welding are formed.
Further, described first workpiece and second workpiece are respectively put into described first perforate and second to open Before hole, described first perforate and the second perforate sidewall arrange sark, so weld at high temperature insostatic pressing (HIP) After connecing, it is simple to described Welding Structure is separated with mould.
Accompanying drawing explanation
The schematic flow sheet of Fig. 1 hot isostatic press welding of the present invention method one embodiment;
Fig. 2 to Fig. 8 is the structural representation of each step of hot isostatic press welding method shown in Fig. 1;
Fig. 9 is the schematic diagram of hot isostatic press welding another embodiment of method of the present invention.
Detailed description of the invention
As stated in the Background Art, existing heat and other static pressuring processes is used directly to process two tungsten alloy things to be welded, The product quality that welding is formed is poor.
The product quality that analysis prior art thing to be welded to tungsten alloy carries out heat and other static pressuring processes formation is poor Reason: tungsten alloy is more crisp, frangible after pressurized, and be not easy processing, use existing high temperature insostatic pressing (HIP) work Skill directly processes two tungsten alloy things to be welded, it is easy to thing to be welded to tungsten alloy causes damage, makes weldering Connect that the product quality of formation is poor even scraps.Additionally, tungsten alloy is usually used in accurate device, therefore two kinds The concentricity requirement of thing to be welded is the highest, when using existing hot isostatic pressing technique to two kinds of things to be welded, Thing to be welded may misplace under bigger pressure, affects the concentricity of thing to be welded, and then reduces The product quality that welding is formed
The present invention made mould before the first workpiece and second workpiece carry out hot isostatic press welding technique, Described mould includes the first perforate for accommodating the first workpiece and opens for accommodating the second of second workpiece Hole.Afterwards described first workpiece and second workpiece are respectively put into described first perforate and the second perforate, and Outside described mould, wrap up jacket, described jacket is carried out heat and other static pressuring processes.At heat and other static pressuring processes During, the position of described first workpiece and second workpiece is fixed by described mould, and the first workpiece Protected by described mould with second workpiece surrounding so that described first workpiece and second workpiece are not easy at height Pressure is extruded and causes damage, and then improves the first workpiece and the Welding Structure of second workpiece welding formation Quality.
Understandable, below in conjunction with the accompanying drawings for enabling the above-mentioned purpose of the present invention, feature and advantage to become apparent from The detailed description of the invention of the present invention is described in detail.
Fig. 1 show the present invention and provides the flow chart of hot isostatic press welding method one embodiment, present invention heat Isostatic pressed welding method generally comprises:
Step S1, it is provided that the first workpiece and second workpiece;
Step S2, make mould, described mould include the first perforate for accommodating the first workpiece and for Accommodating the second perforate of second workpiece, described first perforate and the second perforate are interconnected;
Step S3, is respectively put into described first perforate and the second perforate by described first workpiece and second workpiece;
Step S4, wraps up jacket outside described mould;
Step S5, carries out heat and other static pressuring processes to described jacket, makes described first workpiece and second workpiece weldering Connect formation Welding Structure;
Step S6, removes described jacket, takes out described Welding Structure.
Below in conjunction with each step of hot isostatic press welding embodiment of the method shown in Fig. 1 shown in Fig. 2 to Fig. 8 Schematic diagram, is discussed in detail the detailed description of the invention of the present invention.
With reference to Fig. 2, perform step S1, it is provided that the first workpiece 100 and second workpiece 101.Described first work Part 100 and second workpiece 101 are for welding the cutter forming machining.By the first workpiece 100 He After second workpiece 101 welding forms Welding Structure, the part of former first workpiece 100 may be used for being formed The cutter head of cutter, the part of former second workpiece 101 may be used for being formed the handle of a knife of cutter.
In the present embodiment, the material of described first workpiece 100 and second workpiece 101 is tungsten alloy, tungsten Alloy high-temp intensity and creep-resistant property are fine, are suitable for making the cutter of turnery processing.But the present invention The material of described first workpiece 100 and second workpiece 101 is not limited, in other embodiments, institute The material stating the first workpiece 100 and second workpiece 101 can also be for Steel material, aluminium alloy, titanium alloy etc. Other any metal or alloy materials.
In the present embodiment, described first workpiece 100 and second workpiece 101 be shaped as cylinder.But It is that the shape of described first workpiece 100 and second workpiece 101 is not limited by the present invention.
It is the sectional view of AA` line in Fig. 3 with reference to Fig. 3 and Fig. 4, Fig. 4, performs step S2, make mould Tool 200, described mould 200 includes the first perforate 203 for accommodating the first workpiece 100 and for accommodating Second perforate 204 of second workpiece 101, described first perforate 203 and the second perforate 204 are interconnected.
Specifically, in the present embodiment, in the step making mould 200, the described mould 200 is made to be Tabular cuboid, has first surface 201 and the second surface 202 relative with described first surface 201, Described first perforate 203 is opened in described first surface 201, and described second perforate 204 is opened in described Two surfaces 202.The cuboid that is shaped as of described mould 200 is advantageous in that, it is simple to follow-up jacket makes, And in hot isostatic press welding technique, provide uniform to described first workpiece 100 and second workpiece 101 Pressure, but the shape of described mould 200 is not limited by the present invention, in his embodiment, described mould The shape of tool 200 can also be spheroid, cylinder or other shapes.
In conjunction with reference to Fig. 2, Fig. 3 and Fig. 4, in the present embodiment, due to described first workpiece 100 and the Two workpiece 101 be shaped as cylinder, making described first perforate 203 and the second perforate 204 is cylinder Perforate, in order to accommodate described first workpiece 100 and second workpiece 101.
In the step making mould 200, make the radius of described first perforate 203 and described first workpiece The radius of 100 matches, and makes the radius of described second perforate 204 and the radius phase of described second workpiece 101 Coupling, specifically, makes the radius radius slightly larger than described first workpiece 100 of described first perforate 203, Make the radius radius slightly larger than described second workpiece 101 of described second perforate 204.Such it is in well In, it is simple to described first workpiece 100 and second workpiece 101 are respectively put into described first perforate 203 He Second perforate 204, also allows for described first workpiece 100 and second workpiece 101 after welding completes from described First perforate 203 and the second perforate 204 are taken out, additionally, described first perforate 203 and the second perforate 204 more described first workpiece 100 and second workpiece 101 have certain surplus, open described first for follow-up Hole 203 and the second perforate 204 arrange sark space is provided.
In the present embodiment, in the step making mould 200, described first perforate 203 and second is made The center of perforate 204 aligns.So described first workpiece 100 and second workpiece 101 are being put respectively After entering in described first perforate 203 and the second perforate 204, described first workpiece 100 and second workpiece 101 Center align.In the processing technology of cutter, generally the concentricity between cutter head and handle of a knife is had High requirement, the center of the most described first perforate 203 and the second perforate 204 aligns, it is possible to make There is between first workpiece 100 and second workpiece 101 higher concentricity, and then described first workpiece 100 And higher concentricity between second workpiece 101 cutter head and the handle of a knife that are made.
In the present embodiment, the material of described mould 200 is metal.Metal has certain ductility, adopts With the mould 200 of metal material, it is possible to follow-up carry out heat and other static pressuring processes time, suitably by pressure transmission To described first workpiece 100 and second workpiece 101, make the first workpiece 100 and second workpiece 101 well Weld together.But described mould 200 is not limited by the present invention, in other embodiments, described The material of mould 200 can also be alloy or other materials.
With reference to Fig. 5, Fig. 6, perform step S3, by described first workpiece 100 and second workpiece 101 difference Put into described first perforate 203 and the second perforate 204.
With reference first to Fig. 5, in the present embodiment, by described first workpiece 100 and second workpiece 101 difference Before putting into described first perforate 203 and the second perforate 204, open in described first perforate 203 and second On the sidewall of hole 204, sark is set.
Specifically, in the present embodiment, described first perforate 203 and the second perforate 204 sidewall set The step putting sark includes: coating isolation in described first perforate 203 and the second perforate 204 sidewall Layer 205, makes described sealing coat 205 cover described first perforate 203 and the second perforate 204 sidewall and the One perforate 203 and the joint face (shown in dotted line circle) of the second perforate 204 sidewall.Due to described mould 200 Material be metal, the material of described first workpiece 100 and second workpiece 101 is tungsten alloy, if will Described first workpiece 100 and second workpiece 101 are directly placed into described first perforate 203 and the second perforate 204 In, during follow-up hot isostatic press welding, described first workpiece 100, second workpiece 101 and described Mould 200 is susceptible to adhesion, it is difficult to separate.The effect being coated with described sealing coat 205 is, in heat After isostatic pressed welding, it is simple to described Welding Structure and mould 200 are separated.
In the present embodiment, the material of described sealing coat 205 is boron nitride.Prove through test of many times, Boron nitride material is as sealing coat 205, it is possible to preferably isolate described Welding Structure and described mould 200, anti- Only stick together between described Welding Structure and described mould 200, but the present invention is to described sealing coat 205 Material do not limit, in other embodiments, described sealing coat 205 can also for be prevented from isolation The other materials that the metal or alloy phase counterdiffusion of layer 205 both sides sticks together.
It should be noted that in other embodiments, in described first perforate 203 and the second perforate 204 It is coated with in the step of sealing coat 205 on sidewall, it is also possible to make described sealing coat 205 only cover described first Perforate 203 and the second perforate 204 sidewall, the invention is not limited in this regard.
With reference to Fig. 6, in the present embodiment, described first workpiece 100 has the first solder side 103 and with the The first back side (not shown) that one solder side 103 is relative, described second workpiece 101 has the second solder side 104 and second back side (not shown) relative with the first solder side 104, by described first workpiece 100 With in the step that second workpiece 101 is respectively put into described first perforate 203 and the second perforate 204, make institute State the first solder side 103 and the second solder side 104 in described first perforate 203 and the second perforate 204 Connectivity part (not shown) contacts.
With reference to Fig. 7, perform step S4, outside described mould 200, wrap up jacket 300.Specifically, exist In the present embodiment, the step of parcel jacket 300 includes: will be equipped with the first workpiece 100 and second workpiece 101 Mould 200 be placed on a base plate 301, described mould 200 sidewall wrap up side plate 303, at described mould Have 200 tops and cover cover plate 302, described base plate 301, side plate 303 and cover plate 302 are welded together, Forming the jacket 300 sealed, described mould 200 is wrapped up by described jacket 300.
Alternatively, the mode of described welding can be argon arc welding.
It should be noted that in the present embodiment, before or after welding forms described jacket 300, Drawing deaeration pipe 304 from described jacket 300, it is internal that described deaeration pipe 304 connects described jacket 300. Specifically, in the present embodiment, the hole that described deaeration pipe 304 can be made to be left by jacket 300 sidewall is entered Enter jacket 300 internal.Make a vaccum-pumping equipment (not shown) be connected with described deaeration pipe 304, be used for To described jacket 300 evacuation.
With reference to Fig. 8, perform step S5, described jacket 300 is carried out heat and other static pressuring processes, make described the One workpiece 100 and second workpiece 101 welding form Welding Structure.
In the present embodiment, described jacket 300 is carried out heat and other static pressuring processes, first by described jacket 300 Evacuation, specifically, starts vaccum-pumping equipment, makes the gas within jacket 300 from deaeration pipe 304 row Go out.
In the present embodiment, in the vacuum within jacket 300 to a certain extent, such as vacuum reaches 2×10-3During Pa, start jacket 300 is heated.Described heating process, until being heated to uniform temperature, Such as after reaching 300 DEG C~400 DEG C, carry out incubation step, in described heating and insulating process, continue evacuation, The vacuum in jacket 300 is kept to be at least 2 × 10-3Pa。
After insulation terminates, hold one's breath when continuing to keep jacket 300 inner vacuum, now institute The vacuum stating jacket is at least 2 × 10-3Pa.Afterwards, the jacket 300 held one's breath is placed on high temperature insostatic pressing (HIP) (Hot Isostatic Pressing, HIP) stove carries out heat and other static pressuring processes.In the present embodiment, hold one's breath Method for deaeration pipe 304 is closed, specifically, deaeration pipe 304 can be blocked, or will degassing Pipe 304 is nipped off, and remains in the one end outside jacket 300 after will be switched off and seal, in making jacket 300 Portion forms an airtight vacuum environment.
In the present embodiment, this heat and other static pressuring processes design parameter uses temperature at the model of 750 to 900 degree Enclose, applying argon gas or nitrogen in high temperature insostatic pressing (HIP) stove, keep more than the environmental stress 120Mpa at jacket 300 place And be incubated under conditions of 4~6 hours at this temperature and pressure, the welded hardness of gained tungsten alloy, Consistency, internal organizational structure uniformity more preferable, and percent defective is low, and manufacturing cost is relatively low.But this Invent the design parameters such as the temperature to heat and other static pressuring processes, environmental stress, temperature retention time not limit, can Freely to adjust according to described first workpiece 100 and second workpiece 101.
During heat and other static pressuring processes, described jacket 300 forms great pressure to described mould 200. During heat and other static pressuring processes, the position of described first workpiece 100 and second workpiece 101 is by described mould Tool 200 is fixed, and the first workpiece 100 and second workpiece 101 surrounding are protected by described mould so that Described first workpiece 100 and second workpiece 101 are not easy under high pressure to be extruded and cause damage, Jin Erti The welded quality that high first workpiece 100 and second workpiece 101 welding are formed.
Additionally, during heat and other static pressuring processes, described first workpiece 100 and the position of second workpiece 101 Put and fixed by described mould 200, in the first perforate 203 of described mould 200 and the second perforate 204 The heart aligns, and described first workpiece 100 and second workpiece 101 are less likely to occur dislocation, energy under stress Enough make to have between the first workpiece 100 and second workpiece 101 higher concentricity, and then described first Concentricity higher between cutter head and handle of a knife that workpiece 100 and second workpiece 101 are made.
With continued reference to Fig. 8, perform step S6, remove described jacket 300, take out described Welding Structure.
Specifically, in the present embodiment, after high temperature insostatic pressing (HIP) stove cools down, jacket 300 is taken out, afterwards Remove jacket 300 and take out mould 200.The dismounting of this step can be by chemically or mechanically realizing.
After taking out mould 200, can be by the method for percussion by described Welding Structure and described mould 200 Separate.Specifically, in the present embodiment, as shown in Figure 8, due to the size of described first workpiece 100 Less than the size of second workpiece 101, therefore the unsettled placement of described mould 200 can be made mould 200 Second surface towards ground, tap the surface of described Welding Structure Central Plains the first workpiece 100, described weldering Access node structure can come off from described mould 200.
With reference to Fig. 9, it is shown that the schematic diagram of hot isostatic press welding another embodiment of method of the present invention.This enforcement Example is roughly the same with above-described embodiment, repeats no more with the something in common of above-described embodiment, with above-mentioned enforcement The difference of example is:
The step arranging sark in described first perforate 203 and the second perforate 204 sidewall includes: In described first perforate 203 and the second perforate 204 sidewall, spacer 206 is set, makes described spacer 206 Only cover and state the first perforate 203 and sidewall of the second perforate 204.
Specifically, described first perforate 203 and the second perforate 204 are cylindrical aperture, described spacer 206 is the ring-type spacer being covered each by the first perforate 203 and the second perforate 204 sidewall, described ring The cross section of the vertical described cylinder open generatrix direction of shape spacer is ring-type.Described spacer 206 is permissible Including the Part I 206A being arranged on described first perforate 203 sidewall and be arranged on described second perforate Part II 206B on 204 sidewalls, described Part I 206A and Part II 206B can distinguish It is positioned in described first perforate 203 and the second perforate 204 so that put into the mistake of described spacer 206 Journey is convenient, but the invention is not limited in this regard.
It should be noted that in the present embodiment, the material of described spacer 206 is pottery, described every It is advantageous in that as sark from thing 206, to the isolation between described mould 200 and Welding Structure Can more preferably, and can play a supporting role, after heat and other static pressuring processes, described Welding Structure is not allowed Easily affected by the deformation of described mould 200, make described Welding Structure be easier to take out.
After heat and other static pressuring processes, if the shape of described spacer 206 is uninfluenced, can be by institute State spacer 206 for hot isostatic press welding next time;If described ceramic spacers 206 damages, Described spacer 206 can be broken into pieces so that the space between described mould 200 and Welding Structure becomes big, Described Welding Structure is made to be easier to take out.The isolation performance of pottery is preferable, but the present invention is to described isolation The material of thing 206 does not limits, and in other embodiments, the material of described spacer 206 can also be Other desirably prevent the material of phase counterdiffusion between metal.
Although present disclosure is as above, but the present invention is not limited to this.Any those skilled in the art, Without departing from the spirit and scope of the present invention, all can make various changes or modifications, therefore the guarantor of the present invention The scope of protecting should be as the criterion with claim limited range.

Claims (17)

1. a hot isostatic press welding method, it is characterised in that including:
First workpiece and second workpiece are provided;
Making mould, described mould includes the first perforate for accommodating the first workpiece and for accommodating second Second perforate of workpiece, described first perforate and the second perforate are interconnected;
Described first workpiece and second workpiece are respectively put into described first perforate and the second perforate;
Jacket is wrapped up outside described mould;
Described jacket is carried out heat and other static pressuring processes, makes described first workpiece and second workpiece welding form weldering Access node structure;
Remove described jacket, take out described Welding Structure.
Hot isostatic press welding method the most according to claim 1, it is characterised in that described first workpiece and The material of second workpiece is tungsten alloy.
Hot isostatic press welding method the most according to claim 1, it is characterised in that described first workpiece and Second workpiece be shaped as cylinder, make mould step in, make described first perforate and second Perforate is cylindrical aperture.
Hot isostatic press welding method the most according to claim 3, it is characterised in that make described first perforate The radius of radius and described first workpiece match, make the radius and described second of described second perforate The radius of workpiece matches.
Hot isostatic press welding method the most according to claim 3, it is characterised in that in the step making mould In Zhou, the center of described first perforate and the second perforate is made to align.
Hot isostatic press welding method the most according to claim 1, it is characterised in that in the step making mould In Zhou, making described mould is tabular cuboid, has first surface and relative with described first surface Second surface, described first perforate is opened in described first surface, and described second perforate is opened in described Second surface.
Hot isostatic press welding method the most according to claim 1, it is characterised in that in the step making mould In Zhou, the material of described mould is metal.
Hot isostatic press welding method the most according to claim 1, it is characterised in that by described first workpiece Before being respectively put into described first perforate and the second perforate with second workpiece, in described first perforate and On two perforate sidewalls, sark is set.
Hot isostatic press welding method the most according to claim 8, it is characterised in that in described first perforate Include with the step arranging sark on the second perforate sidewall: in described first perforate and the second perforate side Be coated with sealing coat on wall, and make described sealing coat cover described first perforate and the second perforate sidewall and First perforate and the joint face of the second perforate sidewall.
Hot isostatic press welding method the most according to claim 9, it is characterised in that the material of described sealing coat Material is boron nitride.
11. hot isostatic press welding methods according to claim 8, it is characterised in that in described first perforate Include with the step arranging sark on the second perforate sidewall: in described first perforate and the second perforate side Spacer is set on wall, makes described spacer cover and state the first perforate and the sidewall of the second perforate.
12. hot isostatic press welding methods according to claim 11, it is characterised in that the material of described spacer Material is pottery.
13. hot isostatic press welding methods according to claim 11, it is characterised in that described first perforate and Second perforate is cylindrical aperture, and described spacer is for being covered each by the first perforate and the second perforate side Ring-type spacer on wall, the cross section of the vertical described cylinder open generatrix direction of described ring-type spacer For ring-type.
14. hot isostatic press welding methods according to claim 1, it is characterised in that described first workpiece tool Having the first solder side and first back side relative with the first solder side, described second workpiece has the second weldering Junction and second back side relative with the first solder side, by described first workpiece and second workpiece difference Put in the step of described first perforate and the second perforate, make described first solder side and the second solder side Connectivity part in described first perforate and the second perforate contacts.
15. hot isostatic press welding methods according to claim 1, it is characterised in that outside described mould After parcel jacket, before described jacket is carried out heat and other static pressuring processes, also include: to described jacket Inside is de-gassed technique.
16. hot isostatic press welding methods according to claim 15, it is characterised in that inside described jacket The step of degassing includes: heats after described jacket to temperature reaches 300 DEG C~400 DEG C, carries out incubation step, In described heating and insulating process, lasting evacuation makes the vacuum in jacket be at least 2 × 10-3Pa, Described temperature retention time is 2~4 hours.
17. hot isostatic press welding methods according to claim 1, it is characterised in that described jacket is carried out The step of heat and other static pressuring processes includes: in the range of the temperature of heat and other static pressuring processes is spent 750 to 900, Environmental stress is more than 120 MPas, and the heat-insulation pressure keeping time was at 4 to 6 hours.
CN201510312745.6A 2015-06-09 2015-06-09 Hot isostatic press welding method Pending CN106271012A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510312745.6A CN106271012A (en) 2015-06-09 2015-06-09 Hot isostatic press welding method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510312745.6A CN106271012A (en) 2015-06-09 2015-06-09 Hot isostatic press welding method

Publications (1)

Publication Number Publication Date
CN106271012A true CN106271012A (en) 2017-01-04

Family

ID=57660058

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510312745.6A Pending CN106271012A (en) 2015-06-09 2015-06-09 Hot isostatic press welding method

Country Status (1)

Country Link
CN (1) CN106271012A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105499816A (en) * 2016-02-02 2016-04-20 中国科学院等离子体物理研究所 Manufacturing process suitable for tungsten and steel connection of first wall part of fusion reactor
CN109249025A (en) * 2017-07-14 2019-01-22 北京航空航天大学 A kind of aluminum alloy thin wall pieces hot isostatic pressing manufacturing process

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1423586A (en) * 1999-12-14 2003-06-11 Tdy工业公司 Composite rotary tool and tool fabrication method
US6619537B1 (en) * 2000-06-12 2003-09-16 Tosoh Smd, Inc. Diffusion bonding of copper sputtering targets to backing plates using nickel alloy interlayers
CN102059444A (en) * 2010-12-24 2011-05-18 株洲中车纽兰博科技实业有限公司 Method and device for welding lamp body and lamp mirror of vehicle lamp
CN102126023A (en) * 2011-03-11 2011-07-20 北京航空航天大学 Powder hot isostatic pressing (HIP) forming method for titanium (Ti) alloy blisk
CN102248278A (en) * 2011-06-24 2011-11-23 武汉理工大学 Magnesium alloy and aluminum alloy interlayer diffusion welding method
CN102321871A (en) * 2011-09-19 2012-01-18 基迈克材料科技(苏州)有限公司 Hot isostatic pressing is produced the method for flat-panel monitor with the molybdenum alloy sputtering target material
CN102343437A (en) * 2011-11-11 2012-02-08 宁波江丰电子材料有限公司 Method for manufacturing tungsten target material
CN102554571A (en) * 2011-12-31 2012-07-11 宁波江丰电子材料有限公司 Sealing method for degassing tube
CN102672174A (en) * 2012-05-15 2012-09-19 华中科技大学 Method for manufacturing integral annular case part by using hot isostatic pressing process
CN103111619A (en) * 2013-01-30 2013-05-22 华中科技大学 Hot isostatic pressing two-step forming method of high temperature alloy compact piece

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1423586A (en) * 1999-12-14 2003-06-11 Tdy工业公司 Composite rotary tool and tool fabrication method
US6619537B1 (en) * 2000-06-12 2003-09-16 Tosoh Smd, Inc. Diffusion bonding of copper sputtering targets to backing plates using nickel alloy interlayers
CN102059444A (en) * 2010-12-24 2011-05-18 株洲中车纽兰博科技实业有限公司 Method and device for welding lamp body and lamp mirror of vehicle lamp
CN102126023A (en) * 2011-03-11 2011-07-20 北京航空航天大学 Powder hot isostatic pressing (HIP) forming method for titanium (Ti) alloy blisk
CN102248278A (en) * 2011-06-24 2011-11-23 武汉理工大学 Magnesium alloy and aluminum alloy interlayer diffusion welding method
CN102321871A (en) * 2011-09-19 2012-01-18 基迈克材料科技(苏州)有限公司 Hot isostatic pressing is produced the method for flat-panel monitor with the molybdenum alloy sputtering target material
CN102343437A (en) * 2011-11-11 2012-02-08 宁波江丰电子材料有限公司 Method for manufacturing tungsten target material
CN102554571A (en) * 2011-12-31 2012-07-11 宁波江丰电子材料有限公司 Sealing method for degassing tube
CN102672174A (en) * 2012-05-15 2012-09-19 华中科技大学 Method for manufacturing integral annular case part by using hot isostatic pressing process
CN103111619A (en) * 2013-01-30 2013-05-22 华中科技大学 Hot isostatic pressing two-step forming method of high temperature alloy compact piece

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105499816A (en) * 2016-02-02 2016-04-20 中国科学院等离子体物理研究所 Manufacturing process suitable for tungsten and steel connection of first wall part of fusion reactor
CN109249025A (en) * 2017-07-14 2019-01-22 北京航空航天大学 A kind of aluminum alloy thin wall pieces hot isostatic pressing manufacturing process

Similar Documents

Publication Publication Date Title
US4135286A (en) Sputtering target fabrication method
CN104741773B (en) The welding method of tungsten titanium aluminum target material assembly
US10062874B2 (en) Sealing assembly, method for preparing sealing assembly, and battery comprising the sealing assembly
US4077109A (en) Hot working of metal powders
CN105798409B (en) The welding method of target material assembly
CN102554455A (en) Diffusion welding method for tungsten-titanium alloy target and copper alloy back plate
CN102189261A (en) Densification method of porous workpiece
JPH11221667A (en) Manufacture of metallic vacuum double container
CN106271012A (en) Hot isostatic press welding method
CN104191099B (en) For the preparation method of the composite soldering that the WC particle of carbide quartz welding strengthens
CN105290554B (en) A kind of vacuum brazing technique of niobium tungsten alloy and stainless steel ring-shaped work pieces
US20130340635A1 (en) Residual stress reduction in welding
CN106735830A (en) A kind of fusion reactor enhancing thermic load the first wallboard dissimilar metal diffusion connection method
CN106541249A (en) The manufacture method of target material assembly
NO131926B (en)
CN113042879B (en) Silicon carbide diffusion welding method and silicon carbide heat exchanger
JPH11164784A (en) Metallic vacuum double container
CN206652973U (en) A kind of high temperature insostatic pressing (HIP) one tubular sheath
JPH0255153B2 (en)
US8851359B2 (en) Assembly method using brazing
CN210420134U (en) Support for hot isostatic pressing preparation of tubular target
JPS60170585A (en) Joining member for sintered hard alloy and steel and its production
JP4281881B2 (en) Heating furnace tube and manufacturing method of heating furnace tube
US11060342B2 (en) Vacuum insulated glazing unit
CN214814798U (en) Sheath for isostatic pressing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170104

RJ01 Rejection of invention patent application after publication