CN106216007A - A kind of geological exploration ore pulverizer - Google Patents

A kind of geological exploration ore pulverizer Download PDF

Info

Publication number
CN106216007A
CN106216007A CN201610598280.XA CN201610598280A CN106216007A CN 106216007 A CN106216007 A CN 106216007A CN 201610598280 A CN201610598280 A CN 201610598280A CN 106216007 A CN106216007 A CN 106216007A
Authority
CN
China
Prior art keywords
pole
electric pushrod
crushing
connecting rod
geological exploration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201610598280.XA
Other languages
Chinese (zh)
Inventor
陈小方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610598280.XA priority Critical patent/CN106216007A/en
Publication of CN106216007A publication Critical patent/CN106216007A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C1/00Crushing or disintegrating by reciprocating members
    • B02C1/14Stamping mills
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C23/00Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
    • B02C23/08Separating or sorting of material, associated with crushing or disintegrating
    • B02C23/16Separating or sorting of material, associated with crushing or disintegrating with separator defining termination of crushing or disintegrating zone, e.g. screen denying egress of oversize material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C23/00Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
    • B02C23/08Separating or sorting of material, associated with crushing or disintegrating
    • B02C23/16Separating or sorting of material, associated with crushing or disintegrating with separator defining termination of crushing or disintegrating zone, e.g. screen denying egress of oversize material
    • B02C2023/165Screen denying egress of oversize material

Abstract

The present invention relates to a kind of reducing mechanism, particularly relate to a kind of geological exploration ore pulverizer.The technical problem to be solved in the present invention is to provide a kind of production efficiency device pulverized than big, product granularity uniform geological exploration Ore high, broken.In order to solve above-mentioned technical problem, the invention provides such a geological exploration ore pulverizer, include support, the first pole, the second pole, the first electric pushrod, guide pad, first connecting rod, second connecting rod, slide rail, slide block, gear, tooth bar, the second electric pushrod, electric magnet, stay cord, iron block, weight, crushing groove, wire gauze, base and electronic crushing wheel;Being provided with crushing groove on base, in crushing groove, the left and right sides is equipped with electronic crushing wheel, is provided with wire gauze in crushing groove.Invention achieves when Ore being carried out comminution process that production efficiency is high, the working time is short, broken than big, the uniform effect of product granularity.

Description

A kind of geological exploration ore pulverizer
Technical field
The present invention relates to a kind of reducing mechanism, particularly relate to a kind of geological exploration ore pulverizer.
Background technology
Ore refers to can therefrom extract useful constituent or itself have the mineral aggregate of certain performance that can be utilized, Metalliferous mineral, nonmetallic mineral can be divided into.In Ore, the unit content of useful component is referred to as the noble metals such as the grade of ore, gold, platinum Ore g ton represents, other Ores are commonly used percent and represented.The conventional grade of ore weighs the value of Ore, but has equally In effect composition Ore the composition of stone-like pulse and objectionable impurities number also affect Ore value.
Geology refers to character and the feature of the earth, is primarily referred to as material composition, the structure of the earth, constructs, grows history etc., Including sphere divide different, physical property, chemical property, rock property, mineralogical composition, rock stratum and the output state of rock mass, Contact relation, history has the structural history of the earth, biological evolution history, climatic variation history, and situation is deposited in the tax of mineral resources With the regularity of distribution etc..
Existing ore pulverizer deposits that operationally production efficiency is low, broken to be lacked the most uniformly than little and product granularity Point, therefore needs a kind of production efficiency of design badly high, broken than big and product granularity uniform geological exploration ore pulverizer.
Summary of the invention
(1) to solve the technical problem that
When the present invention is in order to overcome present device busy, production efficiency is low, it is little to crush ratio, the uniform not shortcoming of product granularity, It is high, broken than big, product granularity uniform geological exploration ore deposit that the technical problem to be solved in the present invention is to provide a kind of production efficiency The device that stone is pulverized.
(2) technical scheme
In order to solve above-mentioned technical problem, the invention provides such a geological exploration ore pulverizer, include support, First pole, the second pole, the first electric pushrod, guide pad, first connecting rod, second connecting rod, slide rail, slide block, gear, tooth bar, Second electric pushrod, electric magnet, stay cord, iron block, weight, crushing groove, wire gauze, base and electronic crushing wheel;Install on base Having crushing groove, in crushing groove, the left and right sides is equipped with electronic crushing wheel, is provided with wire gauze in crushing groove, and wire gauze is positioned at electricity Above dynamic crushing wheel, support inside top is sequentially provided with stay cord, the first pole, guide pad and the second pole, stay cord from left to right Bottom is provided with iron block, and connecting bottom iron block has weight, weight to be positioned at the top of crushing groove wire gauze, and the first pole bottom is provided with Gear, guide pad has aperture, and the second pole bottom is provided with the first electric pushrod, and the first electric pushrod left end connects first Connecting rod, first connecting rod passes aperture, and first connecting rod left end is hingedly connected with second connecting rod, second connecting rod left end and the hinged company of gear Connecing, the right side of support is provided with slide rail, and slide rail is provided with slide block, and slide block connects tooth bar, and rack and pinion engages, at the bottom of tooth bar End connection has the second electric pushrod, the second electric pushrod left end to be provided with electric magnet.
Preferably, also including motor, cam and the 3rd pole, base top is provided with the 3rd pole, and the 3rd pole is positioned at The left and right sides of crushing groove, the top of the 3rd pole connects motor, and the front of motor is provided with cam.
Preferably, also including the 3rd electric pushrod, in crushing groove, the left and right sides is arranged with the 3rd electric pushrod, and the 3rd Electric pushrod is connected with electronic crushing wheel.
Preferably, also including crushing teeth, the bottom of weight is provided with crushing teeth.
Preferably, support is Q235 steel with the material of base.
Preferably, stay cord is steel wire rope.
Preferably, the material of crushing teeth is high hardness alloy steel.
Operation principle: when needs carry out pulverization process to Ore, starts electronic crushing wheel and rotates, and startup first is electronic to be pushed away Bar extends, and drives first connecting rod to be moved to the left, and drives second connecting rod to rotate, and driven gear rotates counterclockwise, and makes tooth bar to moving down Dynamic, drive the second electric pushrod to move down, make electric magnet move down, when electric magnet is moved downward to and iron block sustained height Time, starting the second electric pushrod elongation, make electric magnet energising band be magnetic simultaneously, electric magnet contacts with iron block and holds iron block, Stop the second electric pushrod elongation, then adjust the first electric pushrod, make the first electric pushrod shrink, drive first connecting rod to the right Mobile, make gear rotate clockwise, make tooth bar move up, band motor magnet moves up, and drives iron block to move up, makes weight Thing moves up, and when weight height reaches a timing, by electric magnet power-off, makes electric magnet lose magnetism, and weight is made due to gravity With falling down, the hit Ore being positioned at crushing groove, broken Ore drops on wire gauze, the least broken Ore of part from Wire gauze space falls to bottom crushing groove, and broken Ore is pulverized in the work of electronic crushing wheel, the most again adjusts and makes the first electricity Dynamic push rod elongation, drives first connecting rod to be moved to the left, and driven gear rotates counterclockwise, and makes tooth bar move down, when electric magnet moves When moving the right side of iron block, electric magnet is energized, makes electric magnet band be magnetic and hold iron block, continuous according to above-mentioned principle afterwards Ore is carried out broken and pulverization process, when after the crushed work completing Ore, make the first electric pushrod, the second electric pushrod and Electronic crushing wheel resets, and stops the first electric pushrod, the second electric pushrod and the work of electronic crushing wheel, stops electromagnetism Tie Tong Electricity, when also needing to again Ore be carried out pulverization process, can be according to above-mentioned principle task again.
Because also including motor, cam and the 3rd pole, base top is provided with the 3rd pole, and the 3rd pole is positioned at pulverizing The left and right sides of groove, the top of the 3rd pole connects motor, and the front of motor is provided with cam, is carrying out Ore crushed work Time, start electric machine rotation, drive cam rotation, crushing groove can be tapped gently when cam peak contact crushing groove, make ferrum Ore vibrations broken on silk screen fall to bottom crushing groove, it is possible to make crush efficiency higher.
Because also including the 3rd electric pushrod, in crushing groove, the left and right sides is arranged with the 3rd electric pushrod, the 3rd electricity Dynamic push rod is connected with electronic crushing wheel, during the broken work of conducting powder, starts the 3rd electric pushrod and stretches, and driving electric crushing wheel is left Move right, it is possible to the scope making pulverizing is bigger.
Because also including crushing teeth, the bottom of weight is provided with crushing teeth, so being positioned at crushing groove weight-drop is hit In Ore time, ore reduction degree can be made higher, it is possible to make broken ratio bigger.
Because the material of support and base is Q235 steel, compressive property is strong, intensity is high, so support and base service life Longer.
Because stay cord is steel wire rope, pull resistance is more preferable, so stay cord is longer for service life.
Because the material of crushing teeth is high hardness alloy steel, hardness is higher, so the Ore that weight is in hit crushing groove Time, broken ratio can be made bigger.
(3) beneficial effect
Invention achieves when Ore being carried out comminution process that production efficiency is high, the working time is short, broken than big, product granularity Uniform effect.
Accompanying drawing explanation
Fig. 1 is the first main TV structure schematic diagram of the present invention.
Fig. 2 is the second main TV structure schematic diagram of the present invention.
Fig. 3 is the third main TV structure schematic diagram of the present invention.
Fig. 4 is the 4th kind of main TV structure schematic diagram of the present invention.
Being labeled as in accompanying drawing: 1-support, 2-the first pole, 3-aperture, 4-the second pole, 5-the first electric pushrod, 6- Guide pad, 7-first connecting rod, 8-second connecting rod, 9-slide rail, 10-slide block, 11-gear, 12-tooth bar, 13-the second electric pushrod, 14-electric magnet, 15-stay cord, 16-iron block, 17-weight, 18-crushing groove, 19-wire gauze, 20-base, the electronic crushing wheel of 21-, 22-motor, 23-cam, 24-the 3rd pole, 25-the 3rd electric pushrod, 26-crushing teeth.
Detailed description of the invention
The present invention is further illustrated with embodiment below in conjunction with the accompanying drawings.
Embodiment 1
A kind of geological exploration ore pulverizer, as Figure 1-4, includes support the 1, first pole the 2, second pole 4, first Electric pushrod 5, guide pad 6, first connecting rod 7, second connecting rod 8, slide rail 9, slide block 10, gear 11, tooth bar the 12, second electric pushrod 13, electric magnet 14, stay cord 15, iron block 16, weight 17, crushing groove 18, wire gauze 19, base 20 and electronic crushing wheel 21;Base Being provided with crushing groove 18 on 20, in crushing groove 18, the left and right sides is equipped with electronic crushing wheel 21, is provided with wire gauze in crushing groove 18 19, and wire gauze 19 is positioned at above electronic crushing wheel 21, and support 1 inside top is sequentially provided with stay cord 15, first from left to right Pole 2, guide pad 6 and the second pole 4, stay cord 15 bottom is provided with iron block 16, and connecting bottom iron block 16 has weight 17,17, weight The top of wire gauze 19 in crushing groove 18, the first pole 2 bottom is provided with gear 11, and guide pad 6 has aperture 3, second Bar 4 bottom is provided with the first electric pushrod 5, and the first electric pushrod 5 left end connects first connecting rod 7, and first connecting rod 7 passes aperture 3, First connecting rod 7 left end is hingedly connected with second connecting rod 8, and second connecting rod 8 left end is articulated and connected with gear 11, on the right side of support 1 Being provided with slide rail 9, slide rail 9 is provided with slide block 10, and slide block 10 connects has tooth bar 12, tooth bar 12 to engage with gear 11, tooth bar 12 end End connection has the second electric pushrod 13, the second electric pushrod 13 left end to be provided with electric magnet 14.
Also including motor 22, cam 23 and the 3rd pole 24, base 20 top is provided with the 3rd pole 24, the 3rd pole 24 Being positioned at the left and right sides of crushing groove 18, the top of the 3rd pole 24 connects has motor 22, the front of motor 22 to be provided with cam 23.
Also including the 3rd electric pushrod 25, in crushing groove 18, the left and right sides is arranged with the 3rd electric pushrod 25, and the 3rd Electric pushrod 25 is connected with electronic crushing wheel 21.
Also including crushing teeth 26, the bottom of weight 17 is provided with crushing teeth 26.
Support 1 is Q235 steel with the material of base 20.
Stay cord 15 is steel wire rope.
The material of crushing teeth 26 is high hardness alloy steel.
Operation principle: when needs carry out pulverization process to Ore, starts electronic crushing wheel 21 and rotates, and starts first electronic Push rod 5 extends, and drives first connecting rod 7 to be moved to the left, and drives second connecting rod 8 to rotate, and driven gear 11 rotates counterclockwise, and makes tooth bar 12 move down, and drive the second electric pushrod 13 to move down, make electric magnet 14 move down, when electric magnet 14 is moved downward to During with iron block 16 sustained height, start the second electric pushrod 13 and extend, make electric magnet 14 band that is energized be magnetic, electric magnet 14 simultaneously Contact and hold iron block 16 with iron block 16, stop the second electric pushrod 13 and extend, then adjust the first electric pushrod 5, make first Electric pushrod 5 shrinks, and drives first connecting rod 7 to move right, makes gear 11 rotate clockwise, make tooth bar 12 move up, drives Electric magnet 14 moves up, and drives iron block 16 to move up, makes weight 17 move up, when weight 17 highly reaches a timing, By electric magnet 14 power-off, make electric magnet 14 lose magnetism, weight 17 falls down due to action of gravity, the hit crushing groove 18 that is positioned at Ore, broken Ore drops on wire gauze 19, and the broken Ore that part is less falls to from wire gauze 19 space pulverize Bottom groove 18, broken Ore is pulverized in the work of electronic crushing wheel 21, the most again adjusts and makes the first electric pushrod 5 extend, drives First connecting rod 7 is moved to the left, and driven gear 11 rotates counterclockwise, and makes tooth bar 12 move down, when electric magnet 14 moves to iron block 16 right side time, electric magnet 14 is energized, makes electric magnet 14 band be magnetic and hold iron block 16, continuous according to above-mentioned principle afterwards Ore is carried out broken and pulverization process, when, after the crushed work completing Ore, making first electric pushrod the 5, second electric pushrod 13 and electronic crushing wheel 21 reset, stop first electric pushrod the 5, second electric pushrod 13 and electronic crushing wheel 21 work, stop Electric magnet 14 is energized, when also needing to again Ore be carried out pulverization process, can be according to above-mentioned principle task again.
Because also including motor 22, cam 23 and the 3rd pole 24, base 20 top is provided with the 3rd pole 24, the 3rd Bar 24 is positioned at the left and right sides of crushing groove 18, and the top of the 3rd pole 24 connects has motor 22, the front of motor 22 to be provided with cam 23, when carrying out Ore crushed work, start motor 22 and rotate, band moving cam 23 rotates, when the contact of cam 23 peak is pulverized Crushing groove 18 can be tapped during groove 18 gently, make Ore vibrations broken on wire gauze 19 fall to bottom crushing groove 18, so Crush efficiency can be made higher.
Because also including the 3rd electric pushrod 25, in crushing groove 18, the left and right sides is arranged with the 3rd electric pushrod 25, 3rd electric pushrod 25 is connected with electronic crushing wheel 21, during the broken work of conducting powder, starts the 3rd electric pushrod 25 and stretches, drive Electronic crushing wheel 21 moves left and right, it is possible to the scope making pulverizing is bigger.
Because also including crushing teeth 26, the bottom of weight 17 is provided with crushing teeth 26, so falling hit position at weight 17 During Ore in crushing groove 18, ore reduction degree can be made higher, it is possible to make broken ratio bigger.
Because support 1 is Q235 steel with the material of base 20, compressive property is strong, intensity is high, so support 1 makes with base 20 Longer with the life-span.
Because stay cord 15 is steel wire rope, pull resistance is more preferable, so stay cord 15 is longer for service life.
Because the material of crushing teeth 26 is high hardness alloy steel, hardness is higher, so weight 17 is in hit crushing groove 18 Ore time, broken ratio can be made bigger.
Embodiment described above only have expressed the preferred embodiment of the present invention, and it describes more concrete and detailed, but also Therefore the restriction to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that, for those of ordinary skill in the art For, without departing from the inventive concept of the premise, it is also possible to making some deformation, improve and substitute, these broadly fall into this Bright protection domain.Therefore, the protection domain of patent of the present invention should be as the criterion with claims.

Claims (7)

1. a geological exploration ore pulverizer, it is characterised in that include support (1), the first pole (2), the second pole (4), the first electric pushrod (5), guide pad (6), first connecting rod (7), second connecting rod (8), slide rail (9), slide block (10), gear (11), tooth bar (12), the second electric pushrod (13), electric magnet (14), stay cord (15), iron block (16), weight (17), crushing groove (18), wire gauze (19), base (20) and electronic crushing wheel (21);Crushing groove (18), crushing groove are installed on base (20) (18) the interior left and right sides is equipped with electronic crushing wheel (21), is provided with wire gauze (19), and wire gauze (19) in crushing groove (18) Being positioned at electronic crushing wheel (21) top, support (1) inside top is sequentially provided with stay cord (15), the first pole (2) from left to right, leads To block (6) and the second pole (4), stay cord (15) bottom is provided with iron block (16), and iron block (16) bottom connects weight (17), weight (17) being positioned at the top of crushing groove (18) wire gauze (19), the first pole (2) bottom is provided with gear (11), on guide pad (6) Having aperture (3), the second pole (4) bottom is provided with the first electric pushrod (5), and the first electric pushrod (5) left end connects first Connecting rod (7), first connecting rod (7) passes aperture (3), and first connecting rod (7) left end is hingedly connected with second connecting rod (8), second connecting rod (8) left end is articulated and connected with gear (11), and the right side of support (1) is provided with slide rail (9), and slide rail (9) is provided with slide block (10), sliding The upper connection of block (10) has tooth bar (12), tooth bar (12) to engage with gear (11), and tooth bar (12) bottom connects the second electric pushrod (13), the second electric pushrod (13) left end is provided with electric magnet (14).
A kind of geological exploration ore pulverizer the most according to claim 1, it is characterised in that also include motor (22), cam (23) and the 3rd pole (24), base (20) top is provided with the 3rd pole (24), and the 3rd pole (24) is positioned at pulverizing The left and right sides of groove (18), the top of the 3rd pole (24) connects has motor (22), the front of motor (22) to be provided with cam (23).
A kind of geological exploration ore pulverizer the most according to claim 1, it is characterised in that also include the 3rd electronic Push rod (25), crushing groove (18) the interior left and right sides is arranged with the 3rd electric pushrod (25), and the 3rd electric pushrod (25) is with electronic Crushing wheel (21) connects.
A kind of geological exploration ore pulverizer the most according to claim 1, it is characterised in that also include crushing teeth (26), the bottom of weight (17) is provided with crushing teeth (26).
A kind of geological exploration ore pulverizer the most according to claim 1, it is characterised in that support (1) and base (20) material is Q235 steel.
A kind of geological exploration ore pulverizer the most according to claim 1, it is characterised in that stay cord (15) is steel wire Rope.
A kind of geological exploration ore pulverizer the most according to claim 1, it is characterised in that the material of crushing teeth (26) For high hardness alloy steel.
CN201610598280.XA 2016-07-27 2016-07-27 A kind of geological exploration ore pulverizer Withdrawn CN106216007A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610598280.XA CN106216007A (en) 2016-07-27 2016-07-27 A kind of geological exploration ore pulverizer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610598280.XA CN106216007A (en) 2016-07-27 2016-07-27 A kind of geological exploration ore pulverizer

Publications (1)

Publication Number Publication Date
CN106216007A true CN106216007A (en) 2016-12-14

Family

ID=57533616

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610598280.XA Withdrawn CN106216007A (en) 2016-07-27 2016-07-27 A kind of geological exploration ore pulverizer

Country Status (1)

Country Link
CN (1) CN106216007A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106483582A (en) * 2016-12-21 2017-03-08 嘉善弘欣化工厂(普通合伙) A kind of resource technology coal resources surveying device
CN108160153A (en) * 2017-12-18 2018-06-15 重庆中色新材料有限公司 A kind of building stones grinding equipment
CN108176435A (en) * 2017-12-28 2018-06-19 郑州赫恩电子信息技术有限公司 A kind of mining processing ore quick crashing device
CN108212495A (en) * 2017-12-18 2018-06-29 江阴市新纪元食品机械有限公司 It is a kind of that there is the meat grinder of uniform feeding
CN108855524A (en) * 2018-05-28 2018-11-23 芜湖超科机电设备有限公司 A kind of new energy car battery production production graphite powder multistage milling apparatus
CN109453840A (en) * 2018-10-09 2019-03-12 罗剑 Crushing plant is used in a kind of detection of rare earth ore
CN111392768A (en) * 2020-03-20 2020-07-10 王绍云 Titanium slag processing apparatus is used in titanium white powder production

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106483582A (en) * 2016-12-21 2017-03-08 嘉善弘欣化工厂(普通合伙) A kind of resource technology coal resources surveying device
CN106483582B (en) * 2016-12-21 2018-08-28 山东泰山能源有限责任公司 A kind of resource technology coal resources surveying device
CN108160153A (en) * 2017-12-18 2018-06-15 重庆中色新材料有限公司 A kind of building stones grinding equipment
CN108212495A (en) * 2017-12-18 2018-06-29 江阴市新纪元食品机械有限公司 It is a kind of that there is the meat grinder of uniform feeding
CN108176435A (en) * 2017-12-28 2018-06-19 郑州赫恩电子信息技术有限公司 A kind of mining processing ore quick crashing device
CN108855524A (en) * 2018-05-28 2018-11-23 芜湖超科机电设备有限公司 A kind of new energy car battery production production graphite powder multistage milling apparatus
CN109453840A (en) * 2018-10-09 2019-03-12 罗剑 Crushing plant is used in a kind of detection of rare earth ore
CN111392768A (en) * 2020-03-20 2020-07-10 王绍云 Titanium slag processing apparatus is used in titanium white powder production

Similar Documents

Publication Publication Date Title
CN106216007A (en) A kind of geological exploration ore pulverizer
CN108176435A (en) A kind of mining processing ore quick crashing device
CN107115947A (en) A kind of continuous reducing mechanism of industrial ore
CN205761323U (en) A kind of Copper Ores efficiency crushing device
CN106881165A (en) A kind of rare earth processing efficient grinding equipment of building stones
CN207013022U (en) A kind of mining industry high-efficiency breaker
CN108176434A (en) A kind of mining processing shock-absorbing type ore coarse crushing device
CN107127008A (en) A kind of mining industry ore quick crashing device
CN109092412B (en) Building fragment of brick breaker convenient to in time arrange material
CN107855176B (en) A kind of ore sorting grinding device
CN112108208A (en) Ore crushing refines device for ore processing
CN205761326U (en) A kind of Ore collects breaker
CN106140360B (en) A kind of sandstone crushing device
CN205731392U (en) A kind of Ore efficiency crushing device
CN106076469A (en) A kind of mining engineering stone efficiency crushing device
CN206853781U (en) A kind of mining industry ore quick crashing device
CN205731375U (en) A kind of disintegrating machine
CN205743943U (en) Rockbolt installation device is used in a kind of mining
CN205700681U (en) A kind of the most broken brick device for building
CN205288576U (en) Special rubbing crusher of tea benevolence intensive processing
CN101195098A (en) Large scale ore pulverizing method
CN207287541U (en) A kind of use for laboratory ore treatment ore reduction device
CN211514784U (en) Shear type double-roll crusher
CN205308220U (en) Steelmaking is with ore coke mixing arrangement
CN209138794U (en) A kind of crushing device with regulatory function

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20161214