CN106193747A CN201610584720.6A CN201610584720A CN106193747A CN 106193747 A CN106193747 A CN 106193747A CN 201610584720 A CN201610584720 A CN 201610584720A CN 106193747 A CN106193747 A CN 106193747A
Authority
CN
China
Prior art keywords
spring
guide post
baffle plate
word pattern
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610584720.6A
Other languages
Chinese (zh)
Other versions
CN106193747B (en
Inventor
徐龙河
要世乾
李忠献
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jiaotong University
Original Assignee
Beijing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jiaotong University filed Critical Beijing Jiaotong University
Priority to CN201610584720.6A priority Critical patent/CN106193747B/en
Publication of CN106193747A publication Critical patent/CN106193747A/en
Application granted granted Critical
Publication of CN106193747B publication Critical patent/CN106193747B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, or groups of buildings, or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake, extreme climate
    • E04H9/02Buildings, or groups of buildings, or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake, extreme climate withstanding earthquake or sinking of ground
    • E04H9/021Bearing, supporting or connecting constructions specially adapted for such buildings
    • E04H9/022Bearing, supporting or connecting constructions specially adapted for such buildings and comprising laminated structures of alternating elastomeric and rigid layers

Abstract

Stacked Self-resetting energy dissipation brace in one of the present invention assembling, including outer tube, yi word pattern bar and guide post, the middle part of guide post is provided with medium altitude groove, yi word pattern bar inserts in the medium altitude groove of guide post, yi word pattern bar is connected by high-strength bolt is fixing with guide post, is provided with friction plate between yi word pattern bar and guide post.The first spring, the second spring, the 3rd spring and the 4th spring it is arranged with between block adjacent on guide post, outer tube sleeve is located at outside guide post, the two ends of outer tube are fixed with on the right side of outer tube end plate on the left of end plate and outer tube, the left end of yi word pattern bar passes end plate on the left of outer tube, and the right-hand member of described guide post passes end plate on the right side of outer tube.The main stress of this invention and force-transmitting part are an entirety, avoiding because of the steel microstructure that causes of welding and mechanical performance changes and welding residual stress, stress performance is more stable, and main resetting means is clear and definite with rubbing device, structure unitary construction is simple, and processing is with easy for installation.

Description

Stacked Self-resetting energy dissipation brace in a kind of assembling
Technical field
The present invention relates to Self-resetting energy dissipation brace technical field, be specifically related to stacked Self-resetting power consumption in a kind of assembling Support.
Background technology
China is an earthquake-prone countries, and earthquake causes the damage of building even to collapse, brings substantial amounts of Casualties and economic loss.China's current seismic design specification uses Ductility Design thought, by the elastoplasticity of structural elements Deformation earthquake energy, reduces expenditure of construction while improving structural seismic capacity.But after shake, the residual deformation of component The normal use of structure can be affected, bring the rehabilitation expense of great number simultaneously, even structure can only be pushed over reconstruction.Ask for solving this Topic, research worker proposes the most additional energy dissipation brace system, supports and play power consumption effect, dissipation seismic energy when earthquake occurs Amount, protects main member, and reduces structure relative storey displacement angle.The structural seismic capacity of additional energy dissipation brace is improved, But residual deformation angle is still a problem, and therefore research worker proposes Self-resetting energy dissipation brace on the basis of energy dissipation brace, This be supported on power consumption while the residual deformation of structure can be decreased or even eliminated, reduce structure repair required time and take With.
Support and can be divided into according to working method and construction features: common support, anti-buckling support and Self-resetting energy dissipation brace. Common support utilizes the surrender of Low Yield Point Steel to consume energy, and the relatively common support performance of anti-buckling support is more excellent, eliminates common Supporting the asymmetric problem of tensile and compressive property, Self-resetting supports and dissipative system is combined with Self-resetting system, has excellent consumption Can ability and self-resetting capability, Self-resetting system is mainly by deformed bar or the novel intelligent material group with reset capability Become.
From service behaviour, above several supports have following features: common support slenderness ratio is relatively big, easy during pressurized Flexing, causes the reciprocal poor performance of its tension and compression, and hysteresis loop is asymmetric, the fullest, and after compressive buckling, energy dissipation capacity declines to a great extent, It is difficult to effectively consume the incoming energy of earthquake, meanwhile, under big shake effect, supports by reciprocating load, component itself and connection Destroying easily occurs in system so that common support functional reliability is the lowest;Anti-buckling be supported on common support on the basis of increase about Bundle mechanism, constraint inner tube power consumption section, it is ensured that the tensile and compressive property of support etc. are full to, hysteresis loop, have the strongest energy dissipation capacity, but This support system maximum has a problem in that under geological process surrenders, and there is bigger residual deformation so that reinforce and repair after shake Multiple difficulty increases, and even there is the situation being difficult to repair, causes serious economic loss;Self-resetting supports has reset function, Can spontaneous reset in its normal work stage, this characteristic can be decreased or even eliminated the residual deformation of structure, its system that resets System generally uses marmem or deformed bar.The elastic of marmem well has self-resetting capability, can be real The Self-resetting now supported, but Properties of Shape-Memory Alloys temperature influence so that this support feasibility in actual applications It is substantially reduced;The elastic deformation of deformed bar is little, limits the application of this support system.
From structure is constituted: common support is simple with buckling-resistant support structure form, assembled position generally uses weldering Connect realization, have residual deformation and residual stress;The Self-resetting supporting construction using marmem or presstressed reinforcing steel is usual It is provided with inner tube and outer tube, between inner and outer pipes, arranges resetting means and rubbing device, simultaneously need to reasonable Arrangement reset system, therefore Self-resetting support structure is complicated, and connecting portion is mainly realized by welding, easily causes residual deformation and residual stress.
Accordingly, it is desirable to provide stacked Self-resetting energy dissipation brace in a kind of assembling, pre-compressed spring is used to reset material as one Material, consumes energy in combination with friction plate, and reset system and the collaborative work of dissipative system make the hysteresis loop of this system full, residual More than be deformed into zero, there is excellent reseting performance and energy-dissipating property, on the other hand complicated for solving other Self-resetting support structures And need the problem welded, stacked Self-resetting energy dissipation brace in assembling is proposed.
Summary of the invention
The technical problem to be solved in the present invention is to provide stacked Self-resetting energy dissipation brace in a kind of assembling, solve existing commonly The tension and compression supported are asymmetric, hysteresis loop is the fullest, has residual deformation, shape memory alloy properties under anti-buckling support geological process The shortcoming of energy temperature influence, proposes stacked Self-resetting energy dissipation brace in assembling, and component kind is few, and version is simple, processes Convenient, it is easy to mass production, streamline is processed.System stiffness can be changed, by changing by regulation spring specification simultaneously Become dissipative system parameter and can change the power consumption of system, there is good controllability, can extensively apply.
For solving above-mentioned technical problem, the present invention uses following technical proposals:
Stacked Self-resetting energy dissipation brace in a kind of assembling, including outer tube, yi word pattern bar and guide post, in described guide post Portion is provided with medium altitude groove, and the outer surface of described guide post is from left to right sequentially provided with guide post the first block, guide post second gear Block, guide post third gear block, guide post fourth gear block and guide post fifth gear block, be provided with bolt hole, institute between adjacent block Front side edge and the back side edge of stating yi word pattern bar are the most from left to right sequentially provided with yi word pattern bar the first block, yi word pattern bar second gear Block, yi word pattern bar third gear block, yi word pattern bar fourth gear block and yi word pattern bar fifth gear block, the middle part of described yi word pattern bar is provided with Bolt groove, described yi word pattern bar inserts in the medium altitude groove of guide post, the bolt groove of described yi word pattern bar and guide post Bolt hole connects by the first high-strength bolt, the second high-strength bolt, the 3rd high-strength bolt and the 4th high-strength bolt are fixing, and described one It is provided with friction plate between upper surface and the guide post of font bar, is provided with down between lower surface and the guide post of described yi word pattern bar Friction plate.
The first spring, the second spring, the 3rd bullet it is arranged with the most successively between block adjacent on described guide post Spring and the 4th spring, the two ends of described first spring are provided with baffle plate and the first spring right-hand apron on the left of the first spring, and described The two ends of two springs are provided with baffle plate and the second spring right-hand apron on the left of the second spring, and the two ends of described 3rd spring are provided with the 3rd Baffle plate and the 3rd spring right-hand apron on the left of spring, the two ends of described 4th spring are provided with baffle plate and the 4th bullet on the left of the 4th spring Spring right-hand apron, on the left of described first spring, the outside of baffle plate and the first spring right-hand apron is respectively equipped with on the left of the first spring attached Adding additional stops on the right side of baffle plate and number one spring, on the left of described second spring, the outside of baffle plate and the second spring right-hand apron is divided It is not provided with on the left of the second spring additional stops, baffle plate and the 3rd bullet on the left of described 3rd spring on the right side of additional stops and the second spring The outside of spring right-hand apron is respectively equipped with on the left of the 3rd spring additional stops, described 4th bullet on the right side of additional stops and the 3rd spring On the left of spring, the outside of baffle plate and the 4th spring right-hand apron is respectively equipped with on the left of the 4th spring on the right side of additional stops and the 4th spring Additional stops.
Described outer tube sleeve is located at outside guide post, and the two ends of described outer tube are fixed with end plate and outer tube left-hand end on the right side of outer tube Plate, the left end of described yi word pattern bar passes end plate on the left of outer tube, and the right-hand member of described guide post passes end plate on the right side of outer tube.
Preferably, the external diameter of described first spring, the second spring, the 3rd spring and the 4th spring is respectively less than the interior of outer tube Footpath.The internal diameter of described first spring, the second spring, the 3rd spring and the 4th spring is more than the outer chi of guide post with yi word pattern bar Very little.First spring, the second spring, the 3rd spring and the 4th spring can slide the most relatively.
Preferably, baffle plate, the second bullet on the left of baffle plate, the first spring right-hand apron, the second spring on the left of described first spring Keep off on the right side of baffle plate and the 4th spring on the left of baffle plate, the 3rd spring right-hand apron, the 4th spring on the left of spring right-hand apron, the 3rd spring Plate is the circular baffle plate of middle making circular hole, and external diameter is respectively less than the internal diameter of outer tube, and the diameter of middle circular port is more than guide post With the outside dimension of the block of yi word pattern bar, reducing the difficulty assembled, the most each spring stop can occur on the guide bar relatively Slide.Spring stop is used for connecting spring, and extrusion spring also transmits the power between guide post and yi word pattern bar.
Preferably, attached on the left of additional stops, the second spring on the right side of additional stops, number one spring on the left of described first spring Add on the right side of baffle plate, the second spring on the left of additional stops, the 3rd spring additional stops, the 4th bullet on the right side of additional stops, the 3rd spring On the left of spring, on the right side of additional stops and the 4th spring, additional stops is the circular baffle plate that rectangular opening is opened in centre, and external diameter is respectively less than outer tube Internal diameter, the size in intermediate rectangular hole is more than the outside dimension of guide post and yi word pattern bar, less than the gear of guide post Yu yi word pattern bar The outside dimension of block.Spring additional stops is assembled by high-strength bolt by the Semicircular baffle that two shapes are identical, spring Additional stops ensures that spring stop can be slidably in the case of being promoted with guide post block by yi word pattern pole spacing block.
Preferably, on the right side of described outer tube, outer tube, on the left of end plate and outer tube, the material of end plate is normal carbon structure Q235 steel. The material of described first spring, the second spring, the 3rd spring and the 4th spring is 60CrMnA.Described yi word pattern bar, guide post, Baffle plate, the second spring right-hand apron, the 3rd spring on the left of baffle plate, the first spring right-hand apron, the second spring on the left of first spring Baffle plate on the left of baffle plate, the 4th spring right-hand apron, the first spring on the left of left side baffle plate, the 3rd spring right-hand apron, the 4th spring, Baffle plate, the 3rd spring on the left of baffle plate, the second spring right-hand apron, the 3rd spring on the left of first spring right-hand apron, the second spring On the left of right-hand apron, the 4th spring, the material of baffle plate and the 4th spring right-hand apron is low-alloy high-strength structure Q345 steel.Institute The material stating the first high-strength bolt, the second high-strength bolt, the 3rd high-strength bolt and the 4th high-strength bolt is 20MnTiB, and intensity is 10.9 grades.
Beneficial effects of the present invention is as follows:
In a kind of assembling of the present invention, stacked Self-resetting energy dissipation brace is owing to have employed above technical scheme, and main member is Being obtained by milling, main stress and force-transmitting part are an entirety, and main force part is not welded, it is to avoid because welding causes Steel microstructure and mechanical performance changes and welding residual stress so that behavior of members under loading is more stable.Assembling Interior stacked Self-resetting energy dissipation brace generally assembled, main resetting means is clear and definite with rubbing device, and structure unitary construction is simple, Used component kind is few so that the processing of support is with easy for installation.
With conventional support, anti-buckling support, the self-recovery energy dissipation brace of employing marmem, employing deformed bar Self-recovery energy dissipation brace compare and have the advantage that
(1) compared with conventional support, the dissipative system that in the assembling of the present invention, stacked Self-resetting energy dissipation brace is used is Friction energy-dissipating system, is dissipated seismic energy by the friction of friction plate, tensile and compressive property etc. under this is supported on geological process simultaneously To, i.e. hysteresis loop symmetry is good, and shape is full, and energy-dissipating property is excellent, uses structure residual deformation after shake of this support Less or there is not residual deformation, this support structure configuration is simple simultaneously, installs simple and feasible, safeguards, changes easily after shake, contracting Affect, after short shake, the time that structure normally uses.
(2) compared with anti-buckling support, in the assembling of the present invention, stacked Self-resetting energy dissipation brace can effectively eliminate structure Residual deformation, reduce shake after structure repair expense.
(3) compared with the Self-resetting energy dissipation brace using marmem, in normal operation, stacked in assembling The performance temperature influence of Self-resetting energy dissipation brace is little, has the good suitability.
(4) compared with the Self-resetting energy dissipation brace using deformed bar, the row of stacked Self-resetting energy dissipation brace in assembling Cheng Geng great i.e. deformability is higher, can meet the deformation requirements of general structure.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings the detailed description of the invention of the present invention is described in further detail.
Fig. 1 illustrates a kind of structural representation assembling interior stacked Self-resetting energy dissipation brace of the present invention.
Fig. 2 illustrates that a kind of of the present invention assembles end plate and outer tube on the left of the outer tube of interior stacked Self-resetting energy dissipation brace, outer tube The structural representation of right side end plate.
Fig. 3 illustrates a kind of guide post main TV structure schematic diagram assembling interior stacked Self-resetting energy dissipation brace of the present invention.
Fig. 4 illustrates a kind of guide post plan structure schematic diagram assembling interior stacked Self-resetting energy dissipation brace of the present invention.
Fig. 5 illustrates a kind of yi word pattern bar main TV structure schematic diagram assembling interior stacked Self-resetting energy dissipation brace of the present invention.
Fig. 6 illustrates a kind of yi word pattern bar plan structure schematic diagram assembling interior stacked Self-resetting energy dissipation brace of the present invention.
Fig. 7 illustrates the A-A directional profile schematic diagram in Fig. 1 of the present invention.
Fig. 8 illustrates the B-B directional profile schematic diagram in Fig. 1 of the present invention.
Fig. 9 illustrates the C-C directional profile schematic diagram in Fig. 1 of the present invention.
In figure, each labelling is as follows: 1 yi word pattern bar, 2 guide posts, 3 outer tubes, end plate on the right side of 4 outer tubes, end plate on the left of 5 outer tubes, and 6 Baffle plate on the left of first spring, 7 first spring right-hand apron, baffle plate on the left of 8 second springs, 9 second spring right-hand apron, 10 the 3rd Baffle plate on the left of spring, 11 the 3rd spring right-hand apron, baffle plate on the left of 12 the 4th springs, 13 the 4th spring right-hand apron, 14 first Additional stops on the left of spring, additional stops on the right side of 15 number one springs, additional stops on the left of 16 second springs, 17 second springs are right Side additional stops, additional stops on the left of 18 the 3rd springs, additional stops on the right side of 19 the 3rd springs, additional gear position on the left of 20 the 4th springs Plate, additional stops on the right side of 21 the 4th springs, 22 first high-strength bolts, 23 second high-strength bolts, 24 the 3rd high-strength bolts, 25 the 4th High-strength bolt, friction plate on 26,27 times friction plates, 28 guide post the first blocks, 29 guide post the second blocks, 30 guide posts the 3rd Block, 31 guide post fourth gear blocks, 32 guide post fifth gear blocks, 33 yi word pattern bar the first blocks, 34 yi word pattern bar the second blocks, 35 yi word pattern bar third gear blocks, 36 yi word pattern bar fourth gear blocks, 37 yi word pattern bar fifth gear blocks, 38 first springs, 39 second bullets Spring, 40 the 3rd springs, 41 the 4th springs.
Detailed description of the invention
In order to be illustrated more clearly that the present invention, below in conjunction with preferred embodiments and drawings, the present invention is done further Bright.Parts similar in accompanying drawing are indicated with identical reference.It will be appreciated by those skilled in the art that institute is concrete below The content described is illustrative and be not restrictive, and should not limit the scope of the invention with this.
As shown in Fig. 1-Fig. 9, stacked Self-resetting energy dissipation brace in a kind of assembling, including outer tube 3, yi word pattern bar 1 and guiding Bar 2, the middle part of described guide post 2 is provided with medium altitude groove, and the outer surface of described guide post 2 is from left to right sequentially provided with guide post One block 28, guide post the second block 29, guide post third gear block 30, guide post fourth gear block 31 and guide post fifth gear block 32, it is provided with bolt hole between adjacent block, front side edge and the back side edge of described yi word pattern bar 1 are the most from left to right sequentially provided with one Font bar the first block 33, yi word pattern bar the second block 34, yi word pattern bar third gear block 35, yi word pattern bar fourth gear block 36 and Font bar fifth gear block 37, the middle part of described yi word pattern bar 1 is provided with bolt groove, and described yi word pattern bar 1 inserts in guide post 2 In empty groove, the bolt groove of described yi word pattern bar 1 and the bolt hole of guide post 2 are high-strength by the first high-strength bolt 22, second Bolt the 23, the 3rd high-strength bolt 24 and the 4th fixing connection of high-strength bolt 25, the upper surface of described yi word pattern bar 1 and guide post 2 Between be provided with friction plate 26, be provided with lower friction plate 27 between lower surface and the guide post 2 of described yi word pattern bar 1.
Be arranged with the most successively between block adjacent on described guide post 2 first spring the 38, second spring 39, Three spring 40 and the 4th springs 41, the two ends of described first spring 38 are provided with on the left of the first spring on the right side of baffle plate 6 and the first spring Baffle plate 7, the two ends of described second spring 39 are provided with baffle plate 8 and the second spring right-hand apron 9, described 3rd bullet on the left of the second spring The two ends of spring 40 are provided with baffle plate 10 and the 3rd spring right-hand apron 11 on the left of the 3rd spring, and the two ends of described 4th spring 41 are provided with Baffle plate 12 and the 4th spring right-hand apron 13 on the left of 4th spring, keep off on the right side of baffle plate 6 and the first spring on the left of described first spring The outside of plate 7 is respectively equipped with on the left of the first spring additional stops 15, described second bullet on the right side of additional stops 14 and number one spring On the left of spring, the outside of baffle plate 8 and the second spring right-hand apron 9 is respectively equipped with additional stops 16 and the second spring on the left of the second spring Right side additional stops 17, on the left of described 3rd spring, the outside of baffle plate 10 and the 3rd spring right-hand apron 11 is respectively equipped with the 3rd bullet Additional stops 19 on the right side of additional stops 18 and the 3rd spring on the left of spring, on the left of described 4th spring on the right side of baffle plate 12 and the 4th spring The outside of baffle plate 13 is respectively equipped with on the left of the 4th spring additional stops 21 on the right side of additional stops 20 and the 4th spring.
Described outer tube 3 is set in outside guide post 2, and it is left that the two ends of described outer tube 3 are fixed with end plate 4 and outer tube on the right side of outer tube Side end panel 5, the left end of described yi word pattern bar 1 passes end plate 5 on the left of outer tube, and the right-hand member of described guide post 2 passes outer tube right-hand end Plate 4.
The external diameter of described first spring the 38, second spring the 39, the 3rd spring 40 and the 4th spring 41 is respectively less than the interior of outer tube 3 Footpath.The internal diameter of described first spring the 38, second spring the 39, the 3rd spring 40 and the 4th spring 41 is more than guide post 2 and yi word pattern The outside dimension of bar 1.
On the left of described first spring, on the left of baffle plate the 6, first spring right-hand apron the 7, second spring, baffle plate the 8, second spring is right On the left of side shield the 9, the 3rd spring, on the left of baffle plate the 10, the 3rd spring right-hand apron the 11, the 4th spring, baffle plate 12 and the 4th spring are right Side shield 13 is the circular baffle plate of middle making circular hole, and external diameter is respectively less than the internal diameter of outer tube 3, and the diameter of middle circular port is more than The outside dimension of the block of guide post 2 and yi word pattern bar 1.
Add on the left of additional stops the 15, second spring on the right side of additional stops 14, number one spring on the left of described first spring Additional stops 19 on the right side of additional stops the 18, the 3rd spring on the left of additional stops the 17, the 3rd spring on the right side of baffle plate the 16, second spring, On the left of 4th spring, on the right side of additional stops 20 and the 4th spring, additional stops 21 is the middle circular baffle plate opening rectangular opening, and external diameter Being respectively less than the internal diameter of outer tube 3, the size in intermediate rectangular hole is more than the outside dimension of guide post 2 with yi word pattern bar 1, less than guide post 2 Outside dimension with the block of yi word pattern bar 1.
On the right side of described outer tube 3, outer tube, on the left of end plate 4 and outer tube, the material of end plate 5 is normal carbon structure Q235 steel.Described The material of first spring the 38, second spring the 39, the 3rd spring 40 and the 4th spring 41 is 60CrMnA.Described yi word pattern bar 1, lead Baffle plate the 8, second spring right-hand apron on the left of baffle plate the 6, first spring right-hand apron the 7, second spring on the left of bar the 2, first spring 9, baffle plate the 12, the 4th spring right-hand apron on the left of baffle plate the 10, the 3rd spring right-hand apron the 11, the 4th spring on the left of the 3rd spring 13, baffle plate the 8, second spring right-hand apron 9 on the left of baffle plate the 6, first spring right-hand apron the 7, second spring on the left of the first spring, Baffle plate 12 and the 4th spring right-hand apron 13 on the left of baffle plate the 10, the 3rd spring right-hand apron the 11, the 4th spring on the left of three springs Material is low-alloy high-strength structure Q345 steel.Described first high-strength bolt the 22, second high-strength bolt the 23, the 3rd high-strength bolt 24 Being 20MnTiB with the material of the 4th high-strength bolt 25, intensity is 10.9 grades.
The present invention is a kind of assemble interior stacked Self-resetting energy dissipation brace to implement process as follows: during application, according to stress Require to apply initial precompression to spring, spring travel is set according to deformation requirements, by interior for assembling stacked Self-resetting power consumption Support is hinged between building structure levels as bearing diagonal, and guide post 2 leftmost side connects end with the upper (lower) layer of building structure even Connect, yi word pattern bar 1 rightmost side connect end with under building structure (on) layer is connected.When normal use, by spring Precompression and frictional force provide lateral resisting for structure.When structure is by geological process, stacked Self-resetting energy dissipation brace in assembling Stress deforms, and yi word pattern bar 1 and guide post 2 occur relative motion, the upper friction plate between yi word pattern bar 1 and guide post 2 26 and lower friction plate 27 start to dissipate the energy of Seismic input, when geological process terminates, structure unloads, and spring is the reset of main body System will provide restoring force to make structure return to the state before deforming.
When supporting under tension and starting working, it may be assumed that yi word pattern bar 1 is relatively fixed, then the relative yi word pattern of guide post 2 Bar 1 moves right, and drives guide post the first block 28 to promote additional stops 14 on the left of the first spring, guide post the second block 29 to push away Additional stops 16 on the left of dynamic second spring, guide post third gear block 30 promote additional stops 18 on the left of the 3rd spring, guide post the Four blocks 31 promote additional stops 20 on the left of the 4th spring, and on the left of the first spring, additional stops 14 moves right promotion the first spring On the left of baffle plate the 6, second spring of left side, additional stops 16 moves right on the left of promotion the second spring attached on the left of baffle plate the 8, the 3rd spring Add baffle plate 18 to move right on the left of promotion the 3rd spring additional stops 20 on the left of baffle plate the 10, the 4th spring and move right promotion the 4th Baffle plate 12 on the left of spring, on the left of the first spring, baffle plate 6 moves right thus extrudes baffle plate 8 on the left of first spring the 38, second spring Move right thus extrude baffle plate 10 on the left of the second spring the 39, the 3rd spring and move right thus extrude the 3rd spring the 40, the 4th On the left of spring, baffle plate 12 moves right thus extrudes the 4th spring 41, and the first spring 38 is by the first spring right-hand apron 7 simultaneously Right by the second spring right-hand apron 9 and the second spring with the restriction of additional stops 15 on the right side of number one spring, the second spring 39 The restriction of side additional stops 17, the 3rd spring 40 are by additional stops 19 on the right side of the 3rd spring right-hand apron 11 and the 3rd spring Limit, the 4th spring 41 is limited by additional stops 21 on the right side of the 4th spring right-hand apron 13 and the 4th spring, number one bullet On the right side of spring, additional stops 15 and the first spring right-hand apron 7 are by the position-limiting action of yi word pattern bar the second block 34, the second spring Right side additional stops 17 and the second spring right-hand apron 9 are right by position-limiting action, the 3rd spring of yi word pattern bar third gear block 35 Side additional stops 19 and the 3rd spring right-hand apron 11 are by the right side of the position-limiting action of yi word pattern bar fourth gear block 36, the 4th spring Additional stops 21 and the 4th spring right-hand apron 13 are by the position-limiting action of yi word pattern bar fifth gear block 37, relative yi word pattern bar 1 It is not moved, thus ensures that first spring the 38, second spring the 39, the 3rd spring 40 and the 4th spring 41 are compressed;When unloading During load, the first spring 38 promotes on the left of the first spring on the left of additional stops 14 and the first spring baffle plate 6 to left movement, the second spring 39 promote on the left of the second springs baffle plate 8 on the left of additional stops 16 and the second spring to promote the 3rd bullet to left movement, the 3rd spring 40 On the left of spring, on the left of additional stops 18 and the 3rd spring, baffle plate 10 promotes additional gear position on the left of the 4th spring to left movement, the 4th spring 41 On the left of plate 20 and the 4th spring, baffle plate 12 is to left movement, and spring stop movement progress guide post 2 to the left is to left movement, thus overall Structure can return to the state before deforming after unloading completely.In additional assembling, the structure of stacked Self-resetting energy dissipation brace exists Can consume inputting seismic energy by friction energy-dissipating during deformation, resetting means provides reseting performance simultaneously, after being supported on shake Initial position can be recovered, reduce structure residual deformation.
When support is under pressure and starts working, it may be assumed that yi word pattern bar 1 is relatively fixed, then the relative yi word pattern of guide post 2 Bar 1, to left movement, drives guide post the second block 29 to promote additional stops 15 on the right side of number one spring, guide post third gear block 30 Additional stops 17 on the right side of the second spring, guide post fourth gear block 31 is promoted to promote additional stops 19, guide post on the right side of the 3rd spring Fifth gear block 32 promotes additional stops 21 on the right side of the 4th spring, additional stops 15 movement progress first to the left on the right side of number one spring On the right side of spring right-hand apron the 7, second spring, additional stops 17 movement progress the second spring right-hand apron the 9, the 3rd spring to the left is right Additional stops 21 movement progress to the left on the right side of side additional stops 19 movement progress the 3rd spring right-hand apron the 11, the 4th spring to the left 4th spring right-hand apron 13, the first spring right-hand apron 7 is to left movement thus extrudes and keeps off on the right side of first spring the 38, second spring Plate 9 to left movement thus extrude the second spring 39, the 3rd spring right-hand apron 11 to left movement thus extrude the 3rd spring 40, Four spring right-hand apron 13 are to left movement thus extrude the 4th spring 41, and the first spring 38 is by baffle plate on the left of the first spring simultaneously 6 and first on the left of spring the restriction of additional stops 14, the second spring 39 by the left of baffle plate on the left of the second spring 8 and the second spring The restriction of additional stops 16, the 3rd spring 40 are by the limit of additional stops 18 on the left of baffle plate 10 on the left of the 3rd spring and the 3rd spring System, the 4th spring 41 are limited by additional stops 20 on the left of baffle plate 12 on the left of the 4th spring and the 4th spring, a first spring left side On the left of side additional stops 14 and the first spring baffle plate 6 by yi word pattern bar yi word pattern bar the first block 33 position-limiting action, second On the left of spring on the left of additional stops 16 and the second spring baffle plate 8 by the position-limiting action of yi word pattern bar the second block 34, the 3rd bullet On the left of spring on the left of additional stops 18 and the 3rd spring baffle plate 10 by the position-limiting action of yi word pattern bar third gear block 35, the 4th spring On the left of left side additional stops 20 and the 4th spring, baffle plate 12 is by the position-limiting action of yi word pattern bar fourth gear block 36, relative yi word pattern Bar 1 is not moved, thus ensures that first spring the 38, second spring the 39, the 3rd spring 40 and the 4th spring 41 are compressed;When During unloading, the first spring 38 promotes additional stops 15 on the right side of the first spring right-hand apron 7 and number one spring to move right, second Spring 39 promotes additional stops 17 on the right side of the second spring right-hand apron 9 and the second spring to move right, the 3rd spring 40 promotes On the right side of three spring right-hand apron 11 and the 3rd spring, additional stops 19 moves right, the 4th spring 41 promotes and keeps off on the right side of the 4th spring On the right side of plate 13 and the 4th spring, additional stops 21 moves right, and spring stop movement progress guide post 2 to the right moves right, from And overall structure can return to the state before deforming after unloading completely.Structure can be come by friction energy-dissipating when deformation Consuming inputting seismic energy, resetting means provides reseting performance simultaneously, is supported on post earthquake recovery initial position, reduces structure remaining Deformation.
Obviously, the above embodiment of the present invention is only for clearly demonstrating example of the present invention, and is not right The restriction of embodiments of the present invention, for those of ordinary skill in the field, the most also may be used To make other changes in different forms, cannot all of embodiment be given exhaustive here, every belong to this What bright technical scheme was amplified out obviously changes or changes the row still in protection scope of the present invention.

Claims (9)

1. stacked Self-resetting energy dissipation brace in an assembling, it is characterised in that: include outer tube (3), yi word pattern bar (1) and guide post (2), the middle part of described guide post (2) is provided with medium altitude groove, and the outer surface of described guide post (2) is from left to right sequentially provided with guiding Bar the first block (28), guide post the second block (29), guide post third gear block (30), guide post fourth gear block (31) and guiding Bar fifth gear block (32), is provided with bolt hole between adjacent block, the front side edge of described yi word pattern bar (1) and back side edge are all from a left side Be sequentially provided with to the right side yi word pattern bar the first block (33), yi word pattern bar the second block (34), yi word pattern bar third gear block (35), one Font bar fourth gear block (36) and yi word pattern bar fifth gear block (37), the middle part of described yi word pattern bar (1) is provided with bolt groove, institute State in the medium altitude groove that yi word pattern bar (1) inserts guide post (2), the bolt groove of described yi word pattern bar (1) and guide post (2) Bolt hole passes through the first high-strength bolt (22), the second high-strength bolt (23), the 3rd high-strength bolt (24) and the 4th high-strength bolt (25) fixing connection, is provided with friction plate (26), a described word between upper surface and the guide post (2) of described yi word pattern bar (1) It is provided with lower friction plate (27) between lower surface and the guide post (2) of type bar (1);
Be arranged with the most successively between described guide post (2) the most adjacent upper block the first spring (38), the second spring (39), 3rd spring (40) and the 4th spring (41), the two ends of described first spring (38) are provided with baffle plate (6) and on the left of the first spring One spring right-hand apron (7), the two ends of described second spring (39) are provided with on the left of the second spring on the right side of baffle plate (8) and the second spring Baffle plate (9), the two ends of described 3rd spring (40) are provided with baffle plate (10) and the 3rd spring right-hand apron (11) on the left of the 3rd spring, The two ends of described 4th spring (41) are provided with baffle plate (12) and the 4th spring right-hand apron (13) on the left of the 4th spring, and described first On the left of spring the outside of baffle plate (6) and the first spring right-hand apron (7) be respectively equipped with on the left of the first spring additional stops (14) and Additional stops (15) on the right side of number one spring, baffle plate (8) and the outside of the second spring right-hand apron (9) on the left of described second spring It is respectively equipped with on the left of the second spring additional stops (17) on the right side of additional stops (16) and the second spring, keeps off on the left of described 3rd spring The outside of plate (10) and the 3rd spring right-hand apron (11) is respectively equipped with additional stops (18) and the 3rd spring on the left of the 3rd spring Right side additional stops (19), on the left of described 4th spring, the outside of baffle plate (12) and the 4th spring right-hand apron (13) is respectively equipped with Additional stops (21) on the right side of additional stops (20) and the 4th spring on the left of 4th spring;
Described outer tube (3) is set in guide post (2) outward, and the two ends of described outer tube (3) are fixed with end plate on the right side of outer tube (4) and outer End plate (5) on the left of pipe, the left end of described yi word pattern bar (1) passes end plate on the left of outer tube (5), and the right-hand member of described guide post (2) is worn Go out outer tube right-hand end plate (4).
Stacked Self-resetting energy dissipation brace in a kind of assembling the most according to claim 1, it is characterised in that: described first spring (38), the external diameter of the second spring (39), the 3rd spring (40) and the 4th spring (41) is respectively less than the internal diameter of outer tube (3).
Stacked Self-resetting energy dissipation brace in a kind of assembling the most according to claim 2, it is characterised in that: described first spring (38), the internal diameter of the second spring (39), the 3rd spring (40) and the 4th spring (41) is more than guide post (2) and yi word pattern bar (1) Outside dimension.
Stacked Self-resetting energy dissipation brace in a kind of assembling the most according to claim 3, it is characterised in that: described first spring Left side baffle plate (6), the first spring right-hand apron (7), baffle plate (8) on the left of the second spring, the second spring right-hand apron (9), the 3rd Baffle plate (12) and the 4th spring right-hand apron on the left of baffle plate (10), the 3rd spring right-hand apron (11), the 4th spring on the left of spring (13) being the circular baffle plate of middle making circular hole, and external diameter is respectively less than the internal diameter of outer tube (3), the diameter of middle circular port is more than leading Outside dimension to bar (2) Yu the block of yi word pattern bar (1).
Stacked Self-resetting energy dissipation brace in a kind of assembling the most according to claim 4, it is characterised in that: described first spring Left side additional stops (14), additional stops (16), the second spring on the left of additional stops (15), the second spring on the right side of number one spring Right side additional stops (17), additional stops (19) on the right side of additional stops (18), the 3rd spring on the left of the 3rd spring, the 4th spring are left On the right side of side additional stops (20) and the 4th spring, additional stops (21) is the middle circular baffle plate opening rectangular opening, and external diameter is respectively less than The internal diameter of outer tube (3), the size in intermediate rectangular hole is more than the outside dimension of guide post (2) with yi word pattern bar (1), less than guide post (2) with the outside dimension of the block of yi word pattern bar (1).
Stacked Self-resetting energy dissipation brace in a kind of assembling the most according to claim 1, it is characterised in that: described outer tube (3), On the right side of outer tube, on the left of end plate (4) and outer tube, the material of end plate (5) is normal carbon structure Q235 steel.
Stacked Self-resetting energy dissipation brace in a kind of assembling the most according to claim 1, it is characterised in that: described first spring (38), the material of the second spring (39), the 3rd spring (40) and the 4th spring (41) is 60CrMnA.
Stacked Self-resetting energy dissipation brace in a kind of assembling the most according to claim 1, it is characterised in that: described yi word pattern bar (1), baffle plate (8) on the left of baffle plate (6), the first spring right-hand apron (7), the second spring on the left of guide post (2), the first spring, Baffle plate on the left of baffle plate (10), the 3rd spring right-hand apron (11), the 4th spring on the left of two spring right-hand apron (9), the 3rd spring (12), baffle plate (6), the first spring right-hand apron (7), a second spring left side on the left of the 4th spring right-hand apron (13), the first spring Baffle plate (10) on the left of side shield (8), the second spring right-hand apron (9), the 3rd spring, the 3rd spring right-hand apron (11), the 4th On the left of spring, the material of baffle plate (12) and the 4th spring right-hand apron (13) is low-alloy high-strength structure Q345 steel.
Stacked Self-resetting energy dissipation brace in a kind of assembling the most according to claim 1, it is characterised in that: described first high-strength The material of bolt (22), the second high-strength bolt (23), the 3rd high-strength bolt (24) and the 4th high-strength bolt (25) is 20MnTiB, Intensity is 10.9 grades.
CN201610584720.6A 2016-07-22 2016-07-22 Stacked Self-resetting energy dissipation brace in a kind of assembling Active CN106193747B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610584720.6A CN106193747B (en) 2016-07-22 2016-07-22 Stacked Self-resetting energy dissipation brace in a kind of assembling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610584720.6A CN106193747B (en) 2016-07-22 2016-07-22 Stacked Self-resetting energy dissipation brace in a kind of assembling

Publications (2)

Publication Number Publication Date
CN106193747A true CN106193747A (en) 2016-12-07
CN106193747B CN106193747B (en) 2018-05-29

Family

ID=57492326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610584720.6A Active CN106193747B (en) 2016-07-22 2016-07-22 Stacked Self-resetting energy dissipation brace in a kind of assembling

Country Status (1)

Country Link
CN (1) CN106193747B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107489294A (en) * 2017-07-18 2017-12-19 北京交通大学 A kind of built-in spring self-restoring concrete shear force wall
CN112012547A (en) * 2020-06-17 2020-12-01 同济大学 Viscoelastic self-resetting support

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100999916A (en) * 2007-01-12 2007-07-18 清华大学 Steel tube anti-flex energy dissipation support
CN101440639A (en) * 2008-12-10 2009-05-27 上海维固工程实业有限公司 Flexion energy dissipation preventing support
CN101545289A (en) * 2009-04-13 2009-09-30 清华大学 All-steel buckling-preventing energy-consuming brace
CN101718123A (en) * 2009-12-21 2010-06-02 清华大学 E-shaped fastener constrained type assembled buckling-restrained energy-consumed brace
US20130340360A1 (en) * 2012-06-22 2013-12-26 Chong-Shien Tsai Self-centering damper

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100999916A (en) * 2007-01-12 2007-07-18 清华大学 Steel tube anti-flex energy dissipation support
CN101440639A (en) * 2008-12-10 2009-05-27 上海维固工程实业有限公司 Flexion energy dissipation preventing support
CN101545289A (en) * 2009-04-13 2009-09-30 清华大学 All-steel buckling-preventing energy-consuming brace
CN101718123A (en) * 2009-12-21 2010-06-02 清华大学 E-shaped fastener constrained type assembled buckling-restrained energy-consumed brace
US20130340360A1 (en) * 2012-06-22 2013-12-26 Chong-Shien Tsai Self-centering damper

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107489294A (en) * 2017-07-18 2017-12-19 北京交通大学 A kind of built-in spring self-restoring concrete shear force wall
CN112012547A (en) * 2020-06-17 2020-12-01 同济大学 Viscoelastic self-resetting support
CN112012547B (en) * 2020-06-17 2021-09-14 同济大学 Speed-related energy consumption-self-reset function integrated support

Also Published As

Publication number Publication date
CN106193747B (en) 2018-05-29

Similar Documents

Publication Publication Date Title
CN102808464B (en) Fiber pre-stretched rod type self-centering steel buckling-restrained brace
CN104005490B (en) Anti-buckling limit support member for reinforcing post-yield stiffness
CN102535664B (en) Novel support seismic energy dissipator
CN2743444Y (en) Assembling type pure axle force curvature band energy dissipation slant strut structure
CN106567324B (en) A kind of all steel self reset curvature-prevention support based on disc spring
CN105421608B (en) Self-resetting power consumption drag-line support
CN106193747A (en) Stacked Self-resetting energy dissipation brace in a kind of assembling
CN102493570A (en) Multi-stage series anti-buckling support and manufacturing method
CN105256913B (en) A kind of anti-buckling support of shape memory alloy twisted wire Self-resetting friction
CN105507439B (en) A kind of piston type filling compression spring Self-resetting energy dissipation brace
CN109653395B (en) Two-stage performance target self-resetting friction type energy dissipation support
CN106223696A (en) A kind of assembled I-shaped inner tube precompressed disc spring Self-resetting energy dissipation brace
CN102852245A (en) Fiber pre-drawing-rod type self-centering round tube buckling restrained support
CN204401822U (en) A kind of built-in steel plate RPC compound shear wall
CN107542177A (en) A kind of Self-resetting energy consumer
CN102296721B (en) Single-rod square steel tube support with casing and manufacturing method thereof
CN104032848B (en) A kind of Self-resetting frcition damper
CN103526686B (en) A kind of bridge
CN104674975A (en) Frictional energy dissipation type buckling-restrained brace
CN205677328U (en) The diamond-shaped cross-section two-stage surrenders anti-buckling support
CN104929265B (en) Spring Self-reset anti-flexure support device
CN104947826B (en) Self-reset anti-flexure support device
CN107386479B (en) A kind of multiple surrender type shock-absorbing support component
CN109296102B (en) Shear key damping support capable of realizing rigidity degradation and energy consumption
CN105507133A (en) Buckling restrained brace of steel pipe filling concrete type flat plate core material with holes

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant