CN106245986A - 电网线路铁塔的组立方法及装置 - Google Patents
电网线路铁塔的组立方法及装置 Download PDFInfo
- Publication number
- CN106245986A CN106245986A CN201610886497.0A CN201610886497A CN106245986A CN 106245986 A CN106245986 A CN 106245986A CN 201610886497 A CN201610886497 A CN 201610886497A CN 106245986 A CN106245986 A CN 106245986A
- Authority
- CN
- China
- Prior art keywords
- strut
- tower
- tower body
- power network
- assembling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Electric Cable Installation (AREA)
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
本发明公开了一种电网线路铁塔的组立方法,包括组立塔身基础部分;设置若撑杆;将抱杆顶端的拉绳通过撑杆与底座固定连接;将抱杆底端的拉绳与塔身固定;起吊并安装塔身构建;拆除抱杆、撑杆及其连接件,完成铁塔组立。本发明还公开了所述方法应用的装置,包括上拉线、水平拉线、下拉线、撑杆、抱杆和将抱杆底端与塔身固定的拉线;撑杆通过连接金具固定在塔基主材上,通过水平拉线与塔身连接,通过下拉线与底座连接,通过上拉线与抱杆连接。本发明组塔方便、安全、快捷,而且适用于各种地形地貌,不需要挖掘地锚坑,减少了施工的难度,降低了施工成本和施工人员的劳动强度,提高了组塔效率。
Description
技术领域
本发明具体涉及一种电网线路铁塔的组立方法及装置。
背景技术
随着国家经济技术的发展和人们生活水平的提高,电能已经成为了人们生产和生活中不可或缺的二次能源。近年来,我国大力加强基础设施建设,电网线路也在大力建设。
电网线路的铁塔组立一直是电网线路建设的重中之重和难中之难。目前,电网线路的铁塔组立方法主要包括整体组立和分解组立两大类。由于电网线路铁塔一般体积较大,因此将线路铁塔进行分解组立的情况相对见多。
分解组立类方法中,又包括外拉线抱杆、内拉线抱杆、摇臂抱杆、倒装组塔、无拉线小抱杆分件吊装组塔、直升机分段组塔和混合组塔等。外拉线抱杆分解组立方法具有施工方案技术成熟、施工效果好、吊装质量大、操作简单、安全可靠,适用面广等优点,而且抱杆起升、拉线调整和构件就位都相对容易,经济性佳,因此外拉线抱杆分解组塔已经广泛使用于电网线路铁塔组立。
但是,外拉线内悬浮抱杆组立铁塔方法在地形复杂情况下,外拉线设置较为困难,而且拉线对地夹角常常不能满足要求,或拉线长度过大,各拉线受力不均,导致施工安全系数降低;此外,还因设置拉线时需要在在地上挖掘地锚坑,需破坏植被,不利于山区的水保环保。
发明内容
本发明的目的之一在于提供一种组塔方便、安全、快捷,而且适用于各种地形地貌、不需要挖掘地锚坑的电网线路铁塔的组立方法。
本发明的目的之二在于提供一种能够实现所述电网线路铁塔的组立方法的装置。
本发明提供的这一种电网线路铁塔的组立方法,包括如下步骤:
S1. 组立输电线路铁塔的塔身基础部分;
S2. 在已经组立完成的塔基部分上,设置若干根撑杆;
S3. 抱杆顶端的拉绳通过撑杆与塔身基础部分的底座固定连接,使抱杆竖直悬浮;
S4. 将抱杆底端的拉绳与所述塔身固定;
S5. 利用抱杆起吊塔身的其他构件并安装;
S6. 当铁塔组立完成后,拆除抱杆、撑杆及其连接件,完成电网线路铁塔的组立。
所述的撑杆有四根,分别设立在塔身基础的四根主材上,相邻撑杆之间在水平方向上呈90°夹角。
所述的撑杆相对水平面上翘,上翘的角度为10°~15°。
所述的撑杆的长度为7m。
本发明还提供了一种用于实现上述电网线路铁塔的组立方法的装置,包括抱杆、将抱杆底端与塔身固定的拉线、上拉线、水平拉线、下拉线和撑杆;撑杆前端设置有连接上拉线、水平拉线和下拉线的连接金具,撑杆末端设置有用于将撑杆和塔基主材固定连接的连接金具;所述撑杆通过末端设置的连接金具固定在塔基主材上,撑杆的前端通过水平拉线与塔身连接,所述水平拉线将撑杆在水平方向上固定;撑杆的前端利用下拉线与塔身基础部分的底座连接固定;同时利用上拉线将撑杆的前端与抱杆的顶端连接固定。
所述的撑杆前端的连接金为对称布置的十字拉板。
所述的撑杆末端的连接金具为一端开口、另一端固定有两个固定板的圆柱形腔体;所述固定板以圆柱形腔体轴线为对称轴对称设置;所述固定板上设有开口方向垂直于所述圆柱形腔体轴线的通孔;所述通孔与塔基主材相连。
所述撑杆由碳纤维增强树脂基负荷材料,通过缠绕工艺加工制成。
所述的下拉线与塔身基础部分的底座的连接为下拉线通过链条葫芦和8字制动器与塔身基础部分的底座连接。
本发明提供的这种电网线路铁塔的组立方法和相应的装置,使得外拉线内悬浮抱杆组塔方法不再需要在地面进行施工和固定,而通过在塔基主材上设立的撑杆和与撑杆相对应的拉线即可完成,大大减少了施工的难度;而且撑杆和拉线可以反复使用,降低了施工成本;而且采用本发明提供的组塔装置,极大地降低了施工人员的劳动强度,提高了组塔效率,本发明提供的组塔装置和组塔方法,组塔方便、安全、快捷,而且适用于各种地形地貌,不需要挖掘地锚坑。
附图说明
图1为本发明的方法流程图。
图2为本发明的撑杆、塔身、抱杆和水平拉线之间的连接俯视示意图。
图3为本发明的撑杆、塔身、抱杆和拉线之间的连接主视示意图。
图4为本发明的撑杆结构示意图。
具体实施方式
如图1所示为本发明的方法流程图:本发明提供的这种电网线路铁塔的组立方法,包括如下步骤:
S1. 组立输电线路铁塔的塔身基础部分;
S2. 在已经组立完成的塔基部分上,设置4根撑杆,撑杆的长度为7m,设立在塔身基础的四根主材上,相邻撑杆之间在水平方向上呈90°夹角;所述撑杆的末端通过卡具连接在已经组立完成的塔基部分的主材上,撑杆的前端通过水平拉线与塔身连接,所述水平拉线将撑杆在水平方向上固定,撑杆相对水平面上翘,上翘的角度为10°~15°;撑杆的前端利用下拉线与塔身基础部分的底座固定连接;
S3. 将抱杆顶端通过上拉线与撑杆的前端固定连接;
S4. 竖立抱杆,并将抱杆底端的拉绳与所述塔身固定
S5. 利用抱杆起吊塔身的其他构件并完成构件的安装;
S6. 当铁塔组立完成后,拆除抱杆、撑杆及其连接件,完成种电网线路铁塔的组立。
如图2所示为本发明的撑杆、塔身、抱杆和水平拉线之间的连接俯视示意图:本发明适用于外拉线内悬浮抱杆组塔方法,此时图2中中间的小方形为抱杆,图中的大方形3为已经组立好的塔基;共设置四根撑杆1,撑杆1的末端通过连接金具连接在已经组立好的铁塔塔基3的主材上,撑杆1的前端设置有连接金具,一根撑杆连接两根水平拉线2,水平拉线2一端连接撑杆1前端的连接金具,另一端连接已经组立好的、撑杆所连接的塔基3的主材的相邻主材上,两根水平拉线2共同将撑杆1在水平方向上固定;撑杆1还需要连接一根上拉线4,上拉4绳的一端连接撑杆1前端的连接金具,另一端连接内抱杆5的顶端,上拉线将撑杆在竖直方向上固定一端,使得撑杆相对水平面上翘,上翘的角度为10°~15°。
如图3所示为本发明的撑杆、塔身、抱杆和拉线之间的连接主视示意图:撑杆1除了在水平方向连接两根水平拉线2,在竖直方向上连接上拉线4外,还需要连接一根下拉线6,下拉线6的一端连接撑杆1顶端的连接金具,另一端通过链条葫芦7和8字制动器8连接塔身基础部分的底座并固定。
如图4所示为本发明的撑杆结构示意图:撑杆可以按照需要设置为任意长度,撑杆1的两端均设置有连接金具12,前端设置有前端连接金具13,前端连接金具为对称布置的十字拉板,末端设置有末端连接金具14,末端的连接金具为一端开口、另一端固定有两个固定板15的圆柱形腔体;所述固定板15以圆柱形腔体轴线为对称轴对称设置;所述固定板15上设有开口方向垂直于所述圆柱形腔体轴线的通孔;所述通孔与塔基主材相连。
撑杆可以由碳纤维增强树脂基负荷材料,通过缠绕工艺加工制成,从而能够较好的减轻撑杆的重量,也能够保证撑杆的强度。
Claims (9)
1.一种电网线路铁塔的组立方法,包括如下步骤:
S1. 组立输电线路铁塔的塔身基础部分;
S2. 在已经组立完成的塔基部分上,设置若干根撑杆;
S3. 抱杆顶端的拉绳通过撑杆与塔身基础部分的底座固定连接,使抱杆竖直悬浮;
S4. 将抱杆底端的拉绳与所述塔身固定;
S5. 利用抱杆起吊塔身的其他构件并安装;
S6. 当铁塔组立完成后,拆除抱杆、撑杆及其连接件,完成电网线路铁塔的组立。
2.根据权利要求1所述的电网线路铁塔的组立方法,其特征在于所述的撑杆有四根,分别设立在塔身基础的四根主材上,相邻撑杆之间在水平方向上呈90°夹角。
3.根据权利要求2所述的电网线路铁塔的组立方法,其特征在于所述的撑杆相对水平面上翘,上翘的角度为10°~15°。
4.根据权利要求3所述的电网线路铁塔的组立方法,其特征在于所述的撑杆的长度为7m。
5.一种用于实现权利要求1~4所述电网线路铁塔的组立方法的装置,包括抱杆和将抱杆底端与塔身固定的拉线,其特征在于还包括上拉线、水平拉线、下拉线和撑杆;撑杆前端设置有连接上拉线、水平拉线和下拉线的连接金具,撑杆末端设置有用于将撑杆和塔基主材固定连接的连接金具;所述撑杆通过末端设置的连接金具固定在塔基主材上,撑杆的前端通过水平拉线与塔身连接,所述水平拉线将撑杆在水平方向上固定;撑杆的前端利用下拉线与塔身基础部分的底座连接固定;同时利用上拉线将撑杆的前端与抱杆的顶端连接固定。
6.根据权利要求5所述的电网线路铁塔的组立装置,其特征在于所述的撑杆前端的连接金为对称布置的十字拉板。
7.根据权利要求5所述的电网线路铁塔的组立装置,其特征在于所述的撑杆末端的连接金具为一端开口、另一端固定有两个固定板的圆柱形腔体;所述固定板以圆柱形腔体轴线为对称轴对称设置;所述固定板上设有开口方向垂直于所述圆柱形腔体轴线的通孔;所述通孔与塔基主材相连。
8.根据权利要求5所述的电网线路铁塔的组立装置,其特征在于所述撑杆由碳纤维增强树脂基负荷材料,通过缠绕工艺加工制成。
9.根据权利要求5所述的电网线路铁塔的组立装置,其特征在于所述的下拉线与塔身基础部分的底座的连接为下拉线通过链条葫芦和8字制动器与塔身基础部分的底座连接。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610886497.0A CN106245986A (zh) | 2016-10-11 | 2016-10-11 | 电网线路铁塔的组立方法及装置 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610886497.0A CN106245986A (zh) | 2016-10-11 | 2016-10-11 | 电网线路铁塔的组立方法及装置 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN106245986A true CN106245986A (zh) | 2016-12-21 |
Family
ID=57611457
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610886497.0A Pending CN106245986A (zh) | 2016-10-11 | 2016-10-11 | 电网线路铁塔的组立方法及装置 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106245986A (zh) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107143198A (zh) * | 2017-05-24 | 2017-09-08 | 常熟风范电力设备股份有限公司 | 一种适用于山区严峻地段组立特高压输电铁塔的方法 |
| CN112012549A (zh) * | 2020-08-18 | 2020-12-01 | 福州万山电力咨询有限公司 | 一种基于线路输电塔的组装施工方法 |
| CN112302350A (zh) * | 2019-07-26 | 2021-02-02 | 璧典寒 | 一种工程直升机在高压线塔运输方面的施工方案 |
| CN113352650A (zh) * | 2021-04-26 | 2021-09-07 | 江苏融至新材料有限公司 | 一种晶须复合物材料智慧塔杆的生产工艺 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3424067B2 (ja) * | 1998-10-06 | 2003-07-07 | 北海道電力株式会社 | 塔体嵩上げ工法 |
| CN102359302A (zh) * | 2011-10-31 | 2012-02-22 | 湖北省输变电工程公司 | 特高压大跨越铁塔组立方法 |
| CN202346637U (zh) * | 2011-10-31 | 2012-07-25 | 湖北省输变电工程公司 | 双平臂自旋自升座地抱杆 |
| CN105003118A (zh) * | 2015-07-27 | 2015-10-28 | 中国电力科学研究院 | 一种用于组装输电塔的抱杆 |
-
2016
- 2016-10-11 CN CN201610886497.0A patent/CN106245986A/zh active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3424067B2 (ja) * | 1998-10-06 | 2003-07-07 | 北海道電力株式会社 | 塔体嵩上げ工法 |
| CN102359302A (zh) * | 2011-10-31 | 2012-02-22 | 湖北省输变电工程公司 | 特高压大跨越铁塔组立方法 |
| CN202346637U (zh) * | 2011-10-31 | 2012-07-25 | 湖北省输变电工程公司 | 双平臂自旋自升座地抱杆 |
| CN105003118A (zh) * | 2015-07-27 | 2015-10-28 | 中国电力科学研究院 | 一种用于组装输电塔的抱杆 |
Non-Patent Citations (1)
| Title |
|---|
| 陈小元: "塔上外拉线悬浮抱杆分解组塔方法", 《通讯世界》 * |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107143198A (zh) * | 2017-05-24 | 2017-09-08 | 常熟风范电力设备股份有限公司 | 一种适用于山区严峻地段组立特高压输电铁塔的方法 |
| CN112302350A (zh) * | 2019-07-26 | 2021-02-02 | 璧典寒 | 一种工程直升机在高压线塔运输方面的施工方案 |
| CN112012549A (zh) * | 2020-08-18 | 2020-12-01 | 福州万山电力咨询有限公司 | 一种基于线路输电塔的组装施工方法 |
| CN113352650A (zh) * | 2021-04-26 | 2021-09-07 | 江苏融至新材料有限公司 | 一种晶须复合物材料智慧塔杆的生产工艺 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204662661U (zh) | 大跨度双箱梁双索张弦桁架体系 | |
| CN105003118B (zh) | 一种用于组装输电塔的抱杆 | |
| CN101169001A (zh) | 四角锥球面网壳无脚手架施工安装方法及吊装机具 | |
| CN106245986A (zh) | 电网线路铁塔的组立方法及装置 | |
| CN206692235U (zh) | 一种钢结构穹顶起吊安装装置 | |
| CN102797643B (zh) | 一种风力发电塔装置 | |
| CN102535939B (zh) | 拉v塔倒装组立工艺 | |
| CN103342296B (zh) | 风电设备吊装附着自升式塔吊 | |
| CN110182682A (zh) | 一种用于大节段钢桁梁吊装的吊具 | |
| CN202544468U (zh) | 拉杆型电力钢管杆 | |
| CN107842109B (zh) | 一种用于不规则平面索网的环索节点 | |
| CN103993730B (zh) | 钢煤斗对接安装施工操作台 | |
| CN203487767U (zh) | 一种十字盘塔梯 | |
| CN206091551U (zh) | 电网线路铁塔的组立装置 | |
| CN208024047U (zh) | 一种可伸缩安装的钢管塔结构 | |
| CN103967314B (zh) | 一种10kv-110kv应急抢修杆 | |
| CN202072386U (zh) | 一种用于吊装核电站安全壳筏基钢筋笼模块的吊具 | |
| CN205875196U (zh) | 一种钢结构平台立柱装配式支撑架 | |
| CN210597326U (zh) | 一种可拼装的预制混凝土支撑结构 | |
| CN205531392U (zh) | 一种钢网架顶升防倾覆限位装置 | |
| CN109057006A (zh) | 应用于连接有核心筒的钢桁架提升工况中的环向加固桁架 | |
| CN203559570U (zh) | 用于环抱柱悬挑钢管支撑架操作平台 | |
| CN207003983U (zh) | 一种用于建筑施工的高空三角桁架平台 | |
| CN203821931U (zh) | 一种10kv-110kv应急抢修杆 | |
| CN203402856U (zh) | 风电设备吊装附着自升式塔吊 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20161221 |
|
| WD01 | Invention patent application deemed withdrawn after publication |